{{#Wiki_filter: | {{#Wiki_filter:ptember 2, 2014 | ||
==SUBJECT:== | ==SUBJECT:== | ||
| Line 24: | Line 24: | ||
==Dear Mr. Browning:== | ==Dear Mr. Browning:== | ||
On August 14, 2014, the NRC completed its mid-cycle performance review of Arkansas Nuclear One. The results of that review have been transmitted to you separately in publicly available assessment letter. This letter informs you of the | On August 14, 2014, the NRC completed its mid-cycle performance review of Arkansas Nuclear One. The results of that review have been transmitted to you separately in publicly available assessment letter. This letter informs you of the NRCs plans for future security-related inspections at your facility. | ||
The enclosed inspection plan lists the security-related inspections scheduled through December 31, 2015. The inspections listed during the last nine months of the inspection plan are tentative and may be revised at the next semiannual performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to | The enclosed inspection plan lists the security-related inspections scheduled through December 31, 2015. The inspections listed during the last nine months of the inspection plan are tentative and may be revised at the next semiannual performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. Routine force-on-force inspections are conducted approximately every 3 years. You will be notified by separate correspondence 8 to 10 weeks in advance of any force-on-force inspections scheduled for your facility. | ||
While we are fully committed to our goal of ensuring openness in our regulatory process, we must balance that goal with the more immediate need of ensuring the continued safety and secure operation of nuclear facilities and the protection of nuclear materials in our country. Thus due to the security-related information contained in this correspondence, and | While we are fully committed to our goal of ensuring openness in our regulatory process, we must balance that goal with the more immediate need of ensuring the continued safety and secure operation of nuclear facilities and the protection of nuclear materials in our country. | ||
Thus due to the security-related information contained in this correspondence, and in accordance with NRC Policy For Handling, Marking and Protecting Sensitive Unclassified Non-Safeguards Information, a copy of this letter and its enclosure will not be available for public inspection in either the NRC Public Document Room or the Publicly Available Records (PARS) component of NRC's document system (ADAMS). | |||
Please contact me at (817) 200-1527 with any questions you have regarding this letter. | Please contact me at (817) 200-1527 with any questions you have regarding this letter. | ||
Sincerely, | Sincerely, | ||
/RA/ | /RA/ | ||
Mark S. Haire, Chief Plant Support Branch 1 Division of Reactor Safety Docket Nos.: 50-313, 50-368 License Nos.: DPR-51, NPF-6 Enclosure: | |||
Mark S. Haire, Chief Plant Support Branch 1 Division of Reactor Safety | Inspection Plan cc w/enclosure: | ||
Docket Nos.: 50-313, 50-368 License Nos.: DPR-51, NPF-6 Enclosure: | |||
Inspection Plan | |||
cc w/enclosure: | |||
Mr. Jonathan Laplante Senior Manager, Security Operations Entergy Operations, Inc. | Mr. Jonathan Laplante Senior Manager, Security Operations Entergy Operations, Inc. | ||
1340 Echelon Parkway Jackson, MS 39286-1995 | 1340 Echelon Parkway Jackson, MS 39286-1995 ML14245A396 SUNSI Review ADAMS Publicly Available Non-Sensitive Keyword: RGN-002 By: MHaire Yes No Non-Publicly Available Sensitive OFFICE C:PSB1 NAME MHaire/dch SIGNATURE /RA/ | ||
DATE 8/29/2014 Letter to Jeremy Browning from Mark Haire, dated September 2, 2014 SUBJECT: NON-PUBLIC SECURITY INSPECTION PLAN FOR ARKANSAS NUCLEAR ONE (NRC PHYSICAL SECURITY INSPECTION REPORT NUMBERS 05000313/2014402 AND 05000368/2014402) | |||
ML14245A396 SUNSI Review | |||
SUBJECT: NON-PUBLIC SECURITY INSPECTION PLAN FOR ARKANSAS NUCLEAR ONE (NRC PHYSICAL SECURITY INSPECTION REPORT NUMBERS 05000313/2014402 AND 05000368/2014402) | |||
Electronic Distribution by RIV w/enclosure: | Electronic Distribution by RIV w/enclosure: | ||
Security Specialist/NSIR (Eric.Wharton@nrc.gov) | Security Specialist/NSIR (Eric.Wharton@nrc.gov) | ||
Security Specialist/NSIR (Niry.Simonian@nrc.gov) Senior Resident Inspector (Brian.Tindell@nrc.gov) | Security Specialist/NSIR (Niry.Simonian@nrc.gov) | ||
Senior Resident Inspector (Brian.Tindell@nrc.gov) | |||
Electronic Distribution by RIV w/o enclosure | Electronic Distribution by RIV w/o enclosure: | ||
Regional Administrator (Marc.Dapas@nrc.gov) | |||
Deputy Regional Administrator (Kriss.Kennedy@nrc.gov) | Deputy Regional Administrator (Kriss.Kennedy@nrc.gov) | ||
Acting DRP Director (Troy.Pruett@nrc.gov) Acting DRP Deputy Director (Michael.Hay@nrc.gov) DRS Director (Anton.Vegel@nrc.gov) | Acting DRP Director (Troy.Pruett@nrc.gov) | ||
DRS Deputy Director (Jeff.Clark@nrc.gov) | Acting DRP Deputy Director (Michael.Hay@nrc.gov) | ||
DRS Director (Anton.Vegel@nrc.gov) | |||
DRS Deputy Director (Jeff.Clark@nrc.gov) | |||
Resident Inspector (Matt.Young@nrc.gov) | Resident Inspector (Matt.Young@nrc.gov) | ||
Resident Inspector (Abin.Fairbanks@nrc.gov) | Resident Inspector (Abin.Fairbanks@nrc.gov) | ||
Branch Chief, DRP/E (Greg.Werner@nrc.gov) Senior Project Engineer, DRP/E (Cale.Young@nrc.gov) | Branch Chief, DRP/E (Greg.Werner@nrc.gov) | ||
Senior Project Engineer, DRP/E (Cale.Young@nrc.gov) | |||
Project Engineer, DRP/E (Jim.Melfi@nrc.gov) | Project Engineer, DRP/E (Jim.Melfi@nrc.gov) | ||
ANO Administrative Assistant (Gloria.Hatfield@nrc.gov) | ANO Administrative Assistant (Gloria.Hatfield@nrc.gov) | ||
Public Affairs Officer (Victor.Dricks@nrc.gov) | Public Affairs Officer (Victor.Dricks@nrc.gov) | ||
Public Affairs Officer (Lara.Uselding@nrc.gov) Project Manager (Peter.Bamford@nrc.gov) Branch Chief, DRS/TSB (Geoffrey.Miller@nrc.gov) | Public Affairs Officer (Lara.Uselding@nrc.gov) | ||
Project Manager (Peter.Bamford@nrc.gov) | |||
Branch Chief, DRS/TSB (Geoffrey.Miller@nrc.gov) | |||
ACES (R4Enforcement.Resource@nrc.gov) | ACES (R4Enforcement.Resource@nrc.gov) | ||
RITS Coordinator (Marisa.Herrera@nrc.gov) | RITS Coordinator (Marisa.Herrera@nrc.gov) | ||
Regional Counsel (Karla.Fuller@nrc.gov) Technical Support Assistant (Loretta.Williams@nrc.gov) Congressional Affairs Officer (Jenny.Weil@nrc.gov) | Regional Counsel (Karla.Fuller@nrc.gov) | ||
Technical Support Assistant (Loretta.Williams@nrc.gov) | |||
Congressional Affairs Officer (Jenny.Weil@nrc.gov) | |||
RIV/ETA: OEDO (Anthony.Bowers@nrc.gov) | RIV/ETA: OEDO (Anthony.Bowers@nrc.gov) | ||
ROPreports | ROPreports | ||
}} | }} | ||
Revision as of 00:49, 4 November 2019
| ML14245A396 | |
| Person / Time | |
|---|---|
| Site: | Arkansas Nuclear |
| Issue date: | 09/02/2014 |
| From: | Mark Haire Plant Support Branch-1 |
| To: | Jeremy G. Browning Entergy Operations |
| References | |
| IR-2014-402 | |
| Download: ML14245A396 (4) | |
Text
ptember 2, 2014
SUBJECT:
NON-PUBLIC SECURITY INSPECTION PLAN FOR ARKANSAS NUCLEAR ONE (NRC PHYSICAL SECURITY INSPECTION REPORT NUMBERS 05000313/2014402 AND 05000368/2014402)
Dear Mr. Browning:
On August 14, 2014, the NRC completed its mid-cycle performance review of Arkansas Nuclear One. The results of that review have been transmitted to you separately in publicly available assessment letter. This letter informs you of the NRCs plans for future security-related inspections at your facility.
The enclosed inspection plan lists the security-related inspections scheduled through December 31, 2015. The inspections listed during the last nine months of the inspection plan are tentative and may be revised at the next semiannual performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. Routine force-on-force inspections are conducted approximately every 3 years. You will be notified by separate correspondence 8 to 10 weeks in advance of any force-on-force inspections scheduled for your facility.
While we are fully committed to our goal of ensuring openness in our regulatory process, we must balance that goal with the more immediate need of ensuring the continued safety and secure operation of nuclear facilities and the protection of nuclear materials in our country.
Thus due to the security-related information contained in this correspondence, and in accordance with NRC Policy For Handling, Marking and Protecting Sensitive Unclassified Non-Safeguards Information, a copy of this letter and its enclosure will not be available for public inspection in either the NRC Public Document Room or the Publicly Available Records (PARS) component of NRC's document system (ADAMS).
Please contact me at (817) 200-1527 with any questions you have regarding this letter.
Sincerely,
/RA/
Mark S. Haire, Chief Plant Support Branch 1 Division of Reactor Safety Docket Nos.: 50-313, 50-368 License Nos.: DPR-51, NPF-6 Enclosure:
Inspection Plan cc w/enclosure:
Mr. Jonathan Laplante Senior Manager, Security Operations Entergy Operations, Inc.
1340 Echelon Parkway Jackson, MS 39286-1995 ML14245A396 SUNSI Review ADAMS Publicly Available Non-Sensitive Keyword: RGN-002 By: MHaire Yes No Non-Publicly Available Sensitive OFFICE C:PSB1 NAME MHaire/dch SIGNATURE /RA/
DATE 8/29/2014 Letter to Jeremy Browning from Mark Haire, dated September 2, 2014 SUBJECT: NON-PUBLIC SECURITY INSPECTION PLAN FOR ARKANSAS NUCLEAR ONE (NRC PHYSICAL SECURITY INSPECTION REPORT NUMBERS 05000313/2014402 AND 05000368/2014402)
Electronic Distribution by RIV w/enclosure:
Security Specialist/NSIR (Eric.Wharton@nrc.gov)
Security Specialist/NSIR (Niry.Simonian@nrc.gov)
Senior Resident Inspector (Brian.Tindell@nrc.gov)
Electronic Distribution by RIV w/o enclosure:
Regional Administrator (Marc.Dapas@nrc.gov)
Deputy Regional Administrator (Kriss.Kennedy@nrc.gov)
Acting DRP Director (Troy.Pruett@nrc.gov)
Acting DRP Deputy Director (Michael.Hay@nrc.gov)
DRS Director (Anton.Vegel@nrc.gov)
DRS Deputy Director (Jeff.Clark@nrc.gov)
Resident Inspector (Matt.Young@nrc.gov)
Resident Inspector (Abin.Fairbanks@nrc.gov)
Branch Chief, DRP/E (Greg.Werner@nrc.gov)
Senior Project Engineer, DRP/E (Cale.Young@nrc.gov)
Project Engineer, DRP/E (Jim.Melfi@nrc.gov)
ANO Administrative Assistant (Gloria.Hatfield@nrc.gov)
Public Affairs Officer (Victor.Dricks@nrc.gov)
Public Affairs Officer (Lara.Uselding@nrc.gov)
Project Manager (Peter.Bamford@nrc.gov)
Branch Chief, DRS/TSB (Geoffrey.Miller@nrc.gov)
ACES (R4Enforcement.Resource@nrc.gov)
RITS Coordinator (Marisa.Herrera@nrc.gov)
Regional Counsel (Karla.Fuller@nrc.gov)
Technical Support Assistant (Loretta.Williams@nrc.gov)
Congressional Affairs Officer (Jenny.Weil@nrc.gov)
RIV/ETA: OEDO (Anthony.Bowers@nrc.gov)
ROPreports