ML18018A837: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:'REGULATORY"I RNATION OISTRISUTION
{{#Wiki_filter:'REGULATORY     "I     RNATION OISTRISUTION     'SYSl,(RIOR<<
'SYSl,(RIOR<<
  'AOCESSION NBR;8310210136.               DOO.DATE:   83/10/ic,   NOTARIZED:.,No                   DOCKET" i t
t'AOCESSION NBR;8310210136.
FAOIL:50 400 'Shearon Hanr)s,Nuclear Power <<Plantr .Unit"                 ii "Carol')na           05000000
DOO.DATE: 83/10/ic, NOTARIZED:.,No DOCKET" i FAOIL:50 400'Shearon Hanr)s,Nuclear Power<<Plantr.Unit" ii"Carol')na 05000000'50-401'Shear on Hat<<riis'ucl ear}Power P 1 antq.Uni tE 2'~',Carol ina 05000401 AUTH'iNAME AUTHOR AFFILIATION MCDUFFIE'iM>>A,}Carolina-<<Power 8 Light Co>>"RE<<CIP,NAME<<RECIPIENT AFFIL'IATION.DENTONgH.R>>
            '50-401 'Shear on Hat<<riis'ucl ear }Power P antq. Uni tE 2'~ ',Carol ina 1                                    05000401 AUTH'iNAME             AUTHOR AFFILIATION MCDUFFIE'iM>>A,         }Carolina-<<Power 8 Light Co>>
Of fice}of Nucl ear'Reactor-Regul ationi Dir ector Wag'SUBJECT;Forwar ds addi info ne f ire pr otectiong includin'g
      "RE<<CIP,NAME<<RECIPIENT AFFIL'IATION
<<t esponse.to"Safety Review Question 280~iver euised<<safe'hutdown analysis w/exemptiops,8 mods<info requested in-830926 27 meetings H/NRC.5 response<to Enforcement" Action 83 01>>DISTRIBUTION
    .DENTONgH.R>>             Of fice} of Nucl ear 'Reactor -Regul ationi Dir ector Wag
<<CODE;B002S<<COPIES}RECEIVED:L<<TR,'<<ENCL<,"SIZE i.'ITLEs.Li'censing
    'SUBJECT;     Forwar ds addi info ne f ire pr otectiong includin'g <<t esponse .to "Safety Review Question 280 ~ iver euised <<safe'hutdown analysis w/exemptiops,8 mods<info requested in- 830926 27 meetings H/
'Submi,ttal:.Fir e'IProtection NOTES'EC IP XENT ID.CODE/NAME<<
NRC .5 response <to Enforcement" Action 83 01>>
NRR LB3 BC 06'4 INTERNAL;<<ELD/HDS1 NRR/DFJ R 1" 2 1<<COP XES ,LTTR'ENCL<<'.1 1~0 P2 1:RECIPIENT"ID<<CODE/NAME BUCKLEY i B'01 IE-'ILE 07 NRR/DS I/ASB RGN2'COPIES L'TTR ENCL" 1.1 1 1 1 1 1 1 EXTiERNAL>>:
DISTRIBUTION <<CODE; B002S           <<COPIES }RECEIVED:L<<TR, '<<ENCL<,         "SIZE i Li'censing 'Submi,ttal: .Fir e'IProtection                                   .'ITLEs.
ACRS NRC>>PDR.NTIS 10.02.6 6 L'PDR'1 NSXC>>1=03 05-1 1 1',1 Wo 8.4<<gee/E}TOTAL NUMBER.OF COPIES'EQUIRED e L<<TfR 19<<ENCL'18 T<<}~}}l l)<<}r'(f<<}}l<<<<"1}r r}0"I,: l}X," 0<<,i T}}<<,}}l Xf)"nr fn's,)g l 0 rr}}f<<nr f<.'1w>)q}<<n I n l'}}}r i l1 0 r l l'}it<<<<}~)"}qT<<s l}<<0 l pry~}q<<'}<<}f I ff'i p t l<<r,<<I l,." r I n><<}}}r}r')(}r);}}}q<<c,'r}'}g<<<<}<<}lg,r}}$', Q}J<<<<g r"}}jp"" r}n'}gy<<}g}r" IJ')}Pl~r}wo}.[l f>q}).}I'<>>l>>.}}'r))'l I~<<~~Pl t j<<<<~<<,)i Ei , I}g (}<<g r}(<<I r.')}ii~I l)(y$l)3l.)~I'f'f pp<<n),<<i'}<<fear}}<}l
NOTES'EC IP XENT           <<COP XES            :RECIPIENT            'COPIES ID .CODE/NAME<<         ,LTTR 'ENCL<<     "ID <<CODE/NAME        L'TTR ENCL" NRR  LB3 BC              '.1       1     BUCKLEYi B      '01        1      .1 INTERNAL; <<ELD/HDS1                        1"    ~0    IE-'ILE         07       1              1 NRR/DFJ          06'4      2    P2      NRR/DS I/ASB               1               1 R                            1     1     RGN2                      1               1 EXTiERNAL>>: ACRS                 10.       6     6     L'PDR'           03        1              1 NRC>>PDR            02.              1     NSXC>>           05-       1     ',1
'}}ll~~c}r g'}~n l f<<~~<<ree i v<<1<AD r)8 r}A r pi}.f}-P rf qnr 0'}~r)t<<1<}r f c>>>t r>0 r'l o'}4 0'r)r v}~)r1 r q pi<<<"<<y<<r<<Arp r'f$.<<<<"}nJ r}<<".nn g<<'<<}a+'}0 l<<))tb<<''<<}X<<)}I'':f)ll>>: 3%1 l),)'<T,j: l)y7'1<"1 8)1'sf'J PN')'~:)0}),}r}~r 0>cjoy'J oz r).l a,f p rr i".'}}i'r}r ll<<}l Ilg r l:}l)ri 1 C&#xc3;Q0, Carolina Power&Light Company OCT 14 1983 SERIAL: LAP-83-479 Mr.Harold R.Denton, Director Office of Nuclear Reactor Regulation United States Nuclear Regulatory Commission Washington, DC 20555 SHEARON HARRIS NUCLEAR POWER PLANT UNIT NOS.1 AND 2 DOCKET NOS~50-400 AND 50-401 FIRE PROTECTION
              .NTIS                                1=
Wo     8. 4<<gee/E
  }TOTAL NUMBER .OF COPIES'EQUIRED             e L<<TfR   19   <<ENCL'   18


==Dear Mr.Denton:==
T                        "I,: l }X," 0<<,i T}}<<,}} l Xf)                                qT  <<s    )(}r)                            I~
Carolina Power&Light Company hereby transmits one original and forty copies of additional information requested by the NRC as part of the safety review of the Shearon Harris Nuclear Power Plant.This information was requested during the fire protection meetings held September 26-27, 1983 in Bethesda.The enclosures to the letter are delineated in the attached Summary of Enclosures.
I r .'        ) } ii
The attachments include all of the additional information requested on Fire Protection.
<<}  ~ }} l l) <<} r'(  "nr fn's,    )  g l    0  rr}}f                                                          'r l}<<0 l ;}}}q<<c, }'}g<<<<} <<} lg,r}}$ ',          (} <<g              r}(<< ~  I l    )(y$ l f <<} }l<<<< "1 }r r }0 <<nr  f<.'1w>)    q  }                                  pry ~ } q<<'}<<} f Q}J<<<<g r "} } jp"" r}n'}gy<<}g}r" I ff'i IJ ') }Pl
We will be providing responses to other requests for additional information shortly.Yours very truly, M.A.McDuffie Senior Vice President Nuclear Generation MAM/pgp (8185NLU)Enclosures Mr.Wells Eddleman Dr.Phyllis Lotchin Mr.John D.Runkle Dr.Richard D.Wilson Mr.G.0.Bright (ASLB)Dr.J.H.Carpenter (ASLB)Mr.J.L.Kelley (ASLB)411 Fayetteville Street o P.O.Box 1551 o Raleigh, N.C.27602 cc: Mr.B.C.Buckley (NRC)Mr.G.F.Maxwell (NRC-SHNPP)
                                                                          <<n p    t  l<<r              ~r}wo }. [ l f>q} )                ~
Mr.J.P.O'Reilly (NRC-RII)Mr.Travis Payne (KUDZU)Mr.Daniel F.Read (CHANGE/ELP) 88 tXllh Mr.R.P.Gruber (NCUC)O Chapel Hill Public Library'HC Wake County Public Library jul',~U I mgi'OIC FJA 03CLtt-I I I  
                                                                                                                                              <<
Pl    t      ~
                                                                                                                                                              ,  )i )3l            .)
                                                                                  ,<<I l,." r I                    .}I'<>> l >>                        j<<<< Ei          ~
I l l'                                                              }'r) ) 'l
                                                                                                                                                                            'f'f In  l '} } } r      i l1 0  r          }it<<<<}~)  "} n > <<} }}r} r'                          .}                          ~        <<
                                                                                                                                                              , I} g
                                        <<fear}}<}l pp <<n ),<<  i'}                  '}}ll ~c}r g'}
                                                                ~                            '}~r )            t<<1<} r f c>>>t            +'}0 l                :f ) ll>>
                                                  ~    n l f<<~~ <<ree i                                r> 0 r 'l o'}4 0'r)    r v } ~)    <<) )
v<<1    <AD r)8        r}  Ar    pi}                          r1 r q pi<<< "<<y<<r<<Arp r 'f $ .<<<< "}
tb<<''<<}X
                                                                                                                                                          <<
                                                  . f } -P rf        qnr 0                                        nJ r}<<".nn g<<'<<}a            ) }I ''
                                                                    '<T,j: l )y7 '1 < "1 8 ) 1 'sf'J                PN')'~: )0}),}                          ll<<}l Ilg
: 3%1 l                  ),    )
r}~ r 0 >cjoy'J oz r ) . l a,f p rr i".'}}i'r}r                                      r  l: }l)ri
 
1 C&#xc3;Q0, Carolina Power & Light Company                SERIAL: LAP-83-479 OCT  14  1983 Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation United States Nuclear Regulatory Commission Washington, DC 20555 SHEARON HARRIS NUCLEAR POWER PLANT UNIT NOS. 1 AND 2 DOCKET NOS ~ 50-400 AND 50-401 FIRE PROTECTION
 
==Dear Mr. Denton:==
 
Carolina Power & Light Company hereby transmits one original and forty copies of additional information requested by the NRC as part of the safety review of the Shearon Harris Nuclear Power Plant. This information was requested during the fire protection meetings held September 26-27, 1983 in Bethesda. The enclosures to the letter are delineated in the attached Summary of Enclosures. The attachments include all of the additional information requested on Fire Protection.
We will be providing responses           to other requests for additional information shortly.
Yours very       truly, M. A. McDuffie Senior Vice President Nuclear Generation MAM/pgp   (8185NLU)
Enclosures cc: Mr. B. C. Buckley (NRC)                               Mr. Wells Eddleman Mr. G. F. Maxwell (NRC-SHNPP)                         Dr. Phyllis Lotchin Mr. J. P. O'Reilly (NRC-RII)                         Mr. John D. Runkle Mr. Travis Payne (KUDZU)                             Dr. Richard D. Wilson Mr. Daniel F. Read (CHANGE/ELP)                        Mr. G. 0. Bright (ASLB) 88 tXllh Mr. R. P. Gruber (NCUC)                               Dr. J. H. Carpenter (ASLB)
O             Chapel Hill Public Library                           Mr. J. L. Kelley (ASLB)
'HC             Wake County Public Library jul
',~U mgi
'OIC I
411 Fayetteville Street o P. O. Box 1551 o Raleigh, N. C. 27602 FJA 03CLtt- I I
I


==SUMMARY==
==SUMMARY==
OF ENCLOSURES 1.Revised Response to NRC Safety Review Question 280.1 2.Revised Safe Shutdown Analysis with Exemptions and Modifications 3.Additional Information Requested by NRC in Meetings held September 26-27, 1983 4.Response to Inspection and Enforcement Notice 83-41 (8 223FXTt da)
OF ENCLOSURES
ENCLOSURE 1 Shearon Harris Nuclear Power Plant Draft SER Open Item 350 Safety Review estion 280.1 Revised Response The original response to Open Item 350 (Comparison to Branch Technical Position (MEB 9.5-1))was transmitted via letter dated August 12, 1983 (LAP-83-333)
: 1. Revised Response to NRC Safety Review Question 280.1
.'Ihe reviewer requested" that this response be modified as discussed in the September 26-27 meetings.In addition, the NRC requested CP&L to submit an FSAR page change to clarify and correct a reference to NFPA No.72D.Response The revised response to Open Item 350 is attached.'Ihe FSAR page change is also attached and will be included in a future FSAR Amendment.}}
: 2. Revised Safe Shutdown Analysis with Exemptions and Modifications
: 3. Additional Information Requested     by NRC in Meetings held September 26-27, 1983
: 4. Response to Inspection   and Enforcement Notice 83-41 (8 223FXTt da)
 
ENCLOSURE 1 Shearon Harris Nuclear Power Plant Draft SER Open Item 350 Safety Review estion 280.1 Revised Response The original response to Open Item 350 (Comparison to Branch Technical Position   (MEB 9.5-1)) was transmitted via letter dated August 12, 1983 (LAP-83-333) . 'Ihe reviewer requested" that this response be modified as discussed in the September 26 27 meetings.     In addition, the NRC requested CP&L to submit an FSAR page change to clarify and correct a reference to   NFPA No. 72D.
 
===Response===
The revised response to Open Item 350 is attached.   'Ihe FSAR page change is also attached   and will be included in a future FSAR Amendment.}}

Revision as of 03:38, 22 October 2019

Forwards Addl Info Re Fire Protection,Including Response to Safety Review Question 280.1,revised Safe Shutdown Analysis W/Exemptions & Mods,Info Requested in 830926-27 Meetings W/ NRC & Response to Enforcement Action 83-41
ML18018A837
Person / Time
Site: Harris  Duke Energy icon.png
Issue date: 10/14/1983
From: Mcduffie M
CAROLINA POWER & LIGHT CO.
To: Harold Denton
Office of Nuclear Reactor Regulation
References
EA-83-041, EA-83-41, LAP-83-473, NUDOCS 8310210136
Download: ML18018A837 (6)


Text

'REGULATORY "I RNATION OISTRISUTION 'SYSl,(RIOR<<

'AOCESSION NBR;8310210136. DOO.DATE: 83/10/ic, NOTARIZED:.,No DOCKET" i t

FAOIL:50 400 'Shearon Hanr)s,Nuclear Power <<Plantr .Unit" ii "Carol')na 05000000

'50-401 'Shear on Hat<<riis'ucl ear }Power P antq. Uni tE 2'~ ',Carol ina 1 05000401 AUTH'iNAME AUTHOR AFFILIATION MCDUFFIE'iM>>A, }Carolina-<<Power 8 Light Co>>

"RE<<CIP,NAME<<RECIPIENT AFFIL'IATION

.DENTONgH.R>> Of fice} of Nucl ear 'Reactor -Regul ationi Dir ector Wag

'SUBJECT; Forwar ds addi info ne f ire pr otectiong includin'g <<t esponse .to "Safety Review Question 280 ~ iver euised <<safe'hutdown analysis w/exemptiops,8 mods<info requested in- 830926 27 meetings H/

NRC .5 response <to Enforcement" Action 83 01>>

DISTRIBUTION <<CODE; B002S <<COPIES }RECEIVED:L<<TR, '<<ENCL<, "SIZE i Li'censing 'Submi,ttal: .Fir e'IProtection .'ITLEs.

NOTES'EC IP XENT <<COP XES :RECIPIENT 'COPIES ID .CODE/NAME<< ,LTTR 'ENCL<< "ID <<CODE/NAME L'TTR ENCL" NRR LB3 BC '.1 1 BUCKLEYi B '01 1 .1 INTERNAL; <<ELD/HDS1 1" ~0 IE-'ILE 07 1 1 NRR/DFJ 06'4 2 P2 NRR/DS I/ASB 1 1 R 1 1 RGN2 1 1 EXTiERNAL>>: ACRS 10. 6 6 L'PDR' 03 1 1 NRC>>PDR 02. 1 NSXC>> 05- 1 ',1

.NTIS 1=

Wo 8. 4<<gee/E

}TOTAL NUMBER .OF COPIES'EQUIRED e L<<TfR 19 <<ENCL' 18

T "I,: l }X," 0<<,i T<<,}} l Xf) qT <<s )(}r) I~ I r .' ) } ii <<} ~ }} l l) <<} r'( "nr fn's, ) g l 0 rr}}f 'r l}<<0 l ;}}}q<<c, }'}g<<<<} <<} lg,r}}$ ', (} <<g r}(<< ~ I l )(y$ l f <<} }l<<<< "1 }r r }0 <<nr f<.'1w>) q } pry ~ } q<<'}<<} f Q}J<<<<g r "} } jp"" r}n'}gy<<}g}r" I ff'i IJ ') }Pl

                                                                         <<n p     t   l<<r              ~r}wo }. [ l f>q} )                ~
                                                                                                                                              <<

Pl t ~

                                                                                                                                                              ,  )i )3l            .)
                                                                                  ,<<I l,." r I                     .}I'<>> l >>                        j<<<< Ei          ~

I l l' }'r) ) 'l

                                                                                                                                                                            'f'f In  l '} } } r      i l1 0   r          }it<<<<}~)   "} n > <<} }}r} r'                           .}                          ~        <<
                                                                                                                                                              , I} g
                                        <<fear}}<}l pp <<n ),<<   i'}                   '}}ll ~c}r g'}
                                                                ~                            '}~r )             t<<1<} r f c>>>t            +'}0 l                 :f ) ll>>
                                                  ~    n l f<<~~ <<ree i                                r> 0 r 'l o'}4 0'r)    r v } ~)     <<) )

v<<1 <AD r)8 r} Ar pi} r1 r q pi<<< "<<y<<r<<Arp r 'f $ .<<<< "} tb<<<<}X

                                                                                                                                                          <<
                                                 . f } -P rf         qnr 0                                        nJ r}<<".nn g<<'<<}a            ) }I 
                                                                    '<T,j: l )y7 '1 < "1 8 ) 1 'sf'J                PN')'~: )0}),}                           ll<<}l Ilg
3%1 l ), )

r}~ r 0 >cjoy'J oz r ) . l a,f p rr i".'}}i'r}r r l: }l)ri

1 CÃQ0, Carolina Power & Light Company SERIAL: LAP-83-479 OCT 14 1983 Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation United States Nuclear Regulatory Commission Washington, DC 20555 SHEARON HARRIS NUCLEAR POWER PLANT UNIT NOS. 1 AND 2 DOCKET NOS ~ 50-400 AND 50-401 FIRE PROTECTION

Dear Mr. Denton:

Carolina Power & Light Company hereby transmits one original and forty copies of additional information requested by the NRC as part of the safety review of the Shearon Harris Nuclear Power Plant. This information was requested during the fire protection meetings held September 26-27, 1983 in Bethesda. The enclosures to the letter are delineated in the attached Summary of Enclosures. The attachments include all of the additional information requested on Fire Protection. We will be providing responses to other requests for additional information shortly. Yours very truly, M. A. McDuffie Senior Vice President Nuclear Generation MAM/pgp (8185NLU) Enclosures cc: Mr. B. C. Buckley (NRC) Mr. Wells Eddleman Mr. G. F. Maxwell (NRC-SHNPP) Dr. Phyllis Lotchin Mr. J. P. O'Reilly (NRC-RII) Mr. John D. Runkle Mr. Travis Payne (KUDZU) Dr. Richard D. Wilson Mr. Daniel F. Read (CHANGE/ELP) Mr. G. 0. Bright (ASLB) 88 tXllh Mr. R. P. Gruber (NCUC) Dr. J. H. Carpenter (ASLB) O Chapel Hill Public Library Mr. J. L. Kelley (ASLB) 'HC Wake County Public Library jul ',~U mgi 'OIC I 411 Fayetteville Street o P. O. Box 1551 o Raleigh, N. C. 27602 FJA 03CLtt- I I I

SUMMARY

OF ENCLOSURES

1. Revised Response to NRC Safety Review Question 280.1
2. Revised Safe Shutdown Analysis with Exemptions and Modifications
3. Additional Information Requested by NRC in Meetings held September 26-27, 1983
4. Response to Inspection and Enforcement Notice 83-41 (8 223FXTt da)

ENCLOSURE 1 Shearon Harris Nuclear Power Plant Draft SER Open Item 350 Safety Review estion 280.1 Revised Response The original response to Open Item 350 (Comparison to Branch Technical Position (MEB 9.5-1)) was transmitted via letter dated August 12, 1983 (LAP-83-333) . 'Ihe reviewer requested" that this response be modified as discussed in the September 26 27 meetings. In addition, the NRC requested CP&L to submit an FSAR page change to clarify and correct a reference to NFPA No. 72D.

Response

The revised response to Open Item 350 is attached. 'Ihe FSAR page change is also attached and will be included in a future FSAR Amendment.}}