ML14220A317: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(One intermediate revision by the same user not shown)
Line 3: Line 3:
| issue date = 08/20/2014
| issue date = 08/20/2014
| title = Environmental Project Manager Change for the License Renewal of Indian Point Nuclear Generating Unit Nos. 2 and 3
| title = Environmental Project Manager Change for the License Renewal of Indian Point Nuclear Generating Unit Nos. 2 and 3
| author name = Wittick B D
| author name = Wittick B
| author affiliation = NRC/NRR/DLR/RPB2
| author affiliation = NRC/NRR/DLR/RPB2
| addressee name =  
| addressee name =  
Line 9: Line 9:
| docket = 05000247, 05000286
| docket = 05000247, 05000286
| license number =  
| license number =  
| contact person = Wentzel M J, 301-287-659
| contact person = Wentzel M, 301-287-659
| case reference number = TAC MD5411, TAC MD5412
| case reference number = TAC MD5411, TAC MD5412
| document type = Letter
| document type = Letter
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 August 20, 2014 Vice President, Operations Entergy Nuclear Operations, Inc.
-0001   August 20, 2014 Vice President, Operations Entergy Nuclear Operations, Inc.
Indian Point Energy Center 450 Broadway, GSB P.O. Box 249 Buchanan, NY 10511-0249
Indian Point Energy Center 450 Broadway, GSB P.O. Box 249 Buchanan, NY 10511
-0249


==SUBJECT:==
==SUBJECT:==
Line 28: Line 26:
==Dear Sir or Madam:==
==Dear Sir or Madam:==


This letter is to inform you that
This letter is to inform you that, effective immediately, the U.S. Nuclear Regulatory Commission Environmental Project Manager responsibility for the Indian Point Units 2 and 3, license renewal review is transferred from Ms. Lois James to Mr. Michael Wentzel.
, effective immediately, the U.S. Nuclear Regulatory Commission Environmental Project Manager responsibility for the Indian Point Units 2 and 3, license renewal review is transferred from Ms. Lois James to Mr. Michael Wentzel
All correspondence for the Project Manager associated with the environmental review should be sent to:
.
Mr. Michael Wentzel, Project Manager Projects Branch 2 Division of License Renewal Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Mail Stop O-11F1 Washington, DC 20555 Mr. Wentzel may be reached at 301-415-6459 or by e-mail at michael.wentzel@nrc.gov.
All correspondence for the Project Manager associated with the environmental review should be sent to:   M r. Michael Wentzel , Project Manager Projects Branch 2 Division of License Renewal Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Mail Stop O
Sincerely,
-11F1 Washington, DC 20555 M r. Wentzel may be reached at 301-415-6459 or by e-mail at michael.wentzel@nrc.gov
                                                /RA/
. Sincerely,
Brian D. Wittick, Chief Projects Branch 2 Division of License Renewal Office of Nuclear Reactor Regulation Docket Nos. 50-247 and 50-286 cc: Listserv
/RA/ Brian D. Wittick , Chief Projects Branch 2 Division of License Renewal Office of Nuclear Reactor Regulation


Docket Nos. 50
ML14220A317                        *concurrence via e-mail OFFICE      PM:RPB2:DLR          LA:DLR                BC:RPB2:DLR NAME        MWentzel            IKing                BWittick DATE        8/13/14              8/12/14              8/20/14
-247 and 5 0-286 cc: Listserv 


ML14220A317
Letter to Vice President, Operations, Entergy from B. Wittick dated August 20, 2014
  *concurrence via e
-mail OFFICE PM:RPB 2:DLR LA:DLR BC:RPB 2:DLR NAME MWentzel IKing BWittick DATE 8/13/14 8/12/14 8/20/14 Letter to Vice President, Operations, Entergy from B. Wittick dated August 20, 2014


==SUBJECT:==
==SUBJECT:==
ENVIRONMENTAL PROJECT MANAGER CHANGE FOR THE LICENSE RENEWAL OF INDIAN POINT NUCLEAR GENERATING UNIT NOS. 2 AND 3 (TAC NOS. MD5411 AND MD5412)
ENVIRONMENTAL PROJECT MANAGER CHANGE FOR THE LICENSE RENEWAL OF INDIAN POINT NUCLEAR GENERATING UNIT NOS. 2 AND 3 (TAC NOS. MD5411 AND MD5412)
DISTRIBUTION
DISTRIBUTION:
HARD COPY: DLR RF E-MAIL: PUBLIC RidsNrrDlr Resource RidsNrrDlrRpb1 Resource RidsNrrDlrRpb2 Resource RidsNrrDlrRarb Resource RidsNrrDlrRasb Resource RidsNrrDlrRapb Resource RidsNrrDlrRerb Resource RidsNrrDlrRsrg Resource RidsNrrDraAfpb Resource
HARD COPY:
 
DLR RF E-MAIL:
RidsOgcMailCenter Resource
PUBLIC                                             BMizuno, OGC RidsNrrDlr Resource                                 DRoth, OGC RidsNrrDlrRpb1 Resource                             BHarris, OGC RidsNrrDlrRpb2 Resource                             SBurnell, OPA RidsNrrDlrRarb Resource                             DMcIntyre, OPA RidsNrrDlrRasb Resource                             EDacus, OCA RidsNrrDlrRapb Resource                             MGray, RI RidsNrrDlrRerb Resource                             ABurritt, RI RidsNrrDlrRsrg Resource                             DonaldJackson, RI RidsNrrDraAfpb Resource                             GMeyer, RI RidsOgcMailCenter Resource                         MModes, RI
-------------
-------------                                       NSheehan, RI OPA MWentzel                                            DScrenci, RI OPA KGreen                                              DTifft, RI BWittick                                            NMcNamara, RI DWrona                                              GNewman, RI YDiaz                                              JSStewart, RI DPickett                                            AmiPatel, RI STurk, OGC}}
MWentzel KGreen BWittick DWrona YDiaz DPickett STurk, OGC BMizuno, OGC DRoth, OGC BHarris, OGC SBurnell, OPA DMcIntyre, OPA EDacus, OCA MGray, RI ABurritt, RI DonaldJackson, RI GMeyer, RI MModes, RI NSheehan, RI OPA DScrenci, RI OPA DTifft, RI NMcNamara, RI GNewman, RI JSStewart, RI A miPatel, RI}}

Latest revision as of 01:39, 4 November 2019

Environmental Project Manager Change for the License Renewal of Indian Point Nuclear Generating Unit Nos. 2 and 3
ML14220A317
Person / Time
Site: Indian Point  Entergy icon.png
Issue date: 08/20/2014
From: Brian Wittick
License Renewal Projects Branch 2
To:
Entergy Nuclear Operations
Wentzel M, 301-287-659
References
TAC MD5411, TAC MD5412
Download: ML14220A317 (3)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 August 20, 2014 Vice President, Operations Entergy Nuclear Operations, Inc.

Indian Point Energy Center 450 Broadway, GSB P.O. Box 249 Buchanan, NY 10511-0249

SUBJECT:

ENVIRONMENTAL PROJECT MANAGER CHANGE FOR THE LICENSE RENEWAL OF INDIAN POINT NUCLEAR GENERATING UNIT NOS. 2 AND 3 (TAC NOS. MD5411 AND MD5412)

Dear Sir or Madam:

This letter is to inform you that, effective immediately, the U.S. Nuclear Regulatory Commission Environmental Project Manager responsibility for the Indian Point Units 2 and 3, license renewal review is transferred from Ms. Lois James to Mr. Michael Wentzel.

All correspondence for the Project Manager associated with the environmental review should be sent to:

Mr. Michael Wentzel, Project Manager Projects Branch 2 Division of License Renewal Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Mail Stop O-11F1 Washington, DC 20555 Mr. Wentzel may be reached at 301-415-6459 or by e-mail at michael.wentzel@nrc.gov.

Sincerely,

/RA/

Brian D. Wittick, Chief Projects Branch 2 Division of License Renewal Office of Nuclear Reactor Regulation Docket Nos. 50-247 and 50-286 cc: Listserv

ML14220A317 *concurrence via e-mail OFFICE PM:RPB2:DLR LA:DLR BC:RPB2:DLR NAME MWentzel IKing BWittick DATE 8/13/14 8/12/14 8/20/14

Letter to Vice President, Operations, Entergy from B. Wittick dated August 20, 2014

SUBJECT:

ENVIRONMENTAL PROJECT MANAGER CHANGE FOR THE LICENSE RENEWAL OF INDIAN POINT NUCLEAR GENERATING UNIT NOS. 2 AND 3 (TAC NOS. MD5411 AND MD5412)

DISTRIBUTION:

HARD COPY:

DLR RF E-MAIL:

PUBLIC BMizuno, OGC RidsNrrDlr Resource DRoth, OGC RidsNrrDlrRpb1 Resource BHarris, OGC RidsNrrDlrRpb2 Resource SBurnell, OPA RidsNrrDlrRarb Resource DMcIntyre, OPA RidsNrrDlrRasb Resource EDacus, OCA RidsNrrDlrRapb Resource MGray, RI RidsNrrDlrRerb Resource ABurritt, RI RidsNrrDlrRsrg Resource DonaldJackson, RI RidsNrrDraAfpb Resource GMeyer, RI RidsOgcMailCenter Resource MModes, RI


NSheehan, RI OPA MWentzel DScrenci, RI OPA KGreen DTifft, RI BWittick NMcNamara, RI DWrona GNewman, RI YDiaz JSStewart, RI DPickett AmiPatel, RI STurk, OGC