{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 August 9, 2017  
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 August 9, 2017 LICENSEE:     Entergy Operations, Inc.
 
FACILITY:     River Bend Station
LICENSEE: Entergy Operations, Inc.  
 
FACILITY: River Bend Station  


==SUBJECT:==
==SUBJECT:==
Line 28: Line 25:
==SUMMARY==
==SUMMARY==
OF MEETING HELD ON APRIL 25, 2017, BETWEEN THE U.S. NUCLEAR REGULATORY COMMISSION STAFF AND ENTERGY OPERATIONS, INC. REPRESENTATIVES TO DISCUSS THE RIVER BEND STATION, UNIT 1 LICENSE RENEWAL APPLICATION (CAC NO. MF9747)
OF MEETING HELD ON APRIL 25, 2017, BETWEEN THE U.S. NUCLEAR REGULATORY COMMISSION STAFF AND ENTERGY OPERATIONS, INC. REPRESENTATIVES TO DISCUSS THE RIVER BEND STATION, UNIT 1 LICENSE RENEWAL APPLICATION (CAC NO. MF9747)
On April 25, 2017, the Nuclear Regulatory Commission (NRC) staff met with members of Entergy Operations, Inc. in a telephone conference call to discuss the license renewal application (LRA) process. A list of attendees is provided in the Enclosure.  
On April 25, 2017, the Nuclear Regulatory Commission (NRC) staff met with members of Entergy Operations, Inc. in a telephone conference call to discuss the license renewal application (LRA) process. A list of attendees is provided in the Enclosure.
 
During this meeting the NRC staff provided an overview of the License Renewal review process, application requirements, staff recommendations and application of lessons learned, typical review schedule, and conducted coordination of a follow on pre-license renewal application coordination meeting. Presentation slides for this meeting are available in the Agencywide Documents Access and Management System (ADAMS) Accession No. ML17187A046. During this meeting Entergy agreed to conduct, within a months time, an overview of the contents of their proposed LRA, a discussion of the application of lessons learned from previous applications, as well as logistical details regarding an LRA submission.
During this meeting the NRC staff provided an overview of the License Renewal review process, application requirements, staff recommendations and application of lessons learned, typical review schedule, and conducted coordination of a follow on pre-license renewal application coordination meeting. Presentation slides for this meeting are available in the Agencywide Documents Access and Management System (ADAMS) Accession No. ML17187A046. During this meeting Entergy agreed to conduct, within a month's time, an overview of the contents of their proposed LRA, a discussion of the application of lessons learned from previous applications, as well as logistical details regarding an LRA submission.  
Sincerely,
 
                                                /RA/
Sincerely,  
Emmanuel Sayoc, Project Manager Projects Management and Guidance Branch Division of License Renewal Office of Nuclear Reactor Regulation Docket No. 50-458
        /RA/ Emmanuel Sayoc, Project Manager  
 
Projects Management and Guidance Branch Division of License Renewal Office of Nuclear Reactor Regulation  
 
Docket No. 50-458  


==Enclosure:==
==Enclosure:==
Attendance List
cc w/encl:  See next page


ML17187A037 OFFICE PM:RPGB:DLR LA:RPGB:DLR BC:RPGB:DLR NAME ESayoc YEdmonds S Stuchell DATE 8/3/2017 8/3/2017 8/9/2017
Attendance List cc w/encl: See next page


Enclosure  MEETING BETWEEN THE NRC STAFF AND ENTERGY OPERATIONS, INC. RIVER BEND STATION LICENSE RENEWAL APPLICATION ROCKVILLE, MARYLAND TELECOM  MEETING ATTENDANCE LIST  APRIL 25, 2017  
ML17187A037 OFFICE PM:RPGB:DLR LA:RPGB:DLR                      BC:RPGB:DLR NAME          ESayoc                YEdmonds        S Stuchell DATE          8/3/2017              8/3/2017        8/9/2017


PARTICIPANTS A FFILIATIONSSteven Bloom Nuclear Re g ulator y Commission (NRC)Brian Wittick NRCHeather Jones NRC A llen Hise r NRCThomas Broussard Enter gy O p erations, Inc.
MEETING BETWEEN THE NRC STAFF AND ENTERGY OPERATIONS, INC.
(Enter gy) Dann y Williamson Enter gy Rand y Gautreaux Enter gyDavid Lach Enter gyMark S p inelli Enter gyJulie Robinson Enter gy Alan Cox Enter gyHerbert Rideout Enter gy}}
RIVER BEND STATION LICENSE RENEWAL APPLICATION ROCKVILLE, MARYLAND TELECOM MEETING ATTENDANCE LIST APRIL 25, 2017 PARTICIPANTS                           AFFILIATIONS Steven Bloom                           Nuclear Regulatory Commission (NRC)
Brian Wittick                           NRC Heather Jones                           NRC Allen Hiser                            NRC Thomas Broussard                       Entergy Operations, Inc. (Entergy)
Danny Williamson                       Entergy Randy Gautreaux                         Entergy David Lach                             Entergy Mark Spinelli                          Entergy Julie Robinson                         Entergy Alan Cox                               Entergy Herbert Rideout                         Entergy Enclosure}}

Revision as of 01:20, 30 October 2019

04/25/2017 Summary of Meeting Between the U.S. Nuclear Regulatory Commission Staff and Entergy Operations, Inc. Representatives to Discuss the River Bend Station, Unit 1 License Renewal Application
ML17187A037
Person / Time
Site: River Bend Entergy icon.png
Issue date: 08/09/2017
From: Sayoc E
NRC/NRR/DLR/RPGB
To:
Entergy Operations
Sayoc E
References
CAC MF9747
Download: ML17187A037 (3)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 August 9, 2017 LICENSEE: Entergy Operations, Inc.

FACILITY: River Bend Station

SUBJECT:

SUMMARY

OF MEETING HELD ON APRIL 25, 2017, BETWEEN THE U.S. NUCLEAR REGULATORY COMMISSION STAFF AND ENTERGY OPERATIONS, INC. REPRESENTATIVES TO DISCUSS THE RIVER BEND STATION, UNIT 1 LICENSE RENEWAL APPLICATION (CAC NO. MF9747)

On April 25, 2017, the Nuclear Regulatory Commission (NRC) staff met with members of Entergy Operations, Inc. in a telephone conference call to discuss the license renewal application (LRA) process. A list of attendees is provided in the Enclosure.

During this meeting the NRC staff provided an overview of the License Renewal review process, application requirements, staff recommendations and application of lessons learned, typical review schedule, and conducted coordination of a follow on pre-license renewal application coordination meeting. Presentation slides for this meeting are available in the Agencywide Documents Access and Management System (ADAMS) Accession No. ML17187A046. During this meeting Entergy agreed to conduct, within a months time, an overview of the contents of their proposed LRA, a discussion of the application of lessons learned from previous applications, as well as logistical details regarding an LRA submission.

Sincerely,

/RA/

Emmanuel Sayoc, Project Manager Projects Management and Guidance Branch Division of License Renewal Office of Nuclear Reactor Regulation Docket No. 50-458

Enclosure:

Attendance List cc w/encl: See next page

ML17187A037 OFFICE PM:RPGB:DLR LA:RPGB:DLR BC:RPGB:DLR NAME ESayoc YEdmonds S Stuchell DATE 8/3/2017 8/3/2017 8/9/2017

MEETING BETWEEN THE NRC STAFF AND ENTERGY OPERATIONS, INC.

RIVER BEND STATION LICENSE RENEWAL APPLICATION ROCKVILLE, MARYLAND TELECOM MEETING ATTENDANCE LIST APRIL 25, 2017 PARTICIPANTS AFFILIATIONS Steven Bloom Nuclear Regulatory Commission (NRC)

Brian Wittick NRC Heather Jones NRC Allen Hiser NRC Thomas Broussard Entergy Operations, Inc. (Entergy)

Danny Williamson Entergy Randy Gautreaux Entergy David Lach Entergy Mark Spinelli Entergy Julie Robinson Entergy Alan Cox Entergy Herbert Rideout Entergy Enclosure