IR 05000282/2015407: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
| Line 18: | Line 18: | ||
=Text= | =Text= | ||
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION | {{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION ber 30, 2015 | ||
==SUBJECT:== | |||
PRAIRIE ISLAND NUCLEAR GENERATING PLANT, UNITS 1 AND 2 - | |||
NRC SECURITY BASELINE INSPECTION REPORT 05000282/2015407; 05000306/2015407 | |||
==Dear Mr. Davison:== | ==Dear Mr. Davison:== | ||
On November 20, 2015, the U.S. Nuclear Regulatory Commission (NRC) completed a security inspection at your Prairie Island Nuclear Generating Plant, Units 1 and 2. The inspection covered one or more of the key attributes of the security cornerstone of the | On November 20, 2015, the U.S. Nuclear Regulatory Commission (NRC) completed a security inspection at your Prairie Island Nuclear Generating Plant, Units 1 and 2. The inspection covered one or more of the key attributes of the security cornerstone of the NRCs Reactor Oversight Process. The enclosed inspection report documents the inspection results, which were discussed on November 20, 2015, with Mr. C. Calia, and other members of your staff. | ||
The inspection examined activities conducted under your license as they relate to security and compliance with the Commissions rules and regulations, and with the conditions of your license. The inspector reviewed selected procedures and records, observed activities, and interviewed personnel. | |||
No NRC-identified or self-revealing findings were identified during this inspection. | No NRC-identified or self-revealing findings were identified during this inspection. | ||
| Line 32: | Line 35: | ||
If you contest the violation or significance of the NCV, you should provide a response within 30 days of the date of this inspection report, with the basis of your denial, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555-0001; with copies to the Regional Administrator, Region III; the Director, Office of Enforcement, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001; and the NRC Resident Inspector at the Prairie Island Nuclear Generating Station. | If you contest the violation or significance of the NCV, you should provide a response within 30 days of the date of this inspection report, with the basis of your denial, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555-0001; with copies to the Regional Administrator, Region III; the Director, Office of Enforcement, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001; and the NRC Resident Inspector at the Prairie Island Nuclear Generating Station. | ||
Enclosure contains Sensitive Unclassified Non-Safeguards Information. When separated from enclosure, this transmittal document is decontrolled. In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, | Enclosure contains Sensitive Unclassified Non-Safeguards Information. When separated from enclosure, this transmittal document is decontrolled. In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, Public Inspections, Exemptions, Requests for Withholding, of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRCs Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). | ||
However, the material enclosed herewith contains Security-Related Information in accordance with 10 CFR 2.390(d)(1) | However, the material enclosed herewith contains Security-Related Information in accordance with 10 CFR 2.390(d)(1) and its disclosure to unauthorized individuals could present a security vulnerability. Therefore, the material in the enclosure will not be made available electronically for public inspection in the NRC Public Document Room or from the PARS component of NRC's ADAMS. If you choose to provide a response and Security-Related Information is necessary to provide an acceptable response, please mark your entire response Security-Related Information-Withhold from public disclosure under 10 CFR 2.390 in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response. | ||
and its disclosure to unauthorized individuals could present a security vulnerability. | |||
Should you have any questions concerning this inspection, we will be pleased to discuss them with you. | |||
Sincerely, | Sincerely, | ||
/RA/ Steven K. Orth, Chief Plant Support Branch | /RA/ | ||
Steven K. Orth, Chief Plant Support Branch Division of Reactor Safety Docket Nos. 05000282; 05000306 License Nos. DPR-42; DPR-60 Nonpublic Enclosure: | |||
Division of Reactor | IR 05000282/2015407; 05000306/2015407 w/Attachment: Supplemental Information DISTRIBUTION: | ||
IR 05000282/2015407; 05000306/2015407 w/Attachment: Supplemental Information DISTRIBUTION | N. Simonian, NSIR/DSO/DDSO/ST E. Wharton, NSIR R. McKinley, RI B. Desai, RII C. Pederson, RIII D. Roberts, RIII M. Haire, RIV cc w/o encl: Distribution via LISTSERV | ||
Distribution via LISTSERV | |||
}} | }} | ||
Revision as of 02:35, 31 October 2019
| ML15364A599 | |
| Person / Time | |
|---|---|
| Site: | Prairie Island |
| Issue date: | 12/30/2015 |
| From: | Steven Orth Plant Support Branch II |
| To: | Davison K Northern States Power Co |
| References | |
| IR 2015407 | |
| Download: ML15364A599 (4) | |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION ber 30, 2015
SUBJECT:
PRAIRIE ISLAND NUCLEAR GENERATING PLANT, UNITS 1 AND 2 -
NRC SECURITY BASELINE INSPECTION REPORT 05000282/2015407; 05000306/2015407
Dear Mr. Davison:
On November 20, 2015, the U.S. Nuclear Regulatory Commission (NRC) completed a security inspection at your Prairie Island Nuclear Generating Plant, Units 1 and 2. The inspection covered one or more of the key attributes of the security cornerstone of the NRCs Reactor Oversight Process. The enclosed inspection report documents the inspection results, which were discussed on November 20, 2015, with Mr. C. Calia, and other members of your staff.
The inspection examined activities conducted under your license as they relate to security and compliance with the Commissions rules and regulations, and with the conditions of your license. The inspector reviewed selected procedures and records, observed activities, and interviewed personnel.
No NRC-identified or self-revealing findings were identified during this inspection.
However, a licensee-identified violation, which was determined to be of very low security significance (Green), is documented in this report. The NRC is treating this violation as a Non-Cited Violation (NCV) consistent with Section 2.3.2.a. of the Enforcement Policy.
If you contest the violation or significance of the NCV, you should provide a response within 30 days of the date of this inspection report, with the basis of your denial, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555-0001; with copies to the Regional Administrator, Region III; the Director, Office of Enforcement, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001; and the NRC Resident Inspector at the Prairie Island Nuclear Generating Station.
Enclosure contains Sensitive Unclassified Non-Safeguards Information. When separated from enclosure, this transmittal document is decontrolled. In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, Public Inspections, Exemptions, Requests for Withholding, of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRCs Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
However, the material enclosed herewith contains Security-Related Information in accordance with 10 CFR 2.390(d)(1) and its disclosure to unauthorized individuals could present a security vulnerability. Therefore, the material in the enclosure will not be made available electronically for public inspection in the NRC Public Document Room or from the PARS component of NRC's ADAMS. If you choose to provide a response and Security-Related Information is necessary to provide an acceptable response, please mark your entire response Security-Related Information-Withhold from public disclosure under 10 CFR 2.390 in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response.
Should you have any questions concerning this inspection, we will be pleased to discuss them with you.
Sincerely,
/RA/
Steven K. Orth, Chief Plant Support Branch Division of Reactor Safety Docket Nos. 05000282; 05000306 License Nos. DPR-42; DPR-60 Nonpublic Enclosure:
IR 05000282/2015407; 05000306/2015407 w/Attachment: Supplemental Information DISTRIBUTION:
N. Simonian, NSIR/DSO/DDSO/ST E. Wharton, NSIR R. McKinley, RI B. Desai, RII C. Pederson, RIII D. Roberts, RIII M. Haire, RIV cc w/o encl: Distribution via LISTSERV