ML12326A816: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 15: Line 15:


=Text=
=Text=
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 November 21, 2012  
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 November 21, 2012 Florida Power and Light Company ATTN: Mr. Mano Nazar, Senior Vice President Nuclear and Chief Nuclear Officer P.O. Box 14000 Juno Beach, FL 33408-0420
 
Florida Power and Light Company ATTN: Mr. Mano Nazar, Senior Vice President  
 
Nuclear and Chief Nuclear Officer P.O. Box 14000 Juno Beach, FL 33408-0420  


==SUBJECT:==
==SUBJECT:==
Line 25: Line 21:


==SUMMARY==
==SUMMARY==
  - FLORIDA POWER & LIGHT - ST. LUCIE UNIT 1 - DOCKET NO. 50-335 On November 9, 2012, the Nuclear Regulatory Commission (NRC) conducted a meeting with Florida Power and Light staff from the St. Lucie Nuclear Plant to discuss the performance deficiencies and corrective actions related to two NRC Reactor Oversight Process performance indicators that had crossed the Green to White threshold. The White performance indicators resulted in St. Lucie Unit 1 being moved to the Degraded Cornerstone Column of the Reactor Oversight Process Action Matrix. The NRC supplemental inspection activities conducted to assess the adequacy of licensee's actions were also discussed. The meeting was held at the Stuart / Martin County Chamber of Commerce, located at 1650 South Kanner Highway, Stuart, FL 34994. The list of attendees and presentation slides are enclosed.
  - FLORIDA POWER & LIGHT - ST. LUCIE UNIT 1 - DOCKET NO. 50-335 On November 9, 2012, the Nuclear Regulatory Commission (NRC) conducted a meeting with Florida Power and Light staff from the St. Lucie Nuclear Plant to discuss the performance deficiencies and corrective actions related to two NRC Reactor Oversight Process performance indicators that had crossed the Green to White threshold. The White performance indicators resulted in St. Lucie Unit 1 being moved to the Degraded Cornerstone Column of the Reactor Oversight Process Action Matrix. The NRC supplemental inspection activities conducted to assess the adequacy of licensees actions were also discussed. The meeting was held at the Stuart / Martin County Chamber of Commerce, located at 1650 South Kanner Highway, Stuart, FL 34994. The list of attendees and presentation slides are enclosed.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electr onically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).  
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
 
Should you have any questions concerning this meeting, please contact me at (404) 997-4721.
Should you have any questions concerning this meeting, please contact me at (404) 997-4721.  
Sincerely,
 
                                              /RA/
Sincerely,  
Daniel W. Rich, Chief Projects Branch 3 Division of Reactor Projects
 
      /RA/  
 
Daniel W. Rich, Chief Projects Branch 3 Division of Reactor Projects  


==Enclosures:==
==Enclosures:==
: 1. List of Attendees
: 1. List of Attendees
: 2. Florida Power & Light Presentation
: 2. Florida Power & Light Presentation
: 3. NRC Presentation  
: 3. NRC Presentation cc w/encls: (See page 2)
 
cc w/encls: (See page 2)  
 
_________________________  X SUNSI REVIEW COMPLETE G FORM 665 ATTACHED OFFICE RII:DRP RII:DRP      SIGNATURE MJR /RA/ DWR /RA/      NAME MRiches DRich      DATE 11/21/2012 11/21/2012      E-MAIL COPY?    YES NO      YES NO      YES NO      YES NO      YES NO      YES NO      YES NO M. Nazar 2 cc w/encl: Joseph Jensen Site Vice President St. Lucie Nuclear Plant Electronic Mail Distribution
 
Paul Freeman Vice President Organizational Effectiveness
 
Florida Power & Light Company Electronic Mail Distribution
 
Peter Wells Vice President
 
Outage Support CFAM
 
Florida Power & Light Company Electronic Mail Distribution Robert J. Hughes
 
Plant General Manager St. Lucie Nuclear Plant Electronic Mail Distribution
 
Daniel D. DeBoer Operations Site Director St. Lucie Nuclear Plant Electronic Mail Distribution
 
Eric Katzman Licensing Manager St. Lucie Nuclear Plant Electronic Mail Distribution


Larry Nicholson Director Licensing
_________________________                X SUNSI REVIEW COMPLETE G FORM 665 ATTACHED OFFICE            RII:DRP        RII:DRP SIGNATURE          MJR /RA/      DWR /RA/
NAME              MRiches        DRich DATE                  11/21/2012    11/21/2012 E-MAIL COPY?        YES    NO    YES      NO  YES    NO      YES    NO    YES    NO    YES    NO    YES    NO


Florida Power & Light Company Electronic Mail Distribution  
M. Nazar                            2 cc w/encl:                            Bryan Koon Joseph Jensen                        Director Site Vice President                  Florida Division of Emergency Management St. Lucie Nuclear Plant              Electronic Mail Distribution Electronic Mail Distribution Donna Calabrese Paul Freeman                          Emergency Preparedness Manager Vice President                        St. Lucie Plant Organizational Effectiveness          Electronic Mail Distribution Florida Power & Light Company Electronic Mail Distribution          J. Kammel Radiological Emergency Planning Peter Wells                          Administrator Vice President                        Department of Public Safety Outage Support CFAM                  Electronic Mail Distribution Florida Power & Light Company Electronic Mail Distribution          Michael Baughman Training Manager Robert J. Hughes                      St. Lucie Nuclear Plant Plant General Manager                Electronic Mail Distribution St. Lucie Nuclear Plant Electronic Mail Distribution          Faye Outlaw County Administrator Daniel D. DeBoer                      St. Lucie County Operations Site Director              Electronic Mail Distribution St. Lucie Nuclear Plant Electronic Mail Distribution          James Petro Managing Attorney-Nuclear Eric Katzman                          Florida Power & Light Company Licensing Manager                    Electronic Mail Distribution St. Lucie Nuclear Plant Electronic Mail Distribution          Jack Southard Director Larry Nicholson                      Public Safety Department Director                              St. Lucie County Licensing                            Electronic Mail Distribution Florida Power & Light Company Electronic Mail Distribution Alison Brown Nuclear Licensing Florida Power & Light Company Electronic Mail Distribution Cynthia Becker (Acting) Chief Florida Bureau of Radiation Control Department of Health Electronic Mail Distribution


Alison Brown Nuclear Licensing
M. Nazar                                 3 Letter to Mano Nazar from Dan Rich dated November 21, 2012
 
Florida Power & Light Company Electronic Mail Distribution
 
Cynthia Becker (Acting) Chief Florida Bureau of Radiation Control Department of Health Electronic Mail Distribution Bryan Koon Director Florida Division of Emergency Management Electronic Mail Distribution
 
Donna Calabrese Emergency Preparedness Manager St. Lucie Plant Electronic Mail Distribution
 
J. Kammel Radiological Emergency Planning Administrator Department of Public Safety Electronic Mail Distribution
 
Michael Baughman Training Manager St. Lucie Nuclear Plant Electronic Mail Distribution
 
Faye Outlaw County Administrator St. Lucie County Electronic Mail Distribution
 
James Petro
 
Managing Attorney-Nuclear Florida Power & Light Company Electronic Mail Distribution
 
Jack Southard
 
Director Public Safety Department St. Lucie County Electronic Mail Distribution
 
M. Nazar 3 Letter to Mano Nazar from Dan Rich dated November 21, 2012  


==SUBJECT:==
==SUBJECT:==
Line 93: Line 44:


==SUMMARY==
==SUMMARY==
  - FLORIDA POWER & LIGHT - ST. LUCIE UNIT 1 - DOCKET NO. 50-335  
  - FLORIDA POWER & LIGHT - ST. LUCIE UNIT 1 - DOCKET NO. 50-335 Distribution w/encl:
 
C. Evans, RII L. Douglas, RII OE Mail RIDSNRRDIRS PUBLIC RidsNrrPMStLucie Resource
Distribution w/encl
: C. Evans, RII L. Douglas, RII OE Mail RIDSNRRDIRS PUBLIC RidsNrrPMStLucie Resource  
 
Enclosure 1 LIST OF ATTENDEES
 
Nuclear Regulatory Commission (NRC)


LIST OF ATTENDEES Nuclear Regulatory Commission (NRC)
R. Croteau, Director, Division of Reactor Projects (DRP), Region II (RII)
R. Croteau, Director, Division of Reactor Projects (DRP), Region II (RII)
D. Rich, Chief, Reactor Projects Branch 3 (RPB3), RII T. Hoeg, Senior Resident Inspector, St. Lucie, RII C. Rapp, Inspection Team Leader, DRP, RII R. Hannah, Senior Public Affairs Officer, RII  
D. Rich, Chief, Reactor Projects Branch 3 (RPB3), RII T. Hoeg, Senior Resident Inspector, St. Lucie, RII C. Rapp, Inspection Team Leader, DRP, RII R. Hannah, Senior Public Affairs Officer, RII Florida Power and Light (FPL)
 
J. Jensen, VP - St. Lucie Nuclear Plant C. Bible, Director, Engineering - St. Lucie Nuclear Plant E. Katzmann, Licensing Manager - St. Lucie Nuclear Plant Public Attendance V. Barry R. Bright*
Florida Power and Light (FPL)
C. Church D. Clark E. Clark Jim Garlans Jakki Garlans O. Kraehenbuehl K. Myers T. Oster V. Oster D. Sager T. Saporito W. Stubbs K. Webber
 
*Teleconference call Enclosure 1
J. Jensen, VP - St. Lucie Nuclear Plant C. Bible, Director, Engineering - St. Lucie Nuclear Plant E. Katzmann, Licensing Manager - St. Lucie Nuclear Plant  
 
Public Attendance
 
V. Barry R. Bright*  
 
C. Church  
 
D. Clark E. Clark Jim Garlans Jakki Garlans O. Kraehenbuehl  
 
K. Myers T. Oster V. Oster D. Sager T. Saporito  
 
W. Stubbs  
 
K. Webber  
 
*Teleconference call Enclosure 2 Enclosure 2
 
Enclosure 2
 
Enclosure 2
 
Enclosure 2
 
Enclosure 2
 
Enclosure 2
 
Enclosure 2
 
Enclosure 2
 
Enclosure 2
 
Enclosure 2
 
Enclosure 2
 
Enclosure 3


2 Enclosure 3  
2 Enclosure 3


3 Enclosure 3  
3 Enclosure 3


4 Enclosure 3  
4 Enclosure 3


5 Enclosure 3  
5 Enclosure 3


6 Enclosure 3  
6 Enclosure 3


7 Enclosure 3  
7 Enclosure 3


8 Enclosure 3  
8 Enclosure 3


9 Enclosure 3  
9 Enclosure 3


10 Enclosure 3  
10 Enclosure 3


11 Enclosure 3  
11 Enclosure 3


12 Enclosure 3  
12 Enclosure 3


13 Enclosure 3  
13 Enclosure 3


14 Enclosure 3  
14 Enclosure 3


15 Enclosure 3  
15 Enclosure 3


16 Enclosure 3  
16 Enclosure 3


17 Enclosure 3  
17 Enclosure 3


18 Enclosure 3  
18 Enclosure 3


19 Enclosure 3  
19 Enclosure 3


20 Enclosure 3  
20 Enclosure 3


21 Enclosure 3}}
21 Enclosure 3}}

Revision as of 19:50, 11 November 2019

11/9/2012 - Summary of Meeting with the Florida Power and Light Company Regarding the St. Lucie Nuclear Plant
ML12326A816
Person / Time
Site: Saint Lucie NextEra Energy icon.png
Issue date: 11/21/2012
From: Rich D
NRC/RGN-II/DRP/RPB3
To: Nazar M
Florida Power & Light Co
References
Download: ML12326A816 (38)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 November 21, 2012 Florida Power and Light Company ATTN: Mr. Mano Nazar, Senior Vice President Nuclear and Chief Nuclear Officer P.O. Box 14000 Juno Beach, FL 33408-0420

SUBJECT:

PUBLIC MEETING

SUMMARY

- FLORIDA POWER & LIGHT - ST. LUCIE UNIT 1 - DOCKET NO. 50-335 On November 9, 2012, the Nuclear Regulatory Commission (NRC) conducted a meeting with Florida Power and Light staff from the St. Lucie Nuclear Plant to discuss the performance deficiencies and corrective actions related to two NRC Reactor Oversight Process performance indicators that had crossed the Green to White threshold. The White performance indicators resulted in St. Lucie Unit 1 being moved to the Degraded Cornerstone Column of the Reactor Oversight Process Action Matrix. The NRC supplemental inspection activities conducted to assess the adequacy of licensees actions were also discussed. The meeting was held at the Stuart / Martin County Chamber of Commerce, located at 1650 South Kanner Highway, Stuart, FL 34994. The list of attendees and presentation slides are enclosed.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Should you have any questions concerning this meeting, please contact me at (404) 997-4721.

Sincerely,

/RA/

Daniel W. Rich, Chief Projects Branch 3 Division of Reactor Projects

Enclosures:

1. List of Attendees
2. Florida Power & Light Presentation
3. NRC Presentation cc w/encls: (See page 2)

_________________________ X SUNSI REVIEW COMPLETE G FORM 665 ATTACHED OFFICE RII:DRP RII:DRP SIGNATURE MJR /RA/ DWR /RA/

NAME MRiches DRich DATE 11/21/2012 11/21/2012 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO

M. Nazar 2 cc w/encl: Bryan Koon Joseph Jensen Director Site Vice President Florida Division of Emergency Management St. Lucie Nuclear Plant Electronic Mail Distribution Electronic Mail Distribution Donna Calabrese Paul Freeman Emergency Preparedness Manager Vice President St. Lucie Plant Organizational Effectiveness Electronic Mail Distribution Florida Power & Light Company Electronic Mail Distribution J. Kammel Radiological Emergency Planning Peter Wells Administrator Vice President Department of Public Safety Outage Support CFAM Electronic Mail Distribution Florida Power & Light Company Electronic Mail Distribution Michael Baughman Training Manager Robert J. Hughes St. Lucie Nuclear Plant Plant General Manager Electronic Mail Distribution St. Lucie Nuclear Plant Electronic Mail Distribution Faye Outlaw County Administrator Daniel D. DeBoer St. Lucie County Operations Site Director Electronic Mail Distribution St. Lucie Nuclear Plant Electronic Mail Distribution James Petro Managing Attorney-Nuclear Eric Katzman Florida Power & Light Company Licensing Manager Electronic Mail Distribution St. Lucie Nuclear Plant Electronic Mail Distribution Jack Southard Director Larry Nicholson Public Safety Department Director St. Lucie County Licensing Electronic Mail Distribution Florida Power & Light Company Electronic Mail Distribution Alison Brown Nuclear Licensing Florida Power & Light Company Electronic Mail Distribution Cynthia Becker (Acting) Chief Florida Bureau of Radiation Control Department of Health Electronic Mail Distribution

M. Nazar 3 Letter to Mano Nazar from Dan Rich dated November 21, 2012

SUBJECT:

PUBLIC MEETING

SUMMARY

- FLORIDA POWER & LIGHT - ST. LUCIE UNIT 1 - DOCKET NO. 50-335 Distribution w/encl:

C. Evans, RII L. Douglas, RII OE Mail RIDSNRRDIRS PUBLIC RidsNrrPMStLucie Resource

LIST OF ATTENDEES Nuclear Regulatory Commission (NRC)

R. Croteau, Director, Division of Reactor Projects (DRP), Region II (RII)

D. Rich, Chief, Reactor Projects Branch 3 (RPB3), RII T. Hoeg, Senior Resident Inspector, St. Lucie, RII C. Rapp, Inspection Team Leader, DRP, RII R. Hannah, Senior Public Affairs Officer, RII Florida Power and Light (FPL)

J. Jensen, VP - St. Lucie Nuclear Plant C. Bible, Director, Engineering - St. Lucie Nuclear Plant E. Katzmann, Licensing Manager - St. Lucie Nuclear Plant Public Attendance V. Barry R. Bright*

C. Church D. Clark E. Clark Jim Garlans Jakki Garlans O. Kraehenbuehl K. Myers T. Oster V. Oster D. Sager T. Saporito W. Stubbs K. Webber

  • Teleconference call Enclosure 1

2 Enclosure 3

3 Enclosure 3

4 Enclosure 3

5 Enclosure 3

6 Enclosure 3

7 Enclosure 3

8 Enclosure 3

9 Enclosure 3

10 Enclosure 3

11 Enclosure 3

12 Enclosure 3

13 Enclosure 3

14 Enclosure 3

15 Enclosure 3

16 Enclosure 3

17 Enclosure 3

18 Enclosure 3

19 Enclosure 3

20 Enclosure 3

21 Enclosure 3