{{#Wiki_filter:James A. Fitzpatrick LOI-12-2 NRC Exam Written Examination Review | {{#Wiki_filter:James A. Fitzpatrick LOI-12-2 NRC Exam Written Examination Review In accordance with Entergy Procedure EN-TQ-105, NRC Initial License Examination, Development and Administration, and NUREG 1021, Revision 9, Supplement 1, Sections ES-402, ES-403, and ES-501, an examination analysis was conducted on the James A. Fitzpatrick LOI-12-2 NRC Written Examination. This analysis included a detailed review of each question missed by 50% or more of the applicants. The table below summarizes the findings of this detailed question review. | ||
James A. Fitzpatrick LOI-12-2 NRC Exam Analysis - High Miss Questions New, Higher or Percent Modified, Lower System Question Correct Bank Cognitive or Topic Justification Two candidates selected choice B and one candidate selected choice D. | |||
In accordance with Entergy Procedure EN-TQ-105, NRC Initial License Examination, Development and Administration, and NUREG 1021, Revision 9, Supplement 1, Sections ES-402, ES-403, and ES-501, an examination analysis was conducted on the James A. Fitzpatrick LOI-12-2 NRC Written Examination. This analysis included a detailed review of each question missed by 50% or more of the applicants. The table below summarizes the findings of this detailed question review. | These incorrect choices were due to not fully remembering interlocks for Higher RHR / LPCI injection valves and the RHR 28 40% New Cognitive LPCI heat exchanger bypass valve. | ||
James A. Fitzpatrick LOI-12-2 NRC Exam Analysis - High Miss Questions | No discrepancies were noted in this question based on the examination review. | ||
These incorrect choices were due to not fully remembering interlocks for LPCI injection valves and the RHR heat exchanger bypass valve. | Four candidates selected choice D due to not knowing that AOP-30 provided specific guidance on re-establishing RPS / Shutdown Cooling with a de-energized Lower 36 20% New Shutdown RPS bus. | ||
Cognitive Cooling No discrepancies were noted in this question based on the examination review.}} | |||
No discrepancies were noted in this question based on the examination review. | |||
to not knowing that AOP-30 provided specific guidance on re-establishing Shutdown Cooling with a de-energized | |||
RPS bus. | |||
No discrepancies were noted in this question based on the examination review.}} | |||
Revision as of 22:03, 11 November 2019
| ML122710033 | |
| Person / Time | |
|---|---|
| Site: | FitzPatrick |
| Issue date: | 09/27/2012 |
| From: | Operations Branch I |
| To: | Entergy Nuclear Northeast |
| Jackson D | |
| Shared Package | |
| ML120270122 | List: |
| References | |
| TAC U01879 | |
| Download: ML122710033 (1) | |
Text
James A. Fitzpatrick LOI-12-2 NRC Exam Written Examination Review In accordance with Entergy Procedure EN-TQ-105, NRC Initial License Examination, Development and Administration, and NUREG 1021, Revision 9, Supplement 1, Sections ES-402, ES-403, and ES-501, an examination analysis was conducted on the James A. Fitzpatrick LOI-12-2 NRC Written Examination. This analysis included a detailed review of each question missed by 50% or more of the applicants. The table below summarizes the findings of this detailed question review.
James A. Fitzpatrick LOI-12-2 NRC Exam Analysis - High Miss Questions New, Higher or Percent Modified, Lower System Question Correct Bank Cognitive or Topic Justification Two candidates selected choice B and one candidate selected choice D.
These incorrect choices were due to not fully remembering interlocks for Higher RHR / LPCI injection valves and the RHR 28 40% New Cognitive LPCI heat exchanger bypass valve.
No discrepancies were noted in this question based on the examination review.
Four candidates selected choice D due to not knowing that AOP-30 provided specific guidance on re-establishing RPS / Shutdown Cooling with a de-energized Lower 36 20% New Shutdown RPS bus.
Cognitive Cooling No discrepancies were noted in this question based on the examination review.