{{#Wiki_filter:QF-0739, Revision 1 (FP-R-LIC-06) | {{#Wiki_filter:QF-0739, Revision 1 (FP-R-LIC-06) Page 1 of 4 NRC Question Response Form Request Number: Status: | ||
NRC Question Response Form Request Number: | _______________________________________________________________ | ||
Question / Document Request: | Requested By (Inspector name): Jean Trefethen Date Requested: | ||
1-Confirm that the generators were placed back in service in December 2013. 2-How many days (approximate) did the steam generator replacement activities take to complete (e.g. 80 days)? | Question / Document Request: Q / D (circle one) System: | ||
Detailed Question or Request: | |||
1-Confirm that the generators were placed back in service in December 2013. | |||
2-How many days (approximate) did the steam generator replacement activities take to complete (e.g. 80 days)? | |||
3-How many additional workers were used to complete the combined maintenance and refueling outage? | 3-How many additional workers were used to complete the combined maintenance and refueling outage? | ||
4-Confirm that the steam generators were moved from the barge via a self-propelled transporter to a temporary building, which housed the replacement steam generators until they were ready for installation. | 4-Confirm that the steam generators were moved from the barge via a self-propelled transporter to a temporary building, which housed the replacement steam generators until they were ready for installation. | ||
| Line 28: | Line 31: | ||
6-Confirm that no construction activities took place on previously-undisturbed land. | 6-Confirm that no construction activities took place on previously-undisturbed land. | ||
7-What mitigations did you use to reduce environmental impacts (e.g. used best management practices, such as seeding and wetting disturbed areas, using multi-person vehicles for the workforce to reduce the total passenger vehicles miles.)? | 7-What mitigations did you use to reduce environmental impacts (e.g. used best management practices, such as seeding and wetting disturbed areas, using multi-person vehicles for the workforce to reduce the total passenger vehicles miles.)? | ||
Initiated By (individual taking the request): Gene Eckholt Assigned To (Person responding to request): Scott Marty Date Assigned: | |||
Initiated By (individual taking the request): | CAP / Work Order Issued? Yes / No (circle one) Number: 01443632__ | ||
CAP 01443632 was written to document that the need for an additional archeological survey was not evaluated/documented when the Steam Generator Replacement (SGR) Parking Lot storm water retention basin size was increased during construction. Work activities did not identify any cultural resources and subsequent surveys in the surrounding areas did not identify any cultural resources. | |||
Assigned To (Person responding to request): Scott Marty Date Assigned: | |||
CAP / Work Order Issued? Yes / No (circle one) Number: | |||
Response (include a list of documents provided): | Response (include a list of documents provided): | ||
1-Confirm that the generators were placed back in service in December 2013. The Replacement Steam Generators (RSGs) were in-serviced on December 16, 2013 when they were accepted by Operations as being available for decay heat removal per shutdown safety assessment and Technical Specifications. Prairie Island Nuclear Generating Plant Unit 2 was placed back in service with the RSGs on January 3, 2014.}} | 1-Confirm that the generators were placed back in service in December 2013. | ||
The Replacement Steam Generators (RSGs) were in-serviced on December 16, 2013 when they were accepted by Operations as being available for decay heat removal per shutdown safety assessment and Technical Specifications. Prairie Island Nuclear Generating Plant Unit 2 was placed back in service with the RSGs on January 3, 2014. | |||
Use of this form as a procedural aid does not require retention as a quality record.}} | |||
Revision as of 00:45, 4 November 2019
| ML14247A043 | |
| Person / Time | |
|---|---|
| Site: | Prairie Island |
| Issue date: | 08/28/2014 |
| From: | Xcel Energy |
| To: | NRC/FSME/DWMEP |
| Shared Package | |
| ML14247A044 | List: |
| References | |
| QF-0739, Rev. 1 | |
| Download: ML14247A043 (4) | |
Text
QF-0739, Revision 1 (FP-R-LIC-06) Page 1 of 4 NRC Question Response Form Request Number: Status:
_______________________________________________________________
Requested By (Inspector name): Jean Trefethen Date Requested:
Question / Document Request: Q / D (circle one) System:
Detailed Question or Request:
1-Confirm that the generators were placed back in service in December 2013.
2-How many days (approximate) did the steam generator replacement activities take to complete (e.g. 80 days)?
3-How many additional workers were used to complete the combined maintenance and refueling outage?
4-Confirm that the steam generators were moved from the barge via a self-propelled transporter to a temporary building, which housed the replacement steam generators until they were ready for installation.
5-Confirm that in addition to temporary warehouses, that a large crane and transfer cart that was set up outside the containment equipment hatch were used during the steam generator replacement.
6-Confirm that no construction activities took place on previously-undisturbed land.
7-What mitigations did you use to reduce environmental impacts (e.g. used best management practices, such as seeding and wetting disturbed areas, using multi-person vehicles for the workforce to reduce the total passenger vehicles miles.)?
Initiated By (individual taking the request): Gene Eckholt Assigned To (Person responding to request): Scott Marty Date Assigned:
CAP / Work Order Issued? Yes / No (circle one) Number: 01443632__
CAP 01443632 was written to document that the need for an additional archeological survey was not evaluated/documented when the Steam Generator Replacement (SGR) Parking Lot storm water retention basin size was increased during construction. Work activities did not identify any cultural resources and subsequent surveys in the surrounding areas did not identify any cultural resources.
Response (include a list of documents provided):
1-Confirm that the generators were placed back in service in December 2013.
The Replacement Steam Generators (RSGs) were in-serviced on December 16, 2013 when they were accepted by Operations as being available for decay heat removal per shutdown safety assessment and Technical Specifications. Prairie Island Nuclear Generating Plant Unit 2 was placed back in service with the RSGs on January 3, 2014.