ML15217A045: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:CLINTON POWER STATION Job Performance Measure Control Rod Scram Time Testing Restoration  
{{#Wiki_filter:CLINTON POWER STATION Job Performance Measure Control Rod Scram Time Testing Restoration - Inadvertent Rod Withdrawal JPM Number: JPM420 Revision Number: 00 Date: 6/5/15 Developed By: Tony Jennings                     6/5/15 Instructor                       Date Validated By: /s Mike Antonelli                 7/16/15 SME or Instructor                 Date Reviewed By:
- Inadvertent Rod Withdrawal JPM Number: JPM420 Revision Number: 0 0 Date: 6/5/15 Developed By:
Operations Representative         Date Approved By:
Tony Jennings 6/5/15   Instructor Date Validated By:
Training Department               Date
/s Mike Antonelli 7/16/15   SME or Instructor Date Reviewed By:
 
Operations Representative Date Approved By:
JPM Number: CR JPM a.
Training Department Date JPM Number: CR JPM a.
Clinton Power Station Job Performance Measure (JPM)
Clinton Power Station Job Performance Measure (JPM)
Page 2 of 6 READ TO THE OPERATOR I will explain the initial conditions, which step(s) to simulate or discuss, and provide the initiating cues. When you complete the task successfully, the objective of this Job Performance Measure will be satisfied.
READ TO THE OPERATOR I will explain the initial conditions, which step(s) to simulate or discuss, and provide the initiating cues. When you complete the task successfully, the objective of this Job Performance Measure will be satisfied.
TASK STANDARDS
TASK STANDARDS:
Rod 32-37 is re-inserted to position 00 using IN TIMER SKIP IAW CPS 4007.02 Inadvertent Rod Movement.
* Rod 32-37 is re-inserted to position 00 using IN TIMER SKIP IAW CPS 4007.02 Inadvertent Rod Movement.
TOOLS, EQUIPMENT, OTHER SPECIAL REQUIREMENTS:
TOOLS, EQUIPMENT, OTHER SPECIAL REQUIREMENTS:
None PROCEDURAL/
* None PROCEDURAL/


==REFERENCES:==
==REFERENCES:==
* CPS No. 9813.01, Rev 41a Control Rod Scram Time Testing
* CPS No. 9813.01C001, Rev. 33 Control Rod Scram Timing Checklist
* CPS No. 9813.01D003, Rev. 31 Scram Time Testing - Containment Data Sheet
* CPS No. 9813.01D004, Rev. 31b Scram Time Testing - MCR Data Sheet
* CPS No. 3304.02, Rev. 22c Rod Control and Information System (RC&IS)
* CPS 4007.02, Rev. 13c Inadvertent Rod Movement
* NF-CL-721-F-1, Rev 001 Control Rod Sequence Review and Approval Sheet
* NF-CL-721-F-5, Rev 000 Special Maneuver Rod Move Sheet
* NF-CL-721-F-6, Rev 000 Control Rod Sequence: General Instructions EVALUATOR INSTRUCTIONS:
* Amplifying cues are provided within the JPM steps.
* All pre-job briefings are completed.
* When providing the initiating cue, provide the examinee with a copy of each of the following procedures:
o CPS 9813.01 Control Rod Scram Time Testing o CPS No. 9813.01C001, Rev. 33 Control Rod Scram Timing Checklist o CPS No. 9813.01D003, Rev. 31 Scram Time Testing - Containment Data Sheet o CPS No. 9813.01D004, Rev. 31b Scram Time Testing - MCR Data Sheet o CPS 3304.02 Rod Control And Information System (RC&IS) o NF-CL-721-F-1 Control Rod Sequence Review and Approval Sheet Page 2 of 6


CPS No. 9813.01, Rev 41a Control Rod Scram Time Testing CPS No. 9813.01C001, Rev. 33 Control Rod Scram Timing Checklist CPS No. 9813.01D003, Rev. 31 Scram Time Testing
JPM Number: CR JPM a.
- Containment Data Sheet CPS No. 9813.01D004, Rev. 31b Scram Time Testing
Clinton Power Station Job Performance Measure (JPM) o NF-CL-721-F-5 Special Maneuver Rod Move Sheet o NF-CL-721-F-6 Control Rod Sequence: General Instructions o OD-7 Control Rod Notch Positions Page 3 of 6
- MCR Data Sheet CPS No. 3304.02, Rev. 22c Rod Control and Information System (RC&IS)
CPS 4007.02, Rev. 13c Inadvertent Rod Movement NF-CL-721-F-1, Rev 001 Control Rod Sequence Review and Approval Sheet NF-CL-721-F-5, Rev 000 Special Maneuver Rod Move Sheet NF-CL-721-F-6, Rev 000 Control Rod Sequence: General Instructions EVALUATOR INSTRUCTIONS:
Amplifying cues are provided within the JPM steps.
All pre-job briefings are completed.
When providing the initiating cue, provide the examinee with a copy of each of the following procedures:
o CPS 9813.01 Control Rod Scram Time Testing o CPS No. 9813.01C001, Rev. 33 Control Rod Scram Timing Checklist o CPS No. 9813.01D003, Rev. 31 Scram Time Testing
- Containment Data Sheet o CPS No. 9813.01D004, Rev. 31b Scram Time Testing
- MCR Data Sheet o CPS 3304.02 Rod Control And Information System (RC&IS) o NF-CL-721-F-1 Control Rod Sequence Review and Approval Sheet


JPM Number: CR JPM a.
JPM Number: CR JPM a.
Clinton Power Station Job Performance Measure (JPM)
Clinton Power Station Job Performance Measure (JPM)
Page 3 of 6 o NF-CL-721-F-5 Special Maneuver Rod Move Sheet o NF-CL-721-F-6 Control Rod Sequence: General Instructions o OD-7 Control Rod Notch Positions
INITIAL CONDITIONS:
The plant is in Mode 1, operating at approximately 72% power. CPS 9813.01 Control Rod Scram Time Testing on 10% of the control rods is in progress.
* Rod 32-37 has been scrammed and is at position 00.
* Rod 32-37 is de-selected.
* CPS 9813.01 Control Rod Scram Time Testing is complete up through and including step 8.2.15.
INITIATING CUE:
CAUTION All pre-job briefings are completed.
Return control rod 32-37 to its pre-test position (position 48) using single notch withdrawal per step 8.2.16 of CPS 9813.01 Control Rod Scram Time Testing.
Report to the CRS after completing the task.
START TIME:
Page 4 of 6


JPM Number: CR JPM a.
JPM Number: CR JPM a.
Clinton Power Station Job Performance Measure (JPM)
Clinton Power Station Job Performance Measure (JPM)
Page 4 of 6 INITIAL CONDITIONS:
PERFORMANCE INFORMATION Critical steps are denoted with an asterisk (*) to the left of the step number and appear in BOLDED letters. Failure to meet the standards for a critical step constitutes failure of the Job Performance Measure. The sequence of steps is assumed unless denoted in the comments section of the JPM.
The plant is in Mode 1, operating at approximately 72% power. CPS 9813.01 Control Rod Scram Time Testing on 10% of the control rods is in progress
PERFORMANCE STEPS CPS 9813.01 Control Rod Scram Time Testing CPS 3304.02 Rod Control and Information System (RC&IS)
. Rod 32-37 has been scrammed and is at position 00.
Comment STEP                      ELEMENT                                STANDARD                      SAT  UNSAT Number 9813.01 8.2.16          Return control rod 32-37 to pre-  3304.02 8.1.3.1.1 test position.                    Examinee verifies the INDIVID DRIVE light 3304.02 8.1.3 / 8.1.4                                      is energized on the OCM.
Rod 32-37 is de-selected. CPS 9813.01 Control Rod Scram Time Testing is complete up through and including step 8.2.15. INITIATING CUE:
                                                          *3304.02 8.1.3.1.2 & 3 Examinee selects control rod 32-37 by simultaneously depressing the 32 and 37 pushbuttons on 1H13-P680-5004A panel, and then verifies the yellow LED lit for LPRM 30-39.
CAUTION  All pre-job briefings are completed.
                                                          *3304.02 8.1.4.1.2 & 3 Examinee momentarily depresses the WITHDRAW pushbutton twice on 1H13-P680-5004A panel, and then verifies the IN, OUT, and SETTLE lights cycle and that rod 32-37 settles at position 02 and then 04.
Return control rod 32-37 to its pre
Cue: If the examinee reports receiving annunciator 5006-2H Rod Out Block, acknowledge the report.
-test position (position 48) using single notch withdrawal per step 8.2.16 of CPS 9813.01 Control Rod Scram Time Testing.
                                                          *3304.02 8.1.3.3 Examinee depresses the ROD SELECT CLEAR push-button twice on 1H13-P680-5004A.
Report to the CRS after completing the task. START TIME: 
Cue: If the examinee reports annunciator 5006-2H Rod Out Block is reset, acknowledge the report.
Page 5 of 6


JPM Number: CR JPM a.
JPM Number: CR JPM a.
Clinton Power Station Job Performance Measure (JPM)
Clinton Power Station Job Performance Measure (JPM)
Page 5 of 6 PERFORMANCE INFORMATION Critical steps are denoted with an asterisk (*) to the left of the step number and appear in BOLDED letters. Failure to meet the standards for a critical step constitutes failure of the Job Performance Measure. The sequence of steps is assumed unless denoted in the comments section of the JPM.
Comment STEP                   ELEMENT                               STANDARD                         SAT   UNSAT Number 9813.01 8.2.16         Return control rod 32-37 to pre-   3304.02 8.1.3.1.2 & 3 test position. (cont.)
PERFORMANCE STEPS CPS 9813.01 Control Rod Scram Time Testing CPS 3304.02 Rod Control and Information System (RC&IS)
3304.02 8.1.3 / 8.1.4                                     Examinee selects control rod 32-37 by simultaneously depressing the 32 and 37 (cont.)                                                    pushbuttons on 1H13-P680-5004A panel, and then verifies the yellow LED lit for LPRM 30-39.
STEP ELEMENT STANDARD SAT UNSAT Comment Number 9813.01 8.2.16 3304.02 8.1.3 / 8.1.4 Return control rod 32-37 to pre-test position
ALTERNATE PATH BEGINS Respond to inadvertent rod 9813.01 8.2.16         movement.                          3304.02 8.1.4.1.2 & 3 Examinee momentarily depresses the 3304.02 8.1.3 / 8.1.4                                      WITHDRAW pushbutton on 1H13-P680-4007.02 Inadvertent                                        5004A panel, and then verifies that control Rod Movement                                              rod 32-37 fails to settle at position 06 and continues to withdraw.
. 3304.02 8.1.3.1.1 Examinee verifies the INDIVID DRIVE light is energized on the OCM
Cue: If the examinee reports receiving annunciator 5006-4G Rod Drift and/or that rod 32-37 is inadvertently withdrawing, acknowledge the report.
.    *3304.02 8.1.3.1.2
                                                            *4007.02 step 3.2 (immediate action)
& 3 Examinee selects control rod 32-37 by simultaneously depressing the 32 and 37 pushbuttons on 1H13
Examinee depresses and holds the IN TIMER SKIP push-button on 1H13-P680-5004A and inserts control rod 32-37 to position 00.
-P680-5004A panel, and then verifies the yellow LED lit for LPRM 30
Evaluator Note: if examinee has not inserted rod 32-37 before reaching position 20, this critical task is UNSAT.
-39.    *3304.02 8.1.4.1
Cue: If the examinee reports that 32-37 has been inserted to position 00, acknowledge the report and state that the JPM is complete.
.2 & 3 Examinee momentarily depresses the WITHDRAW pushbutton twice on 1H13-P680-5004A panel, and then verifies the IN, OUT, and SETTLE lights cycle and that rod 32-37 settles at position 02 and then 04. Cue: If the examinee reports receiving annunciator 5006
-2H Rod Out Block, acknowledge the report
.    *3304.02 8.1.3.3 Examinee depresses the ROD SELECT CLEAR push
-button twice on 1H13-P680-5004A. Cue: If the examinee reports annunciator 5006-2H Rod Out Block is reset, acknowledge the report
.
JPM Number:  CR JPM a.
Clinton Power Station Job Performance Measure (JPM)
Page 6 of 6  STEP ELEMENT STANDARD SAT UNSAT Comment Number 9813.01 8.2.16 3304.02 8.1.3 / 8.1.4 (cont.) Return control rod 32-37 to pre-test position. (cont.) 3304.02 8.1.3.1.2 & 3
 
Examinee selects control rod 32-37 by simultaneously depressing the 32 and 37 pushbuttons on 1H13
-P680-5004A panel, and then verifies the yellow LED lit for LPRM 30-39. ALTERNATE PATH BEGINS 9813.01 8.2.16 3304.02 8.1.3 / 8.1.4 4007.02 Inadvertent Rod Movement Respond to inadvertent rod movement. 3304.02 8.1.4.1.2 & 3 Examinee momentarily depresses the WITHDRAW pushbutton on 1H13
-P680-5004A panel, and then verifies that control rod 32-37 fails to settle at position 0 6 and continues to withdraw.
Cue: If the examinee reports receiving annunciator 5006
-4G Rod Drift and/or that rod 32-37 is inadvertently withdrawing, acknowledge the report
.    *4007.02 step 3.2 (immediate action)
Examinee depresses and holds the IN TIMER SKIP push-button on 1H13
-P680-5004A and inserts control rod 32-37 to position 00
. Evaluator Note: if examinee has not inserted rod 32
-37 before reaching position 20, this critical task is UNSAT.
Cue: If the examinee reports that 32-37 has been inserted to position 00 , acknowledge the report and state that the JPM is complete
.
TERMINATING CUES:
TERMINATING CUES:
Control Rod 32-37 has been inserted to position 00 IAW CPS No.
Control Rod 32-37 has been inserted to position 00 IAW CPS No. 4007.02 Inadvertent Rod Movement.
4007.02 Inadvertent Rod Movement. STOP TIME:
STOP TIME:
Page 6 of 6


CLINTON POWER STATION Job Performance Measure Initiate Low Pressure ECCS System and Maximize Injection (Alternate Path)
CLINTON POWER STATION Job Performance Measure Initiate Low Pressure ECCS System and Maximize Injection (Alternate Path)
JPM Number: JPM250 Revision Number: 0 3 Date: 6/5/15 Developed By:
JPM Number: JPM250 Revision Number: 03 Date: 6/5/15 Developed By: Tony Jennings                 6/5/15 Instructor                     Date Validated By: /s Mike Antonelli             7/16/15 SME or Instructor             Date Reviewed By:
Tony Jennings 6/5/15   Instructor Date Validated By: /s Mike Antonelli 7/16/15   SME or Instructor Date Reviewed By:
Operations Representative     Date Approved By:
Operations Representative Date Approved By:
Training Department           Date
Training Department Date JPM Number: JPM CR b rev 03 Clinton Power Station Job Performance Measure (JPM)
 
Page 2 of 7 READ TO THE OPERATOR I will explain the initial conditions, which step(s) to simulate or discuss, and provide the initiating cues. When you complete the task successfully, the objective of this Job Performance Measure will be satisfied.
JPM Number: JPM CR b rev 03 Clinton Power Station Job Performance Measure (JPM)
TASK STANDARDS
READ TO THE OPERATOR I will explain the initial conditions, which step(s) to simulate or discuss, and provide the initiating cues. When you complete the task successfully, the objective of this Job Performance Measure will be satisfied.
RHR Pump 'A' and RHR Pump 'B' running and 1E12-F053A and B fully opened.
TASK STANDARDS:
. TOOLS, EQUIPMENT, OTHER SPECIAL REQUIREMENTS:
* RHR Pump A and RHR Pump B running and 1E12-F053A and B fully opened..
None PROCEDURAL/
TOOLS, EQUIPMENT, OTHER SPECIAL REQUIREMENTS:
* None PROCEDURAL/


==REFERENCES:==
==REFERENCES:==
* CPS No. 3312.01, Rev. 45b Residual Heat Removal
* CPS No. 3313.01, Rev. 16d Low Pressure Core Spray
* CPS No. 4411.03, Rev. 10c Injection/Flooding Sources EVALUATOR INSTRUCTIONS:
* Amplifying cues are provided within the JPM steps.
* All pre-job briefings are completed.
* ADS will automatically initiate at TAF.
Page 2 of 7


CPS No. 3312.01, Rev. 45b Residual Heat Removal CPS No. 3313.01, Rev. 16 d Low Pressure Core Spray CPS No. 4411.03, Rev. 10 c Injection/Flooding Sources EVALUATOR INSTRUCTIONS:
JPM Number: JPM CR b rev 03 Clinton Power Station Job Performance Measure (JPM)
Amplifying cues are provided within the JPM steps.
INITIAL CONDITIONS:
All pre-job briefings are completed.
You are the Extra RO. There are NO high pressure injection systems available and RPV level is trending down. ADS will be initiated by the B Reactor Operator when RPV level reaches TAF.
ADS will automatically initiate at TAF.
 
JPM Number: JPM CR b rev 03 Clinton Power Station Job Performance Measure (JPM)
Page 3 of 7 INITIAL CONDITIONS:
You are the Extra RO. There are NO high pressure injection systems available and RPV level is trending down. ADS will be initiated by the "B" Reactor Operator when RPV level reaches TAF.
INITIATING CUE:
INITIATING CUE:
CAUTION All pre-job briefings are completed.
CAUTION All pre-job briefings are completed.
Using CPS No. 4411.03, INJECTION/FLOODING SOURCES, start all Low Pressure ECCS Systems. MAXIMIZE injection using ONLY preferred ECCS injection systems to restore RPV level above Level 3. PR038 and PR039 are in service.
Using CPS No. 4411.03, INJECTION/FLOODING SOURCES, start all Low Pressure ECCS Systems. MAXIMIZE injection using ONLY preferred ECCS injection systems to restore RPV level above Level 3. PR038 and PR039 are in service.
Hard Cards are authorized and IMD has defeated all applicable interlocks.
Hard Cards are authorized and IMD has defeated all applicable interlocks.
Report to the CRS after completing the task
Report to the CRS after completing the task.
. START TIME:
START TIME:
Page 3 of 7


JPM Number: JPM CR b rev 03 Clinton Power Station Job Performance Measure (JPM)
JPM Number: JPM CR b rev 03 Clinton Power Station Job Performance Measure (JPM)
Page 4 of 7 PERFORMANCE INFORMATION Critical steps are denoted with an asterisk (*) to the left of the step number and appear in BOLDED letters. Failure to meet the standards for a critical step constitutes failure of the Job Performance Measure. The sequence of steps is assumed unless denoted in the comments section of the JPM.
PERFORMANCE INFORMATION Critical steps are denoted with an asterisk (*) to the left of the step number and appear in BOLDED letters. Failure to meet the standards for a critical step constitutes failure of the Job Performance Measure. The sequence of steps is assumed unless denoted in the comments section of the JPM.
PERFORMANCE STEPS CPS 3313.01 LOW PRESSURE CORE SPRAY, APPENDIX A: LPCS INITIATION
PERFORMANCE STEPS
/ SHUTDOWN HARD CARD CPS 3312.01 LPCI INITIATION / SHUTDOWN HARD CARD Note to Evaluator  
* CPS 3313.01 LOW PRESSURE CORE SPRAY, APPENDIX A: LPCS INITIATION /
- Low Pressure ECCS Systems can be initiated and aligned by the examinee in any order.
SHUTDOWN HARD CARD
STEP ELEMENT STANDARD SAT UNSAT Comment Number 1 Control RPV water level 3 to level 8 by initiating Division 1 ECCS (LPCS and RHR 'A') pumps. *3213.01 App. A & 3312.01 App. C At 1H13-P601-5063, examinee arms and depresses LPCS/LPCI FM RHR A MANUAL INITIATION push
* CPS 3312.01 LPCI INITIATION / SHUTDOWN HARD CARD Note to Evaluator - Low Pressure ECCS Systems can be initiated and aligned by the examinee in any order.
-button. 3313.01 App. A Examinee verifies LPCS Pump starts (red indicating light illuminated, green indicating light extinguished, motor current meter pegs high and then returns to the green band)
Comment STEP       ELEMENT                                     STANDARD                                 SAT   UNSAT Number 1           Control RPV water       *3213.01 App. A & 3312.01 App. C level 3 to level 8 by At 1H13-P601-5063, examinee arms and depresses initiating Division 1 LPCS/LPCI FM RHR A MANUAL INITIATION push-button.
. Cue: If examinee reports that the Div 1 Low Pressure ECCS Pumps have been initiated, acknowledge the report. 3312.01 App. C Examinee verifies RHR Pump 'A' starts (red indicating light illuminated, green indicating light extinguished, motor current meter pegs high and then returns to the green band).
ECCS (LPCS and RHR A) pumps.
3313.01 App. A Examinee verifies LPCS Pump starts (red indicating light illuminated, green indicating light extinguished, motor current meter pegs high and then returns to the green band).
Cue: If examinee reports that the Div 1 Low Pressure ECCS Pumps have been initiated, acknowledge the report.
Cue: If examinee reports that the Div 1 Low Pressure ECCS Pumps have been initiated, acknowledge the report.
3312.01 App. C Examinee verifies RHR Pump A starts (red indicating light illuminated, green indicating light extinguished, motor current meter pegs high and then returns to the green band).
Cue: If examinee reports that the Div 1 Low Pressure ECCS Pumps have been initiated, acknowledge the report.
Page 4 of 7


JPM Number: JPM CR b rev 03 Clinton Power Station Job Performance Measure (JPM)
JPM Number: JPM CR b rev 03 Clinton Power Station Job Performance Measure (JPM)
Page 5 of 7 STEP ELEMENT STANDARD SAT UNSAT Comment Number 2 Control RPV water level 3 to level 8 by initiating Division 2 ECCS (RHR 'B' and RHR 'C') pumps.
Comment STEP       ELEMENT                                     STANDARD                                   SAT   UNSAT Number 2         Control RPV water       *3312.01 App. C.1 level 3 to level 8 by At 1H13-P601-5065, examinee arms and depresses LPCI initiating Division 2 FM RHR B & C MANUAL INITIATION push-button.
*3312.01 App. C
ECCS (RHR B and RHR C) pumps.        3312.01 App. C.2 Examinee verifies RHR Pump B starts (red indicating light illuminated, green indicating light extinguished, motor current meter pegs high and then returns to the green band).
.1 At 1H13-P601-5065, examinee arms and depresses LPCI FM RHR B & C MANUAL INITIATION push
Cue: If examinee reports that RHR Pump B has been initiated, acknowledge the report.
-button. 3312.01 App. C
3312.01 App. C.2 Examinee determines that RHR Pump C failed to start.
.2 Examinee verifies RHR Pump 'B' starts (red indicating light illuminated, green indicating light extinguished, motor current meter pegs high and then returns to the green band).
Examinee places control switch for RHR Pump C to start, and observes the amber trip light illuminated and reports failure to the CRS.
Cue: If examinee reports that RHR Pump 'B' has been initiated, acknowledge the report.
Cue: If examinee reports failure of the RHR Pump C pump to start, acknowledge the report.
3312.01 App. C
Page 5 of 7
.2 Examinee determines that RHR Pump 'C' failed to start.
Examinee places control switch for RHR Pump 'C' to start, and observes the amber trip light illuminated and reports failure to the CRS. Cue: If examinee reports failure of the RHR Pump 'C' pump to start, acknowledge the report.


JPM Number: JPM CR b rev 03 Clinton Power Station Job Performance Measure (JPM)
JPM Number: JPM CR b rev 03 Clinton Power Station Job Performance Measure (JPM)
Page 6 of 7 STEP ELEMENT STANDARD SAT UNSAT Comment Number 3 Verifies the system alignments for RHR 'A' and 'B' subsystems.
Comment STEP       ELEMENT                                     STANDARD                                 SAT   UNSAT Number 3         Verifies the system     3312.01 App. C.3.2 & C.3.3 (RHR Pump A) alignments for RHR A and B subsystems.      At 1H13-P601-5064, examinee verifies 1E12-F048A RHR A Hx Bypass Valve AND 1E12-F027A RHR A Hx Bypass Valve open (red light ON, green light OFF).
3312.01 App. C.3.2 & C.3.3 (RHR Pump 'A')
3312.01 App. C.3.2 & C.3.3 (RHR Pump B)
At 1H13-P601-5064, examinee verifies 1E12
At 1H13-P601-5065, examinee verifies 1E12-F048B RHR B Hx Bypass Valve AND 1E12-F027B RHR B Hx Bypass Valve open (red light ON, green light OFF).
-F048A RHR A Hx Bypass Valve AND 1E12-F0 27A RHR A Hx Bypass Valve open (red light ON, green light OFF).
4         Verifies Low Pressure   3313.01 App. A.3 (LPCS)
3312.01 App. C.3.2 & C.3.3 (RHR Pump 'B')
ECCS Injection Valves open when RPV            At 1H13-P601-5063, examinee verifies 1E21-F005 LPCS To pressure reaches 472    CNMT Outbd Isol Valve open (red light ON, green light OFF).
At 1H13-P601-5065, examinee verifies 1E12
psig.                    3312.01 App. C.4 (RHR Pump A)
-F048 B RHR B Hx Bypass Valve AND 1E12-F027B RHR B Hx Bypass Valve open (red light ON, green light OFF).
When RPV pressure reaches 472 psig, at 1H13-P601-5064, examinee verifies 1E12-F042A LPCI Fm RHR A Shutoff Valve fails to open (red light OFF, green light ON).
4 Verifies Low Pressure ECCS Injection Valves open when RPV pressure reaches 472 psig. 3313.01 App. A.3 (LPCS)
Examinee may attempt to manually open 1E12-F042A or recognizes indication of 1E12-F042A breaker being OFF and reports unavailability of 1E12-F042A to the CRS.
At 1H13-P601-5063, examinee verifies 1E21
-F005 LPCS To CNMT Outbd Isol Valve open (red light ON, green light OFF).
3312.01 App. C.4 (RHR Pump 'A')
When RPV pressure reaches 472 psig, at 1H13-P601-5064, examinee verifies 1E12
-F04 2 A LPCI Fm RHR A Shutoff Valve fails to open (red light OFF, green light ON).
Examinee may attempt to manually open 1E12
-F042A or recognizes indication of 1E12
-F042A breaker being OFF and report s unavailability of 1E12-F042A to the CRS.
Cue: If examinee reports unavailability of 1E12-F042A, acknowledge the report.
Cue: If examinee reports unavailability of 1E12-F042A, acknowledge the report.
3312.01 App. C.4 (RHR Pump 'B') When RPV pressure reaches 472 psig, at 1H13-P601-5065, examinee verifies 1E12
3312.01 App. C.4 (RHR Pump B)
-F04 2B LPCI Fm RHR B Shutoff Valve fails to open (red light OFF, green light ON).
When RPV pressure reaches 472 psig, at 1H13-P601-5065, examinee verifies 1E12-F042B LPCI Fm RHR B Shutoff Valve fails to open (red light OFF, green light ON).
Examinee may attempt to manually open 1E12
Examinee may attempt to manually open 1E12-F042B or recognizes indication of 1E12-F042B breaker being OFF and reports unavailability of 1E12-F042B to the CRS.
-F042B or recognizes indication of 1E12-F042B breaker being OFF and reports unavailability of 1E12
-F042B to the CRS.
Cue: If examinee reports unavailability of 1E12-F042B, acknowledge the report.
Cue: If examinee reports unavailability of 1E12-F042B, acknowledge the report.
BEGIN ALTERNATE PATH CPS 4411.03 Injection/Flooding Sources App A: RHR Injection / Flooding Flowpath  
BEGIN ALTERNATE PATH CPS 4411.03 Injection/Flooding Sources App A: RHR Injection / Flooding Flowpath - Method 1:
- Method 1: RHR Through Shutdown Cooling 5 Defeats RHR Injection / Flooding Interlocks 1.1 No examinee action required  
RHR Through Shutdown Cooling 5         Defeats RHR Injection   1.1
- per the initiating cue, IMD has defeated all applicable interlocks
          / Flooding Interlocks No examinee action required - per the initiating cue, IMD has defeated all applicable interlocks Page 6 of 7


JPM Number: JPM CR b rev 03 Clinton Power Station Job Performance Measure (JPM)
JPM Number: JPM CR b rev 03 Clinton Power Station Job Performance Measure (JPM)
Page 7 of 7 STEP ELEMENT STANDARD SAT UNSAT Comment Number 6 Starts RHR Pumps 'A' and 'B' for injection through Shutdown Cooling  1.2 Examinee verifies RHR Pump 'A' and 'B' running (red light ON, green light OFF) at 1H13
Comment STEP       ELEMENT                                   STANDARD                                 SAT   UNSAT Number 6         Starts RHR Pumps A   1.2 and B for injection through Shutdown       Examinee verifies RHR Pump A and B running (red light ON, Cooling                green light OFF) at 1H13-P601-5064 and 5065.
-P601-5064 and 5065.
7         Aligns RHR injection   *1.3 through the Shutdown Examinee fully opens 1E12-F053A and B (red light ON, Cooling Return Lines.
7 Aligns RHR injection through the Shutdown Cooling Return Lines.
green light OFF).
*1.3 Examinee fully opens 1E12-F053A and B (red light ON, green light OFF).
Note to examiner - to maximize injection, BOTH 1E12-F053A and B must be fully opened. Examinee verifies RPV Water Level rises after injection is maximized.
Note to examiner  
Cue: When examinee reports that LPCS, RHR A and RHR B are injecting at maximum flow to the RPV, acknowledge the report and cue the examinee that the JPM is complete.
- to maximize injection, BOTH 1E12
-F053A and B must be fully opened. Examinee verifies RPV Water Level rises after injection is maximized.
Cue: When examinee reports that LPCS , RHR 'A' and RHR 'B' are injecting at maximum flow to the RPV, acknowledge the report and cue the examinee that the JPM is complete.
TERMINATING CUES:
TERMINATING CUES:
RHR Pump 'A' and 'B' are running and injecting through the Shutdown Cooling lines to the RPV via 1E12-F053A and B IAW CPS No. 4411.03 Appendix A: RHR Injection/Flooding Flow Paths.
RHR Pump A and B are running and injecting through the Shutdown Cooling lines to the RPV via 1E12-F053A and B IAW CPS No. 4411.03 Appendix A: RHR Injection/Flooding Flow Paths.
STOP TIME:
STOP TIME:
Page 7 of 7


CLINTON POWER STATION Job Performance Measure Turbine On Line Tests JPM Number: JPM517 Revision Number: 0 1 Date: 06/25/201 5 Developed By:
CLINTON POWER STATION Job Performance Measure Turbine On Line Tests JPM Number: JPM517 Revision Number: 01 Date: 06/25/2015 Developed By: Tony Jennings                 06/25/15 Instructor                     Date Validated By: /s Mike Antonelli             7/16/15 SME or Instructor             Date Reviewed By:
Tony Jennings 06/25/15   Instructor Date Validated By:
Operations Representative     Date Approved By:
/s Mike Antonelli 7/16/15   SME or Instructor Date Reviewed By:
Training Department           Date
Operations Representative Date Approved By:
 
Training Department Date JPM Number:
JPM Number: CR JPM c. Rev 01 Clinton Power Station Job Performance Measure (JPM)
C R J P M c. Rev 0 1  Clinton Power Station Job Performance Measure (JPM)
READ TO THE OPERATOR I will explain the initial conditions, which step(s) to simulate or discuss, and provide the initiating cues. When you complete the task successfully, the objective of this Job Performance Measure will be satisfied.
Page 2 of 7 READ TO THE OPERATOR I will explain the initial conditions, which step(s) to simulate or discuss, and provide the initiating cues. When you complete the task successfully, the objective of this Job Performance Measure will be satisfied.
TASK STANDARDS:
TASK STANDARDS
* CPS 3812.01 Rev. 16a, Turbine On Line Tests, Section 8.1 suspended, and the electrical trip circuitry reset.
CPS 3812.01 Rev. 1 6a, Turbine On Line Tests, Section 8.1 suspended, and the electrical trip circuitry reset.
TOOLS, EQUIPMENT, OTHER SPECIAL REQUIREMENTS:
TOOLS, EQUIPMENT, OTHER SPECIAL REQUIREMENTS:
None PROCEDURAL/
* None PROCEDURAL/


==REFERENCES:==
==REFERENCES:==
 
* CPS 3812.01 Rev. 16a, Turbine On Line Tests
CPS 3812.01 Rev. 1 6a, Turbine On Line Tests CPS 3105.01 Rev.
* CPS 3105.01 Rev. 41a, Turbine (TG, EHC, TS)
41a, Turbine (TG, EHC, TS)
EVALUATOR INSTRUCTIONS:
EVALUATOR INSTRUCTIONS:
Amplifying cues are provided within the JPM steps.
* Amplifying cues are provided within the JPM steps.
All pre-job briefings are completed.
* All pre-job briefings are completed.
Provide the examinee with a copy of
* Provide the examinee with a copy of:
: o Initial Conditions and Initiating Cue page (back page of the JPM) when providing the initiating cue.
o Initial Conditions and Initiating Cue page (back page of the JPM) when providing the initiating cue.
o Marked up copy of CPS 3812.01 Rev. 16a, Turbine On Line Tests.
o Marked up copy of CPS 3812.01 Rev. 16a, Turbine On Line Tests.
Page 2 of 7


JPM Number:
JPM Number: CR JPM c. Rev 01 Clinton Power Station Job Performance Measure (JPM)
C R J P M c. Rev 0 1  Clinton Power Station Job Performance Measure (JPM)
INITIAL CONDITIONS:
Page 3 of 7 INITIAL CONDITIONS:
You are the B RO.
You are the B RO.
The plant is in Mode 1 with the Main Turbine synchronized to the grid
The plant is in Mode 1 with the Main Turbine synchronized to the grid.
.  
 
CPS 3812.01, Turbine On Line Tests is scheduled to be performed.
CPS 3812.01, Turbine On Line Tests is scheduled to be performed.
All prerequisites for CPS 3812.01 Turbine On Line Tests Section 8.1 Electrical Trip Test and Section 8.2 BOST Test are complete.
All prerequisites for CPS 3812.01 Turbine On Line Tests Section 8.1 Electrical Trip Test and Section 8.2 BOST Test are complete.
Turbine Trips are NOT Disabled (NOT BYPASSED) per CPS 3105.01, Disabling Turbine Trips Using Global Bypass.
Turbine Trips are NOT Disabled (NOT BYPASSED) per CPS 3105.01, Disabling Turbine Trips Using Global Bypass.
 
Operators are stationed at Main Turbine Front Standard and at the first hit panel 1PA06J to reset annunciators.
Operators are stationed at Main Turbine Front Standard and at the first hit panel 1PA06J to reset annunciators. INITIATING CUE:
INITIATING CUE:
CAUTION All pre-job briefings are completed.
CAUTION All pre-job briefings are completed.
Perform CPS 3812.01, Turbine On Line Tests.
Perform CPS 3812.01, Turbine On Line Tests.
Report to the CRS after completing the task.
Report to the CRS after completing the task.
START TIME:
START TIME:
Page 3 of 7


JPM Number:
JPM Number: CR JPM c. Rev 01 Clinton Power Station Job Performance Measure (JPM)
C R J P M c. Rev 0 1  Clinton Power Station Job Performance Measure (JPM)
PERFORMANCE INFORMATION Critical steps are denoted with an asterisk (*) to the left of the step number and appear in BOLDED letters. Failure to meet the standards for a critical step constitutes failure of the Job Performance Measure. The sequence of steps is assumed unless denoted in the comments section of the JPM.
Page 4 of 7 PERFORMANCE INFORMATION Critical steps are denoted with an asterisk (*) to the left of the step number and appear in BOLDED letters. Failure to meet the standards for a critical step constitutes failure of the Job Performance Measure. The sequence of steps is assumed unless denoted in the comments section of the JPM.
PERFORMANCE STEPS CPS 3812.01, Turbine On Line Tests Section 8.1, Electrical Trip Test 8.1.1   Verify applicable prerequisites are met.
PERFORMANCE STEPS CPS 3812.01, Turbine On Line Tests Section 8.1, Electrical Trip Test 8.1.1 Verify applicable prerequisites are met.
Standard:           Examinee verifies applicable section 5.0 prerequisites are complete.
Standard: Examinee verifies applicable section 5.0 prerequisites are complete.
Cue:
Cue: Comments Examinee verifies 5.1
Comments           Examinee verifies 5.1-5.4, 5.8 and 5.9 complete.
-5.4, 5.8 and 5.9 complete.
SAT               UNSAT                   Comment Number 8.1.2   Verify Turbine Trips are NOT Disabled (NOT BYPASSED) per CPS 3105.01, Disabling Turbine Trips Using Global Bypass.
SAT   UNSAT   Comment Number 8.1.2 Verify Turbine Trips are NOT Disabled (NOT BYPASSED) per CPS 3105.01, Disabling Turbine Trips Using Global Bypass.
Standard:           No action required; provided in the initiating cue.
Standard: No action required; provided in the initiating cue.
Cue:
Cue: Comments   SAT   UNSAT   Comment Number
Comments SAT               UNSAT                   Comment Number Page 4 of 7


JPM Number:
JPM Number: CR JPM c. Rev 01 Clinton Power Station Job Performance Measure (JPM) 8.1.3 Observe the following:
C R J P M c. Rev 0 1  Clinton Power Station Job Performance Measure (JPM)
Page 5 of 7 8.1.3 Observe the following:
: 1. NORMAL light is ON
: 1. NORMAL light is ON
: 2. RESET light is ON
: 2. RESET light is ON
: 3. Remaining lights in ELECTRICAL TRIP TEST Group are OFF Standard: Examinee observes the following Electrical Trip Test lights on 1H13-P870-5018: 1. NORMAL light is ON.
: 3. Remaining lights in ELECTRICAL TRIP TEST Group are OFF Standard:       Examinee observes the following Electrical Trip Test lights on 1H13-P870-5018:
: 1. NORMAL light is ON.
: 2. RESET light is ON.
: 2. RESET light is ON.
: 3. Remaining lights in ELECTRICAL TRIP TEST Group are OFF.
: 3. Remaining lights in ELECTRICAL TRIP TEST Group are OFF.
Cue: Comments   SAT   UNSAT   Comment Number
Cue:
  *8.1.4 Depress and hold START TEST push
Comments SAT               UNSAT               Comment Number
-button 1. Observe NORMAL light goes OFF.
        *8.1.4 Depress and hold START TEST push-button
: 1. Observe NORMAL light goes OFF.
: 2. Observe LOCKED OUT light comes ON.
: 2. Observe LOCKED OUT light comes ON.
Standard: Examinee depresses and holds the Electrical Trip Test Start Test Pushbutton on 1H13-P870-5018 and verifies the following:
Standard:       Examinee depresses and holds the Electrical Trip Test Start Test Pushbutton on 1H13-P870-5018 and verifies the following:
NORMAL light goes OFF LOCKED OUT light comes ON Cue: All status lights and annunciators were received at P
* NORMAL light goes OFF
-680 and 1PA06J as expected.
* LOCKED OUT light comes ON Cue:           All status lights and annunciators were received at P-680 and 1PA06J as expected.
Comments   SAT   UNSAT   Comment Number
Comments SAT               UNSAT               Comment Number Page 5 of 7


JPM Number:
JPM Number: CR JPM c. Rev 01 Clinton Power Station Job Performance Measure (JPM)
C R J P M c. Rev 0 1  Clinton Power Station Job Performance Measure (JPM)
Begin Alternate Path 8.1.5 Release START TEST push-button. Observe the following sequence:
Page 6 of 7 Begin Alternate Path 8.1.5 Release START TEST push
-button. Observe the following sequence:
: 1. RESET light goes OFF, and TRIPPED light comes ON.
: 1. RESET light goes OFF, and TRIPPED light comes ON.
: 2. TRIPPED light goes OFF, and RESET light comes ON.
: 2. TRIPPED light goes OFF, and RESET light comes ON.
: 3. LOCKED OUT light goes OFF and NORMAL light comes ON.
: 3. LOCKED OUT light goes OFF and NORMAL light comes ON.
Standard: Examinee releases the Start Test push
Standard:       Examinee releases the Start Test push-button on 1H13-P870-5018 and observes the following:
-button on 1H13
* RESET light goes OFF, and
-P870-5018 and observes the following:
* TRIPPED light comes ON
RESET light goes OFF, and TRIPPED light comes ON Test Malfunction Light comes ON Cue: When the examinee reports the malfunction to the CRS, acknowledge the report , inform the examinee that troubleshooting is complete and direct the examinee to take necessary actions to move on to the next section of the test. If an Equipment Operator is sent to check status of the trip mechanism, report that the trip linkage is reset.
* Test Malfunction Light comes ON Cue:
Comments   SAT   UNSAT   Comment Number
* When the examinee reports the malfunction to the CRS, acknowledge the report, inform the examinee that troubleshooting is complete and direct the examinee to take necessary actions to move on to the next section of the test.
* If an Equipment Operator is sent to check status of the trip mechanism, report that the trip linkage is reset.
Comments SAT               UNSAT                   Comment Number Page 6 of 7


JPM Number:
JPM Number: CR JPM c. Rev 01 Clinton Power Station Job Performance Measure (JPM)
C R J P M c. Rev 0 1  Clinton Power Station Job Performance Measure (JPM)
              *6.1   If a malfunction occurs during performance of the Mechanical Overspeed Trip, the Mechanical Trip Piston or the Electrical Trip, THEN The test sequence stops before completion.
Page 7 of 7 *6.1 If a malfunction occurs during performance of the Mechanical Overspeed Trip, the Mechanical Trip Piston or the Electrical Trip, THEN The test sequence stops before completion.
Depressing the respective STOP - GO - NORMAL push-button will reset the system to normal, except in cases noted in section 8.3 and 8.4, Mechanical Overspeed Trip Test and Mechanical Trip Piston Test.
Depressing the respective STOP  
Standard:         Examinee depresses the Electrical Trip Test Stop Go Normal pushbutton, and verifies the following:
- GO - NORMAL push-button will reset the system to normal, except in cases noted in section 8.3 and 8.4, Mechanical Overspeed Trip Test and Mechanical Trip Piston Test.
* Test Malfunction light goes OFF
Standard: Examinee depresses the Electrical Trip Test Stop Go Normal pushbutton, and verifies the following:
* TRIPPED light goes OFF
Test Malfunction light goes OFF TRIPPED light goes OFF RESET light comes on LOCKED OUT light goes OFF NORMAL light comes on Cue: When the examinee reports the Electrical Trip Test Circuitry has been reset, acknowledge the report and cue the examinee that the JPM is complete. Comments   SAT   UNSAT   Comment Number TERMINATING CUES:
* RESET light comes on
Electrical Trip Test Circuitry for the Main Turbine is reset IAW CPS No. 3812.01 Turbine On Line Tests. STOP TIME:
* LOCKED OUT light goes OFF
* NORMAL light comes on Cue:               When the examinee reports the Electrical Trip Test Circuitry has been reset, acknowledge the report and cue the examinee that the JPM is complete.
Comments SAT               UNSAT                 Comment Number TERMINATING CUES:
Electrical Trip Test Circuitry for the Main Turbine is reset IAW CPS No. 3812.01 Turbine On Line Tests.
STOP TIME:
Page 7 of 7


Retain approved Master Copy per SRRS 3D.126/3D.111 CLINTON POWER STATION Job Performance Measure Perform a HPCS Pump Operability Test (Alternate Path)
CLINTON POWER STATION Job Performance Measure Perform a HPCS Pump Operability Test (Alternate Path)
JPM Number: JPM288 Revision Number: 01 Date: 8/4/14 Developed By:
JPM Number: JPM288 Revision Number: 01 Date: 8/4/14 Developed By:       Tony Jennings                   7/16/15 Instructor                     Date Validated By:       /s Mike Antonelli               7/16/15 SME or Instructor               Date Reviewed By:
Tony Jennings 7/16/15   Instructor Date Validated By:
Operations Representative       Date Approved By:
/s Mike Antonelli 7/16/15   SME or Instructor Date Reviewed By:
Training Department             Date Retain approved Master Copy per SRRS 3D.126/3D.111
Operations Representative Date Approved By:
 
Training Department Date JPM CR d - Rev 01 Clinton Power Station Job Performance Measure (JPM)
JPM CR d - Rev 01 Clinton Power Station Job Performance Measure (JPM)
Page 2 of 7 READ TO THE OPERATOR I will explain the initial conditions, which step(s) to simulate or discuss, and provide the initiating cues. When you complete the task successfully, the objective of this Job Performance Measure will be satisfied.
READ TO THE OPERATOR I will explain the initial conditions, which step(s) to simulate or discuss, and provide the initiating cues. When you complete the task successfully, the objective of this Job Performance Measure will be satisfied.
TASK STANDARDS
TASK STANDARDS:
HPCS Pump has been tripped due to loss of suction source.
* HPCS Pump has been tripped due to loss of suction source.
TOOLS, EQUIPMENT, OTHER SPECIAL REQUIREMENTS:
TOOLS, EQUIPMENT, OTHER SPECIAL REQUIREMENTS:
None PROCEDURAL/
* None PROCEDURAL/


==REFERENCES:==
==REFERENCES:==
* CPS No. 9051.01, Rev 47e HPCS Pump HPCS Water Leg Pump Operability
* CPS No. 9051.01D001, Rev 48 HPCS Pump HPCS Water Leg Pump Operability Data Sheet
* CPS No. 5062.04, Rev 27b Alarm Panel 5062 Annunciators - Row 4 EVALUATOR INSTRUCTIONS:
* Mark up CPS No. 9051.01, HPCS Pump & HPCS Water Leg Pump Operability up to and including step 8.2.7.1.
* Mark up CPS No. 9051.01D001, HPCS Pump & HPCS Water Leg Pump Operability Data Sheet up to and including any data collected up to step 8.2.7.1.
* Amplifying cues are provided within the JPM steps.
* All pre-job briefings are completed.
Page 2 of 7


CPS No. 9051.01, Rev 47e HPCS Pump HPCS Water Leg Pump Operability CPS No. 9051.01D001, Rev 48 HPCS Pump HPCS Water Leg Pump Operability Data Sheet CPS No. 5062.04 , Rev 27 b Alarm Panel 5062 Annunciators
JPM CR d - Rev 01 Clinton Power Station Job Performance Measure (JPM)
- Row 4 EVALUATOR INSTRUCTIONS:
INITIAL CONDITIONS:
Mark up CPS No. 9051.01, HPCS Pump & HPCS Water Leg Pump Operability up to and including step 8.2.7.1.
Mark up CPS No. 9051.01D001, HPCS Pump & HPCS Water Leg Pump Operability Data Sheet up to and including any data collected up to step 8.2.7.1.
Amplifying cues are provided within the JPM steps.
All pre-job briefings are completed.
 
JPM CR d - Rev 01 Clinton Power Station Job Performance Measure (JPM)
Page 3 of 7 INITIAL CONDITIONS:
You are the Extra RO assuming the shift. CPS 9051.01, HPCS Pump & HPCS Water Leg Pump Operability is in progress. An Equipment Operator is stationed locally at the HPCS Pump and has established communication with the Main Control Room.
You are the Extra RO assuming the shift. CPS 9051.01, HPCS Pump & HPCS Water Leg Pump Operability is in progress. An Equipment Operator is stationed locally at the HPCS Pump and has established communication with the Main Control Room.
INITIATING CUE:
INITIATING CUE:
Continue performing CPS 9051.01, HPCS Pump & HPCS Water Leg Pump Operability commencing at section 8.2.7.2.
Continue performing CPS 9051.01, HPCS Pump & HPCS Water Leg Pump Operability commencing at section 8.2.7.2.
Inform the CRS when section 8.2 is complete.
Inform the CRS when section 8.2 is complete.
START TIME:
START TIME:
Page 3 of 7


JPM CR d - Rev 01 Clinton Power Station Job Performance Measure (JPM)
JPM CR d - Rev 01 Clinton Power Station Job Performance Measure (JPM)
Page 4 of 7 PERFORMANCE INFORMATION Critical steps are denoted with an asterisk (*) to the left of the step number and appear in BOLDED letters. Failure to meet the standards for a critical step constitutes failure of the Job Performance Measure. The sequence of steps is assumed unless denoted in the comments section of the JPM.
PERFORMANCE INFORMATION Critical steps are denoted with an asterisk (*) to the left of the step number and appear in BOLDED letters. Failure to meet the standards for a critical step constitutes failure of the Job Performance Measure. The sequence of steps is assumed unless denoted in the comments section of the JPM.
9051.01 HPCS PUMP & HPCS WATER LEG PUMP OPERABILITY 8.2.7.2 Verify HPCS WATER LEG DISCHARGE PRESSURE LOW annunciator 5062
9051.01 HPCS PUMP & HPCS WATER LEG PUMP OPERABILITY 8.2.7.2       Verify HPCS WATER LEG DISCHARGE PRESSURE LOW annunciator 5062-7D is cleared.
-7D is cleared.
Standard:           Observes annunciator 5062-7D is not illuminated.
Standard: Observes annunciator 5062
Cue:
-7D is not illuminated.
Comments SAT               UNSAT                   Comment Number
Cue: Comments   SAT   UNSAT   Comment Number
      *8.2.7.3       Start HPCS Pump, 1E22-C001.
  *8.2.7.3 Start HPCS Pump, 1E22
Standard:           Operator places control switch for 1E22-C001 to the START position. Verifies RED light ON, GREEN light OFF. Observes HPCS motor current.
-C001. Standard: Operator places control switch for 1E22
Cue:
-C001 to the 'START' position. Verifies RED light ON, GREEN light OFF. Observes HPCS motor current.
Comments SAT               UNSAT                   Comment Number Page 4 of 7
Cue: Comments   SAT   UNSAT   Comment Number


JPM CR d - Rev 01 Clinton Power Station Job Performance Measure (JPM)
JPM CR d - Rev 01 Clinton Power Station Job Performance Measure (JPM) 8.2.7.4.1 Observe/perform (Record): Verify 1E22-F012, HPCS Pump Min Flow To Suppr Pool, indicates open.
Page 5 of 7 8.2.7.4.1 Observe/perform (Record):   Verify 1E22
Standard:     Observes RED light ON, GREEN light OFF for 1E22-F012. Records SAT for 1E22-F012 stroking open on the data sheet.
-F012, HPCS Pump Min Flow To Suppr Pool, indicates open.
Cue:
Standard: Observes RED light ON, GREEN light OFF for 1E22
Comments SAT               UNSAT               Comment Number
-F012. Records "SAT" for 1E22-F012 stroking open on the data sheet.
   *8.2.7.4.2 Alternately slowly throttle open both 1E22-F010 and 1E22-F011, HPCS First and Second Test Vlv To Storage Tank, and increase flow to ~ 5050 gpm as read on Comp Pt HP-DA301.
Cue: Comments   SAT   UNSAT   Comment Number
Standard:     Places both control switches for 1E22-F010 and 1E22-F011 to the throttle open position.
   *8.2.7.4.2 Alternately slowly throttle open both 1E22
Cue:         If examinee reports receipt of Annunciator 5062-4D, acknowledge report.
-F010 and 1E22
Comments     The suction line will start clogging when HPCS flow exceeds approximately 2000 gpm. HPCS Pump amps and flow will rapidly oscillate.
-F011, HPCS First and Second Test Vlv To Storage Tank, and increase flow to ~ 5050 gpm as read on Comp Pt HP
SAT               UNSAT               Comment Number Page 5 of 7
-DA301. Standard: Places both control switches for 1E22-F010 and 1E22
-F011 to the throttle open position. Cue: If examinee reports receipt of Annunciator 5062
-4D, acknowledge report.
Comments The suction line will start clogging when HPCS flow exceeds approximately 2000 gpm. HPCS Pump amps and flow will rapidly oscillate.
SAT   UNSAT   Comment Number


JPM CR d - Rev 01 Clinton Power Station Job Performance Measure (JPM)
JPM CR d - Rev 01 Clinton Power Station Job Performance Measure (JPM)
Page 6 of 7 BEGINS ALTERNATE PATH 5062-4D, HPCS PUMP SUCTION PRESSURE ABNORMAL NOTE: Steps 1 and 2 may be performed in any order.
BEGINS ALTERNATE PATH 5062-4D, HPCS PUMP SUCTION PRESSURE ABNORMAL NOTE: Steps 1 and 2 may be performed in any order.
: 1. Verify/establish an available HPCS Suction Path (1E22
: 1.       Verify/establish an available HPCS Suction Path (1E22-F001 preferred unless RCIC Tank/Suction Piping is not available) per CPS 3309.01, High Pressure Core Spray (HPCS). Refer to CPS 3309.01 (HPCS) CLOC PRECAUTION criteria.
-F001 preferred unless RCIC Tank/Suction Piping is not available) per CPS 3309.01, High Pressure Core Spray (HPCS). Refer to CPS 3309.01 (HPCS) CLOC PRECAUTION criteria.
Standard:     Verifies 1E22-F001 is full open.
Standard: Verifies 1E22
Cue:
-F001 is full open.
Comments SAT               UNSAT                 Comment Number
Cue: Comments   SAT   UNSAT   Comment Number
      *2       If HPCS pump is running for testing, and normal suction pressure was not restored by the previous step, trip the HPCS pump.
  *2 If HPCS pump is running for testing, and normal suction pressure was not restored by the previous step, trip the HPCS pump.
Standard:     Examinee trips the HPCS Pump using the associated control switch.
Standard: Examinee trips the HPCS Pump using the associated control switch.
Cue:           If an operator is dispatched to investigate, cue the examinee that loud surging noises are coming from the HPCS Pump.
Cue: If an operator is dispatched to investigate, cue the examinee that loud 'surging' noises are coming from the HPCS Pump.
Comments SAT               UNSAT                 Comment Number Page 6 of 7
Comments   SAT   UNSAT   Comment Number


JPM CR d - Rev 01 Clinton Power Station Job Performance Measure (JPM)
JPM CR d - Rev 01 Clinton Power Station Job Performance Measure (JPM)
Page 7 of 7  Informs Control Room Supervisor.
Informs Control Room Supervisor.
Standard: Informs Control Room Supervisor the HPCS was tripped per Annunciator Response Procedure.
Standard:       Informs Control Room Supervisor the HPCS was tripped per Annunciator Response Procedure.
Cue: Acknowledge the report. State JPM is complete.
Cue:           Acknowledge the report. State JPM is complete.
Comments 1. SAT   UNSAT   Comment Number
Comments               1.
SAT               UNSAT               Comment Number TERMINATING CUES:
HPCS Pump has been tripped due to loss of suction source.
STOP TIME:
Page 7 of 7


TERMINATING CUES:
CLINTON POWER STATION Job Performance Measure Manually Perform a Group 1 Isolation (Alternate Path)
HPCS Pump has been tripped due to loss of suction source.
JPM Number: JPM219 Revision Number: 03 Date: 6/29/15 Developed By:      Tony Jennings                  6/29/15 Instructor                      Date Validated By:      /s Mike Antonelli              7/16/15 SME or Instructor              Date Reviewed By:
STOP TIME: 
Operations Representative      Date Approved By:
Training Department            Date Retain approved Master Copy per SRRS 3D.126/3D.111


Retain approved Master Copy per SRRS 3D.126/3D.111 CLINTON POWER STATION Job Performance Measure Manually Perform a Group 1 Isolation (Alternate Path)
JPM Number: CR JPM e Rev 03 Clinton Power Station Job Performance Measure (JPM)
JPM Number: JPM219 Revision Number: 0 3 Date:  6/29/15 Developed By:
READ TO THE OPERATOR I will explain the initial conditions, which step(s) to simulate or discuss, and provide the initiating cues. When you complete the task successfully, the objective of this Job Performance Measure will be satisfied.
Tony Jennings 6/29/15  Instructor Date  Validated By:
TASK STANDARDS:
/s Mike Antonelli  7/16/15  SME or Instructor Date  Reviewed By:
* Manually isolates Group 1 Primary Containment Isolation Valves (Main Steam Lines and Drains) per 4001.02C001 Automatic Isolation Checklist or CPS 3101.01 Main Steam (MS, IS
Operations Representative Date  Approved By:
        & ADS).
Training Department Date JPM Number:
TOOLS, EQUIPMENT, OTHER SPECIAL REQUIREMENTS:
C R J P M e R e v 0 3  Clinton Power Station Job Performance Measure (JPM)
* None PROCEDURAL/
Page 2 of 5 READ TO THE OPERATOR I will explain the initial conditions, which step(s) to simulate or discuss, and provide the initiating cues. When you complete the task successfully, the objective of this Job Performance Measure will be satisfied.
TASK STANDARDS
Manually isolates Group 1 Primary Containment Isolation Valves (Main Steam Lines and Drains) per 4001.02C001 Automatic Isolation Checklist or CPS 3101.01 Main Steam (MS, IS & ADS). TOOLS, EQUIPMENT, OTHER SPECIAL REQUIREMENTS: None PROCEDURAL/


==REFERENCES:==
==REFERENCES:==
* CPS No. 3101.01, Rev 23b MAIN STEAM
* CPS No. 4001.02, Rev 17c AUTOMATIC ISOLATION
* CPS No. 4001.02C001, Rev 16 AUTOMATIC ISOLATION CHECKLIST EVALUATOR INSTRUCTIONS:
* Amplifying cues are provided within the JPM steps.
* All pre-job briefings are completed.
* Prior to reading Initial Conditions and Initiating Cue, place Simulator in RUN.
Page 2 of 5


CPS No. 3101.01, Rev 23b MAIN STEAM CPS No. 4001.
JPM Number: CR JPM e Rev 03 Clinton Power Station Job Performance Measure (JPM)
02, Rev 17c AUTOMATIC ISOLATION CPS No. 4001.02C001, Rev 16 AUTOMATIC ISOLATION CHECKLIST EVALUATOR INSTRUCTIONS:
INITIAL CONDITIONS:
Amplifying cues are provided within the JPM steps.
A Group 1 isolation signal has been received due to low condenser vacuum.
All pre-job briefings are completed.
INITIATING CUE:
Prior to reading Initial Conditions and Initiating Cue, place Simulator in RUN.
CAUTION All pre-job briefings are completed.
 
JPM Number:
C R J P M e R e v 0 3  Clinton Power Station Job Performance Measure (JPM)
Page 3 of 5 INITIAL CONDITIONS:
A Group 1 isolation signal has been received due to low condenser vacuum
. INITIATING CUE:
CAUTION All pre-job briefings are completed.
The CRS has directed you to verify a complete Group 1 isolation.
The CRS has directed you to verify a complete Group 1 isolation.
START TIME:
START TIME:
Page 3 of 5


JPM Number:
JPM Number: CR JPM e Rev 03 Clinton Power Station Job Performance Measure (JPM)
C R J P M e R e v 0 3  Clinton Power Station Job Performance Measure (JPM)
PERFORMANCE INFORMATION Critical steps are denoted with an asterisk (*) to the left of the step number and appear in BOLDED letters. Failure to meet the standards for a critical step constitutes failure of the Job Performance Measure. The sequence of steps is assumed unless denoted in the comments section of the JPM.
Page 4 of 5 PERFORMANCE INFORMATION Critical steps are denoted with an asterisk (*) to the left of the step number and appear in BOLDED letters. Failure to meet the standards for a critical step constitutes failure of the Job Performance Measure. The sequence of steps is assumed unless denoted in the comments section of the JPM.
PERFORMANCE STEPS 4001.02 Automatic Isolation, 4001.02C001 Automatic Isolation Checklist, CPS 3101.01 Main Steam (MS, IS & ADS) Appendix A: Group 1 Isolation and MSL Drains Usage Hard Card NOTE: The following steps may be performed in any order. The examinee may elect to use the Main Steam, Appendix A Hard Card.
PERFORMANCE STEPS 4001.02 Automatic Isolation, 4001.02C001 Automatic Isolation Checklist, CPS 3101.01 Main Steam (MS, IS & ADS) Appendix A: Group 1 Isolation and MSL Drains Usage Hard Card NOTE: The following steps may be performed in any order. The examinee may elect to use the Main Steam, Appendix A Hard Card.
Comment STEP       ELEMENT                                     STANDARD                                   SAT   UNSAT Number 1         Complete CPS            *Examinee takes control switch at 1H13-P601 (5066 / 5067) 4001.02C001              to shut (red light OFF, green light ON) for:
STEP ELEMENT STANDARD SAT UNSAT Comment Number 1    
Automatic Isolation Checklist for Group 1
* 1B21-F022B (fails to close) and / or 1B21-F028B (fails Valves or CPS                  to close) Main Steam Line B Inbd / Outbd MSIV 3101.01 App A: Group
* 1B21-F022D and / or 1B21-F028D Main Steam Line 1 Isolation And MSL              D Inbd / Outbd MSIV Drains Usage Hard Card.
* 1B21-F022A and / or 1B21-F028A Main Steam Line A Inbd / Outbd MSIV
* 1B21-F022C and / or 1B21-F028C Main Steam Line C Inbd / Outbd MSIV Note to evaluator - only one valve in each line must be shut to meet the critical step.
Cue: If the examinee reports that 1B21-F022B and/or 28B have failed to close, acknowledge the report.
Cue: If the examinee asks for guidance, ask the examinee for a recommendation and direct the examinee to proceed as recommended.
Page 4 of 5


Complete CPS 4001.02C001 Automatic Isolation Checklist for Group 1 Valves or CPS 3101.01 App A: Group 1 Isolation And MSL Drains Usage Hard Card.     
JPM Number: CR JPM e Rev 03 Clinton Power Station Job Performance Measure (JPM)
*Examinee takes control switch at 1H13
Comment STEP         ELEMENT                                     STANDARD                                     SAT   UNSAT Number Examinee observes red light OFF and green light ON at 1H13-1 (contd)  Complete CPS            P601 (5066 / 5067) for each of the following valves:
-P601 (5066 / 5067) to shut (red light OFF, green light ON) for:
4001.02C001 Automatic Isolation
1B21-F022B (fails to close) and / or 1B21
* 1B21-F016 Mn Drn & MSIV Byp Inbd Isol Valve Checklist for Group 1
-F028B (fails to close) Main Steam Line B Inbd / Outbd MSIV 1B21-F022D and / or 1B21
* 1B21-F019 Mn Drn & MSIV Byp Outbd Isol Valve Valves or CPS 3101.01 App A: Group
-F028D Main Steam Line D Inbd / Outbd MSIV 1B21-F022A and / or 1B21
* 1B21-F067B MSL B Outbd MSIV Before Seat Drn Vlv 1 Isolation And MSL
-F028A Main Steam Line A Inbd / Outbd MSIV 1B21-F022C and / or 1B21
* 1B21-F067D MSL D Outbd MSIV Before Seat Drn Vlv Drains Usage Hard Card. (contd)
-F028C Main Steam Line C Inbd / Outbd MSIV Note to evaluator
* 1B21-F067A MSL A Outbd MSIV Before Seat Drn Vlv
- only one valve in each line must be shut to meet the critical step.
* 1B21-F067C MSL C Outbd MSIV Before Seat Drn Vlv Begin Alternate Path 2           Isolate the B Main   *Examinee takes control switch at 1H13-P601-5067 to shut Steam Line              for 1B21-F098B Main Steam Line B Shutoff Valve and verifies red light OFF and green light ON.
Cue: If the examinee reports that 1B21
Note to evaluator - Examinee may elect to Arm & Depress CRVICS MANUAL INITIATION push-button(s) (Logic A & D push-buttons and/or Logic B & C push-buttons) on 1H13-P680-5006). These actions will fail to isolate the B Main Steam Line.
-F022B and/or 28B have failed to close, acknowledge the report.
Cue: If the examinee reports that the B MSL has been isolated, acknowledge the report and state, The JPM is complete.
Cue: If the examinee asks for guidance, ask the examinee for a recommendation and direct the examinee to proceed as recommended
.
JPM Number:
C R J P M e R e v 0 3  Clinton Power Station Job Performance Measure (JPM)
Page 5 of 5 STEP ELEMENT STANDARD SAT UNSAT Comment Number 1 (cont'd)  Complete CPS 4001.02C001
 
Automatic Isolation Checklist for Group 1 Valves or CPS 3101.01 App A: Group 1 Isolation And MSL Drains Usage Hard Card. (cont'd) Examinee observes red light OFF and green light ON at 1H13-P601 (5066 / 5067) for each of the following valves
1B21-F016 Mn Drn & MSIV Byp Inbd Isol Valve 1B21-F019 Mn Drn & MSIV Byp Outbd Isol Valve 1B21-F067B MSL B Outbd MSIV Before Seat Drn Vlv 1B21-F067D MSL D Outbd MSIV Before Seat Drn Vlv 1B21-F067A MSL A Outbd MSIV Before Seat Drn Vlv 1B21-F067C MSL C Outbd MSIV Before Seat Drn Vlv Begin Alternate Path 2 Isolate the 'B' Main Steam Line
*Examinee takes control switch at 1H13
-P601-5067 to shut for 1B21-F098B Main Steam Line B Shutoff Valve and verifies red light OFF and green light ON
. Note to evaluator  
- Examinee may elect to Arm & Depress CRVICS MANUAL INITIATION push
-button(s) (Logic A & D push-buttons and/or Logic B & C push
-buttons) on 1H13
-P680-5006). These actions will fail to isolate the 'B' Main Steam Line.
Cue: If the examinee reports that the 'B' MSL has been isolated, acknowledge the report and state, "The JPM is complete".
TERMINATING CUES:
TERMINATING CUES:
Manually isolates Group 1 Primary Containment Isolation Valves (Main Steam Lines and Drains) per 4001.02C001 Automatic Isolation Checklist or CPS 3101.01 Main Steam (MS, IS & ADS).
Manually isolates Group 1 Primary Containment Isolation Valves (Main Steam Lines and Drains) per 4001.02C001 Automatic Isolation Checklist or CPS 3101.01 Main Steam (MS, IS & ADS).
STOP TIME:
STOP TIME:
Page 5 of 5
 
CLINTON POWER STATION Job Performance Measure Perform a Manual Scram Functional/SDV Hi Level Bypass Test JPM Number: JPM519 Revision Number: 01 Date: 06/26/2015 Developed By:          W. D. Kiser                      06/26/15 Instructor                        Date Validated By:        /s Mike Antonelli                7/16/15 SME or Instructor                Date Reviewed By:
Operations Representative        Date Approved By:
Training Department              Date Retain approved Master Copy per SRRS 3D.126/3D.111


Retain approved Master Copy per SRRS 3D.126/3D.111 CLINTON POWER STATION Job Performance Measure Perform a Manual Scram Functional/SDV Hi Level Bypass Test JPM Number: JPM519 Revision Number: 0 1 Date:  06/26/2015 Developed By:
JPM Number: CR JPM f. - rev 01 Clinton Power Station Job Performance Measure (JPM)
W. D. Kiser 06/26/15  Instructor Date  Validated By:
READ TO THE OPERATOR I will explain the initial conditions, which step(s) to simulate or discuss, and provide the initiating cues. When you complete the task successfully, the objective of this Job Performance Measure will be satisfied.
/s Mike Antonelli  7/16/15  SME or Instructor Date  Reviewed By:
TASK STANDARDS:
Operations Representative Date  Approved By:
* The Manual Scram Functional / SDV Hi Level Bypass Test completed.
Training Department Date JPM Number:
CR JPM f. - rev 0 1  Clinton Power Station Job Performance Measure (JPM)
Page 2 of 12 READ TO THE OPERATOR I will explain the initial conditions, which step(s) to simulate or discuss, and provide the initiating cues. When you complete the task successfully, the objective of this Job Performance Measure will be satisfied.
TASK STANDARDS
The Manual Scram Functional / SDV Hi Level Bypass Test completed.
TOOLS, EQUIPMENT, OTHER SPECIAL REQUIREMENTS:
TOOLS, EQUIPMENT, OTHER SPECIAL REQUIREMENTS:
None PROCEDURAL/
* None PROCEDURAL/


==REFERENCES:==
==REFERENCES:==
 
* CPS 9031.16, Manual Scram Functional / SDV Hi Level Bypass Test, Rev. 31a EVALUATOR INSTRUCTIONS:
CPS 9031.16, Manual Scram Functional
* Amplifying cues are provided within the JPM steps.
/ SDV Hi Level Bypass Test, Rev. 3 1a EVALUATOR INSTRUCTIONS:
* All pre-job briefings are completed.
Amplifying cues are provided within the JPM steps.
* Provide the examinee with the following items:
All pre-job briefings are completed.
Provide the examinee with the following items:
o A copy of the Initial Conditions and Initiating Cue page (back page of the JPM) when providing the initiating cue.
o A copy of the Initial Conditions and Initiating Cue page (back page of the JPM) when providing the initiating cue.
o Copy of the OD
o Copy of the OD-7 printout obtained during simulator setup.
-7 printout obtained during simulator setup.
Page 2 of 12


JPM Number:
JPM Number: CR JPM f. - rev 01 Clinton Power Station Job Performance Measure (JPM)
CR JPM f. - rev 0 1  Clinton Power Station Job Performance Measure (JPM)
INITIAL CONDITIONS:
Page 3 of 12 INITIAL CONDITIONS:
You are an extra RO in the MCR.
You are an extra RO in the MCR.
The plant is in Mode 1.
The plant is in Mode 1.
All Prerequisites for CPS 9031.16, Manual Scram Functional / SDV Hi Level Bypass Test have been completed. 'A' and 'B' Scram Solenoid Temperatures on all withdrawn control rods have been verified > ambient temperature locally.
All Prerequisites for CPS 9031.16, Manual Scram Functional / SDV Hi Level Bypass Test have been completed.
A and B Scram Solenoid Temperatures on all withdrawn control rods have been verified >
ambient temperature locally.
An SRO is available and stationed to provide TT data when requested.
An SRO is available and stationed to provide TT data when requested.
INITIATING CUE:
INITIATING CUE:
CAUTION All pre-job briefings are completed.
CAUTION All pre-job briefings are completed.
Perform CPS 9031.16, Manual Scram Channel Functional / SDV Hi Level Bypass Test for Division 1, beginning at Step 8.1.
Perform CPS 9031.16, Manual Scram Channel Functional / SDV Hi Level Bypass Test for Division 1, beginning at Step 8.1.3.
: 3. Report to the CRS after completing the task.
Report to the CRS after completing the task.
START TIME:
START TIME:
Page 3 of 12


JPM Number:
JPM Number: CR JPM f. - rev 01 Clinton Power Station Job Performance Measure (JPM)
CR JPM f. - rev 0 1  Clinton Power Station Job Performance Measure (JPM)
PERFORMANCE INFORMATION Critical steps are denoted with an asterisk (*) to the left of the step number and appear in BOLDED letters. Failure to meet the standards for a critical step constitutes failure of the Job Performance Measure. The sequence of steps is assumed unless denoted in the comments section of the JPM.
Page 4 of 12 PERFORMANCE INFORMATION Critical steps are denoted with an asterisk (*) to the left of the step number and appear in BOLDED letters. Failure to meet the standards for a critical step constitutes failure of the Job Performance Measure. The sequence of steps is assumed unless denoted in the comments section of the JPM.
PERFORMANCE STEPS CPS 9031.16, Manual Scram Channel Functional / SDV Hi Level Bypass Test 8.1 Division 1 Manual Scram Functional Test
PERFORMANCE STEPS CPS 9031.16, Manual Scram Channel Functional / SDV Hi Level Bypass Test 8.1 Division 1 Manual Scram Functional Test
*8.1.3 Place Div 1 MANUAL SCRAM switch collar in ARM.
            *8.1.3   Place Div 1 MANUAL SCRAM switch collar in ARM.
Standard: At 1H13-P680-5004, the examinee rotates the Div 1 MANUAL SCRAM switch collar to the "ARM" position.
Standard:           At 1H13-P680-5004, the examinee rotates the Div 1 MANUAL SCRAM switch collar to the ARM position.
Cue: If the examinee reports receipt of expected annunciator 5004
Cue:               If the examinee reports receipt of expected annunciator 5004-2E, acknowledge the report.
-2E, acknowledge the report. Comments   SAT   UNSAT   Comment Number 8.1.4 Verify annunciator DIV 1 OR 4 MAN SCRAM SW ARMED
Comments SAT               UNSAT                   Comment Number 8.1.4   Verify annunciator DIV 1 OR 4 MAN SCRAM SW ARMED [5004-2E] alarming.
[5004-2E] alarming.
Standard:           At 1H13-P680-5004, the examinee verifies annunciator 5004-2E DIV 1 OR 4 MAN SCRAM SW ARMED is alarming.
Standard: At 1H13-P680-5004, the examinee verifies annunciator 5004
Cue:               If the examinee reports receipt of expected annunciator 5004-2E, acknowledge the report.
-2E DIV 1 OR 4 MAN SCRAM SW ARMED is alarming. Cue: If the examinee reports receipt of expected annunciator 5004
Comments SAT               UNSAT                   Comment Number Page 4 of 12
-2E, acknowledge the report. Comments   SAT   UNSAT   Comment Number


JPM Number:
JPM Number: CR JPM f. - rev 01 Clinton Power Station Job Performance Measure (JPM)
CR JPM f. - rev 0 1  Clinton Power Station Job Performance Measure (JPM)
        *8.1.5 Momentarily depress Div 1 MANUAL SCRAM pushbutton.
Page 5 of 12 *8.1.5 Momentarily depress Div 1 MANUAL SCRAM pushbutton.
Standard:       At 1H13-P680-5004, the examinee momentarily depresses the Div 1 MANUAL SCRAM pushbutton.
Standard: At 1H13-P680-5004, the examinee momentarily depresses the Div 1 MANUAL SCRAM pushbutton
Cue:           If the examinee reports receipt of annunciators 5002-2P, 5004-1A, 5004-1E and/or 5009-5B, acknowledge the report.
. Cue: If the examinee reports receipt of annunciators 5002-2P, 5004-1A , 5004-1E and/or 5009-5B, acknowledge the report.
Comments SAT               UNSAT               Comment Number 8.1.6 Verify following status lights not lit.
Comments   SAT   UNSAT   Comment Number 8.1.6 Verify following status lights not lit.
: 1. Div 1 SCRAM SOL ENERGIZED A
: 1. Div 1 SCRAM SOL ENERGIZED A
: 2. Div 2 SCRAM SOL ENERGIZED B
: 2. Div 2 SCRAM SOL ENERGIZED B
: 3. Div 3 SCRAM SOL ENERGIZED B
: 3. Div 3 SCRAM SOL ENERGIZED B
: 4. Div 4 SCRAM SOL ENERGIZED A Standard: At 1H13-P680-5004 & 5005, the examinee verifies the listed Scram Solenoid status lights are OFF:
: 4. Div 4 SCRAM SOL ENERGIZED A Standard:       At 1H13-P680-5004 & 5005, the examinee verifies the listed Scram Solenoid status lights are OFF:
: 1. Div 1 SCRAM SOL ENERGIZED A
: 1. Div 1 SCRAM SOL ENERGIZED A
: 2. Div 2 SCRAM SOL ENERGIZED B
: 2. Div 2 SCRAM SOL ENERGIZED B
: 3. Div 3 SCRAM SOL ENERGIZED B
: 3. Div 3 SCRAM SOL ENERGIZED B
: 4. Div 4 SCRAM SOL ENERGIZED A Cue: Comments   SAT   UNSAT   Comment Number
: 4. Div 4 SCRAM SOL ENERGIZED A Cue:
Comments SAT               UNSAT               Comment Number Page 5 of 12


JPM Number:
JPM Number: CR JPM f. - rev 01 Clinton Power Station Job Performance Measure (JPM) 8.1.7 Verify Div 1 RESET PERMISSIVE status light lit (after ~ 10 sec).
CR JPM f. - rev 0 1  Clinton Power Station Job Performance Measure (JPM)
Standard:       At 1H13-P680-5004, the examinee verifies the Div 1 RESET PERMISSIVE status light is ON (approximately 10 seconds after the Div 1 Manual Scram pushbutton was released).
Page 6 of 12  8.1.7 Verify Div 1 RESET PERMISSIVE status light lit (after ~ 10 sec).
Cue:
Standard: At 1H13-P680-5004, the examinee verifies the Div 1 RESET PERMISSIVE status light is ON (approximately 10 seconds after the Div 1 Manual Scram pushbutton was released).
Comments       The time component (~ 10 sec) is not meant to be measured. It is only there as a guide for the operator to know that the change in state of the status light will be delayed.
Cue: Comments The time component (~ 10 sec) is not meant to be measured. It is only there as a guide for the operator to know that the change in state of the status light will be delayed. SAT   UNSAT   Comment Number 8.1.8 Verify following annunciators alarming.
SAT               UNSAT                 Comment Number 8.1.8 Verify following annunciators alarming.
: 1. DIV 1 HALF SCRAM IA, IIB, IIIB, IVA [5004
: 1. DIV 1 HALF SCRAM IA, IIB, IIIB, IVA [5004-1A]
-1A] 2. DIV 1 MANUAL SCRAM TRIP [5004
: 2. DIV 1 MANUAL SCRAM TRIP [5004-1E]
-1E] 3. RX WTR LVL CONT SYS ALARM [5002
: 3. RX WTR LVL CONT SYS ALARM [5002-2P](FW-MAN-SCRAM-IN1 input)
-2P](FW-MAN-SCRAM-IN1 input)
Standard:       At 1H13-P680-5004, the examinee verifies Annunciators 5004-1A, 5004-1E and 5002-2P in alarm.
Standard: At 1H13-P680-5004, the examinee verifies Annunciators 5004
Cue:
-1A , 5004-1E and 500 2-2P in alarm. Cue: Comments   SAT   UNSAT   Comment Number
Comments SAT               UNSAT                 Comment Number Page 6 of 12


JPM Number:
JPM Number: CR JPM f. - rev 01 Clinton Power Station Job Performance Measure (JPM) 8.1.9 Verify following computer points TRIPPED.
CR JPM f. - rev 0 1  Clinton Power Station Job Performance Measure (JPM)
Page 7 of 12  8.1.9 Verify following computer points TRIPPED.
: 1. C71DC013, MAN SCRAM TRIP SYS 1/4
: 1. C71DC013, MAN SCRAM TRIP SYS 1/4
: 2. C71NC005, MANUAL SCRAM DIV 1 OR 4
: 2. C71NC005, MANUAL SCRAM DIV 1 OR 4
: 3. C71NC029, 1/2 SCRM IA, IIB, IIIB, IVA Standard: At 1H13-P680-5009, the examinee pulls up computer points C71DC013, C71NC005, and C71NC029 and verifies they indicate tripped.
: 3. C71NC029, 1/2 SCRM IA, IIB, IIIB, IVA Standard:       At 1H13-P680-5009, the examinee pulls up computer points C71DC013, C71NC005, and C71NC029 and verifies they indicate tripped.
Cue: Comments   SAT   UNSAT   Comment Number 8.1.1 0 Verify TT Channel 286 (SCRAMD1) tripped (~ +5 vdc).
Cue:
Standard: Examinee verifies that TT Channel 286 (SCRAMD1) is reading ~ +5 vdc. Cue: Cue the examinee that TT Channel 286 is reading +5 vdc.
Comments SAT             UNSAT               Comment Number 8.1.10 Verify TT Channel 286 (SCRAMD1) tripped (~ +5 vdc).
Comments   SAT   UNSAT   Comment Number
Standard:       Examinee verifies that TT Channel 286 (SCRAMD1) is reading ~ +5 vdc.
  *8.1.1 1 Momentarily depress Div 1 SCRAM RESET pushbutton.
Cue:           Cue the examinee that TT Channel 286 is reading +5 vdc.
Standard: At 1H13-P680-5004, the examinee momentarily depresses the Div 1 SCRAM RESET pushbutton
Comments SAT             UNSAT               Comment Number
. Cue: If examinee announces that 5002-2P, 5004-1A and 5004-1E are reset, acknowledge the examinee.
        *8.1.11 Momentarily depress Div 1 SCRAM RESET pushbutton.
Comments   SAT   UNSAT   Comment Number
Standard:       At 1H13-P680-5004, the examinee momentarily depresses the Div 1 SCRAM RESET pushbutton.
Cue:           If examinee announces that 5002-2P, 5004-1A and 5004-1E are reset, acknowledge the examinee.
Comments SAT             UNSAT               Comment Number Page 7 of 12


JPM Number:
JPM Number: CR JPM f. - rev 01 Clinton Power Station Job Performance Measure (JPM) 8.1.12 Verify DIV 1 RESET PERMISSIVE status light not lit.
CR JPM f. - rev 0 1  Clinton Power Station Job Performance Measure (JPM)
Standard:       At 1H13-P680-5004, the examinee verifies the DIV 1 RESET PERMISSIVE status light is OFF.
Page 8 of 12 8.1.1 2 Verify DIV 1 RESET PERMISSIVE status light not lit.
Cue:
Standard: At 1H13-P680-5004, the examinee verifies the DIV 1 RESET PERMISSIVE status light is OFF. Cue: Comments   SAT   UNSAT   Comment Number 8.1.1 3 Verify following annunciators reset.
Comments SAT               UNSAT             Comment Number 8.1.13 Verify following annunciators reset.
: 1. DIV 1 HALF SCRAM IA, IIB, IIIB, IVA [5004
: 1. DIV 1 HALF SCRAM IA, IIB, IIIB, IVA [5004-1A]
-1A] 2. DIV 1 MANUAL SCRAM TRIP [5004
: 2. DIV 1 MANUAL SCRAM TRIP [5004-1E]
-1E] 3. RX WTR LVL CONT SYS ALARM [5002
: 3. RX WTR LVL CONT SYS ALARM [5002-2P](FW-MAN-SCRAM-IN1 input)
-2P](FW-MAN-SCRAM-IN1 input)
Standard:       At 1H13-P680-5004, the examinee verifies annunciators 5004-1A, 5004-1E and 5002-2P are reset.
Standard: At 1H13-P680-5004, the examinee verifies annunciators 5004
Cue:           If examinee announces that 5002-2P, 5004-1A and 5004-1E are reset, acknowledge the examinee.
-1A , 5004-1E and 500 2-2P are reset.
Comments SAT               UNSAT             Comment Number Page 8 of 12
Cue: If examinee announces that 5002-2P, 5004-1A and 5004-1E are reset, acknowledge the examinee.
Comments   SAT   UNSAT   Comment Number


JPM Number:
JPM Number: CR JPM f. - rev 01 Clinton Power Station Job Performance Measure (JPM) 8.1.14 Verify following computer points RESET.
CR JPM f. - rev 0 1  Clinton Power Station Job Performance Measure (JPM)
Page 9 of 12  8.1.1 4 Verify following computer points RESET.
: 1. C71DC013, MAN SCRAM TRIP SYS 1/4
: 1. C71DC013, MAN SCRAM TRIP SYS 1/4
: 2. C71NC005, MANUAL SCRAM DIV 1 OR 4
: 2. C71NC005, MANUAL SCRAM DIV 1 OR 4
: 3. C71NC029, 1/2 SCRM IA, IIB, IIIB, IVA Standard: At 1H13-P680-5009, the examinee pulls up computer points C71DC013, C71NC005, and C71NC029 and verifies they indicate RESET.
: 3. C71NC029, 1/2 SCRM IA, IIB, IIIB, IVA Standard:       At 1H13-P680-5009, the examinee pulls up computer points C71DC013, C71NC005, and C71NC029 and verifies they indicate RESET.
Cue: Comments   SAT   UNSAT   Comment Number 8.1.1 5 Verify TT Channel 286 (SCRAMD1) reset (~  
Cue:
-5 vdc). Standard: Examinee verifies that TT Channel 286 (SCRAMD1) is reading ~  
Comments SAT             UNSAT               Comment Number 8.1.15 Verify TT Channel 286 (SCRAMD1) reset (~ -5 vdc).
-5 vdc. Cue: Cue the examinee that TT Channel 286 is reading  
Standard:       Examinee verifies that TT Channel 286 (SCRAMD1) is reading ~ -5 vdc.
-5 vdc. Comments   SAT   UNSAT   Comment Number
Cue:           Cue the examinee that TT Channel 286 is reading -5 vdc.
Comments SAT             UNSAT               Comment Number Page 9 of 12


JPM Number:
JPM Number: CR JPM f. - rev 01 Clinton Power Station Job Performance Measure (JPM)
CR JPM f. - rev 0 1  Clinton Power Station Job Performance Measure (JPM)
        *8.1.16 Place Div 1 MANUAL SCRAM switch collar in D-ARM.
Page 10 of 12  *8.1.1 6 Place Div 1 MANUAL SCRAM switch collar in D
Standard:       At 1H13-P680-5004, the examinee places Div 1 MANUAL SCRAM switch collar in D-ARM.
-ARM. Standard: At 1H13-P680-5004, the examinee places Div 1 MANUAL SCRAM switch collar in D-ARM. Cue: If examinee reports that annunciator 5004
Cue:           If examinee reports that annunciator 5004-2E has reset, acknowledge the report.
-2E has reset, acknowledge the report. Cue the examinee that Independent Verification (IV) of step 8.1.17 has been completed.
Cue the examinee that Independent Verification (IV) of step 8.1.17 has been completed.
Comments   SAT   UNSAT   Comment Number 8.1.1 7 Verify annunciator DIV 1 OR 4 MAN SCRAM SW ARMED
Comments SAT             UNSAT                 Comment Number 8.1.17 Verify annunciator DIV 1 OR 4 MAN SCRAM SW ARMED [5004-2E] reset.
[5004-2E] reset.
Standard:       At 1H13-P680-5004, the examinee verifies annunciator DIV 1 OR 4 MAN SCRAM SW ARMED [5004-2E] is reset.
Standard: At 1H13-P680-5004, the examinee verifies annunciator DIV 1 OR 4 MAN SCRAM SW ARMED
Cue:           If examinee reports that annunciator 5004-2E has reset, acknowledge the report.
[5004-2E] is reset. Cue: If examinee reports that annunciator 5004
Comments SAT             UNSAT                 Comment Number Page 10 of 12
-2E has reset, acknowledge the report.
Comments   SAT   UNSAT   Comment Number


JPM Number:
JPM Number: CR JPM f. - rev 01 Clinton Power Station Job Performance Measure (JPM) 8.1.18 For all 145 HCUs, verify Scram Inlet/Scram Outlet valves in closed position (green LED not lit) as indicated by RC&IS.
CR JPM f. - rev 0 1  Clinton Power Station Job Performance Measure (JPM)
Standard:       On 1H13-P680-5004A, the examinee depresses the SCRAM VALVES pushbutton on the Display Selection Section of the Operator Control Module (OCM) and verifies that the Green LEDs are OFF for all 145 Scram Inlet/Scram Outlet Valves on the Full Core Map.
Page 11 of 12  8.1.18 For all 145 HCUs, verify Scram Inlet/Scram Outlet valves in closed position (green LED not lit) as indicated by RC&IS.
Cue:
Standard: On 1H13-P680-5004A, the examinee depresses the SCRAM VALVES pushbutton on the Display Selection Section of the Operator Control Module (OCM) and verifies that the Green LEDs are OFF for all 145 Scram Inlet/Scram Outlet Valves on the Full Core Map.
Comments SAT               UNSAT                 Comment Number 8.1.19 Verify with new OD-7 or 3D monicore (printout or on CRT) that current rod positions are identical to rod positions obtained prior to start of test. If any rod position different, immediately notify SMngt.
Cue: Comments   SAT   UNSAT   Comment Number 8.1.19 Verify with new OD
Standard:       Examinee obtains current OD-7 and verifies rod positions are identical to those on the initial OD-7 provided at the beginning of the JPM.
-7 or 3D monicore (printout or on CRT) that current rod positions are identical to rod positions obtained prior to start of test.
Cue:
If any rod position different, immediately notify SMngt. Standard: Examinee obtains current OD
Comments SAT               UNSAT                 Comment Number Page 11 of 12
-7 and verifies rod positions are identical to those on the initial OD
-7 provided at the beginning of the JPM.
Cue: Comments   SAT   UNSAT   Comment Number


JPM Number:
JPM Number: CR JPM f. - rev 01 Clinton Power Station Job Performance Measure (JPM) 8.1.20  Verify following status lights lit.
CR JPM f. - rev 0 1  Clinton Power Station Job Performance Measure (JPM)
: 1. Div 1 SCRAM SOL ENERGIZED A
Page 12 of 12 8.1.2 0 Verify following status lights lit. 1. Div 1 SCRAM SOL ENERGIZED A
: 2. Div 1 SCRAM SOL ENERGIZED B
: 2. Div 1 SCRAM SOL ENERGIZED B
: 3. Div 2 SCRAM SOL ENERGIZED A
: 3. Div 2 SCRAM SOL ENERGIZED A
Line 562: Line 529:
: 5. Div 3 SCRAM SOL ENERGIZED A
: 5. Div 3 SCRAM SOL ENERGIZED A
: 6. Div 3 SCRAM SOL ENERGIZED B
: 6. Div 3 SCRAM SOL ENERGIZED B
: 7. Div 4 SCRAM SOL ENERGIZED A 8. Div 4 SCRAM SOL ENERGIZED B Standard: At 1H13-P680-5004 & 5005, the examinee verifies the above listed Scram Solenoid status lights are ON.
: 7. Div 4 SCRAM SOL ENERGIZED A
Cue: Cue the examinee that Independent Verification (IV) has also been completed for step 8.1.22.
: 8. Div 4 SCRAM SOL ENERGIZED B Standard:         At 1H13-P680-5004 & 5005, the examinee verifies the above listed Scram Solenoid status lights are ON.
When the examinee has completed step 8.1.22, inform him/her that the JPM is complete. Comments   SAT   UNSAT   Comment Number TERMINATING CUES:
Cue:             Cue the examinee that Independent Verification (IV) has also been completed for step 8.1.22.
When the examinee has completed step 8.1.22, inform him/her that the JPM is complete.
Comments SAT               UNSAT             Comment Number TERMINATING CUES:
The Division 1 Manual Scram Functional Test is complete IAW CPS No. 9031.16 Manual Scram Channel Functional/SDV Hi Level Bypass Test.
The Division 1 Manual Scram Functional Test is complete IAW CPS No. 9031.16 Manual Scram Channel Functional/SDV Hi Level Bypass Test.
STOP TIME:   
STOP TIME:
Page 12 of 12
 
CLINTON POWER STATION Job Performance Measure Startup the Control Room Ventilation System (VC) in the High Radiation Mode JPM Number: JPM504 Revision Number: 01 Date: 06/26/2015 Developed ByW. D. Kiser                        06/26/15 Instructor                          Date Validated By: /s Mike Antonelli                  7/16/15 SME or Instructor                  Date Reviewed By:
Operations Representative          Date Approved By:
Training Department                Date


CLINTON POWER STATION Job Performance Measure Startup the Control Room Ventilation System (VC) in the High Radiation Mode JPM Number: JPM504 Revision Number: 0 1 Date:  06/26/2015 Developed By:
JPM Number: CR JPM g - rev 01 Clinton Power Station Job Performance Measure (JPM)
W. D. Kiser 06/26/15  Instructor Date  Validated By:
READ TO THE OPERATOR I will explain the initial conditions, which step(s) to simulate or discuss, and provide the initiating cues. When you complete the task successfully, the objective of this Job Performance Measure will be satisfied.
/s Mike Antonelli 7/16/15  SME or Instructor Date  Reviewed By:
TASK STANDARDS:
Operations Representative Date  Approved By:
* The A VC System is running in the High Radiation Mode with Minimum Outside Air Damper 0VC01YA OPEN.
Training Department Date JPM Number:
CR JPM g - rev 01 Clinton Power Station Job Performance Measure (JPM)
Page 2 of 9 READ TO THE OPERATOR I will explain the initial conditions, which step(s) to simulate or discuss, and provide the initiating cues. When you complete the task successfully, the objective of this Job Performance Measure will be satisfied.
TASK STANDARDS
The "A" VC System is running in the High Radiation Mode with Minimum Outside Ai r Damper 0VC01YA OPEN.
TOOLS, EQUIPMENT, OTHER SPECIAL REQUIREMENTS:
TOOLS, EQUIPMENT, OTHER SPECIAL REQUIREMENTS:
None PROCEDURAL/
* None PROCEDURAL/


==REFERENCES:==
==REFERENCES:==
* CPS No. 3402.01 Rev. 29, CONTROL ROOM HVAC (VC)
* CPS No. 5050.07 Rev. 33, ALARM PANEL 5050 ANNUNCIATORS - ROW 7
* CPS No. 5052.07 Rev. 33e, ALARM PANEL 5052 ANNUNCIATORS - ROW 7
* CPS No. 5050.02 Rev. 34, ALARM PANEL 5050 ANNUNCIATORS - ROW 2
* CPS No. 5050.08 Rev. 31b, ALARM PANEL 5050 ANNUNCIATORS - ROW 8 EVALUATOR INSTRUCTIONS:
* Amplifying cues are provided within the JPM steps.
* All pre-job briefings are completed.
* Ensure a blank copy of CPS 3402.01 Control Room HVAC (VC) is available to provide to the examinee during performance of the JPM.
* THIS IS A TIME CRITICAL JPM. VC train A must be placed in high rad mode within 20 minutes of receipt of annunciators 5050-7M and 5052-7M. After the examinee has acknowledged the task, mark the start time.
* When the examinee has completed step 8.3.3.8, mark the stop time. Ensure the lapsed time does not exceed 20 minutes. If this time limit is exceeded, the JPM is unsatisfactory.
Page 2 of 9


CPS No. 3402.01 Rev.
JPM Number: CR JPM g - rev 01 Clinton Power Station Job Performance Measure (JPM)
29, CONTROL ROOM HVAC (VC)
INITIAL CONDITIONS:
CPS No. 5050.07 Rev. 33, ALARM PANEL 5050 ANNUNCIATORS
- ROW 7  CPS No. 5052.07 Rev. 33e, ALARM PANEL 5052 ANNUNCIATORS - ROW 7  CPS No. 5050.02 Rev. 34, ALARM PANEL 5050 ANNUNCIATORS
- ROW 2  CPS No. 5050.08 Rev. 31b, ALARM PANEL 5050 ANNUNCIATORS
- ROW 8 EVALUATOR INSTRUCTIONS:
Amplifying cues are provided within the JPM steps.
All pre-job briefings are completed.
Ensure a blank copy of CPS 3402.01 Control Room HVAC (VC) is available to provide to the examinee during performance of the JPM.
THIS IS A TIME CRITICAL JPM. VC train A must be placed in high rad mode within 20 minutes of receipt of annunciators 5050
-7M and 5052-7M. After the examinee has acknowledged the task, mark the start time.
When the examinee has completed step 8.3.3.
8, mark the stop time. Ensure the lapsed time does not exceed 20 minutes. If this time limit is exceeded, the JPM is unsatisfactory
.
JPM Number:
CR JPM g - rev 01 Clinton Power Station Job Performance Measure (JPM)
Page 3 of 9 INITIAL CONDITIONS:
You are the B RO. The plant is operating at power.
You are the B RO. The plant is operating at power.
INITIATING CUE:
INITIATING CUE:
CAUTION All pre-job briefings are completed.
CAUTION All pre-job briefings are completed.
THIS JPM IS TIME CRITICAL.
THIS JPM IS TIME CRITICAL.
You have just received annunciators 5050
You have just received annunciators 5050-7M HI RADIATION CONT RM HVAC SYS DIVISION 1 and 5052-7M HI RADIATION CONT RM HVAC SYS DIVISION 2. Respond to annunciators as appropriate.
-7M HI RADIATION CONT RM HVAC SYS DIVISION 1 and 5052-7M HI RADIATION CONT RM HVAC SYS DIVISION 2. Respond to annunciators as appropriate.
Evaluator Note:
Evaluator Note:
After the examinee has acknowledged the task, mark the start time.
After the examinee has acknowledged the task, mark the start time.
START TIME:
START TIME:
Page 3 of 9


JPM Number:
JPM Number: CR JPM g - rev 01 Clinton Power Station Job Performance Measure (JPM)
CR JPM g - rev 01 Clinton Power Station Job Performance Measure (JPM)
PERFORMANCE INFORMATION Critical steps are denoted with an asterisk (*) to the left of the step number and appear in BOLDED letters. Failure to meet the standards for a critical step constitutes failure of the Job Performance Measure. The sequence of steps is assumed unless denoted in the comments section of the JPM.
Page 4 of 9 PERFORMANCE INFORMATION Critical steps are denoted with an asterisk (*) to the left of the step number and appear in BOLDED letters. Failure to meet the standards for a critical step constitutes failure of the Job Performance Measure. The sequence of steps is assumed unless denoted in the comments section of the JPM. PERFORMANCE STEPS CPS 5050.07/5052.07 ALARM PANEL 5050/5052 ANNUNCIATORS  
PERFORMANCE STEPS CPS 5050.07/5052.07 ALARM PANEL 5050/5052 ANNUNCIATORS - ROW 7
- ROW 7 1. Initiate/verify initiated VC High Radiation MODE on the operating VC Train per CPS 3402.01, Control Room HVAC (VC).
: 1. Initiate/verify initiated VC High Radiation MODE on the operating VC Train per CPS 3402.01, Control Room HVAC (VC).
Standard: Examinee proceeds to CPS 3402.01, Control Room HVAC (VC).
Standard:           Examinee proceeds to CPS 3402.01, Control Room HVAC (VC).
Cue: Comments When candidate locates CPS 3402.01, provide him/her with a blank exam copy.
Cue:
SAT   UNSAT   Comment Number CPS 3402.01 Control Room HVAC (VC) 8.3.3.1 IF Manual Initiation of a High Radiation Isolation is required, THEN Depress both Cont Rm Mu Trn Hi Rad initiation push
Comments           When candidate locates CPS 3402.01, provide him/her with a blank exam copy.
-buttons. Standard: On P801-5050 and 5052, either depress es both Cont Rm Mu Trn Hi Rad initiation push-buttons or verifies red light above pushbutton is lit
SAT                 UNSAT                 Comment Number CPS 3402.01 Control Room HVAC (VC) 8.3.3.1   IF           Manual Initiation of a High Radiation Isolation is required, THEN         Depress both Cont Rm Mu Trn Hi Rad initiation push-buttons.
. Cue: Comments The operating VC train will not shift to High Rad Mode.
Standard:           On P801-5050 and 5052, either depresses both Cont Rm Mu Trn Hi Rad initiation push-buttons or verifies red light above pushbutton is lit.
SAT   UNSAT   Comment Number
Cue:
Comments           The operating VC train will not shift to High Rad Mode.
SAT                 UNSAT                 Comment Number Page 4 of 9


JPM Number:
JPM Number: CR JPM g - rev 01 Clinton Power Station Job Performance Measure (JPM) 8.3.3.2 Verify Supply Air Trn A un-isolates as follows:
CR JPM g - rev 01 Clinton Power Station Job Performance Measure (JPM)
Page 5 of 9 8.3.3.2 Verify Supply Air Trn A un-isolates as follows:
: 1) 0VC09YA, Sply Air Trn A Filt Inlet Dmpr opens.
: 1) 0VC09YA, Sply Air Trn A Filt Inlet Dmpr opens.
: 2) 0VC10YA, Sply Air Trn A Filt Byp Dmpr closes.
: 2) 0VC10YA, Sply Air Trn A Filt Byp Dmpr closes.
: 3) 0VC11YA, Sply Air Trn A Filt Outlet Dmpr opens.
: 3) 0VC11YA, Sply Air Trn A Filt Outlet Dmpr opens.
Standard: Determines the Supply Air Trn A is still isolated Cue: Comments   SAT   UNSAT   Comment Number
Standard:       Determines the Supply Air Trn A is still isolated Cue:
    *8.3.3.2 IF   Supply Air Trn A did not unisolate, THEN Place Sply Air Fltr Dmprs 0VC09YA/10YA/11YA control switch in the FILTER position and repeat 8.3.3.1 and 2.
Comments SAT               UNSAT                 Comment Number
Standard: Examinee verifies damper lights for 0VC09YA and 0VC11YA indicate OPEN (red light ON, green light OFF) and damper light for 0VC10YA indicates CLOSED (red light OFF, green light ON).
      *8.3.3.2 IF         Supply Air Trn A did not unisolate, THEN       Place Sply Air Fltr Dmprs 0VC09YA/10YA/11YA control switch in the FILTER position and repeat 8.3.3.1 and 2.
Cue: Comments   SAT   UNSAT   Comment Number
Standard:       Examinee verifies damper lights for 0VC09YA and 0VC11YA indicate OPEN (red light ON, green light OFF) and damper light for 0VC10YA indicates CLOSED (red light OFF, green light ON).
Cue:
Comments SAT               UNSAT                 Comment Number Page 5 of 9


JPM Number:
JPM Number: CR JPM g - rev 01 Clinton Power Station Job Performance Measure (JPM) 8.3.3.1 IF         Manual Initiation of a High Radiation Isolation is required, THEN       Depress both Cont Rm Mu Trn Hi Rad initiation push-buttons.
CR JPM g - rev 01 Clinton Power Station Job Performance Measure (JPM)
Standard:       On P801-5050 and 5052, either depresses both Cont Rm Mu Trn Hi Rad initiation push-buttons or verifies red light above pushbutton is lit.
Page 6 of 9  8.3.3.1 IF Manual Initiation of a High Radiation Isolation is required, THEN Depress both Cont Rm Mu Trn Hi Rad initiation push
Cue:
-buttons. Standard: On P801-5050 and 5052, either depresses both Cont Rm Mu Trn Hi Rad initiation push-buttons or verifies red light above pushbutton is lit
Comments       No plant response expected.
. Cue: Comments No plant response expected.
SAT               UNSAT                 Comment Number 8.3.3.2 Verify Supply Air Trn A un-isolates as follows:
SAT   UNSAT   Comment Number 8.3.3.2 Verify Supply Air Trn A un
-isolates as follows:
: 1) 0VC09YA, Sply Air Trn A Filt Inlet Dmpr opens.
: 1) 0VC09YA, Sply Air Trn A Filt Inlet Dmpr opens.
: 2) 0VC10YA, Sply Air Trn A Filt Byp Dmpr closes.
: 2) 0VC10YA, Sply Air Trn A Filt Byp Dmpr closes.
: 4) 0VC11YA, Sply Air Trn A Filt Outlet Dmpr opens.
: 4) 0VC11YA, Sply Air Trn A Filt Outlet Dmpr opens.
Standard: Examinee verifies damper lights for 0VC09YA and 0VC11YA indicate OPEN (red light ON, green light OFF) and damper light for 0VC10YA indicates CLOSED (red light OFF, green light ON).
Standard:       Examinee verifies damper lights for 0VC09YA and 0VC11YA indicate OPEN (red light ON, green light OFF) and damper light for 0VC10YA indicates CLOSED (red light OFF, green light ON).
Cue: Comments   SAT   UNSAT   Comment Number
Cue:
Comments SAT               UNSAT                 Comment Number Page 6 of 9


JPM Number:
JPM Number: CR JPM g - rev 01 Clinton Power Station Job Performance Measure (JPM) 8.3.3.3 Verify running/start 0VC05CA, Cont Rm HVAC A MU Air Fan.
CR JPM g - rev 01 Clinton Power Station Job Performance Measure (JPM)
Standard:       Examinee verifies 0VC05CA, Cont Rm HVAC A MU Air Fan is running (red light ON, green light OFF).
Page 7 of 9  8.3.3.3 Verify running/start 0VC05CA, Cont Rm HVAC A MU Air Fan.
Cue:
Standard: Examinee verifies 0VC05CA, Cont Rm HVAC A MU Air Fan is running (red light ON, green light OFF)
Comments SAT               UNSAT               Comment Number 8.3.3.4 Verify the following dampers open:
. Cue: Comments   SAT   UNSAT   Comment Number 8.3.3.4 Verify the following dampers open: 1) 0VC02YA, Cont Rm Trn A MU Air Dmpr.
: 1) 0VC02YA, Cont Rm Trn A MU Air Dmpr.
: 2) 0VC06YA, Cont Rm MU Trn A Outlet Dmpr.
: 2) 0VC06YA, Cont Rm MU Trn A Outlet Dmpr.
: 3) Verify 0VC114YA, Cont Rm MU Trn A Flow Cont Dmpr modulates.
: 3) Verify 0VC114YA, Cont Rm MU Trn A Flow Cont Dmpr modulates.
Standard: Examinee verifies damper lights for 0VC02YA and 0VC06YA indicate OPEN (red light ON, green light OFF) and damper lights for 0VC114YA indicates modulating (red light ON, green light ON).
Standard:       Examinee verifies damper lights for 0VC02YA and 0VC06YA indicate OPEN (red light ON, green light OFF) and damper lights for 0VC114YA indicates modulating (red light ON, green light ON).
Cue: Comments   SAT   UNSAT   Comment Number
Cue:
Comments SAT               UNSAT               Comment Number Page 7 of 9


JPM Number:
JPM Number: CR JPM g - rev 01 Clinton Power Station Job Performance Measure (JPM) 8.3.3.6 Verify the following dampers close:
CR JPM g - rev 01 Clinton Power Station Job Performance Measure (JPM)
Page 8 of 9 8.3.3.6 Verify the following dampers close:
: 1) 0VC03YA, Cont Rm Trn A Min OS Dmpr.
: 1) 0VC03YA, Cont Rm Trn A Min OS Dmpr.
: 2) 0VC05YA, MCR Max Intake & Purge Dmpr.
: 2) 0VC05YA, MCR Max Intake & Purge Dmpr.
Line 665: Line 630:
: 7) 0VC69Y, MCR Locker Rm Exhaust Dmpr.
: 7) 0VC69Y, MCR Locker Rm Exhaust Dmpr.
: 8) 0VC70Y, MCR Locker Rm Exhaust Dmpr.
: 8) 0VC70Y, MCR Locker Rm Exhaust Dmpr.
: 9) 0VC11C, MCR Locker Rm Exhaust Fan is not running Standard: Examinee verifies damper lights for 0VC03YA, 0VC05YA, 0VC48YA, 0VC49YA, 0VC81YA, 0VC115YA, 0VC69Y,and 0VC70Y indicate CLOSED (red light OFF, green light ON).
: 9) 0VC11C, MCR Locker Rm Exhaust Fan is not running Standard:       Examinee verifies damper lights for 0VC03YA, 0VC05YA, 0VC48YA, 0VC49YA, 0VC81YA, 0VC115YA, 0VC69Y,and 0VC70Y indicate CLOSED (red light OFF, green light ON).
Examinee verifies 0VC11C, MCR Locker Rm Exhaust Fan is not running (red light OFF, green light ON).
Examinee verifies 0VC11C, MCR Locker Rm Exhaust Fan is not running (red light OFF, green light ON).
Cue: Comments   SAT   UNSAT   Comment Number 8.3.3.7 0VC01YA(B), Cont Rm Trn A(B) Min Air Dmpr is located on the east (west) side of the plant.
Cue:
Comments SAT               UNSAT                 Comment Number 8.3.3.7 0VC01YA(B), Cont Rm Trn A(B) Min Air Dmpr is located on the east (west) side of the plant.
Use the following table to quickly locate monitors and indicators to aid in completion of the remaining steps in section 8.3.3.
Use the following table to quickly locate monitors and indicators to aid in completion of the remaining steps in section 8.3.3.
Standard: Examinee determines that higher radiation condition exists on the WEST side.
Standard:       Examinee determines that higher radiation condition exists on the WEST side.
Cue: Comments   SAT   UNSAT   Comment Number
Cue:
Comments SAT               UNSAT                 Comment Number Page 8 of 9


JPM Number:
JPM Number: CR JPM g - rev 01 Clinton Power Station Job Performance Measure (JPM)
CR JPM g - rev 01 Clinton Power Station Job Performance Measure (JPM)
        *8.3.3.8   IF A high radiation condition exists as indicated by OS Air Inlet Rad Mon on P801-66B and 67B, THEN
Page 9 of 9  *8.3.3.8 IF A high radiation condition exists as indicated by OS Air Inlet Rad Mon on P801-66B and 67B, THEN 1. Open/verify open the minimum air damper with the lowest radiation level (0VC01YA).
: 1. Open/verify open the minimum air damper with the lowest radiation level (0VC01YA).
: 2. Shut/verify shut the other minimum air damper (0VC01YB).
: 2. Shut/verify shut the other minimum air damper (0VC01YB).
Standard: Examinee verifies 0VC01YA is OPEN (red light ON, green light OFF) and closes 0VC01YB (red light OFF, green light ON).
Standard:         Examinee verifies 0VC01YA is OPEN (red light ON, green light OFF) and closes 0VC01YB (red light OFF, green light ON).
Cue: Comments   SAT   UNSAT   Comment Number
Cue:
 
Comments SAT             UNSAT               Comment Number TERMINATING CUES:
TERMINATING CUES:
The VC System is running in the High Radiation Mode with Minimum Outside Air Damper 0VC01YA OPEN and 0VC01YB SHUT.
The VC System is running in the High Radiation Mode with Minimum Outside Air Damper 0VC01YA OPEN and 0VC01YB SHUT
STOP TIME:
. STOP TIME:}}
Page 9 of 9}}

Revision as of 08:26, 31 October 2019

2015 Clinton Power Station Initial License Examination Re-Take Proposed Control Room JPMs
ML15217A045
Person / Time
Site: Clinton Constellation icon.png
Issue date: 08/19/2015
From: Mcneil D
NRC/RGN-III/DRS/OLB
To:
Exelon Generation Co
Shared Package
ML15216A595 List:
References
Download: ML15217A045 (53)


Text

CLINTON POWER STATION Job Performance Measure Control Rod Scram Time Testing Restoration - Inadvertent Rod Withdrawal JPM Number: JPM420 Revision Number: 00 Date: 6/5/15 Developed By: Tony Jennings 6/5/15 Instructor Date Validated By: /s Mike Antonelli 7/16/15 SME or Instructor Date Reviewed By:

Operations Representative Date Approved By:

Training Department Date

JPM Number: CR JPM a.

Clinton Power Station Job Performance Measure (JPM)

READ TO THE OPERATOR I will explain the initial conditions, which step(s) to simulate or discuss, and provide the initiating cues. When you complete the task successfully, the objective of this Job Performance Measure will be satisfied.

TASK STANDARDS:

  • Rod 32-37 is re-inserted to position 00 using IN TIMER SKIP IAW CPS 4007.02 Inadvertent Rod Movement.

TOOLS, EQUIPMENT, OTHER SPECIAL REQUIREMENTS:

  • None PROCEDURAL/

REFERENCES:

  • CPS No. 9813.01D003, Rev. 31 Scram Time Testing - Containment Data Sheet
  • CPS No. 9813.01D004, Rev. 31b Scram Time Testing - MCR Data Sheet
  • CPS No. 3304.02, Rev. 22c Rod Control and Information System (RC&IS)
  • CPS 4007.02, Rev. 13c Inadvertent Rod Movement
  • NF-CL-721-F-1, Rev 001 Control Rod Sequence Review and Approval Sheet
  • NF-CL-721-F-5, Rev 000 Special Maneuver Rod Move Sheet
  • NF-CL-721-F-6, Rev 000 Control Rod Sequence: General Instructions EVALUATOR INSTRUCTIONS:
  • Amplifying cues are provided within the JPM steps.
  • All pre-job briefings are completed.
  • When providing the initiating cue, provide the examinee with a copy of each of the following procedures:

o CPS 9813.01 Control Rod Scram Time Testing o CPS No. 9813.01C001, Rev. 33 Control Rod Scram Timing Checklist o CPS No. 9813.01D003, Rev. 31 Scram Time Testing - Containment Data Sheet o CPS No. 9813.01D004, Rev. 31b Scram Time Testing - MCR Data Sheet o CPS 3304.02 Rod Control And Information System (RC&IS) o NF-CL-721-F-1 Control Rod Sequence Review and Approval Sheet Page 2 of 6

JPM Number: CR JPM a.

Clinton Power Station Job Performance Measure (JPM) o NF-CL-721-F-5 Special Maneuver Rod Move Sheet o NF-CL-721-F-6 Control Rod Sequence: General Instructions o OD-7 Control Rod Notch Positions Page 3 of 6

JPM Number: CR JPM a.

Clinton Power Station Job Performance Measure (JPM)

INITIAL CONDITIONS:

The plant is in Mode 1, operating at approximately 72% power. CPS 9813.01 Control Rod Scram Time Testing on 10% of the control rods is in progress.

  • Rod 32-37 has been scrammed and is at position 00.

INITIATING CUE:

CAUTION All pre-job briefings are completed.

Return control rod 32-37 to its pre-test position (position 48) using single notch withdrawal per step 8.2.16 of CPS 9813.01 Control Rod Scram Time Testing.

Report to the CRS after completing the task.

START TIME:

Page 4 of 6

JPM Number: CR JPM a.

Clinton Power Station Job Performance Measure (JPM)

PERFORMANCE INFORMATION Critical steps are denoted with an asterisk (*) to the left of the step number and appear in BOLDED letters. Failure to meet the standards for a critical step constitutes failure of the Job Performance Measure. The sequence of steps is assumed unless denoted in the comments section of the JPM.

PERFORMANCE STEPS CPS 9813.01 Control Rod Scram Time Testing CPS 3304.02 Rod Control and Information System (RC&IS)

Comment STEP ELEMENT STANDARD SAT UNSAT Number 9813.01 8.2.16 Return control rod 32-37 to pre- 3304.02 8.1.3.1.1 test position. Examinee verifies the INDIVID DRIVE light 3304.02 8.1.3 / 8.1.4 is energized on the OCM.

  • 3304.02 8.1.3.1.2 & 3 Examinee selects control rod 32-37 by simultaneously depressing the 32 and 37 pushbuttons on 1H13-P680-5004A panel, and then verifies the yellow LED lit for LPRM 30-39.
  • 3304.02 8.1.4.1.2 & 3 Examinee momentarily depresses the WITHDRAW pushbutton twice on 1H13-P680-5004A panel, and then verifies the IN, OUT, and SETTLE lights cycle and that rod 32-37 settles at position 02 and then 04.

Cue: If the examinee reports receiving annunciator 5006-2H Rod Out Block, acknowledge the report.

  • 3304.02 8.1.3.3 Examinee depresses the ROD SELECT CLEAR push-button twice on 1H13-P680-5004A.

Cue: If the examinee reports annunciator 5006-2H Rod Out Block is reset, acknowledge the report.

Page 5 of 6

JPM Number: CR JPM a.

Clinton Power Station Job Performance Measure (JPM)

Comment STEP ELEMENT STANDARD SAT UNSAT Number 9813.01 8.2.16 Return control rod 32-37 to pre- 3304.02 8.1.3.1.2 & 3 test position. (cont.)

3304.02 8.1.3 / 8.1.4 Examinee selects control rod 32-37 by simultaneously depressing the 32 and 37 (cont.) pushbuttons on 1H13-P680-5004A panel, and then verifies the yellow LED lit for LPRM 30-39.

ALTERNATE PATH BEGINS Respond to inadvertent rod 9813.01 8.2.16 movement. 3304.02 8.1.4.1.2 & 3 Examinee momentarily depresses the 3304.02 8.1.3 / 8.1.4 WITHDRAW pushbutton on 1H13-P680-4007.02 Inadvertent 5004A panel, and then verifies that control Rod Movement rod 32-37 fails to settle at position 06 and continues to withdraw.

Cue: If the examinee reports receiving annunciator 5006-4G Rod Drift and/or that rod 32-37 is inadvertently withdrawing, acknowledge the report.

  • 4007.02 step 3.2 (immediate action)

Examinee depresses and holds the IN TIMER SKIP push-button on 1H13-P680-5004A and inserts control rod 32-37 to position 00.

Evaluator Note: if examinee has not inserted rod 32-37 before reaching position 20, this critical task is UNSAT.

Cue: If the examinee reports that 32-37 has been inserted to position 00, acknowledge the report and state that the JPM is complete.

TERMINATING CUES:

Control Rod 32-37 has been inserted to position 00 IAW CPS No. 4007.02 Inadvertent Rod Movement.

STOP TIME:

Page 6 of 6

CLINTON POWER STATION Job Performance Measure Initiate Low Pressure ECCS System and Maximize Injection (Alternate Path)

JPM Number: JPM250 Revision Number: 03 Date: 6/5/15 Developed By: Tony Jennings 6/5/15 Instructor Date Validated By: /s Mike Antonelli 7/16/15 SME or Instructor Date Reviewed By:

Operations Representative Date Approved By:

Training Department Date

JPM Number: JPM CR b rev 03 Clinton Power Station Job Performance Measure (JPM)

READ TO THE OPERATOR I will explain the initial conditions, which step(s) to simulate or discuss, and provide the initiating cues. When you complete the task successfully, the objective of this Job Performance Measure will be satisfied.

TASK STANDARDS:

TOOLS, EQUIPMENT, OTHER SPECIAL REQUIREMENTS:

  • None PROCEDURAL/

REFERENCES:

  • CPS No. 4411.03, Rev. 10c Injection/Flooding Sources EVALUATOR INSTRUCTIONS:
  • Amplifying cues are provided within the JPM steps.
  • All pre-job briefings are completed.
  • ADS will automatically initiate at TAF.

Page 2 of 7

JPM Number: JPM CR b rev 03 Clinton Power Station Job Performance Measure (JPM)

INITIAL CONDITIONS:

You are the Extra RO. There are NO high pressure injection systems available and RPV level is trending down. ADS will be initiated by the B Reactor Operator when RPV level reaches TAF.

INITIATING CUE:

CAUTION All pre-job briefings are completed.

Using CPS No. 4411.03, INJECTION/FLOODING SOURCES, start all Low Pressure ECCS Systems. MAXIMIZE injection using ONLY preferred ECCS injection systems to restore RPV level above Level 3. PR038 and PR039 are in service.

Hard Cards are authorized and IMD has defeated all applicable interlocks.

Report to the CRS after completing the task.

START TIME:

Page 3 of 7

JPM Number: JPM CR b rev 03 Clinton Power Station Job Performance Measure (JPM)

PERFORMANCE INFORMATION Critical steps are denoted with an asterisk (*) to the left of the step number and appear in BOLDED letters. Failure to meet the standards for a critical step constitutes failure of the Job Performance Measure. The sequence of steps is assumed unless denoted in the comments section of the JPM.

PERFORMANCE STEPS

SHUTDOWN HARD CARD

  • CPS 3312.01 LPCI INITIATION / SHUTDOWN HARD CARD Note to Evaluator - Low Pressure ECCS Systems can be initiated and aligned by the examinee in any order.

Comment STEP ELEMENT STANDARD SAT UNSAT Number 1 Control RPV water *3213.01 App. A & 3312.01 App. C level 3 to level 8 by At 1H13-P601-5063, examinee arms and depresses initiating Division 1 LPCS/LPCI FM RHR A MANUAL INITIATION push-button.

ECCS (LPCS and RHR A) pumps.

3313.01 App. A Examinee verifies LPCS Pump starts (red indicating light illuminated, green indicating light extinguished, motor current meter pegs high and then returns to the green band).

Cue: If examinee reports that the Div 1 Low Pressure ECCS Pumps have been initiated, acknowledge the report.

3312.01 App. C Examinee verifies RHR Pump A starts (red indicating light illuminated, green indicating light extinguished, motor current meter pegs high and then returns to the green band).

Cue: If examinee reports that the Div 1 Low Pressure ECCS Pumps have been initiated, acknowledge the report.

Page 4 of 7

JPM Number: JPM CR b rev 03 Clinton Power Station Job Performance Measure (JPM)

Comment STEP ELEMENT STANDARD SAT UNSAT Number 2 Control RPV water *3312.01 App. C.1 level 3 to level 8 by At 1H13-P601-5065, examinee arms and depresses LPCI initiating Division 2 FM RHR B & C MANUAL INITIATION push-button.

ECCS (RHR B and RHR C) pumps. 3312.01 App. C.2 Examinee verifies RHR Pump B starts (red indicating light illuminated, green indicating light extinguished, motor current meter pegs high and then returns to the green band).

Cue: If examinee reports that RHR Pump B has been initiated, acknowledge the report.

3312.01 App. C.2 Examinee determines that RHR Pump C failed to start.

Examinee places control switch for RHR Pump C to start, and observes the amber trip light illuminated and reports failure to the CRS.

Cue: If examinee reports failure of the RHR Pump C pump to start, acknowledge the report.

Page 5 of 7

JPM Number: JPM CR b rev 03 Clinton Power Station Job Performance Measure (JPM)

Comment STEP ELEMENT STANDARD SAT UNSAT Number 3 Verifies the system 3312.01 App. C.3.2 & C.3.3 (RHR Pump A) alignments for RHR A and B subsystems. At 1H13-P601-5064, examinee verifies 1E12-F048A RHR A Hx Bypass Valve AND 1E12-F027A RHR A Hx Bypass Valve open (red light ON, green light OFF).

3312.01 App. C.3.2 & C.3.3 (RHR Pump B)

At 1H13-P601-5065, examinee verifies 1E12-F048B RHR B Hx Bypass Valve AND 1E12-F027B RHR B Hx Bypass Valve open (red light ON, green light OFF).

4 Verifies Low Pressure 3313.01 App. A.3 (LPCS)

ECCS Injection Valves open when RPV At 1H13-P601-5063, examinee verifies 1E21-F005 LPCS To pressure reaches 472 CNMT Outbd Isol Valve open (red light ON, green light OFF).

psig. 3312.01 App. C.4 (RHR Pump A)

When RPV pressure reaches 472 psig, at 1H13-P601-5064, examinee verifies 1E12-F042A LPCI Fm RHR A Shutoff Valve fails to open (red light OFF, green light ON).

Examinee may attempt to manually open 1E12-F042A or recognizes indication of 1E12-F042A breaker being OFF and reports unavailability of 1E12-F042A to the CRS.

Cue: If examinee reports unavailability of 1E12-F042A, acknowledge the report.

3312.01 App. C.4 (RHR Pump B)

When RPV pressure reaches 472 psig, at 1H13-P601-5065, examinee verifies 1E12-F042B LPCI Fm RHR B Shutoff Valve fails to open (red light OFF, green light ON).

Examinee may attempt to manually open 1E12-F042B or recognizes indication of 1E12-F042B breaker being OFF and reports unavailability of 1E12-F042B to the CRS.

Cue: If examinee reports unavailability of 1E12-F042B, acknowledge the report.

BEGIN ALTERNATE PATH CPS 4411.03 Injection/Flooding Sources App A: RHR Injection / Flooding Flowpath - Method 1:

RHR Through Shutdown Cooling 5 Defeats RHR Injection 1.1

/ Flooding Interlocks No examinee action required - per the initiating cue, IMD has defeated all applicable interlocks Page 6 of 7

JPM Number: JPM CR b rev 03 Clinton Power Station Job Performance Measure (JPM)

Comment STEP ELEMENT STANDARD SAT UNSAT Number 6 Starts RHR Pumps A 1.2 and B for injection through Shutdown Examinee verifies RHR Pump A and B running (red light ON, Cooling green light OFF) at 1H13-P601-5064 and 5065.

7 Aligns RHR injection *1.3 through the Shutdown Examinee fully opens 1E12-F053A and B (red light ON, Cooling Return Lines.

green light OFF).

Note to examiner - to maximize injection, BOTH 1E12-F053A and B must be fully opened. Examinee verifies RPV Water Level rises after injection is maximized.

Cue: When examinee reports that LPCS, RHR A and RHR B are injecting at maximum flow to the RPV, acknowledge the report and cue the examinee that the JPM is complete.

TERMINATING CUES:

RHR Pump A and B are running and injecting through the Shutdown Cooling lines to the RPV via 1E12-F053A and B IAW CPS No. 4411.03 Appendix A: RHR Injection/Flooding Flow Paths.

STOP TIME:

Page 7 of 7

CLINTON POWER STATION Job Performance Measure Turbine On Line Tests JPM Number: JPM517 Revision Number: 01 Date: 06/25/2015 Developed By: Tony Jennings 06/25/15 Instructor Date Validated By: /s Mike Antonelli 7/16/15 SME or Instructor Date Reviewed By:

Operations Representative Date Approved By:

Training Department Date

JPM Number: CR JPM c. Rev 01 Clinton Power Station Job Performance Measure (JPM)

READ TO THE OPERATOR I will explain the initial conditions, which step(s) to simulate or discuss, and provide the initiating cues. When you complete the task successfully, the objective of this Job Performance Measure will be satisfied.

TASK STANDARDS:

  • CPS 3812.01 Rev. 16a, Turbine On Line Tests, Section 8.1 suspended, and the electrical trip circuitry reset.

TOOLS, EQUIPMENT, OTHER SPECIAL REQUIREMENTS:

  • None PROCEDURAL/

REFERENCES:

  • CPS 3812.01 Rev. 16a, Turbine On Line Tests
  • CPS 3105.01 Rev. 41a, Turbine (TG, EHC, TS)

EVALUATOR INSTRUCTIONS:

  • Amplifying cues are provided within the JPM steps.
  • All pre-job briefings are completed.
  • Provide the examinee with a copy of:

o Initial Conditions and Initiating Cue page (back page of the JPM) when providing the initiating cue.

o Marked up copy of CPS 3812.01 Rev. 16a, Turbine On Line Tests.

Page 2 of 7

JPM Number: CR JPM c. Rev 01 Clinton Power Station Job Performance Measure (JPM)

INITIAL CONDITIONS:

You are the B RO.

The plant is in Mode 1 with the Main Turbine synchronized to the grid.

CPS 3812.01, Turbine On Line Tests is scheduled to be performed.

All prerequisites for CPS 3812.01 Turbine On Line Tests Section 8.1 Electrical Trip Test and Section 8.2 BOST Test are complete.

Turbine Trips are NOT Disabled (NOT BYPASSED) per CPS 3105.01, Disabling Turbine Trips Using Global Bypass.

Operators are stationed at Main Turbine Front Standard and at the first hit panel 1PA06J to reset annunciators.

INITIATING CUE:

CAUTION All pre-job briefings are completed.

Perform CPS 3812.01, Turbine On Line Tests.

Report to the CRS after completing the task.

START TIME:

Page 3 of 7

JPM Number: CR JPM c. Rev 01 Clinton Power Station Job Performance Measure (JPM)

PERFORMANCE INFORMATION Critical steps are denoted with an asterisk (*) to the left of the step number and appear in BOLDED letters. Failure to meet the standards for a critical step constitutes failure of the Job Performance Measure. The sequence of steps is assumed unless denoted in the comments section of the JPM.

PERFORMANCE STEPS CPS 3812.01, Turbine On Line Tests Section 8.1, Electrical Trip Test 8.1.1 Verify applicable prerequisites are met.

Standard: Examinee verifies applicable section 5.0 prerequisites are complete.

Cue:

Comments Examinee verifies 5.1-5.4, 5.8 and 5.9 complete.

SAT UNSAT Comment Number 8.1.2 Verify Turbine Trips are NOT Disabled (NOT BYPASSED) per CPS 3105.01, Disabling Turbine Trips Using Global Bypass.

Standard: No action required; provided in the initiating cue.

Cue:

Comments SAT UNSAT Comment Number Page 4 of 7

JPM Number: CR JPM c. Rev 01 Clinton Power Station Job Performance Measure (JPM) 8.1.3 Observe the following:

1. NORMAL light is ON
2. RESET light is ON
3. Remaining lights in ELECTRICAL TRIP TEST Group are OFF Standard: Examinee observes the following Electrical Trip Test lights on 1H13-P870-5018:
1. NORMAL light is ON.
2. RESET light is ON.
3. Remaining lights in ELECTRICAL TRIP TEST Group are OFF.

Cue:

Comments SAT UNSAT Comment Number

  • 8.1.4 Depress and hold START TEST push-button
1. Observe NORMAL light goes OFF.
2. Observe LOCKED OUT light comes ON.

Standard: Examinee depresses and holds the Electrical Trip Test Start Test Pushbutton on 1H13-P870-5018 and verifies the following:

  • NORMAL light goes OFF
  • LOCKED OUT light comes ON Cue: All status lights and annunciators were received at P-680 and 1PA06J as expected.

Comments SAT UNSAT Comment Number Page 5 of 7

JPM Number: CR JPM c. Rev 01 Clinton Power Station Job Performance Measure (JPM)

Begin Alternate Path 8.1.5 Release START TEST push-button. Observe the following sequence:

1. RESET light goes OFF, and TRIPPED light comes ON.
2. TRIPPED light goes OFF, and RESET light comes ON.
3. LOCKED OUT light goes OFF and NORMAL light comes ON.

Standard: Examinee releases the Start Test push-button on 1H13-P870-5018 and observes the following:

  • RESET light goes OFF, and
  • TRIPPED light comes ON
  • Test Malfunction Light comes ON Cue:
  • When the examinee reports the malfunction to the CRS, acknowledge the report, inform the examinee that troubleshooting is complete and direct the examinee to take necessary actions to move on to the next section of the test.
  • If an Equipment Operator is sent to check status of the trip mechanism, report that the trip linkage is reset.

Comments SAT UNSAT Comment Number Page 6 of 7

JPM Number: CR JPM c. Rev 01 Clinton Power Station Job Performance Measure (JPM)

  • 6.1 If a malfunction occurs during performance of the Mechanical Overspeed Trip, the Mechanical Trip Piston or the Electrical Trip, THEN The test sequence stops before completion.

Depressing the respective STOP - GO - NORMAL push-button will reset the system to normal, except in cases noted in section 8.3 and 8.4, Mechanical Overspeed Trip Test and Mechanical Trip Piston Test.

Standard: Examinee depresses the Electrical Trip Test Stop Go Normal pushbutton, and verifies the following:

  • Test Malfunction light goes OFF
  • TRIPPED light goes OFF
  • RESET light comes on
  • LOCKED OUT light goes OFF
  • NORMAL light comes on Cue: When the examinee reports the Electrical Trip Test Circuitry has been reset, acknowledge the report and cue the examinee that the JPM is complete.

Comments SAT UNSAT Comment Number TERMINATING CUES:

Electrical Trip Test Circuitry for the Main Turbine is reset IAW CPS No. 3812.01 Turbine On Line Tests.

STOP TIME:

Page 7 of 7

CLINTON POWER STATION Job Performance Measure Perform a HPCS Pump Operability Test (Alternate Path)

JPM Number: JPM288 Revision Number: 01 Date: 8/4/14 Developed By: Tony Jennings 7/16/15 Instructor Date Validated By: /s Mike Antonelli 7/16/15 SME or Instructor Date Reviewed By:

Operations Representative Date Approved By:

Training Department Date Retain approved Master Copy per SRRS 3D.126/3D.111

JPM CR d - Rev 01 Clinton Power Station Job Performance Measure (JPM)

READ TO THE OPERATOR I will explain the initial conditions, which step(s) to simulate or discuss, and provide the initiating cues. When you complete the task successfully, the objective of this Job Performance Measure will be satisfied.

TASK STANDARDS:

  • HPCS Pump has been tripped due to loss of suction source.

TOOLS, EQUIPMENT, OTHER SPECIAL REQUIREMENTS:

  • None PROCEDURAL/

REFERENCES:

  • CPS No. 9051.01, Rev 47e HPCS Pump HPCS Water Leg Pump Operability
  • CPS No. 9051.01D001, Rev 48 HPCS Pump HPCS Water Leg Pump Operability Data Sheet
  • CPS No. 5062.04, Rev 27b Alarm Panel 5062 Annunciators - Row 4 EVALUATOR INSTRUCTIONS:
  • Mark up CPS No. 9051.01, HPCS Pump & HPCS Water Leg Pump Operability up to and including step 8.2.7.1.
  • Mark up CPS No. 9051.01D001, HPCS Pump & HPCS Water Leg Pump Operability Data Sheet up to and including any data collected up to step 8.2.7.1.
  • Amplifying cues are provided within the JPM steps.
  • All pre-job briefings are completed.

Page 2 of 7

JPM CR d - Rev 01 Clinton Power Station Job Performance Measure (JPM)

INITIAL CONDITIONS:

You are the Extra RO assuming the shift. CPS 9051.01, HPCS Pump & HPCS Water Leg Pump Operability is in progress. An Equipment Operator is stationed locally at the HPCS Pump and has established communication with the Main Control Room.

INITIATING CUE:

Continue performing CPS 9051.01, HPCS Pump & HPCS Water Leg Pump Operability commencing at section 8.2.7.2.

Inform the CRS when section 8.2 is complete.

START TIME:

Page 3 of 7

JPM CR d - Rev 01 Clinton Power Station Job Performance Measure (JPM)

PERFORMANCE INFORMATION Critical steps are denoted with an asterisk (*) to the left of the step number and appear in BOLDED letters. Failure to meet the standards for a critical step constitutes failure of the Job Performance Measure. The sequence of steps is assumed unless denoted in the comments section of the JPM.

9051.01 HPCS PUMP & HPCS WATER LEG PUMP OPERABILITY 8.2.7.2 Verify HPCS WATER LEG DISCHARGE PRESSURE LOW annunciator 5062-7D is cleared.

Standard: Observes annunciator 5062-7D is not illuminated.

Cue:

Comments SAT UNSAT Comment Number

Standard: Operator places control switch for 1E22-C001 to the START position. Verifies RED light ON, GREEN light OFF. Observes HPCS motor current.

Cue:

Comments SAT UNSAT Comment Number Page 4 of 7

JPM CR d - Rev 01 Clinton Power Station Job Performance Measure (JPM) 8.2.7.4.1 Observe/perform (Record): Verify 1E22-F012, HPCS Pump Min Flow To Suppr Pool, indicates open.

Standard: Observes RED light ON, GREEN light OFF for 1E22-F012. Records SAT for 1E22-F012 stroking open on the data sheet.

Cue:

Comments SAT UNSAT Comment Number

  • 8.2.7.4.2 Alternately slowly throttle open both 1E22-F010 and 1E22-F011, HPCS First and Second Test Vlv To Storage Tank, and increase flow to ~ 5050 gpm as read on Comp Pt HP-DA301.

Standard: Places both control switches for 1E22-F010 and 1E22-F011 to the throttle open position.

Cue: If examinee reports receipt of Annunciator 5062-4D, acknowledge report.

Comments The suction line will start clogging when HPCS flow exceeds approximately 2000 gpm. HPCS Pump amps and flow will rapidly oscillate.

SAT UNSAT Comment Number Page 5 of 7

JPM CR d - Rev 01 Clinton Power Station Job Performance Measure (JPM)

BEGINS ALTERNATE PATH 5062-4D, HPCS PUMP SUCTION PRESSURE ABNORMAL NOTE: Steps 1 and 2 may be performed in any order.

1. Verify/establish an available HPCS Suction Path (1E22-F001 preferred unless RCIC Tank/Suction Piping is not available) per CPS 3309.01, High Pressure Core Spray (HPCS). Refer to CPS 3309.01 (HPCS) CLOC PRECAUTION criteria.

Standard: Verifies 1E22-F001 is full open.

Cue:

Comments SAT UNSAT Comment Number

  • 2 If HPCS pump is running for testing, and normal suction pressure was not restored by the previous step, trip the HPCS pump.

Standard: Examinee trips the HPCS Pump using the associated control switch.

Cue: If an operator is dispatched to investigate, cue the examinee that loud surging noises are coming from the HPCS Pump.

Comments SAT UNSAT Comment Number Page 6 of 7

JPM CR d - Rev 01 Clinton Power Station Job Performance Measure (JPM)

Informs Control Room Supervisor.

Standard: Informs Control Room Supervisor the HPCS was tripped per Annunciator Response Procedure.

Cue: Acknowledge the report. State JPM is complete.

Comments 1.

SAT UNSAT Comment Number TERMINATING CUES:

HPCS Pump has been tripped due to loss of suction source.

STOP TIME:

Page 7 of 7

CLINTON POWER STATION Job Performance Measure Manually Perform a Group 1 Isolation (Alternate Path)

JPM Number: JPM219 Revision Number: 03 Date: 6/29/15 Developed By: Tony Jennings 6/29/15 Instructor Date Validated By: /s Mike Antonelli 7/16/15 SME or Instructor Date Reviewed By:

Operations Representative Date Approved By:

Training Department Date Retain approved Master Copy per SRRS 3D.126/3D.111

JPM Number: CR JPM e Rev 03 Clinton Power Station Job Performance Measure (JPM)

READ TO THE OPERATOR I will explain the initial conditions, which step(s) to simulate or discuss, and provide the initiating cues. When you complete the task successfully, the objective of this Job Performance Measure will be satisfied.

TASK STANDARDS:

& ADS).

TOOLS, EQUIPMENT, OTHER SPECIAL REQUIREMENTS:

  • None PROCEDURAL/

REFERENCES:

  • CPS No. 4001.02, Rev 17c AUTOMATIC ISOLATION
  • CPS No. 4001.02C001, Rev 16 AUTOMATIC ISOLATION CHECKLIST EVALUATOR INSTRUCTIONS:
  • Amplifying cues are provided within the JPM steps.
  • All pre-job briefings are completed.
  • Prior to reading Initial Conditions and Initiating Cue, place Simulator in RUN.

Page 2 of 5

JPM Number: CR JPM e Rev 03 Clinton Power Station Job Performance Measure (JPM)

INITIAL CONDITIONS:

A Group 1 isolation signal has been received due to low condenser vacuum.

INITIATING CUE:

CAUTION All pre-job briefings are completed.

The CRS has directed you to verify a complete Group 1 isolation.

START TIME:

Page 3 of 5

JPM Number: CR JPM e Rev 03 Clinton Power Station Job Performance Measure (JPM)

PERFORMANCE INFORMATION Critical steps are denoted with an asterisk (*) to the left of the step number and appear in BOLDED letters. Failure to meet the standards for a critical step constitutes failure of the Job Performance Measure. The sequence of steps is assumed unless denoted in the comments section of the JPM.

PERFORMANCE STEPS 4001.02 Automatic Isolation, 4001.02C001 Automatic Isolation Checklist, CPS 3101.01 Main Steam (MS, IS & ADS) Appendix A: Group 1 Isolation and MSL Drains Usage Hard Card NOTE: The following steps may be performed in any order. The examinee may elect to use the Main Steam, Appendix A Hard Card.

Comment STEP ELEMENT STANDARD SAT UNSAT Number 1 Complete CPS *Examinee takes control switch at 1H13-P601 (5066 / 5067) 4001.02C001 to shut (red light OFF, green light ON) for:

Automatic Isolation Checklist for Group 1

Cue: If the examinee reports that 1B21-F022B and/or 28B have failed to close, acknowledge the report.

Cue: If the examinee asks for guidance, ask the examinee for a recommendation and direct the examinee to proceed as recommended.

Page 4 of 5

JPM Number: CR JPM e Rev 03 Clinton Power Station Job Performance Measure (JPM)

Comment STEP ELEMENT STANDARD SAT UNSAT Number Examinee observes red light OFF and green light ON at 1H13-1 (contd) Complete CPS P601 (5066 / 5067) for each of the following valves:

4001.02C001 Automatic Isolation

  • 1B21-F016 Mn Drn & MSIV Byp Inbd Isol Valve Checklist for Group 1

Note to evaluator - Examinee may elect to Arm & Depress CRVICS MANUAL INITIATION push-button(s) (Logic A & D push-buttons and/or Logic B & C push-buttons) on 1H13-P680-5006). These actions will fail to isolate the B Main Steam Line.

Cue: If the examinee reports that the B MSL has been isolated, acknowledge the report and state, The JPM is complete.

TERMINATING CUES:

Manually isolates Group 1 Primary Containment Isolation Valves (Main Steam Lines and Drains) per 4001.02C001 Automatic Isolation Checklist or CPS 3101.01 Main Steam (MS, IS & ADS).

STOP TIME:

Page 5 of 5

CLINTON POWER STATION Job Performance Measure Perform a Manual Scram Functional/SDV Hi Level Bypass Test JPM Number: JPM519 Revision Number: 01 Date: 06/26/2015 Developed By: W. D. Kiser 06/26/15 Instructor Date Validated By: /s Mike Antonelli 7/16/15 SME or Instructor Date Reviewed By:

Operations Representative Date Approved By:

Training Department Date Retain approved Master Copy per SRRS 3D.126/3D.111

JPM Number: CR JPM f. - rev 01 Clinton Power Station Job Performance Measure (JPM)

READ TO THE OPERATOR I will explain the initial conditions, which step(s) to simulate or discuss, and provide the initiating cues. When you complete the task successfully, the objective of this Job Performance Measure will be satisfied.

TASK STANDARDS:

TOOLS, EQUIPMENT, OTHER SPECIAL REQUIREMENTS:

  • None PROCEDURAL/

REFERENCES:

  • CPS 9031.16, Manual Scram Functional / SDV Hi Level Bypass Test, Rev. 31a EVALUATOR INSTRUCTIONS:
  • Amplifying cues are provided within the JPM steps.
  • All pre-job briefings are completed.
  • Provide the examinee with the following items:

o A copy of the Initial Conditions and Initiating Cue page (back page of the JPM) when providing the initiating cue.

o Copy of the OD-7 printout obtained during simulator setup.

Page 2 of 12

JPM Number: CR JPM f. - rev 01 Clinton Power Station Job Performance Measure (JPM)

INITIAL CONDITIONS:

You are an extra RO in the MCR.

The plant is in Mode 1.

All Prerequisites for CPS 9031.16, Manual Scram Functional / SDV Hi Level Bypass Test have been completed.

A and B Scram Solenoid Temperatures on all withdrawn control rods have been verified >

ambient temperature locally.

An SRO is available and stationed to provide TT data when requested.

INITIATING CUE:

CAUTION All pre-job briefings are completed.

Perform CPS 9031.16, Manual Scram Channel Functional / SDV Hi Level Bypass Test for Division 1, beginning at Step 8.1.3.

Report to the CRS after completing the task.

START TIME:

Page 3 of 12

JPM Number: CR JPM f. - rev 01 Clinton Power Station Job Performance Measure (JPM)

PERFORMANCE INFORMATION Critical steps are denoted with an asterisk (*) to the left of the step number and appear in BOLDED letters. Failure to meet the standards for a critical step constitutes failure of the Job Performance Measure. The sequence of steps is assumed unless denoted in the comments section of the JPM.

PERFORMANCE STEPS CPS 9031.16, Manual Scram Channel Functional / SDV Hi Level Bypass Test 8.1 Division 1 Manual Scram Functional Test

Standard: At 1H13-P680-5004, the examinee rotates the Div 1 MANUAL SCRAM switch collar to the ARM position.

Cue: If the examinee reports receipt of expected annunciator 5004-2E, acknowledge the report.

Comments SAT UNSAT Comment Number 8.1.4 Verify annunciator DIV 1 OR 4 MAN SCRAM SW ARMED [5004-2E] alarming.

Standard: At 1H13-P680-5004, the examinee verifies annunciator 5004-2E DIV 1 OR 4 MAN SCRAM SW ARMED is alarming.

Cue: If the examinee reports receipt of expected annunciator 5004-2E, acknowledge the report.

Comments SAT UNSAT Comment Number Page 4 of 12

JPM Number: CR JPM f. - rev 01 Clinton Power Station Job Performance Measure (JPM)

Standard: At 1H13-P680-5004, the examinee momentarily depresses the Div 1 MANUAL SCRAM pushbutton.

Cue: If the examinee reports receipt of annunciators 5002-2P, 5004-1A, 5004-1E and/or 5009-5B, acknowledge the report.

Comments SAT UNSAT Comment Number 8.1.6 Verify following status lights not lit.

1. Div 1 SCRAM SOL ENERGIZED A
2. Div 2 SCRAM SOL ENERGIZED B
3. Div 3 SCRAM SOL ENERGIZED B
4. Div 4 SCRAM SOL ENERGIZED A Standard: At 1H13-P680-5004 & 5005, the examinee verifies the listed Scram Solenoid status lights are OFF:
1. Div 1 SCRAM SOL ENERGIZED A
2. Div 2 SCRAM SOL ENERGIZED B
3. Div 3 SCRAM SOL ENERGIZED B
4. Div 4 SCRAM SOL ENERGIZED A Cue:

Comments SAT UNSAT Comment Number Page 5 of 12

JPM Number: CR JPM f. - rev 01 Clinton Power Station Job Performance Measure (JPM) 8.1.7 Verify Div 1 RESET PERMISSIVE status light lit (after ~ 10 sec).

Standard: At 1H13-P680-5004, the examinee verifies the Div 1 RESET PERMISSIVE status light is ON (approximately 10 seconds after the Div 1 Manual Scram pushbutton was released).

Cue:

Comments The time component (~ 10 sec) is not meant to be measured. It is only there as a guide for the operator to know that the change in state of the status light will be delayed.

SAT UNSAT Comment Number 8.1.8 Verify following annunciators alarming.

1. DIV 1 HALF SCRAM IA, IIB, IIIB, IVA [5004-1A]
2. DIV 1 MANUAL SCRAM TRIP [5004-1E]
3. RX WTR LVL CONT SYS ALARM [5002-2P](FW-MAN-SCRAM-IN1 input)

Standard: At 1H13-P680-5004, the examinee verifies Annunciators 5004-1A, 5004-1E and 5002-2P in alarm.

Cue:

Comments SAT UNSAT Comment Number Page 6 of 12

JPM Number: CR JPM f. - rev 01 Clinton Power Station Job Performance Measure (JPM) 8.1.9 Verify following computer points TRIPPED.

1. C71DC013, MAN SCRAM TRIP SYS 1/4
2. C71NC005, MANUAL SCRAM DIV 1 OR 4
3. C71NC029, 1/2 SCRM IA, IIB, IIIB, IVA Standard: At 1H13-P680-5009, the examinee pulls up computer points C71DC013, C71NC005, and C71NC029 and verifies they indicate tripped.

Cue:

Comments SAT UNSAT Comment Number 8.1.10 Verify TT Channel 286 (SCRAMD1) tripped (~ +5 vdc).

Standard: Examinee verifies that TT Channel 286 (SCRAMD1) is reading ~ +5 vdc.

Cue: Cue the examinee that TT Channel 286 is reading +5 vdc.

Comments SAT UNSAT Comment Number

  • 8.1.11 Momentarily depress Div 1 SCRAM RESET pushbutton.

Standard: At 1H13-P680-5004, the examinee momentarily depresses the Div 1 SCRAM RESET pushbutton.

Cue: If examinee announces that 5002-2P, 5004-1A and 5004-1E are reset, acknowledge the examinee.

Comments SAT UNSAT Comment Number Page 7 of 12

JPM Number: CR JPM f. - rev 01 Clinton Power Station Job Performance Measure (JPM) 8.1.12 Verify DIV 1 RESET PERMISSIVE status light not lit.

Standard: At 1H13-P680-5004, the examinee verifies the DIV 1 RESET PERMISSIVE status light is OFF.

Cue:

Comments SAT UNSAT Comment Number 8.1.13 Verify following annunciators reset.

1. DIV 1 HALF SCRAM IA, IIB, IIIB, IVA [5004-1A]
2. DIV 1 MANUAL SCRAM TRIP [5004-1E]
3. RX WTR LVL CONT SYS ALARM [5002-2P](FW-MAN-SCRAM-IN1 input)

Standard: At 1H13-P680-5004, the examinee verifies annunciators 5004-1A, 5004-1E and 5002-2P are reset.

Cue: If examinee announces that 5002-2P, 5004-1A and 5004-1E are reset, acknowledge the examinee.

Comments SAT UNSAT Comment Number Page 8 of 12

JPM Number: CR JPM f. - rev 01 Clinton Power Station Job Performance Measure (JPM) 8.1.14 Verify following computer points RESET.

1. C71DC013, MAN SCRAM TRIP SYS 1/4
2. C71NC005, MANUAL SCRAM DIV 1 OR 4
3. C71NC029, 1/2 SCRM IA, IIB, IIIB, IVA Standard: At 1H13-P680-5009, the examinee pulls up computer points C71DC013, C71NC005, and C71NC029 and verifies they indicate RESET.

Cue:

Comments SAT UNSAT Comment Number 8.1.15 Verify TT Channel 286 (SCRAMD1) reset (~ -5 vdc).

Standard: Examinee verifies that TT Channel 286 (SCRAMD1) is reading ~ -5 vdc.

Cue: Cue the examinee that TT Channel 286 is reading -5 vdc.

Comments SAT UNSAT Comment Number Page 9 of 12

JPM Number: CR JPM f. - rev 01 Clinton Power Station Job Performance Measure (JPM)

Standard: At 1H13-P680-5004, the examinee places Div 1 MANUAL SCRAM switch collar in D-ARM.

Cue: If examinee reports that annunciator 5004-2E has reset, acknowledge the report.

Cue the examinee that Independent Verification (IV) of step 8.1.17 has been completed.

Comments SAT UNSAT Comment Number 8.1.17 Verify annunciator DIV 1 OR 4 MAN SCRAM SW ARMED [5004-2E] reset.

Standard: At 1H13-P680-5004, the examinee verifies annunciator DIV 1 OR 4 MAN SCRAM SW ARMED [5004-2E] is reset.

Cue: If examinee reports that annunciator 5004-2E has reset, acknowledge the report.

Comments SAT UNSAT Comment Number Page 10 of 12

JPM Number: CR JPM f. - rev 01 Clinton Power Station Job Performance Measure (JPM) 8.1.18 For all 145 HCUs, verify Scram Inlet/Scram Outlet valves in closed position (green LED not lit) as indicated by RC&IS.

Standard: On 1H13-P680-5004A, the examinee depresses the SCRAM VALVES pushbutton on the Display Selection Section of the Operator Control Module (OCM) and verifies that the Green LEDs are OFF for all 145 Scram Inlet/Scram Outlet Valves on the Full Core Map.

Cue:

Comments SAT UNSAT Comment Number 8.1.19 Verify with new OD-7 or 3D monicore (printout or on CRT) that current rod positions are identical to rod positions obtained prior to start of test. If any rod position different, immediately notify SMngt.

Standard: Examinee obtains current OD-7 and verifies rod positions are identical to those on the initial OD-7 provided at the beginning of the JPM.

Cue:

Comments SAT UNSAT Comment Number Page 11 of 12

JPM Number: CR JPM f. - rev 01 Clinton Power Station Job Performance Measure (JPM) 8.1.20 Verify following status lights lit.

1. Div 1 SCRAM SOL ENERGIZED A
2. Div 1 SCRAM SOL ENERGIZED B
3. Div 2 SCRAM SOL ENERGIZED A
4. Div 2 SCRAM SOL ENERGIZED B
5. Div 3 SCRAM SOL ENERGIZED A
6. Div 3 SCRAM SOL ENERGIZED B
7. Div 4 SCRAM SOL ENERGIZED A
8. Div 4 SCRAM SOL ENERGIZED B Standard: At 1H13-P680-5004 & 5005, the examinee verifies the above listed Scram Solenoid status lights are ON.

Cue: Cue the examinee that Independent Verification (IV) has also been completed for step 8.1.22.

When the examinee has completed step 8.1.22, inform him/her that the JPM is complete.

Comments SAT UNSAT Comment Number TERMINATING CUES:

The Division 1 Manual Scram Functional Test is complete IAW CPS No. 9031.16 Manual Scram Channel Functional/SDV Hi Level Bypass Test.

STOP TIME:

Page 12 of 12

CLINTON POWER STATION Job Performance Measure Startup the Control Room Ventilation System (VC) in the High Radiation Mode JPM Number: JPM504 Revision Number: 01 Date: 06/26/2015 Developed By: W. D. Kiser 06/26/15 Instructor Date Validated By: /s Mike Antonelli 7/16/15 SME or Instructor Date Reviewed By:

Operations Representative Date Approved By:

Training Department Date

JPM Number: CR JPM g - rev 01 Clinton Power Station Job Performance Measure (JPM)

READ TO THE OPERATOR I will explain the initial conditions, which step(s) to simulate or discuss, and provide the initiating cues. When you complete the task successfully, the objective of this Job Performance Measure will be satisfied.

TASK STANDARDS:

  • The A VC System is running in the High Radiation Mode with Minimum Outside Air Damper 0VC01YA OPEN.

TOOLS, EQUIPMENT, OTHER SPECIAL REQUIREMENTS:

  • None PROCEDURAL/

REFERENCES:

  • CPS No. 3402.01 Rev. 29, CONTROL ROOM HVAC (VC)
  • CPS No. 5050.08 Rev. 31b, ALARM PANEL 5050 ANNUNCIATORS - ROW 8 EVALUATOR INSTRUCTIONS:
  • Amplifying cues are provided within the JPM steps.
  • All pre-job briefings are completed.
  • Ensure a blank copy of CPS 3402.01 Control Room HVAC (VC) is available to provide to the examinee during performance of the JPM.
  • THIS IS A TIME CRITICAL JPM. VC train A must be placed in high rad mode within 20 minutes of receipt of annunciators 5050-7M and 5052-7M. After the examinee has acknowledged the task, mark the start time.
  • When the examinee has completed step 8.3.3.8, mark the stop time. Ensure the lapsed time does not exceed 20 minutes. If this time limit is exceeded, the JPM is unsatisfactory.

Page 2 of 9

JPM Number: CR JPM g - rev 01 Clinton Power Station Job Performance Measure (JPM)

INITIAL CONDITIONS:

You are the B RO. The plant is operating at power.

INITIATING CUE:

CAUTION All pre-job briefings are completed.

THIS JPM IS TIME CRITICAL.

You have just received annunciators 5050-7M HI RADIATION CONT RM HVAC SYS DIVISION 1 and 5052-7M HI RADIATION CONT RM HVAC SYS DIVISION 2. Respond to annunciators as appropriate.

Evaluator Note:

After the examinee has acknowledged the task, mark the start time.

START TIME:

Page 3 of 9

JPM Number: CR JPM g - rev 01 Clinton Power Station Job Performance Measure (JPM)

PERFORMANCE INFORMATION Critical steps are denoted with an asterisk (*) to the left of the step number and appear in BOLDED letters. Failure to meet the standards for a critical step constitutes failure of the Job Performance Measure. The sequence of steps is assumed unless denoted in the comments section of the JPM.

PERFORMANCE STEPS CPS 5050.07/5052.07 ALARM PANEL 5050/5052 ANNUNCIATORS - ROW 7

1. Initiate/verify initiated VC High Radiation MODE on the operating VC Train per CPS 3402.01, Control Room HVAC (VC).

Standard: Examinee proceeds to CPS 3402.01, Control Room HVAC (VC).

Cue:

Comments When candidate locates CPS 3402.01, provide him/her with a blank exam copy.

SAT UNSAT Comment Number CPS 3402.01 Control Room HVAC (VC) 8.3.3.1 IF Manual Initiation of a High Radiation Isolation is required, THEN Depress both Cont Rm Mu Trn Hi Rad initiation push-buttons.

Standard: On P801-5050 and 5052, either depresses both Cont Rm Mu Trn Hi Rad initiation push-buttons or verifies red light above pushbutton is lit.

Cue:

Comments The operating VC train will not shift to High Rad Mode.

SAT UNSAT Comment Number Page 4 of 9

JPM Number: CR JPM g - rev 01 Clinton Power Station Job Performance Measure (JPM) 8.3.3.2 Verify Supply Air Trn A un-isolates as follows:

1) 0VC09YA, Sply Air Trn A Filt Inlet Dmpr opens.
2) 0VC10YA, Sply Air Trn A Filt Byp Dmpr closes.
3) 0VC11YA, Sply Air Trn A Filt Outlet Dmpr opens.

Standard: Determines the Supply Air Trn A is still isolated Cue:

Comments SAT UNSAT Comment Number

  • 8.3.3.2 IF Supply Air Trn A did not unisolate, THEN Place Sply Air Fltr Dmprs 0VC09YA/10YA/11YA control switch in the FILTER position and repeat 8.3.3.1 and 2.

Standard: Examinee verifies damper lights for 0VC09YA and 0VC11YA indicate OPEN (red light ON, green light OFF) and damper light for 0VC10YA indicates CLOSED (red light OFF, green light ON).

Cue:

Comments SAT UNSAT Comment Number Page 5 of 9

JPM Number: CR JPM g - rev 01 Clinton Power Station Job Performance Measure (JPM) 8.3.3.1 IF Manual Initiation of a High Radiation Isolation is required, THEN Depress both Cont Rm Mu Trn Hi Rad initiation push-buttons.

Standard: On P801-5050 and 5052, either depresses both Cont Rm Mu Trn Hi Rad initiation push-buttons or verifies red light above pushbutton is lit.

Cue:

Comments No plant response expected.

SAT UNSAT Comment Number 8.3.3.2 Verify Supply Air Trn A un-isolates as follows:

1) 0VC09YA, Sply Air Trn A Filt Inlet Dmpr opens.
2) 0VC10YA, Sply Air Trn A Filt Byp Dmpr closes.
4) 0VC11YA, Sply Air Trn A Filt Outlet Dmpr opens.

Standard: Examinee verifies damper lights for 0VC09YA and 0VC11YA indicate OPEN (red light ON, green light OFF) and damper light for 0VC10YA indicates CLOSED (red light OFF, green light ON).

Cue:

Comments SAT UNSAT Comment Number Page 6 of 9

JPM Number: CR JPM g - rev 01 Clinton Power Station Job Performance Measure (JPM) 8.3.3.3 Verify running/start 0VC05CA, Cont Rm HVAC A MU Air Fan.

Standard: Examinee verifies 0VC05CA, Cont Rm HVAC A MU Air Fan is running (red light ON, green light OFF).

Cue:

Comments SAT UNSAT Comment Number 8.3.3.4 Verify the following dampers open:

1) 0VC02YA, Cont Rm Trn A MU Air Dmpr.
2) 0VC06YA, Cont Rm MU Trn A Outlet Dmpr.
3) Verify 0VC114YA, Cont Rm MU Trn A Flow Cont Dmpr modulates.

Standard: Examinee verifies damper lights for 0VC02YA and 0VC06YA indicate OPEN (red light ON, green light OFF) and damper lights for 0VC114YA indicates modulating (red light ON, green light ON).

Cue:

Comments SAT UNSAT Comment Number Page 7 of 9

JPM Number: CR JPM g - rev 01 Clinton Power Station Job Performance Measure (JPM) 8.3.3.6 Verify the following dampers close:

1) 0VC03YA, Cont Rm Trn A Min OS Dmpr.
2) 0VC05YA, MCR Max Intake & Purge Dmpr.
3) 0VC48YA, MCR Max Intake & Purge Dmpr.
4) 0VC49YA, MCR Max Intake & Purge Dmpr.
5) 0VC81YA, MCR Max Intake & Purge Dmpr.
6) 0VC115YA, Cont Rm Trn A Min OS Dmpr.
7) 0VC69Y, MCR Locker Rm Exhaust Dmpr.
8) 0VC70Y, MCR Locker Rm Exhaust Dmpr.
9) 0VC11C, MCR Locker Rm Exhaust Fan is not running Standard: Examinee verifies damper lights for 0VC03YA, 0VC05YA, 0VC48YA, 0VC49YA, 0VC81YA, 0VC115YA, 0VC69Y,and 0VC70Y indicate CLOSED (red light OFF, green light ON).

Examinee verifies 0VC11C, MCR Locker Rm Exhaust Fan is not running (red light OFF, green light ON).

Cue:

Comments SAT UNSAT Comment Number 8.3.3.7 0VC01YA(B), Cont Rm Trn A(B) Min Air Dmpr is located on the east (west) side of the plant.

Use the following table to quickly locate monitors and indicators to aid in completion of the remaining steps in section 8.3.3.

Standard: Examinee determines that higher radiation condition exists on the WEST side.

Cue:

Comments SAT UNSAT Comment Number Page 8 of 9

JPM Number: CR JPM g - rev 01 Clinton Power Station Job Performance Measure (JPM)

  • 8.3.3.8 IF A high radiation condition exists as indicated by OS Air Inlet Rad Mon on P801-66B and 67B, THEN
1. Open/verify open the minimum air damper with the lowest radiation level (0VC01YA).
2. Shut/verify shut the other minimum air damper (0VC01YB).

Standard: Examinee verifies 0VC01YA is OPEN (red light ON, green light OFF) and closes 0VC01YB (red light OFF, green light ON).

Cue:

Comments SAT UNSAT Comment Number TERMINATING CUES:

The VC System is running in the High Radiation Mode with Minimum Outside Air Damper 0VC01YA OPEN and 0VC01YB SHUT.

STOP TIME:

Page 9 of 9