ML18073A211: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:U.S. NUCLEAR REGULATORY COMMISSION MANAGEMENT DIRECTIVE (M D) MD 8.14 AGENCY ACTION REVIEW MEETING DT-1 Volume 8: Licensee Oversight Programs Approved B y: William M. Dean, Director Office of Nuclear Reactor Regulation Date Approved: October 25 , 2015 Issuing Office:
{{#Wiki_filter:U.S. NUCLEAR REGULATORY COMMISSION MANAGEMENT DIRECTIVE (MD)
Office of Nuclear Reactor Regulation Division of Inspection and Regional Support Contact: Andrew J. Waugh 301-415-5601EXECUTIVE
MD 8.14             AGENCY ACTION REVIEW MEETING                                                                   DT-17-167 Volume 8:           Licensee Oversight Programs Approved By:         William M. Dean, Director Office of Nuclear Reactor Regulation Date Approved:       October 25, 2015 Cert. Date:          N/A, for the latest version of any NRC directive or handbook, see the online MD Catalog.
Issuing Office:     Office of Nuclear Reactor Regulation Division of Inspection and Regional Support Contact:             Andrew J. Waugh 301-415-5601 EXECUTIVE


==SUMMARY==
==SUMMARY==


Management Directive and Handbook 8.14, "Agency Action Review Meeting," are being revised to incorporate
Management Directive and Handbook 8.14, Agency Action Review Meeting, are being revised to incorporate
- The revised reporting criteria for the discussion of fuel facilities during the AgencyAction Review Meeting (AARM),Organizational changes resulting from the merger of the Office of Nuclear MaterialSafety and Safeguards and the Office of Federal and State Materials andEnvironmental Management Programs
* The revised reporting criteria for the discussion of fuel facilities during the Agency Action Review Meeting (AARM),
,Clarification of the process for preparing and distributing the AARM meetingminutes, andMinor editorial updates
* Organizational changes resulting from the merger of the Office of Nuclear Material Safety and Safeguards and the Office of Federal and State Materials and Environmental Management Programs,
.TABLE OF CONTENTS POLICY .............................................................................................................................. 2 OBJECTIVES
* Clarification of the process for preparing and distributing the AARM meeting minutes, and
.................................................................................................................... 2 ORGANIZAT IONAL RESPONSIBILITIES AND DELEGATIONS OF AUTHORITY
* Minor editorial updates.
........... 3 A.Executive Director for Operations (EDO)
TABLE OF CONTENTS POLICY..............................................................................................................................2 OBJECTIVES ....................................................................................................................2 ORGANIZATIONAL RESPONSIBILITIES AND DELEGATIONS OF AUTHORITY ........... 3 A. Executive Director for Operations (EDO) ......................................................................3 B. Director, Office of Nuclear Reactor Regulation (NRR) ..................................................3 C. Director, Office of Nuclear Material Safety and Safeguards (NMSS).............................3 D. Director, Office of Nuclear Security and Incident Response (NSIR) ..............................3 E. Director, Office of New Reactors (NRO) .......................................................................4 F. Region II Regional Administrator ..................................................................................4
...................................................................... 3 B.Director, Office of Nuclear Reactor Regulation (NRR)
_____________________________________________________________________________________________
.................................................. 3 C.Director, Office of Nuclear Material Safety and Safeguards (NMSS)
For updates or revisions to policies contained in this MD that were published after the MD was signed, please see the Yellow Announcement to Management Directive index (YA-to-MD index).
............................. 3 D.Director, Office of Nuclear Security and Incident Response (NSIR)
.............................. 3 E.Director, Office of New Reactors (NRO)
....................................................................... 4 F.Region II Regional Administrator
.................................................................................. 4  


MD 8.14 AGENCY ACTION REVIEW MEETING Date Approved:
MD 8.14       AGENCY ACTION REVIEW MEETING                                                       Date Approved: 10/25/2015 G. All Regional Administrators (All RAs) ............................................................................4 H. Directors of Staff Offices ...............................................................................................5 I. Assistant for Operations, Office of the Executive Director for Operations (OEDO) ........................................................................................................................5 APPLICABILITY ................................................................................................................5 DIRECTIVE HANDBOOK ..................................................................................................5 REFERENCES ...................................................................................................................5 POLICY It is the policy of the U.S. Nuclear Regulatory Commission to have its senior managers conduct an annual Agency Action Review Meeting (AARM). The AARM is an integral part of the evaluative process used by the agency to ensure the operational safety performance of nuclear licensees.
10/25/2015 For the latest version of any NRC directive or handbook, see the online MD Catalog.
OBJECTIVES Review the appropriateness of agency actions taken for those power reactor plants with significant performance issues using data compiled during the end-of-cycle (EOC) review and those that have moved into the multiple/repetitive degraded cornerstone or the unacceptable performance columns of the Reactor Oversight Process (ROP)
2 G.All Regional Administrators (All RAs)
Action Matrix during the first quarter of the year in which the AARM is held and to identify additional actions, as appropriate.
............................................................................ 4 H.Directors of Staff Offices
Review the appropriateness of agency actions taken for those power reactor plants under construction with significant performance issues using data compiled during the CEOC review and those that have moved into the multiple/repetitive degraded cornerstone or the unacceptable performance columns of the Construction Reactor Oversight Process (cROP) Action Matrix during the first quarter of the year in which the AARM is held and to identify additional actions, as appropriate.
............................................................................................... 5 I.Assistant for Operations, Office of the Executive Director for Operations(OEDO) ........................................................................................................................ 5 APPLICABILITY
Review the appropriateness of agency actions taken for those nuclear materials licensees, including fuel cycle facilities that meet the criteria for discussion at the AARM as defined in SECY-11-0132, Revision of the Criteria for Identifying Nuclear Materials Licensees for Discussion at the Agency Action Review Meeting, and to identify additional actions, as appropriate.
................................................................................................................ 5 DIRECTIVE HANDBOOK
Ensure that coordinated courses of action are developed and implemented for licensees with performance issues.
.................................................................................................. 5 REFERENCES
Review the results of the staffs annual assessment of ROP effectiveness, including a review of all approved deviations from the Action Matrix.
................................................................................................................... 5 POLICY It is the policy of the U.S. Nuclear Regulatory Commission to have its senior managers conduct an annual Agency Action Review Meeting (AARM). The AARM is an integral part of the evaluative process used by the agency to ensure the operational safety performance of nuclear licensees.
For the latest version of any NRC directive or handbook, see the online MD Catalog.                                                         2
OBJECTIVES
 
- Review the appropriateness of agency actions taken for those power reactor plants with significant performance issues using data compiled during the end
MD 8.14      AGENCY ACTION REVIEW MEETING                                Date Approved: 10/25/2015 Review the results of the staffs assessment of cROP effectiveness, including all approved deviations from the Construction Action Matrix.
-of-cycle (EOC) review and those that have moved into the "multiple/repetitive degraded cornerstone" or the "unacceptable performance" columns of the Reactor Oversight Process (ROP) Action Matrix during the first quarter of the year in which the AARM is held and to identify additional actions, as appropriate.  
Ensure that trends in industry and licensee performance are recognized and appropriately addressed.
- Review the appropriateness of agency actions taken for those power reactor plants under construction with significant performance issues using data compiled during the CEOC review and those that have moved into the "multiple/repetitive degraded cornerstone" or the "unacceptable performance" columns of the Construction Reactor Oversight Process (cROP) Action Matrix during the first quarter of the year in which the AARM is held and to identify additional actions, as appropriate.  
ORGANIZATIONAL RESPONSIBILITIES AND DELEGATIONS OF AUTHORITY A. Executive Director for Operations (EDO)
- Review the appropriateness of agency actions taken for those nuclear materials licensees, including fuel cycle facilities that meet the criteria for discussion at the AARM as defined in SECY-11-0132 , "Revision of the Criteria for Identifying Nuclear Materials Licensees for Discussion at the Agency Action Review Meeting,"
: 1. Oversees AARM activities and conducts the meeting.
and to identify additional actions, as appropriate. - Ensure that coordinated courses of action are developed and implemented for licensees with performance issues. - Review the results of the staff
: 2. Decides if any additional or alternate NRC actions besides those already completed or planned are to be conducted at a particular licensees facility on the basis of discussions at the AARM.
's annual assessment of ROP effectiveness, including a review o f all approved deviations from the Action Matrix.
: 3. Briefs the Commission on the results of the AARM.
MD 8.14 AGENCY ACTION REVIEW MEETING Date Approved:
B. Director, Office of Nuclear Reactor Regulation (NRR)
10/25/2015 For the latest version of any NRC directive or handbook, see the online MD Catalog.
: 1. Develops guidance for coordinating AARM preparation activities.
3 - Review the results of the staff's assessment of cROP effectiveness, including all approved deviations from the Con struction Action Matrix. - Ensure that trends in industry and licensee performance are recognized and appropriately addressed.
: 2. Coordinates AARM preparations and discussions pertaining to nuclear reactors within the Office of Nuclear Reactor Regulation (NRR) and between other NRC headquarters and regional offices.
ORGANIZATIONAL RESPONSIBILITIES AND DELEGATIONS OF AUTHORITY A.Executive Director for Operations (EDO)1.Oversees AARM activities and conducts the meeting.
: 3. Coordinates and conducts EOC summary meetings, if necessary, on the basis of the results of the regional EOC reviews.
2.Decides if any additional or alternate NRC actions besides those already complet ed or planned are to be conducted at a particular licensee
: 4. Develops ROP program policies and procedures, and ensures the effectiveness of program implementation.
's facility on the basis ofdiscussions at the AARM.
: 5. Participates in the AARM and leads discussion, as necessary.
3.Briefs the Commission on the results of the AARM.B.Director, Office of Nuclear Reactor Regulation (NRR) 1.Develops guidance for coordinating AARM preparation activities.
: 6. Coordinates with the Office of New Reactors (NRO) and other NRC headquarters and regional offices on preparation of the AARM agenda and meeting minutes.
2.Coordinates AARM preparations and discussions pertaining to nuclear reactorswithin the Office of Nuclear Reactor Regulation (NRR) and between other NRCheadquarters and regional offices.3.Coordinates and conducts EOC summary meetings, if necessary, on the basis of theresults of the regional EOC reviews.
C. Director, Office of Nuclear Material Safety and Safeguards (NMSS)
4.Develops ROP program policies and procedures, and ensures the effectiveness of program implementation.
: 1. Coordinates with other NRC headquarters and regional offices on preparations and discussions before the AARM pertaining to fuel cycle and other nuclear materials licensees. In consultation with the appropriate regional administrators (RAs), the Office of Nuclear Material Safety and Safeguards (NMSS) determines which, if any, fuel cycle or other nuclear materials licensees will be discussed at the AARM.
5.Participates in the AARM and leads discussion, as necessary
: 2. Participates in the AARM and leads discussions, as necessary.
.6.Coordinates with the Office of New Reactors (NRO) and other NRC headquartersand regional offices on preparation of the AARM agenda and meeting minutes.
D. Director, Office of Nuclear Security and Incident Response (NSIR)
C.Director, Office of Nuclear Material Safety and Safeguards (NMSS) 1.Coordinates with other NRC headquarters and regional offices on preparations and discussions before the AARM pertaining to fuel cycle and other nuclear materialslicensees. In consultation with the appropriate regional administrators (RAs), th e Office of Nuclear Material Safety and Safeguards (NMSS) determines which, if any,fuel cycle or other nuclear materials licensees will be discussed at the AARM.
: 1. Coordinates AARM preparations and discussions pertaining to the emergency preparedness and security cornerstones of the ROP and cROP, as well as fuel facility security issues between other NRC headquarters and regional offices.
2.Participates in the AARM and leads discussions, as necessary.
For the latest version of any NRC directive or handbook, see the online MD Catalog.               3
D.Director, Office of Nuclear Security and Incident Response (NSIR) 1.Coordinates AARM preparations and discussions pertaining to the emergency preparedness and security cornerstones of the ROP and cROP, as well as fuelfacility security issues between other NRC headquarters and regional offices.
 
MD 8.14 AGENCY ACTION REVIEW MEETING Date Approved:
MD 8.14      AGENCY ACTION REVIEW MEETING                                Date Approved: 10/25/2015
10/25/2015 For the latest version of any NRC directive or handbook, see the online MD Catalog.
: 2. Develops emergency preparedness and security-related ROP, cROP, and materials program policies and procedures, and ensures the effectiveness of program implementation.
4 2.Develops emergency preparedness and security-related ROP, cROP, and materialsprogram policies and procedures, and ensures the effectiveness of programimplementation.
: 3. Participates in the AARM and leads discussion, as necessary.
3.Participates in the AARM and leads discussion, as necessary
: 4. Coordinates with the other NRC headquarters and regional offices on preparation of the AARM agenda and meeting minutes.
.4.Coordinates with the other NRC headquarters and regional offices on preparation ofthe AARM agenda and meeting minutes.
E. Director, Office of New Reactors (NRO)
E.Director, Office of New Reactors (NRO) 1.Coordinates AARM preparations and discussions pertaining to nuclear reactorsunder construction within NRO and between other NRC headquarters and regionaloffices.2.Coordinates and conducts EOC summary meetings, if necessary, on the basis of theresults of the regional EOC review meetings.
: 1. Coordinates AARM preparations and discussions pertaining to nuclear reactors under construction within NRO and between other NRC headquarters and regional offices.
3.Develops cROP program policies and procedures, and ensures the effectiveness ofprogram implementation.
: 2. Coordinates and conducts EOC summary meetings, if necessary, on the basis of the results of the regional EOC review meetings.
4.Participates in the AARM and leads discussion, as necessary
: 3. Develops cROP program policies and procedures, and ensures the effectiveness of program implementation.
.F.Region II Regional AdministratorBriefs the Director of NRO and other internal stakeholders at the EOC summary meeti ng on the performance of licensees with reactors under construction for those plants wit h significant performance problems as described in Section I.D of this handbook.G.All Regional Administrators (All RAs)1.Brief the Director of NRR and other internal stakeholders at the EOC summary meeting on the performance of licensees of operating reactors in their respectiv e regions for those plants with significant performance problems as described i n Section I.B of th is handbook.2.Coordinate AARM preparations with the program offices.
: 4. Participates in the AARM and leads discussion, as necessary.
3.Participate in the AARM and lead discussions for reactor licensees in their respectiv e regions.4.Make recommendations to the Director of NMSS, as applicable, on candidat e materials licensees to be discussed at the AARM. Brief the Director of NMSS and other internal stakeholders on the performance of nuclear materials licensees withinthe region and the Agreement States that are identified for discussion as a result of significant safety or safeguards performance issues, and lead the related AARM discussions, as applicable.
F. Region II Regional Administrator Briefs the Director of NRO and other internal stakeholders at the EOC summary meeting on the performance of licensees with reactors under construction for those plants with significant performance problems as described in Section I.D of this handbook.
MD 8.14 AGENCY ACTION REVIEW MEETING Date Approved:
G. All Regional Administrators (All RAs)
10/25/2015 For the latest version of any NRC directive or handbook, see the online MD Catalog.
: 1. Brief the Director of NRR and other internal stakeholders at the EOC summary meeting on the performance of licensees of operating reactors in their respective regions for those plants with significant performance problems as described in Section I.B of this handbook.
5 H.Directors of Staff Offices 1.Coordinate with program and regional offices in providing input to both the AARMand EOC meetings, as applicable.
: 2. Coordinate AARM preparations with the program offices.
2.Participate in the AARM as specified in the applicable portions of this handbook or asdirected by the Executive Director for Operations
: 3. Participate in the AARM and lead discussions for reactor licensees in their respective regions.
.I.Assistant for Operations, Office of the Executive Director for Operations (OEDO)1.Coordinates or delegates coordination of AARM preparation s with program andregional offices.
: 4. Make recommendations to the Director of NMSS, as applicable, on candidate materials licensees to be discussed at the AARM. Brief the Director of NMSS and other internal stakeholders on the performance of nuclear materials licensees within the region and the Agreement States that are identified for discussion as a result of significant safety or safeguards performance issues, and lead the related AARM discussions, as applicable.
2.Is responsible or delegates responsibility for AARM logistics.
For the latest version of any NRC directive or handbook, see the online MD Catalog.               4
APPLICABILITY The policy and guidance in Management Directive 8.14 apply to all NRC employees and contractors
 
. DIRECTIVE HANDBOOK Handbook 8.14 provides guidance for the preparation and conduct of the AARM.
MD 8.14      AGENCY ACTION REVIEW MEETING                                Date Approved: 10/25/2015 H. Directors of Staff Offices
REFERENCES Code of Federal Regulations 10 CFR 2.348, "Separation of Functions." Nuclear Regulatory Commission Documents Management Directive
: 1. Coordinate with program and regional offices in providing input to both the AARM and EOC meetings, as applicable.
- 5.12, "International Nuclear and Radiological Event Scale (INES) Participation."
: 2. Participate in the AARM as specified in the applicable portions of this handbook or as directed by the Executive Director for Operations.
8.1, "Abnormal Occurrence Reporting Procedure."
I. Assistant for Operations, Office of the Executive Director for Operations (OEDO)
NRC Enforcement Manual , available at http://www.nrc.gov/about
: 1. Coordinates or delegates coordination of AARM preparations with program and regional offices.
-nrc/regulatory/enforcement/guidance.html#manual. NRC Enforcement Policy, available at http://www.nrc.gov/about
: 2. Is responsible or delegates responsibility for AARM logistics.
-nrc/regulatory/enforcement/enforce
APPLICABILITY The policy and guidance in Management Directive 8.14 apply to all NRC employees and contractors.
-pol.html. NRC Inspection Manual Chapters: 0305, "Operating Reactor Assessment Program." 0307, "Reactor Oversight Process Self
DIRECTIVE HANDBOOK Handbook 8.14 provides guidance for the preparation and conduct of the AARM.
-Assessment Program." 0313, "Industry Trends Program." 0350, "Oversight of Reactor Facilities in a Shutdown Condition Due to Significant Performance and/or Operational Concerns."
REFERENCES Code of Federal Regulations 10 CFR 2.348, Separation of Functions.
MD 8.14 AGENCY ACTION REVIEW MEETING Date Approved:
Nuclear Regulatory Commission Documents Management Directive 5.12, International Nuclear and Radiological Event Scale (INES) Participation.
10/25/2015 For the latest version of any NRC directive or handbook, see the online MD Catalog.
8.1, Abnormal Occurrence Reporting Procedure.
6 2505, "Periodic Assessment of Construction Inspection Program Results."
NRC Enforcement Manual, available at http://www.nrc.gov/about-nrc/regulatory/enforcement/guidance.html#manual.
2522, "Construction Reactor Oversight Process Self-Assessment Program."
NRC Enforcement Policy, available at http://www.nrc.gov/about-nrc/regulatory/enforcement/enforce-pol.html.
NUREG-1614, "NRC Strategic Plan."
NRC Inspection Manual Chapters:
SECY-11-0132 , "Revision of the Criteria for Identifying Nuclear Materials Licensees for Discussion at the Agency Action Review Meeting," September 20, 20 11 (ML112280111). Staff Requirements Memorandum, from Andrew L. Bates to Luis A. Reyes, COMSECY-07-000 5 , "Discussion of Plants in the Multiple/Repetitive Degraded Cornerstone Column of the Reactor Oversight Process Action Matrix," April 19, 2007 (ML071090473). Staff Requirements Memorandum , from Annette L. Vietti
0305, Operating Reactor Assessment Program.
-Cook to Luis A. Reyes, "Staff Requirements , Briefing on Results of the Agency Action Review Meeting (SECY-05-0070), 9:30 a.m., Wednesday, May 25, 2005, Commissioners' Conference Room, One White Flint North, Rockville, Maryland (Open to Public Attendance)," June 30, 2005 (ML051810313
0307, Reactor Oversight Process Self-Assessment Program.
). Staff Requirements Memorandum, from Annette L. Vietti
0313, Industry Trends Program.
-Cook to Luis A. Reyes, SRM-M040504B, "Staff Requirements - Briefing on Results of the Agency Action Review Meeting, 9:30 a.m., Tuesday, May 4, 2004, Commissioners' Conference Room, One White Flint North, Rockville, Maryland (Open to Public Attendance)," May 27, 2004 (ML041480131
0350, Oversight of Reactor Facilities in a Shutdown Condition Due to Significant Performance and/or Operational Concerns.
).
For the latest version of any NRC directive or handbook, see the online MD Catalog.               5
U.S. NUCLEAR REGULATORY COMMISSION DIRECTIVE HANDBOOK (DH) DH 8.14 AGENCY ACTION REVIEW MEETING DT-1 Volume 8: Licensee Oversight Programs Approved B y: William M. Dean, Director Office of Nuclear Reactor Regulation Date Approved: October 25 , 2015 : Issuing Office:
 
Office of Nuclear Reactor Regulation Division of Inspection and Regional Support Contact: Andrew J. Waugh 301-415-5601EXECUTIVE
MD 8.14      AGENCY ACTION REVIEW MEETING                                Date Approved: 10/25/2015 2505, Periodic Assessment of Construction Inspection Program Results.
2522, Construction Reactor Oversight Process Self-Assessment Program.
NUREG-1614, NRC Strategic Plan.
SECY-11-0132, Revision of the Criteria for Identifying Nuclear Materials Licensees for Discussion at the Agency Action Review Meeting, September 20, 2011 (ML112280111).
Staff Requirements Memorandum, from Andrew L. Bates to Luis A. Reyes, COMSECY-07-0005, Discussion of Plants in the Multiple/Repetitive Degraded Cornerstone Column of the Reactor Oversight Process Action Matrix, April 19, 2007 (ML071090473).
Staff Requirements Memorandum, from Annette L. Vietti-Cook to Luis A. Reyes, Staff Requirements, Briefing on Results of the Agency Action Review Meeting (SECY-05-0070), 9:30 a.m., Wednesday, May 25, 2005, Commissioners Conference Room, One White Flint North, Rockville, Maryland (Open to Public Attendance),
June 30, 2005 (ML051810313).
Staff Requirements Memorandum, from Annette L. Vietti-Cook to Luis A. Reyes, SRM-M040504B, Staff Requirements - Briefing on Results of the Agency Action Review Meeting, 9:30 a.m., Tuesday, May 4, 2004, Commissioners Conference Room, One White Flint North, Rockville, Maryland (Open to Public Attendance), May 27, 2004 (ML041480131).
For the latest version of any NRC directive or handbook, see the online MD Catalog.              6
 
U.S. NUCLEAR REGULATORY COMMISSION DIRECTIVE HANDBOOK (DH)
DH 8.14             AGENCY ACTION REVIEW MEETING                                                                   DT-17-167 Volume 8:           Licensee Oversight Programs Approved By:         William M. Dean, Director Office of Nuclear Reactor Regulation Date Approved:       October 25, 2015 Cert Date:           N/A, for the latest version of any NRC directive or handbook, see the online MD Catalog.
Issuing Office:     Office of Nuclear Reactor Regulation Division of Inspection and Regional Support Contact:             Andrew J. Waugh 301-415-5601 EXECUTIVE


==SUMMARY==
==SUMMARY==
Management Directive and Handbook 8.14, "Agency Action Review Meeting," are being revised to incorporate
- The revised reporting criteria for the discussion of fuel facilities during the AgencyAction Review Meeting (AARM),Organizational changes resulting from the merger of the Office of Nuclear MaterialSafety and Safeguards and the Office of Federal and State Materials andEnvironmental Management Programs
,Clarification of the process for preparing and distributing the AARM meetingminutes, andMinor editorial updates.TABLE OF CONTENTS I.PREPARATION FOR THE AGENCY ACTION REVIEW MEETING (AARM)
.................... 2 A.General ........................................................................................................................ 2 B.End-of-Cycle Reviews and Summary Meetings for Operating Reactors
....................... 2 C.Final AARM Preparations for Operating Reactor Licensees
.......................................... 3 D.End-of-Cycle Reviews and Summary Meetings for Reactors that ar e Under Construction
....................................................................................................... 5 E.Final AARM Preparations for Reactor Construction Licensees
..................................... 5 F.Final AARM Preparations for Materials Licensees, Including Fuel Cycl e Facilities ....................................................................................................................... 6 G.AARM Notebook Distribution
........................................................................................ 7


D H 8.14 AGENCY ACTION REVIEW MEETING Date Approved: 10/25/2015 For the latest version of any NRC directive or handbook, see the online MD Catalog.
Management Directive and Handbook 8.14, Agency Action Review Meeting, are being revised to incorporate
II. CONDUCT OF THE AGENCY ACTION REVIEW MEETING (AARM) AND COMMISSION BRIEFING
* The revised reporting criteria for the discussion of fuel facilities during the Agency Action Review Meeting (AARM),
................................
* Organizational changes resulting from the merger of the Office of Nuclear Material Safety and Safeguards and the Office of Federal and State Materials and Environmental Management Programs,
................................................................
* Clarification of the process for preparing and distributing the AARM meeting minutes, and
.. 8 A. General ................................................................................................
* Minor editorial updates.
........................
TABLE OF CONTENTS I. PREPARATION FOR THE AGENCY ACTION REVIEW MEETING (AARM) ....................2 A. General ........................................................................................................................2 B. End-of-Cycle Reviews and Summary Meetings for Operating Reactors .......................2 C. Final AARM Preparations for Operating Reactor Licensees..........................................3 D. End-of-Cycle Reviews and Summary Meetings for Reactors that are Under Construction .......................................................................................................5 E. Final AARM Preparations for Reactor Construction Licensees .....................................5 F. Final AARM Preparations for Materials Licensees, Including Fuel Cycle Facilities .......................................................................................................................6 G. AARM Notebook Distribution ........................................................................................7
8 B. Operating Reactor Plant Performance Discussions and Review of Agency Actions
_____________________________________________________________________________________________
................................
For updates or revisions to policies contained in this MD that were published after the MD was signed, please see the Yellow Announcement to Management Directive index (YA-to-MD index).
................................................................
 
.............
DH 8.14     AGENCY ACTION REVIEW MEETING                                                         Date Approved: 10/25/2015 II. CONDUCT OF THE AGENCY ACTION REVIEW MEETING (AARM) AND COMMISSION BRIEFING ..................................................................................................8 A. General ........................................................................................................................8 B. Operating Reactor Plant Performance Discussions and Review of Agency Actions .............................................................................................................8 C. Operating Reactor Oversight Process Self-Assessment ...............................................9 D. Analysis of Operating Reactor Industry Trends ...........................................................10 E. Reactor Construction Performance Discussions and Review of Agency Actions .......................................................................................................................10 F. Construction Reactor Oversight Process Self-Assessment ......................................... 11 G. Discussion of Materials Facilities, Including Fuel Cycle Facilities ................................ 11 H. Analysis of Materials Licensee Performance Trends ..................................................11 I. Correspondence Following the AARM ........................................................................12 J. Commission Briefing ...................................................................................................12 I. PREPARATION FOR THE AGENCY ACTION REVIEW MEETING (AARM)
8 C. Operating Reactor Oversight Process Self
A. General
-Assessment
: 1. Headquarters and regional staff will work together to develop the information to be used at the Agency Action Review Meeting (AARM). The Office of Nuclear Reactor Regulation (NRR) will assemble this information into the AARM notebook, which will be distributed to AARM participants in advance of the meeting. Informational copies will be provided to the Commission after the AARM as part of background material for the Commission briefing on the results of the AARM.
...............................................
9 D. Analysis of Operating Reactor Industry Trends
................................
...........................
10 E. Reactor Construction Performance Discussions and Review of Agency Actions ................................
................................................................
.......................
10 F. Construction Reactor Oversight Process Self
-Assessment
................................
......... 11 G. Discussion of Materials Facilities, Including Fuel Cycle Facilities
................................
11 H. Analysis of Materials Licensee Performance Trends
................................
..................
11 I. Correspondence Following the AARM
................................
........................................ 12 J. Commission Briefing
................................
................................................................
... 12   I. PREPARATION FOR THE AGENCY ACTION REVIEW MEETING (AARM)
A. General 1. Headquarters and regional staff will work together to develop the information to be used at the Agency Action Review Meeting (AARM). The Office of Nuclear Reactor Regulation (N RR) will assemble this information into the AARM notebook, which will be distributed to AARM participants in advance of the meeting. Informational copies will be provided to the Commission after the AARM as part of background material for the Commission briefing on the results of the AARM.
: 2. Throughout this management directive (MD)
: 2. Throughout this management directive (MD)
- (a) The term "Action Matri x" refers to the Reactor Oversight Process (ROP)
(a) The term Action Matrix refers to the Reactor Oversight Process (ROP) Action Matrix in Inspection Manual Chapter (IMC) 0305, Operating Reactor Assessment Program.
Action Matrix in Inspection Manual Chapter (IMC) 0305, "Operating Reactor Assessment Program
(b) The term Construction Action Matrix refers to the Construction Reactor Oversight Process (cROP) Action Matrix in IMC 2505, Periodic Assessment of Construction Inspection Program Results.
."  (b) The term "Construction Action Matrix
(c) Any reference to nuclear materials licensees includes certificate holders and other regulated entities.
" refers to the Construction R eactor Oversight Process (cROP)
Action Matrix in IMC 2505, "Periodic Assessment of Construction Inspection Program Results."
(c) Any reference to nuclear materials licensees include s certificate holders and other regulated entities.
B. End-of-Cycle Reviews and Summary Meetings for Operating Reactors
B. End-of-Cycle Reviews and Summary Meetings for Operating Reactors
: 1. Each regional office will conduct an end-of-cycle (EOC) review for all operating reactors within its purview in accordance with IMC 0305. The EOC review is a comprehensive assessment of licensee performance using the most recent D H 8.14 AGENCY ACTION REVIEW MEETING Date Approved: 10/25/2015 For the latest version of any NRC directive or handbook, see the online MD Catalog.
: 1. Each regional office will conduct an end-of-cycle (EOC) review for all operating reactors within its purview in accordance with IMC 0305. The EOC review is a comprehensive assessment of licensee performance using the most recent For the latest version of any NRC directive or handbook, see the online MD Catalog.                                                       2
performance indicators and inspection findings from the recently completed 12-month annual assessment cycle. The staff conducts EOC reviews to analyze license e performance information from inspection reports and performance indicators, along with other pertinent data, to confirm NRC actions and allocate resources.
 
DH 8.14      AGENCY ACTION REVIEW MEETING                                  Date Approved: 10/25/2015 performance indicators and inspection findings from the recently completed 12-month annual assessment cycle. The staff conducts EOC reviews to analyze licensee performance information from inspection reports and performance indicators, along with other pertinent data, to confirm NRC actions and allocate resources.
: 2. In addition, the EOC summary meeting is conducted at the conclusion of the EOC reviews to discuss the results with the Director of NRR and other internal stakeholders. Plant performance discussions are limited to those plants that meet the criteria specified in IMC 0305. The regional staff will coordinate with NRR to schedule and conduct the summary meeting.
: 2. In addition, the EOC summary meeting is conducted at the conclusion of the EOC reviews to discuss the results with the Director of NRR and other internal stakeholders. Plant performance discussions are limited to those plants that meet the criteria specified in IMC 0305. The regional staff will coordinate with NRR to schedule and conduct the summary meeting.
C. Final AARM Preparations for Operating Reactor Licensees
C. Final AARM Preparations for Operating Reactor Licensees
: 1. Following the EOC reviews, the headquarters and regional staff will work together to develop the information to be discussed at the AARM. Plant performance discussions are limited to those plants that met the following criteria during the recently completed 12
: 1. Following the EOC reviews, the headquarters and regional staff will work together to develop the information to be discussed at the AARM. Plant performance discussions are limited to those plants that met the following criteria during the recently completed 12-month annual assessment:
-month annual assessment
(a) Have been in the multiple/repetitive degraded cornerstone column, (b) Have been in the unacceptable performance column, (c) Are under IMC 0350, Oversight of Reactor Facilities in a Shutdown Condition Due to Significant Performance and/or Operational Concerns, (d) Have been in the degraded cornerstone column for 3 years, 1 or (e) Have moved into the multiple/repetitive degraded cornerstone column or the unacceptable performance column of the Action Matrix during the first quarter of the year in which the AARM is held. 2
(a) Have been in the "multiple/repetitive degraded cornerstone" column
: 2. NRR will assemble information into the AARM notebook. For each reactor to be discussed, the associated regional office will provide NRR the following information:
, (b) Have been in the "unacceptable performance" column
(a) A presentation of plant performance, (b) Pertinent performance indicator (PI) report, (c) Finding summary report, and 1   As directed by Staff Requirements Memorandum COMSECY-07-0005, Discussion of Plants in the Multiple/Repetitive Degraded Cornerstone Column of the Reactor Oversight Process Action Matrix, the ROP has been changed to include a provision that a licensee who remains in column 3 for 3 years should be invited to meet with the Commission. The Commission will then evaluate the need for subsequent briefings by the licensee with senior agency management after the AARM.
, (c) Are under IMC 0350, "Oversight of Reactor Facilities in a Shutdown Condition Due to Significant Performance and/or Operational Concerns
2   A licensee who enters the multiple/repetitive degraded cornerstone column or the unacceptable performance column may not necessarily be invited to meet with the Commission following the subsequent AARM.
,(d) Have been in the "degraded cornerstone" column for 3 years
For the latest version of any NRC directive or handbook, see the online MD Catalog.                  3
, 1 or (e) H a ve moved into the "multiple/repetitive degraded cornerstone" column or the "unacceptable performance" column of the Action Matrix during the first quarter of the year in which the AARM is hel d.2 2. NRR will assemble information into the AARM notebook. For each reactor to be discussed, the associated regional office will provide NRR the following information:
(a) A presentation of plant performance
, (b) Pertinent performance indicator (PI) report , (c) Finding summary report
, and 1 As directed by Staff Requirements Memorandum COMSECY 0005, "Discussion of Plants in the Multiple/Repetitive Degraded Cornerstone Column of the Reactor Oversight Process Action Matrix," the ROP has been changed to include a provision that a licensee who remains in column 3 for 3 years should be invited to meet with the Commission. The Commission will then evaluate the need for subsequent briefings by the licensee with senior agency management after the AARM.
2 A licensee who enters the "multiple/repetitive degraded cornerstone" column or the "unacceptable performance" column may not necessarily be invited to meet with the Commission following the subsequent AARM.


D H 8.14 AGENCY ACTION REVIEW MEETING Date Approved: 10/25/2015 For the latest version of any NRC directive or handbook, see the online MD Catalog.
DH 8.14     AGENCY ACTION REVIEW MEETING                                 Date Approved: 10/25/2015 (d) The plant performance summary information used in the EOC summary meeting and to be revised to incorporate any insights developed during the meeting, including (i) An operating summary; (ii) A performance overview (current overall assessment and previous assessment results);
(d) The plant performance summary information used in the EOC summary meeting and to be revised to incorporate any insights developed during the meeting, including- (i) A n operating summary; (ii) A performance overview (current overall assessment and previous assessment results)
(iii) Inspection and PI results by cornerstones; (iv) Other issues (i.e., substantive cross-cutting issues (SCCIs), PI verification, and non-significance determination process (non-SDP) enforcement actions of at least Severity Level III);
(iii) Inspection and PI results by cornerstones; (iv) Other issues (i.e., substantive cross
(v) A proposed inspection plan; and (vi) The plant-specific Action Matrix used in the EOC summary meeting that details the timeline and consideration of PIs and inspection findings in the assessment program.
-cutting issues (SCCIs), PI verification , and non-significance determination process (non-SDP) enforcement actions of at least Severity Level III)
: 3. NRR will include the following information in the AARM notebook:
(v) A proposed inspection plan
(a) A meeting agenda.
; and (vi) The plant-specific Action Matrix used in the EOC summary meeting that details the timeline and consideration of PIs and inspection findings in the assessment program.
(b) A presentation of the self-assessment of the ROP, including lessons learned and recommended program adjustments. An annual report, prepared in accordance with IMC 0307, Reactor Oversight Process Self-Assessment Program, may be referenced for the AARM but will be included in the AARM notebook provided to the Commission. This process is intended to assess the effectiveness of the ROP and to develop recommendations for improvement.
: 3. NRR will include the following information in the AARM notebook
(c) All ROP Action Matrix deviations 3 to ensure that the causes for the deviations are fully understood and to identify any necessary changes to the ROP to improve guidance documents. (This specific aspect of the self-assessment must be discussed at the AARM, and the Commissioners must also be briefed on this evaluation).
(a) A meeting agenda
(d) A presentation of industry performance trends. An annual report, prepared in accordance with IMC 0313 Industry Trends Program, may be referenced for the AARM but will be included in the AARM notebook provided to the Commission.
(b) A presentation of the self
This process will ensure that the agency recognizes and appropriately addresses trends in industry and licensee performance.
-assessment of the ROP, including lessons learned and recommended program adjustments. An annual report, prepared in accordance with IMC 0307, "Reactor Oversight Process Self
(e) Other information as necessary or as specified by the Executive Director for Operations (EDO).
-Assessment Program," may be referenced for the AARM but will be included in the AARM notebook provided to the Commission. This process is intended to assess the effectiveness of the ROP and to develop recommendations for improvement
3   Staff Requirement Memorandum dated May 27, 2004, reference M040504B.
. (c) All ROP Action Matrix deviations 3 to ensure that the causes for the deviations are fully understood and to identify any necessary changes to the ROP to improve guidance documents
For the latest version of any NRC directive or handbook, see the online MD Catalog.                4
. (This specific aspect of the self
-assessment must be discussed at the AARM, and the Commissioners must also be briefed on this evaluation)
. (d) A presentation of industry performance trends. An annual report, prepared in accordance with IMC 0313 "Industry Trends Program," may be referenced for the AARM but will be included in the AARM notebook provided to the Commission. This process will ensure that the agency recognizes and appropriately addresses trends in industry and licensee performance
. (e) Other information as necessary or as specified by the Executive Director for Operations (EDO).
3 Staff Requirement Memorandum dated May 27, 2004, reference M040504B.


D H 8.14 AGENCY ACTION REVIEW MEETING Date Approved: 10/25/2015 For the latest version of any NRC directive or handbook, see the online MD Catalog.
DH 8.14     AGENCY ACTION REVIEW MEETING                                 Date Approved: 10/25/2015 D. End-of-Cycle Reviews and Summary Meetings for Reactors that are Under Construction
D. End-of-Cycle Reviews and Summary Meetings for Reactors that are Under Construction
: 1. Region II will conduct an EOC review for all reactors that are under construction in accordance with IMC 2505. The EOC review is a comprehensive assessment of licensee performance using the most recent inspection findings from the recently completed (12-month) annual assessment cycle. The regional staff conducts EOC reviews to analyze licensee performance information from inspection reports, along with other pertinent data, to confirm NRC actions and allocate resources.
: 1. Region II will conduct an EOC review for all reactors that are under construction in accordance with IMC 2505. The EOC review is a comprehensive assessment of licensee performance using the most recent inspection findings from the recently completed (12
: 2. An EOC Summary Briefing may be necessary before the AARM to summarize licensee performance results with the Office of New Reactors (NRO) senior management. Plant performance discussions are limited to those plants that meet the criteria specified in IMC 2505. The regional staff will coordinate with NRO to schedule and conduct the summary meeting.
-month) annual assessment cycle. The regional staff conducts EOC reviews to analyze licensee performance information from inspection reports, along with other pertinent data, to confirm NRC actions and allocate resources.
: 2. An EOC Summary Briefing may be necessary before the AARM to summarize licensee performance results with the Office of New Reactor s (NRO) senior management. Plant performance discussions are limited to those plants that meet the criteria specified in IMC 2505. The regional staff will coordinate with NRO to schedule and conduct the summary meeting.
E. Final AARM Preparations for Reactor Construction Licensees
E. Final AARM Preparations for Reactor Construction Licensees
: 1. Following the EOC reviews, the headquarters and regional staff will work together to develop the information to be discussed at the AARM. Plant performance discussions are limited to those plants during the recently completed 12
: 1. Following the EOC reviews, the headquarters and regional staff will work together to develop the information to be discussed at the AARM. Plant performance discussions are limited to those plants during the recently completed 12-month annual assessment cycle that (a) Have been in the multiple/repetitive degraded cornerstone column, or (b) Have been in the unacceptable performance column, or (c) Have been in the degraded cornerstone column for one and one-half years, or (d) Have moved into the multiple/repetitive degraded cornerstone column or the unacceptable performance column of the Construction Action Matrix during the first quarter of the year in which the AARM is held.
-month annual assessment cycle that
: 2. NRO will provide information to NRR for assembly into the AARM notebook. For each reactor under construction to be discussed, Region II will provide NRO the following information:
(a) Have been in the "multiple/repetitive degraded cornerstone" column , or (b) Have been in the "unacceptable performance" column , or (c) Have been in the "degraded cornerstone" column for one and one
(a) A presentation of plant performance, (b) Finding summary report, and (c) Construction plant performance summary information used in the EOC summary meeting and to be revised to incorporate any insights developed during the meeting, including (i) A performance overview (current overall assessment and previous assessment results),
-half years
(ii) Other issues (i.e., construction SCCIs and non-significance determination process (non-SDP) enforcement actions of at least Severity Level III),
, or (d) Have moved into the "multiple/repetitive degraded cornerstone" column or the "unacceptable performance" column of the Construction Action Matrix during the first quarter of the year in which the AARM is held.
(iii) A proposed inspection plan, and For the latest version of any NRC directive or handbook, see the online MD Catalog.               5
: 2. NRO will provide information to NRR for assembly into the AARM notebook. For each reactor under construction to be discussed, Region II will provide NRO the following information
 
(a) A presentation of plant performance
DH 8.14      AGENCY ACTION REVIEW MEETING                                  Date Approved: 10/25/2015 (iv) The plant-specific Construction Action Matrix used in the EOC summary meeting that details the timeline and consideration of inspection findings in the assessment program.
, (b) Finding summary report
: 3. NRO will provide NRR the following information for inclusion in the notebook:
, and (c) Construction plant performance summary information used in the EOC summary meeting and to be revised to incorporate any insights developed during the meeting, including
(a) A presentation of the self-assessment of the cROP, including lessons learned and recommended program adjustments. An annual report, prepared in accordance with IMC 2522, Construction Reactor Oversight Process Self-Assessment Program, may be referenced for the AARM but will be included in the AARM notebook provided to the Commission. This process is intended to assess the effectiveness of the cROP and to develop recommendations for improvement.
(i) A performance overview (current overall assessment and previous assessment results)
(b) All cROP Construction Action Matrix deviations to ensure that the causes for the deviations are understood and to identify any necessary changes to the cROP to improve the guidance documents. (This specific aspect of the self-assessment must be discussed at the AARM, and the Commissioners must also be briefed on this evaluation.)
, (ii) Other issues (i.e., construction SCCIs and non-significance determination process (non
(c) Other information, as necessary or as specified by the EDO.
-SDP) enforcement actions of at least Severity Level III)
F. Final AARM Preparations for Materials Licensees, Including Fuel Cycle Facilities
, (iii) A proposed inspection plan, and D H 8.14 AGENCY ACTION REVIEW MEETING Date Approved: 10/25/2015 For the latest version of any NRC directive or handbook, see the online MD Catalog.
: 1. The Office of Nuclear Material Safety and Safeguards (NMSS), in collaboration with the regions and the Agreement States, will prepare briefing documents regarding nuclear materials licensees. Headquarters and regional staff will work together to develop the information to be used at the AARM. The staff will distribute the briefing documents to AARM participants in advance of the meeting, as applicable. NRR will assemble this information into the AARM notebook, which will include (a) A presentation of nuclear materials licensee(s) with significant performance issues that meet the criteria described in SECY-11-0132, Revision of the Criteria for Identifying Nuclear Materials Licensees for Discussion at the Agency Action Review Meeting, as appropriate, and (b) A presentation of the nuclear materials and waste programs performance and trending analysis.
(iv) The plant-specific Construction Action Matrix used in the EOC summary meeting that details the timeline and consideration of inspection findings in the assessment program
: 2. NMSS and the regional offices will limit the performance discussion to those nuclear materials licensees that meet one of the following criteria as described in SECY-11-0132:
. 3. NRO will provide NRR the following information for inclusion in the notebook: (a) A presentation of the self
(a) The licensee has an event that results in the failure to meet a Strategic Outcome for Safety or Security in the NRC Strategic Plan (NUREG-1614).
-assessment of the cROP, including lessons learned and recommended program adjustments. An annual report, prepared in accordance with IMC 2522, "Construction Reactor Oversight Process Self
(b) The licensees performance has unique or unusual aspects that required or will likely require additional NRC oversight (e.g., a significant event warranting an incident investigation team or augmented inspection team), and the licensee has an issue or event that results or will likely result in (i) An Abnormal Occurrence Report to Congress (in accordance with MD 8.1, Abnormal Occurrence Reporting Procedure),
-Assessment Program," may be referenced for the AARM but will be included in the AARM notebook provided to the Commission. This process is intended to assess the effectiveness of the cROP and to develop recommendations for improvement
For the latest version of any NRC directive or handbook, see the online MD Catalog.                 6
. (b) All cROP Construction Action Matrix deviations to ensure that the causes for the deviations are understood and to identify any necessary changes to the cROP to improve the guidance documents
 
. (This specific aspect of the self
DH 8.14      AGENCY ACTION REVIEW MEETING                                    Date Approved: 10/25/2015 (ii) A Severity Level I or II violation 4 (including equivalent violations dispositioned by Alternative Dispute Resolution), or (iii) A Level 3 or higher International Nuclear Event Scale Report to the International Atomic Energy Agency (in accordance with MD 5.12, International Nuclear and Radiological Event Scale (INES) Participation).
-assessment must be discussed at the AARM, and the Commissioners must also be briefed on this evaluation
(c) The licensees performance has unique or unusual aspects that required or will likely require additional NRC oversight (e.g., an oversight panel formed for order implementation), and the licensee has or will likely have (i) Multiple and/or repetitive significant program issues identified over more than one inspection or inspection period, and (ii) The issues are supported by a Severity Level I, II, or III violation (including equivalent violations dispositioned by Alternative Dispute Resolution).
.) (c) Other information
(d) The licensees corrective actions did not address or were ineffective in correcting the underlying issues that were discussed at the previous AARM.
, as necessary or as specified by the EDO
: 3. The cognizant regional office will prepare a narrative summary of licensee performance for each nuclear materials licensee to be discussed at the AARM.
. F. Final AARM Preparations for Materials Licensees, Including Fuel Cycle Facilities
: 4. NMSS, in collaboration with the regions and the Agreement States, will prepare an annual report that analyzes the significant nuclear materials issues and adverse licensee performance trends in the nuclear materials and waste programs. The annual report may be referenced for the AARM, but will be included in the AARM notebook provided to the Commission. This process will ensure that trends in industry and licensee performance are recognized and appropriately addressed.
: 1. The Office of Nuclear Material Safety and Safeguards (NMSS), in collaboration with the regions and the Agreement States
G. AARM Notebook Distribution
, will prepare briefing documents regarding nuclear materials licensees. Headquarters and regional staff will work together to develop the information to be used at the AARM. The staff will distribute the briefing documents to AARM participants in advance of the meeting, as applicable. NRR will assemble this information into the AARM notebook, which will include
- (a) A presentation of nuclear materials licensee(s) with significant performance issues that meet the criteria described in SECY-11-0132 , "Revision of the Criteria for Identifying Nuclear Materials Licensees for Discussion at the Agency Action Review Meeting," as appropriate, and (b) A presentation of the nuclear materials and waste programs' performance and trending analysis.
: 2. NMSS and the regional offices will limit the performance discussion to those nuclear materials licensees that meet one of the following criteria as described in SECY-11-0132: (a) The licensee has an event that results in the failure to meet a Strategic Outcome for Safety or Security in the NRC Strategic Plan (NUREG
-1614). (b) The licensee's performance has unique or unusual aspects that require d or will likely require additional NRC oversight (e.g., a significant event warranting an incident investigation team or augmented inspection team), and the licensee has an issue or event that results or will likely result in(i) An Abnormal Occurrence Report to Congress (in accordance with M D 8.1 , "Abnormal Occurrence Reporting Procedure"
),
D H 8.14 AGENCY ACTION REVIEW MEETING Date Approved: 10/25/2015 For the latest version of any NRC directive or handbook, see the online MD Catalog.
(ii) A Severity Level I or II violation 4 (including equivalent violations dispositioned by Alternative Dispute Resolution)
, or (iii) A Level 3 or highe r International Nuclear Event Scale Report to the International Atomic Energy Agency (in accordance with M D 5.12 , "International Nuclear and Radiological Event Scale (INES) Participation"). (c) The licensee's performance has unique or unusual aspects that required or will likely require additional NRC oversight (e.g., an oversight panel formed for order implementation), and the licensee has or will likely have
(i) Multiple and/or repetitive significant program issues identified over more than one inspection or inspection period
, and (ii) The issues are supported by a Severity Level I, II, or III violation (including equivalent violations dispositioned by Alternative Dispute Resolution).
(d) The licensee's corrective actions did not address or were ineffective in correcting the underlying issues that were discussed at the previous AARM. 3. The cognizant regional office will prepare a narrative summary of licensee performance for each nuclear materials licensee to be discussed at the AARM.
: 4. NMSS, in collaboration with the regions and the Agreement States, will prepare an annual report that analyzes the significant nuclear materials issues and adverse licensee performance trends in the nuclear materials and waste programs. The annual report may be referenced for the AARM
, but will be included in the AARM notebook provided to the Commission. This process will ensure that trends in industry and licensee performance are recognized and appropriately addressed. G. AARM Notebook Distribution
: 1. The AARM notebooks will be distributed to AARM participants in advance of the meeting. The notebooks will be provided to the Commission after the AARM as part of background material for the Commission briefing.
: 1. The AARM notebooks will be distributed to AARM participants in advance of the meeting. The notebooks will be provided to the Commission after the AARM as part of background material for the Commission briefing.
: 2. The staff ensure s that sensitive information used in the AARM and in the notebook s is appropriately controlled based on information security requirements.
: 2. The staff ensures that sensitive information used in the AARM and in the notebooks is appropriately controlled based on information security requirements.
: 3. The staff coordinate s with the Office of the General Counsel (OGC) before distribution of the AARM materials to the Commission to ensure conformance to the separation of functions rules in Title 10 of the Code of Federal Regulations (10 CFR) 2.348, "Separation of Functions
: 3. The staff coordinates with the Office of the General Counsel (OGC) before distribution of the AARM materials to the Commission to ensure conformance to the separation of functions rules in Title 10 of the Code of Federal Regulations (10 CFR) 2.348, Separation of Functions, pertaining to communications related to contested adjudicatory matters.
," pertaining to communications related to contested adjudicatory matters.
4   As defined in the NRC Enforcement Policy.
 
For the latest version of any NRC directive or handbook, see the online MD Catalog.                      7
4 As defined in the NRC Enforcement Policy.


D H 8.14 AGENCY ACTION REVIEW MEETING Date Approved: 10/25/2015 For the latest version of any NRC directive or handbook, see the online MD Catalog.
DH 8.14     AGENCY ACTION REVIEW MEETING                                 Date Approved: 10/25/2015 II. CONDUCT OF THE AGENCY ACTION REVIEW MEETING (AARM) AND COMMISSION BRIEFING A. General
II. CONDUCT OF THE AGENCY ACTION REVIEW MEETING (AARM) AND COMMISSION BRIEFING A. General 1. The AARM is part of an integrated evaluative process used by the agency to ensure the operational safety, construction safety, and security performance of nuclear licensees. The AARM includes management reviews according to the objectives as described in Section II of this directive.
: 1. The AARM is part of an integrated evaluative process used by the agency to ensure the operational safety, construction safety, and security performance of nuclear licensees. The AARM includes management reviews according to the objectives as described in Section II of this directive.
: 2. Since the AARM serves as a forum to review overall industry trends and the effectiveness of the ROP, the cROP, and the nuclear materials and waste programs, the AARM is conducted on an annual basis regardless of whether any individual licensees are scheduled to be discussed.
: 2. Since the AARM serves as a forum to review overall industry trends and the effectiveness of the ROP, the cROP, and the nuclear materials and waste programs, the AARM is conducted on an annual basis regardless of whether any individual licensees are scheduled to be discussed.
: 3. The EDO direct s the conduct of the AARM. Participation will vary, depending on the portion of the AARM involved. The attendees typically will include, at varying times
: 3. The EDO directs the conduct of the AARM. Participation will vary, depending on the portion of the AARM involved. The attendees typically will include, at varying times, the Deputy Executive Director for Reactor and Preparedness Programs (DEDR); the Deputy Executive Director for Materials, Waste, Research, State, Tribal, Compliance, Administration, and Human Capital (DEDM); the Directors of NMSS, NRO, NRR, Office of Nuclear Security and Incident Response (NSIR), Office of Enforcement (OE), Office of Investigations (OI), Office of Nuclear Regulatory Research (RES), the regional administrators (RAs); and other support personnel, such as OGC, as directed. Participation in each portion of the AARM will be as noted in the relevant sections of this handbook or as determined by the EDO.
, the Deputy Executive Director for Reactor and Preparedness Programs (DEDR); the Deputy Executive Director for Materials, Waste, Research, State, Tribal, Compliance , Administration, and Human Capital (DEDM)
: 4. The AARM is conducted annually and occurs when all necessary inputs from Section I of this handbook are complete. If discussion of classified, Safeguards, or Sensitive Unclassified Non-Safeguards Information is necessary to achieve AARM objectives, a separate, closed session will be conducted among senior NRC managers with a need-to-know. The results of that meeting will be summarized by the EDO or designee during the AARM, ensuring that sensitive content remains undisclosed.
; the Directors of NMSS, NRO, NRR, Office of Nuclear Security and Incident Response (NSIR), Office of Enforcement (OE), Office of Investigations (OI), Office of Nuclear Regulatory Research (RES), the regional administrators (RAs)
: 5. Following each AARM, licensees are informed of any NRC decisions or actions that differ from those previously conveyed (if any agency actions change as a result of the senior managers discussions). The Commission is briefed on the AARM results at a public meeting.
; and other support personnel, such as OGC, as directed. Participation in each portion of the AARM will be as noted in the relevant sections of this handbook or as determined by the EDO.
: 4. The AARM is conducted annually and occurs when all necessary inputs from Section I of this handbook are complete. If discussion of classified, Safeguards
, or Sensitive Unclassified Non
-Safeguards Information is necessary to achieve AARM objectives, a separate, closed session will be conducted among senior NRC managers with a nee d-to-know. The results of that meeting will be summarized by the EDO or designee during the AARM
, ensuring that sensitive content remains undisclosed.
: 5. Following each AARM, licensees are informed of any NRC decisions or actions that differ from those previously conveyed (if any agency actions change as a result of the senior managers' discussions
). The Commission is briefed on the AARM results at a public meeting.
B. Operating Reactor Plant Performance Discussions and Review of Agency Actions
B. Operating Reactor Plant Performance Discussions and Review of Agency Actions
: 1. The discussions of plant performance are led by the cognizant R A. Plant performance discussions are limited to those plants that me et the criteria outlined in Section I.
: 1. The discussions of plant performance are led by the cognizant RA. Plant performance discussions are limited to those plants that meet the criteria outlined in Section I.C of this handbook, Final AARM Preparations for Operating Reactor Licensees.
C of this handbook, "Final AARM Preparations for Operating Reactor Licensees."
: 2. Primary participants in the plant performance discussion portion of the AARM include the EDO, the DEDR, the Director of NRR, and the RAs. OGC and the Directors of OE, OI, NRO, NSIR, and RES, also may participate if issues relative to their areas of responsibility will be discussed.
: 2. Primary participants in the plant performance discussion portion of the AARM include the EDO , the DEDR, the Director of NRR, and the RAs. OGC and the Directors of O E , OI , NRO, NSIR, and RES
For the latest version of any NRC directive or handbook, see the online MD Catalog.                 8
, also may participate if issues relative to their areas of responsibility will be discussed.
 
D H 8.14 AGENCY ACTION REVIEW MEETING Date Approved: 10/25/2015 For the latest version of any NRC directive or handbook, see the online MD Catalog.
DH 8.14      AGENCY ACTION REVIEW MEETING                                  Date Approved: 10/25/2015
3. As noted in IMC 0305, agency actions based on licensee performance are expected to be in accordance with the ROP Action Matrix. The ROP Action Matrix provide s for a range of actions for NRC to take to appropriately address plant performance issues. Because actions would be taken on an ongoing basis, the role of the AARM is more informational and confirmatory. The senior managers will review the agency's actions that have been planned or completed to confirm their appropriateness. This step may include discussion of possible improvements or enhancements to the ROP.
: 3. As noted in IMC 0305, agency actions based on licensee performance are expected to be in accordance with the ROP Action Matrix. The ROP Action Matrix provides for a range of actions for NRC to take to appropriately address plant performance issues. Because actions would be taken on an ongoing basis, the role of the AARM is more informational and confirmatory. The senior managers will review the agencys actions that have been planned or completed to confirm their appropriateness. This step may include discussion of possible improvements or enhancements to the ROP.
: 4. The staff ensure s that safeguards and other sensitive unclassified information is appropriately controlled and not released to the public. Furthermore, attendance of personnel must be controlled as necessary when sensitive information is being discussed, with additional focus on control of Safeguards Information.
: 4. The staff ensures that safeguards and other sensitive unclassified information is appropriately controlled and not released to the public. Furthermore, attendance of personnel must be controlled as necessary when sensitive information is being discussed, with additional focus on control of Safeguards Information.
: 5. As a result of AARM discussions, the senior managers may identify additional or alternate actions and/or allocation of agencywide resources. These actions should all be encompassed by and in accordance with the ROP Action Matrix or approved deviations from the Action Matrix. This step may include conducting a special team inspection to ascertain the causes of the performance problems, holding discussions between senior officials of both NRC and the licensee to further enhance the quality of communications, or convening a meeting with the Commission to review plant performance and licensee plans to improve performance.
: 5. As a result of AARM discussions, the senior managers may identify additional or alternate actions and/or allocation of agencywide resources. These actions should all be encompassed by and in accordance with the ROP Action Matrix or approved deviations from the Action Matrix. This step may include conducting a special team inspection to ascertain the causes of the performance problems, holding discussions between senior officials of both NRC and the licensee to further enhance the quality of communications, or convening a meeting with the Commission to review plant performance and licensee plans to improve performance.
: 6. Any or all of the actions discussed in the applicable sections of IMC 0305 are appropriate for plants that are discussed. The objective of these actions is to ensure that the licensee establishes a plan for improvement that incorporates measurable goals to determine when performance has improved. Whether and when to take any one of these actions is a determination that will be made at the NRC's sole discretion. The contents of this handbook and IMC 0305 do not restrict NRC from taking any necessary actions to fulfill its responsibilities under any applicable law.
: 6. Any or all of the actions discussed in the applicable sections of IMC 0305 are appropriate for plants that are discussed. The objective of these actions is to ensure that the licensee establishes a plan for improvement that incorporates measurable goals to determine when performance has improved. Whether and when to take any one of these actions is a determination that will be made at the NRCs sole discretion. The contents of this handbook and IMC 0305 do not restrict NRC from taking any necessary actions to fulfill its responsibilities under any applicable law.
C. Operating Reactor Oversight Process Self
C. Operating Reactor Oversight Process Self-Assessment
-Assessment
: 1. The ROP annual self-assessment report is discussed by NRR at the AARM. The ROP self-assessment program is implemented in accordance with IMC 0307, Reactor Oversight Process Self-Assessment Program. This program is conducted to assess the effectiveness of the ROP and develop recommendations for improvement.
: 1. T he ROP annual self
: 2. NRR prepares a report on an annual basis that includes a ROP self-assessment, analysis of the metrics, and other relevant information. These reports form the basis for discussions during the AARM regarding the ROP self-assessment and will be provided to the Commission. Also, Action Matrix deviations must be discussed at the AARM, and the Commissioners must also be briefed on this evaluation. 5
-assessment report is discussed by NRR at the AARM. The ROP self-assessment program is implemented in accordance with IMC 0307, "Reactor Oversight Process Self
: 3. Participants in the ROP self-assessment portion of the AARM include the EDO; the DEDR; the Directors of NRR, NSIR, RES, and OE; and the RAs. Other office directors may also participate as applicable and at the discretion of the EDO.
-Assessment Program." This program is conducted to assess the effectiveness of the ROP and develop recommendations for improvement.
5  As directed in Staff Requirement Memorandum dated May 27, 2004, reference M040504B.
: 2. NRR prepare s a report on an annual basis that includes a ROP self
For the latest version of any NRC directive or handbook, see the online MD Catalog.                9
-assessment, analysis of the metrics, and other relevant information. These reports form the basis for discussions during the AARM regarding the ROP self
-assessment and will be provided to the Commission. Also, Action Matrix deviations must be discussed at the AARM, and the Commissioners must also be briefed on this evaluation.
5 3. Participants in the ROP self
-assessment portion of the AARM include the EDO
; the DEDR; the Directors of NRR, NSIR, RES, and OE
; an d the RAs. Other office directors may also participate as applicable and at the discretion of the EDO.  


5 As directed in Staff Requirement Memorandum dated May 27, 2004, reference M040504B.
DH 8.14     AGENCY ACTION REVIEW MEETING                                 Date Approved: 10/25/2015 D. Analysis of Operating Reactor Industry Trends
 
D H 8.14 AGENCY ACTION REVIEW MEETING Date Approved: 10/25/2015 For the latest version of any NRC directive or handbook, see the online MD Catalog.
10  D. Analysis of Operating Reactor Industry Trends
: 1. The industry trends annual report is discussed by NRR at the AARM. This report is prepared in accordance with IMC 0313 and is intended to ensure that trends in industry and licensee performance are recognized and appropriately addressed. The report will be used as the basis for discussions during the AARM regarding the analysis of industry trends and will be provided to the Commission.
: 1. The industry trends annual report is discussed by NRR at the AARM. This report is prepared in accordance with IMC 0313 and is intended to ensure that trends in industry and licensee performance are recognized and appropriately addressed. The report will be used as the basis for discussions during the AARM regarding the analysis of industry trends and will be provided to the Commission.
: 2. Participants in the industry trends portion of the AARM will include the EDO, the DEDR, the Directors of NRR and RES, and the RAs. OGC and the Directors of OE and OI may also participate as applicable and at the discretion of the EDO. E. Reactor Construction Performance Discussions and Review of Agency Actions
: 2. Participants in the industry trends portion of the AARM will include the EDO, the DEDR, the Directors of NRR and RES, and the RAs. OGC and the Directors of OE and OI may also participate as applicable and at the discretion of the EDO.
: 1. The discussions of reactor construction performance are led by the Region II RA. Construction performance discussions are limited to those plants that met the criteria outlined in Section I.
E. Reactor Construction Performance Discussions and Review of Agency Actions
E of this handbook, "Final AARM Preparations for Reactor Construction Licensees."
: 1. The discussions of reactor construction performance are led by the Region II RA.
: 2. Primary participants in the plant performance discussion portion of the AARM will include the EDO, the DEDR, the Director of NRO, and the RAs. In addition, OGC and the Directors of OE, OI, NRR, NSIR, and RES
Construction performance discussions are limited to those plants that met the criteria outlined in Section I.E of this handbook, Final AARM Preparations for Reactor Construction Licensees.
, may also participate if issues relative to their areas of responsibility will be discussed.
: 2. Primary participants in the plant performance discussion portion of the AARM will include the EDO, the DEDR, the Director of NRO, and the RAs. In addition, OGC and the Directors of OE, OI, NRR, NSIR, and RES, may also participate if issues relative to their areas of responsibility will be discussed.
: 3. As noted in IMC 2505, agency actions based on licensee performance are expected to be in accordance with the cROP Construction Action Matrix. The cROP Construction Action Matrix provides for a range of actions for NRC to take to appropriately address plant performance issues. Because actions would be taken on an ongoing basis, the role of the AARM is more informational and confirmatory. The senior managers will review the agency's actions that have been planned or completed to confirm their appropriateness. This step may include discussion of possible improvements or enhancements to the cROP.
: 3. As noted in IMC 2505, agency actions based on licensee performance are expected to be in accordance with the cROP Construction Action Matrix. The cROP Construction Action Matrix provides for a range of actions for NRC to take to appropriately address plant performance issues. Because actions would be taken on an ongoing basis, the role of the AARM is more informational and confirmatory. The senior managers will review the agencys actions that have been planned or completed to confirm their appropriateness. This step may include discussion of possible improvements or enhancements to the cROP.
: 4. The staff ensure s that safeguards and other sensitive unclassified information is appropriately controlled and not released to the public. Furthermore, attendance of personnel must be controlled as necessary when sensitive information is being discussed, with additional focus on control of Safeguards Information.
: 4. The staff ensures that safeguards and other sensitive unclassified information is appropriately controlled and not released to the public. Furthermore, attendance of personnel must be controlled as necessary when sensitive information is being discussed, with additional focus on control of Safeguards Information.
: 5. As a result of AARM discussions, the senior managers may identify additional or alternate actions and/or allocation of agencywide resources. These actions should all be encompassed by and in accordance with the cROP Construction Action Matrix or approved deviations from the Construction Action Matrix. This step may include conducting a special team inspection to ascertain the causes of the performance problems, holding discussions between senior officials of both NRC and the licensee to further enhance the quality of communications, or convening a meeting with the Commission to review construction performance and licensee plans to improve performance.
: 5. As a result of AARM discussions, the senior managers may identify additional or alternate actions and/or allocation of agencywide resources. These actions should all be encompassed by and in accordance with the cROP Construction Action Matrix or approved deviations from the Construction Action Matrix. This step may include conducting a special team inspection to ascertain the causes of the performance problems, holding discussions between senior officials of both NRC and the licensee to further enhance the quality of communications, or convening a meeting with the Commission to review construction performance and licensee plans to improve performance.
: 6. Any or all of the actions discussed in the applicable sections of IMC 2505 are appropriate for plants that are discussed. The objective of these actions is to ensure that the licensee establishes a plan for improvement that incorporates measurable D H 8.14 AGENCY ACTION REVIEW MEETING Date Approved: 10/25/2015 For the latest version of any NRC directive or handbook, see the online MD Catalog.
: 6. Any or all of the actions discussed in the applicable sections of IMC 2505 are appropriate for plants that are discussed. The objective of these actions is to ensure that the licensee establishes a plan for improvement that incorporates measurable For the latest version of any NRC directive or handbook, see the online MD Catalog.               10
11  goals to determine when performance has improved. Whether and when to take any one of these actions is a determination that will be made at the NRC's sole discretion. The contents of this handbook and IMC 2505 do not restrict NRC from taking any necessary actions to fulfill its responsibilities under any applicable la
 
: w. F. Construction Reactor Oversight Process Self
DH 8.14      AGENCY ACTION REVIEW MEETING                                    Date Approved: 10/25/2015 goals to determine when performance has improved. Whether and when to take any one of these actions is a determination that will be made at the NRCs sole discretion. The contents of this handbook and IMC 2505 do not restrict NRC from taking any necessary actions to fulfill its responsibilities under any applicable law.
-Assessment NRO will conduct an annual self
F. Construction Reactor Oversight Process Self-Assessment NRO will conduct an annual self-assessment to assess the effectiveness of the cROP, resource utilization, and to develop recommendations for improvement. An annual report will be prepared and used as the basis for discussion during the AARM. This report will be provided to the Commission and made publicly available.
-assessment to assess the effectiveness of the cROP, resource utilization, and to develop recommendations for improvement. An annual report will be prepared and used as the basis for discussion during the AARM. This report will be provided to the Commission and made publicly available.
G. Discussion of Materials Facilities, Including Fuel Cycle Facilities
G. Discussion of Materials Facilities, Including Fuel Cycle Facilities
: 1. The Director of NMSS or the RAs, as directed by the EDO, will lead the discussion of performance for any materials licensees, including categories of licensees that have significant safety, security, or safeguards performance issues. Primary participants in these discussions will include the EDO, the DEDM, the Director of NMSS
: 1. The Director of NMSS or the RAs, as directed by the EDO, will lead the discussion of performance for any materials licensees, including categories of licensees that have significant safety, security, or safeguards performance issues. Primary participants in these discussions will include the EDO, the DEDM, the Director of NMSS, and the RAs. In addition, other office directors may participate as appropriate and at the discretion of the EDO.
, and th e RAs. In addition, other office directors may participate as appropriate and at the discretion of the EDO.
: 2. The staff ensures that classified, safeguards, and other sensitive unclassified information is appropriately controlled and not released to the public. Furthermore, attendance of personnel must be controlled as necessary when sensitive information is being discussed, with additional focus on control of Safeguards Information.
: 2. The staff ensure s that classified, safeguards, and other sensitive unclassified information is appropriately controlled and not released to the public. Furthermore, attendance of personnel must be controlled as necessary when sensitive information is being discussed, with additional focus on control of Safeguards Information.
: 3. The senior managers will review the agencys actions that have been planned or completed to confirm their appropriateness. As a result of AARM discussions, the senior managers may recommend additional or alternate actions and/or allocation of agencywide resources.
: 3. The senior managers will review the agency's actions that have been planned or completed to confirm their appropriateness. As a result of AARM discussions, the senior managers may recommend additional or alternate actions and/or allocation of agencywide resources.
H. Analysis of Materials Licensee Performance Trends
H. Analysis of Materials Licensee Performance Trends
: 1. NMSS, in collaboration with the regional offices and the Agreement States, will analyze the nuclear materials licensee performance trends. Data for this trending analysis will be obtained from operating experience associated with reportable events and generic issues affecting the industry.
: 1. NMSS, in collaboration with the regional offices and the Agreement States, will analyze the nuclear materials licensee performance trends. Data for this trending analysis will be obtained from operating experience associated with reportable events and generic issues affecting the industry.
: 2. The data will be compiled and examined for any significant trends in performance, particularly adverse trends. If any statistically significant trends 6 are identified, NRC will conduct further examination of the data to determine what, if any, actions may be appropriate.
: 2. The data will be compiled and examined for any significant trends in performance, particularly adverse trends. If any statistically significant trends 6 are identified, NRC will conduct further examination of the data to determine what, if any, actions may be appropriate.
: 3. A report will be prepared on an annual basis that includes the analysis of the nuclear materials licensee performance trends. This report will be used as the basis for discussion during the AARM regarding the analysis of performance trends. This report will be provided to the Commission and made publicly available.  
: 3. A report will be prepared on an annual basis that includes the analysis of the nuclear materials licensee performance trends. This report will be used as the basis for discussion during the AARM regarding the analysis of performance trends. This report will be provided to the Commission and made publicly available.
6  As defined in IMC 0313 Appendix C, Long-Term Trending.
For the latest version of any NRC directive or handbook, see the online MD Catalog.                    11


6 As defined in IMC 0313 Appendix C, "Long
DH 8.14     AGENCY ACTION REVIEW MEETING                                   Date Approved: 10/25/2015 I. Correspondence Following the AARM
-Term Trending."
: 1. In addition to the annual assessment letters to power reactor licensees, regional offices will issue separate letters to those reactor plants discussed during the AARM if any agency actions change as a result of the senior managers discussions. These letters are issued within 1 week following completion of the AARM, and at least 2 weeks before the Commission briefing. For materials licensees, the agency will evaluate the need to issue a letter to individual licensees or categories of licensees on a case-by-case basis.
 
: 2. For Agreement State licensees, regional offices will consult on a case-by-case basis with the Agreement State Radiation Control Program Director when evaluating the need to issue a letter to individual licensees or categories of licensees.
D H 8.14 AGENCY ACTION REVIEW MEETING Date Approved: 10/25/2015 For the latest version of any NRC directive or handbook, see the online MD Catalog.
: 3. Meeting minutes that summarize the key discussions and conclusions from the AARM are issued by the EDO. The AARM meeting minutes will be provided to the Commission as part of the briefing background material. The staff will coordinate with OGC on potential separation of functions issues before such distribution.
12  I. Correspondence Following the AARM 1. In addition to the annual assessment letters to power reactor licensees , regional offices will issue separate letters to those reactor plants discussed during the AARM if any agency actions change as a result of the senior managers' discussions. These letters are issued within 1 week following completion of the AARM, and at least 2 weeks before the Commission briefing. For materials licensees, the agency will evaluate the need to issue a letter to individual licensees or categories of licensees on a case-by-case basis.
: 2. For Agreement State licensees, regional offices will consult on a case-by-case basis with the Agreement State Radiation Control Program Director when evaluating the need to issue a letter to individual licensees or categories of licensees. 3. Meeting minutes that summarize the key discussions and conclusions from the AARM are issued by the EDO. The AARM meeting minutes will be provided to the Commission as part of the briefing background material. The staff will coordinate with OGC on potential separation of functions issues before such distribution.
J. Commission Briefing
J. Commission Briefing
: 1. The staff will brief the Commission on the AARM results at a public meeting, approximately 4 to 6 weeks following completion of the AARM. The staff delivering the briefing will typically include the EDO and the appropriate office directors or RAs, as directed by the EDO. The staff will consult with OGC to ensure the briefing is consistent with the NRC's separation of functions rules in 10 CFR 2.348.
: 1. The staff will brief the Commission on the AARM results at a public meeting, approximately 4 to 6 weeks following completion of the AARM. The staff delivering the briefing will typically include the EDO and the appropriate office directors or RAs, as directed by the EDO. The staff will consult with OGC to ensure the briefing is consistent with the NRCs separation of functions rules in 10 CFR 2.348.
: 2. The public briefing will include discussions of those plants and nuclear materials licensees that have significant performance problems and that were discussed during the AARM, if applicable. The staff's briefing will also include discussions of the results of the staff's self
: 2. The public briefing will include discussions of those plants and nuclear materials licensees that have significant performance problems and that were discussed during the AARM, if applicable. The staffs briefing will also include discussions of the results of the staffs self-assessment of the ROP and cROP, including lessons learned and recommended policy adjustments, changes to the ROP and/or the cROP as a result of evaluating Action Matrix deviations, and an analysis of reactor and materials industry performance trends.
-assessment of the ROP and cROP, including lessons learned and recommended policy adjustments, changes to the ROP and/or the cROP as a result of evaluating Action Matrix deviations, and an analysis of reactor and materials industry performance trends.
: 3. A separate public meeting or session between the Commission and the licensee may be convened for reactor and nuclear materials licensees that are discussed at the AARM Commission meeting, if deemed appropriate by the EDO or the Commission.
: 3. A separate public meeting or session between the Commission and the licensee may be convened for reactor and nuclear materials licensees that are discussed at the AARM Commission meeting, if deemed appropriate by the EDO or the Commission. These licensees should present their plans for improving performance at their facilities
These licensees should present their plans for improving performance at their facilities. 7 The chief nuclear officer of a licensee of a new multiple/repetitive degraded cornerstone column plant will typically be invited to brief the Commission on the activities the licensee will be taking to improve the operation of the unit within 6 months of entering into the multiple/repetitive degraded cornerstone column.
.7 The chief nuclear officer of a licensee of a new "multiple/repetitive degraded cornerstone" column plant will typically be invited to brief the Commission on the activities the licensee will be taking to improve the operation of the unit with in 6 months of entering into the "multiple/repetitive degraded cornerstone" column. Similarly, the chief nuclear officer of a licensee of a new "multiple/repetitive degraded cornerstone" column plant under construction will typically, within 6 months of entering into the "multiple/repetitive degraded cornerstone" column, will be invited to  
Similarly, the chief nuclear officer of a licensee of a new multiple/repetitive degraded cornerstone column plant under construction will typically, within 6 months of entering into the multiple/repetitive degraded cornerstone column, will be invited to 7   Staff Requirements Memorandum dated June 30, 2005, reference M050525B, and Staff Requirements Memorandum COMSECY-07-0005, Discussion of Plants in the Multiple/Repetitive Degraded Cornerstone Column of the Reactor Oversight Process Action Matrix.
 
For the latest version of any NRC directive or handbook, see the online MD Catalog.                  12
7 Staff Requirements Memorandum dated June 30, 200 5, reference M050525B, and Staff Requirements Memorandum COMSECY 0005, "Discussion of Plants in the Multiple/Repetitive Degraded Cornerstone Column of the Reactor Oversight Process Action Matrix."


D H 8.14 AGENCY ACTION REVIEW MEETING Date Approved: 10/25/2015 For the latest version of any NRC directive or handbook, see the online MD Catalog.
DH 8.14     AGENCY ACTION REVIEW MEETING                                 Date Approved: 10/25/2015 brief the Commission on the activities the licensee will be taking to improve the construction of the unit(s). The time of the meeting will be based on a determination by the Commission informed by a recommendation from the EDO. In addition, any reactor licensee that remains in the degraded cornerstone column for 3 or more years should be invited to meet with the Commission. 8
13  brief the Commission on the activities the licensee will be taking to improve the construction of the unit(s). The time of the meeting will be based on a determination by the Commission informed by a recommendation from the EDO. In addition, any reactor licensee that remains in the "degraded cornerstone" column for 3 or more years should be invited to meet with the Commission
: 4. Information regarding licensee performance that is not publicly available will not be discussed at the public meeting. As necessary, the Commissioners will be briefed on non-public/sensitive discussion topics from the AARM in a separate non-public meeting.
.8 4. Information regarding licensee performance that is not publicly available will not be discussed at the public meeting. As necessary, the Commissioners will be briefed on non-public/sensitive discussion topics from the AARM in a separate non
8   The Commission will then evaluate the need for subsequent briefings by the licensee with senior agency management after the AARM.
-public meeting.
For the latest version of any NRC directive or handbook, see the online MD Catalog.                13}}
8 The Commission will then evaluate the need for subsequent briefings by the licensee with senior agency management after the AARM.}}

Revision as of 16:04, 21 October 2019

Management Directive 8.14, Agency Action Review Meeting.
ML18073A211
Person / Time
Issue date: 10/25/2015
From:
Office of Nuclear Reactor Regulation
To:
References
DT-17-167 MD 8.14
Download: ML18073A211 (19)


Text

U.S. NUCLEAR REGULATORY COMMISSION MANAGEMENT DIRECTIVE (MD)

MD 8.14 AGENCY ACTION REVIEW MEETING DT-17-167 Volume 8: Licensee Oversight Programs Approved By: William M. Dean, Director Office of Nuclear Reactor Regulation Date Approved: October 25, 2015 Cert. Date: N/A, for the latest version of any NRC directive or handbook, see the online MD Catalog.

Issuing Office: Office of Nuclear Reactor Regulation Division of Inspection and Regional Support Contact: Andrew J. Waugh 301-415-5601 EXECUTIVE

SUMMARY

Management Directive and Handbook 8.14, Agency Action Review Meeting, are being revised to incorporate

  • The revised reporting criteria for the discussion of fuel facilities during the Agency Action Review Meeting (AARM),
  • Organizational changes resulting from the merger of the Office of Nuclear Material Safety and Safeguards and the Office of Federal and State Materials and Environmental Management Programs,
  • Clarification of the process for preparing and distributing the AARM meeting minutes, and
  • Minor editorial updates.

TABLE OF CONTENTS POLICY..............................................................................................................................2 OBJECTIVES ....................................................................................................................2 ORGANIZATIONAL RESPONSIBILITIES AND DELEGATIONS OF AUTHORITY ........... 3 A. Executive Director for Operations (EDO) ......................................................................3 B. Director, Office of Nuclear Reactor Regulation (NRR) ..................................................3 C. Director, Office of Nuclear Material Safety and Safeguards (NMSS).............................3 D. Director, Office of Nuclear Security and Incident Response (NSIR) ..............................3 E. Director, Office of New Reactors (NRO) .......................................................................4 F. Region II Regional Administrator ..................................................................................4

_____________________________________________________________________________________________

For updates or revisions to policies contained in this MD that were published after the MD was signed, please see the Yellow Announcement to Management Directive index (YA-to-MD index).

MD 8.14 AGENCY ACTION REVIEW MEETING Date Approved: 10/25/2015 G. All Regional Administrators (All RAs) ............................................................................4 H. Directors of Staff Offices ...............................................................................................5 I. Assistant for Operations, Office of the Executive Director for Operations (OEDO) ........................................................................................................................5 APPLICABILITY ................................................................................................................5 DIRECTIVE HANDBOOK ..................................................................................................5 REFERENCES ...................................................................................................................5 POLICY It is the policy of the U.S. Nuclear Regulatory Commission to have its senior managers conduct an annual Agency Action Review Meeting (AARM). The AARM is an integral part of the evaluative process used by the agency to ensure the operational safety performance of nuclear licensees.

OBJECTIVES Review the appropriateness of agency actions taken for those power reactor plants with significant performance issues using data compiled during the end-of-cycle (EOC) review and those that have moved into the multiple/repetitive degraded cornerstone or the unacceptable performance columns of the Reactor Oversight Process (ROP)

Action Matrix during the first quarter of the year in which the AARM is held and to identify additional actions, as appropriate.

Review the appropriateness of agency actions taken for those power reactor plants under construction with significant performance issues using data compiled during the CEOC review and those that have moved into the multiple/repetitive degraded cornerstone or the unacceptable performance columns of the Construction Reactor Oversight Process (cROP) Action Matrix during the first quarter of the year in which the AARM is held and to identify additional actions, as appropriate.

Review the appropriateness of agency actions taken for those nuclear materials licensees, including fuel cycle facilities that meet the criteria for discussion at the AARM as defined in SECY-11-0132, Revision of the Criteria for Identifying Nuclear Materials Licensees for Discussion at the Agency Action Review Meeting, and to identify additional actions, as appropriate.

Ensure that coordinated courses of action are developed and implemented for licensees with performance issues.

Review the results of the staffs annual assessment of ROP effectiveness, including a review of all approved deviations from the Action Matrix.

For the latest version of any NRC directive or handbook, see the online MD Catalog. 2

MD 8.14 AGENCY ACTION REVIEW MEETING Date Approved: 10/25/2015 Review the results of the staffs assessment of cROP effectiveness, including all approved deviations from the Construction Action Matrix.

Ensure that trends in industry and licensee performance are recognized and appropriately addressed.

ORGANIZATIONAL RESPONSIBILITIES AND DELEGATIONS OF AUTHORITY A. Executive Director for Operations (EDO)

1. Oversees AARM activities and conducts the meeting.
2. Decides if any additional or alternate NRC actions besides those already completed or planned are to be conducted at a particular licensees facility on the basis of discussions at the AARM.
3. Briefs the Commission on the results of the AARM.

B. Director, Office of Nuclear Reactor Regulation (NRR)

1. Develops guidance for coordinating AARM preparation activities.
2. Coordinates AARM preparations and discussions pertaining to nuclear reactors within the Office of Nuclear Reactor Regulation (NRR) and between other NRC headquarters and regional offices.
3. Coordinates and conducts EOC summary meetings, if necessary, on the basis of the results of the regional EOC reviews.
4. Develops ROP program policies and procedures, and ensures the effectiveness of program implementation.
5. Participates in the AARM and leads discussion, as necessary.
6. Coordinates with the Office of New Reactors (NRO) and other NRC headquarters and regional offices on preparation of the AARM agenda and meeting minutes.

C. Director, Office of Nuclear Material Safety and Safeguards (NMSS)

1. Coordinates with other NRC headquarters and regional offices on preparations and discussions before the AARM pertaining to fuel cycle and other nuclear materials licensees. In consultation with the appropriate regional administrators (RAs), the Office of Nuclear Material Safety and Safeguards (NMSS) determines which, if any, fuel cycle or other nuclear materials licensees will be discussed at the AARM.
2. Participates in the AARM and leads discussions, as necessary.

D. Director, Office of Nuclear Security and Incident Response (NSIR)

1. Coordinates AARM preparations and discussions pertaining to the emergency preparedness and security cornerstones of the ROP and cROP, as well as fuel facility security issues between other NRC headquarters and regional offices.

For the latest version of any NRC directive or handbook, see the online MD Catalog. 3

MD 8.14 AGENCY ACTION REVIEW MEETING Date Approved: 10/25/2015

2. Develops emergency preparedness and security-related ROP, cROP, and materials program policies and procedures, and ensures the effectiveness of program implementation.
3. Participates in the AARM and leads discussion, as necessary.
4. Coordinates with the other NRC headquarters and regional offices on preparation of the AARM agenda and meeting minutes.

E. Director, Office of New Reactors (NRO)

1. Coordinates AARM preparations and discussions pertaining to nuclear reactors under construction within NRO and between other NRC headquarters and regional offices.
2. Coordinates and conducts EOC summary meetings, if necessary, on the basis of the results of the regional EOC review meetings.
3. Develops cROP program policies and procedures, and ensures the effectiveness of program implementation.
4. Participates in the AARM and leads discussion, as necessary.

F. Region II Regional Administrator Briefs the Director of NRO and other internal stakeholders at the EOC summary meeting on the performance of licensees with reactors under construction for those plants with significant performance problems as described in Section I.D of this handbook.

G. All Regional Administrators (All RAs)

1. Brief the Director of NRR and other internal stakeholders at the EOC summary meeting on the performance of licensees of operating reactors in their respective regions for those plants with significant performance problems as described in Section I.B of this handbook.
2. Coordinate AARM preparations with the program offices.
3. Participate in the AARM and lead discussions for reactor licensees in their respective regions.
4. Make recommendations to the Director of NMSS, as applicable, on candidate materials licensees to be discussed at the AARM. Brief the Director of NMSS and other internal stakeholders on the performance of nuclear materials licensees within the region and the Agreement States that are identified for discussion as a result of significant safety or safeguards performance issues, and lead the related AARM discussions, as applicable.

For the latest version of any NRC directive or handbook, see the online MD Catalog. 4

MD 8.14 AGENCY ACTION REVIEW MEETING Date Approved: 10/25/2015 H. Directors of Staff Offices

1. Coordinate with program and regional offices in providing input to both the AARM and EOC meetings, as applicable.
2. Participate in the AARM as specified in the applicable portions of this handbook or as directed by the Executive Director for Operations.

I. Assistant for Operations, Office of the Executive Director for Operations (OEDO)

1. Coordinates or delegates coordination of AARM preparations with program and regional offices.
2. Is responsible or delegates responsibility for AARM logistics.

APPLICABILITY The policy and guidance in Management Directive 8.14 apply to all NRC employees and contractors.

DIRECTIVE HANDBOOK Handbook 8.14 provides guidance for the preparation and conduct of the AARM.

REFERENCES Code of Federal Regulations 10 CFR 2.348, Separation of Functions.

Nuclear Regulatory Commission Documents Management Directive 5.12, International Nuclear and Radiological Event Scale (INES) Participation.

8.1, Abnormal Occurrence Reporting Procedure.

NRC Enforcement Manual, available at http://www.nrc.gov/about-nrc/regulatory/enforcement/guidance.html#manual.

NRC Enforcement Policy, available at http://www.nrc.gov/about-nrc/regulatory/enforcement/enforce-pol.html.

NRC Inspection Manual Chapters:

0305, Operating Reactor Assessment Program.

0307, Reactor Oversight Process Self-Assessment Program.

0313, Industry Trends Program.

0350, Oversight of Reactor Facilities in a Shutdown Condition Due to Significant Performance and/or Operational Concerns.

For the latest version of any NRC directive or handbook, see the online MD Catalog. 5

MD 8.14 AGENCY ACTION REVIEW MEETING Date Approved: 10/25/2015 2505, Periodic Assessment of Construction Inspection Program Results.

2522, Construction Reactor Oversight Process Self-Assessment Program.

NUREG-1614, NRC Strategic Plan.

SECY-11-0132, Revision of the Criteria for Identifying Nuclear Materials Licensees for Discussion at the Agency Action Review Meeting, September 20, 2011 (ML112280111).

Staff Requirements Memorandum, from Andrew L. Bates to Luis A. Reyes, COMSECY-07-0005, Discussion of Plants in the Multiple/Repetitive Degraded Cornerstone Column of the Reactor Oversight Process Action Matrix, April 19, 2007 (ML071090473).

Staff Requirements Memorandum, from Annette L. Vietti-Cook to Luis A. Reyes, Staff Requirements, Briefing on Results of the Agency Action Review Meeting (SECY-05-0070), 9:30 a.m., Wednesday, May 25, 2005, Commissioners Conference Room, One White Flint North, Rockville, Maryland (Open to Public Attendance),

June 30, 2005 (ML051810313).

Staff Requirements Memorandum, from Annette L. Vietti-Cook to Luis A. Reyes, SRM-M040504B, Staff Requirements - Briefing on Results of the Agency Action Review Meeting, 9:30 a.m., Tuesday, May 4, 2004, Commissioners Conference Room, One White Flint North, Rockville, Maryland (Open to Public Attendance), May 27, 2004 (ML041480131).

For the latest version of any NRC directive or handbook, see the online MD Catalog. 6

U.S. NUCLEAR REGULATORY COMMISSION DIRECTIVE HANDBOOK (DH)

DH 8.14 AGENCY ACTION REVIEW MEETING DT-17-167 Volume 8: Licensee Oversight Programs Approved By: William M. Dean, Director Office of Nuclear Reactor Regulation Date Approved: October 25, 2015 Cert Date: N/A, for the latest version of any NRC directive or handbook, see the online MD Catalog.

Issuing Office: Office of Nuclear Reactor Regulation Division of Inspection and Regional Support Contact: Andrew J. Waugh 301-415-5601 EXECUTIVE

SUMMARY

Management Directive and Handbook 8.14, Agency Action Review Meeting, are being revised to incorporate

  • The revised reporting criteria for the discussion of fuel facilities during the Agency Action Review Meeting (AARM),
  • Organizational changes resulting from the merger of the Office of Nuclear Material Safety and Safeguards and the Office of Federal and State Materials and Environmental Management Programs,
  • Clarification of the process for preparing and distributing the AARM meeting minutes, and
  • Minor editorial updates.

TABLE OF CONTENTS I. PREPARATION FOR THE AGENCY ACTION REVIEW MEETING (AARM) ....................2 A. General ........................................................................................................................2 B. End-of-Cycle Reviews and Summary Meetings for Operating Reactors .......................2 C. Final AARM Preparations for Operating Reactor Licensees..........................................3 D. End-of-Cycle Reviews and Summary Meetings for Reactors that are Under Construction .......................................................................................................5 E. Final AARM Preparations for Reactor Construction Licensees .....................................5 F. Final AARM Preparations for Materials Licensees, Including Fuel Cycle Facilities .......................................................................................................................6 G. AARM Notebook Distribution ........................................................................................7

_____________________________________________________________________________________________

For updates or revisions to policies contained in this MD that were published after the MD was signed, please see the Yellow Announcement to Management Directive index (YA-to-MD index).

DH 8.14 AGENCY ACTION REVIEW MEETING Date Approved: 10/25/2015 II. CONDUCT OF THE AGENCY ACTION REVIEW MEETING (AARM) AND COMMISSION BRIEFING ..................................................................................................8 A. General ........................................................................................................................8 B. Operating Reactor Plant Performance Discussions and Review of Agency Actions .............................................................................................................8 C. Operating Reactor Oversight Process Self-Assessment ...............................................9 D. Analysis of Operating Reactor Industry Trends ...........................................................10 E. Reactor Construction Performance Discussions and Review of Agency Actions .......................................................................................................................10 F. Construction Reactor Oversight Process Self-Assessment ......................................... 11 G. Discussion of Materials Facilities, Including Fuel Cycle Facilities ................................ 11 H. Analysis of Materials Licensee Performance Trends ..................................................11 I. Correspondence Following the AARM ........................................................................12 J. Commission Briefing ...................................................................................................12 I. PREPARATION FOR THE AGENCY ACTION REVIEW MEETING (AARM)

A. General

1. Headquarters and regional staff will work together to develop the information to be used at the Agency Action Review Meeting (AARM). The Office of Nuclear Reactor Regulation (NRR) will assemble this information into the AARM notebook, which will be distributed to AARM participants in advance of the meeting. Informational copies will be provided to the Commission after the AARM as part of background material for the Commission briefing on the results of the AARM.
2. Throughout this management directive (MD)

(a) The term Action Matrix refers to the Reactor Oversight Process (ROP) Action Matrix in Inspection Manual Chapter (IMC) 0305, Operating Reactor Assessment Program.

(b) The term Construction Action Matrix refers to the Construction Reactor Oversight Process (cROP) Action Matrix in IMC 2505, Periodic Assessment of Construction Inspection Program Results.

(c) Any reference to nuclear materials licensees includes certificate holders and other regulated entities.

B. End-of-Cycle Reviews and Summary Meetings for Operating Reactors

1. Each regional office will conduct an end-of-cycle (EOC) review for all operating reactors within its purview in accordance with IMC 0305. The EOC review is a comprehensive assessment of licensee performance using the most recent For the latest version of any NRC directive or handbook, see the online MD Catalog. 2

DH 8.14 AGENCY ACTION REVIEW MEETING Date Approved: 10/25/2015 performance indicators and inspection findings from the recently completed 12-month annual assessment cycle. The staff conducts EOC reviews to analyze licensee performance information from inspection reports and performance indicators, along with other pertinent data, to confirm NRC actions and allocate resources.

2. In addition, the EOC summary meeting is conducted at the conclusion of the EOC reviews to discuss the results with the Director of NRR and other internal stakeholders. Plant performance discussions are limited to those plants that meet the criteria specified in IMC 0305. The regional staff will coordinate with NRR to schedule and conduct the summary meeting.

C. Final AARM Preparations for Operating Reactor Licensees

1. Following the EOC reviews, the headquarters and regional staff will work together to develop the information to be discussed at the AARM. Plant performance discussions are limited to those plants that met the following criteria during the recently completed 12-month annual assessment:

(a) Have been in the multiple/repetitive degraded cornerstone column, (b) Have been in the unacceptable performance column, (c) Are under IMC 0350, Oversight of Reactor Facilities in a Shutdown Condition Due to Significant Performance and/or Operational Concerns, (d) Have been in the degraded cornerstone column for 3 years, 1 or (e) Have moved into the multiple/repetitive degraded cornerstone column or the unacceptable performance column of the Action Matrix during the first quarter of the year in which the AARM is held. 2

2. NRR will assemble information into the AARM notebook. For each reactor to be discussed, the associated regional office will provide NRR the following information:

(a) A presentation of plant performance, (b) Pertinent performance indicator (PI) report, (c) Finding summary report, and 1 As directed by Staff Requirements Memorandum COMSECY-07-0005, Discussion of Plants in the Multiple/Repetitive Degraded Cornerstone Column of the Reactor Oversight Process Action Matrix, the ROP has been changed to include a provision that a licensee who remains in column 3 for 3 years should be invited to meet with the Commission. The Commission will then evaluate the need for subsequent briefings by the licensee with senior agency management after the AARM.

2 A licensee who enters the multiple/repetitive degraded cornerstone column or the unacceptable performance column may not necessarily be invited to meet with the Commission following the subsequent AARM.

For the latest version of any NRC directive or handbook, see the online MD Catalog. 3

DH 8.14 AGENCY ACTION REVIEW MEETING Date Approved: 10/25/2015 (d) The plant performance summary information used in the EOC summary meeting and to be revised to incorporate any insights developed during the meeting, including (i) An operating summary; (ii) A performance overview (current overall assessment and previous assessment results);

(iii) Inspection and PI results by cornerstones; (iv) Other issues (i.e., substantive cross-cutting issues (SCCIs), PI verification, and non-significance determination process (non-SDP) enforcement actions of at least Severity Level III);

(v) A proposed inspection plan; and (vi) The plant-specific Action Matrix used in the EOC summary meeting that details the timeline and consideration of PIs and inspection findings in the assessment program.

3. NRR will include the following information in the AARM notebook:

(a) A meeting agenda.

(b) A presentation of the self-assessment of the ROP, including lessons learned and recommended program adjustments. An annual report, prepared in accordance with IMC 0307, Reactor Oversight Process Self-Assessment Program, may be referenced for the AARM but will be included in the AARM notebook provided to the Commission. This process is intended to assess the effectiveness of the ROP and to develop recommendations for improvement.

(c) All ROP Action Matrix deviations 3 to ensure that the causes for the deviations are fully understood and to identify any necessary changes to the ROP to improve guidance documents. (This specific aspect of the self-assessment must be discussed at the AARM, and the Commissioners must also be briefed on this evaluation).

(d) A presentation of industry performance trends. An annual report, prepared in accordance with IMC 0313 Industry Trends Program, may be referenced for the AARM but will be included in the AARM notebook provided to the Commission.

This process will ensure that the agency recognizes and appropriately addresses trends in industry and licensee performance.

(e) Other information as necessary or as specified by the Executive Director for Operations (EDO).

3 Staff Requirement Memorandum dated May 27, 2004, reference M040504B.

For the latest version of any NRC directive or handbook, see the online MD Catalog. 4

DH 8.14 AGENCY ACTION REVIEW MEETING Date Approved: 10/25/2015 D. End-of-Cycle Reviews and Summary Meetings for Reactors that are Under Construction

1. Region II will conduct an EOC review for all reactors that are under construction in accordance with IMC 2505. The EOC review is a comprehensive assessment of licensee performance using the most recent inspection findings from the recently completed (12-month) annual assessment cycle. The regional staff conducts EOC reviews to analyze licensee performance information from inspection reports, along with other pertinent data, to confirm NRC actions and allocate resources.
2. An EOC Summary Briefing may be necessary before the AARM to summarize licensee performance results with the Office of New Reactors (NRO) senior management. Plant performance discussions are limited to those plants that meet the criteria specified in IMC 2505. The regional staff will coordinate with NRO to schedule and conduct the summary meeting.

E. Final AARM Preparations for Reactor Construction Licensees

1. Following the EOC reviews, the headquarters and regional staff will work together to develop the information to be discussed at the AARM. Plant performance discussions are limited to those plants during the recently completed 12-month annual assessment cycle that (a) Have been in the multiple/repetitive degraded cornerstone column, or (b) Have been in the unacceptable performance column, or (c) Have been in the degraded cornerstone column for one and one-half years, or (d) Have moved into the multiple/repetitive degraded cornerstone column or the unacceptable performance column of the Construction Action Matrix during the first quarter of the year in which the AARM is held.
2. NRO will provide information to NRR for assembly into the AARM notebook. For each reactor under construction to be discussed, Region II will provide NRO the following information:

(a) A presentation of plant performance, (b) Finding summary report, and (c) Construction plant performance summary information used in the EOC summary meeting and to be revised to incorporate any insights developed during the meeting, including (i) A performance overview (current overall assessment and previous assessment results),

(ii) Other issues (i.e., construction SCCIs and non-significance determination process (non-SDP) enforcement actions of at least Severity Level III),

(iii) A proposed inspection plan, and For the latest version of any NRC directive or handbook, see the online MD Catalog. 5

DH 8.14 AGENCY ACTION REVIEW MEETING Date Approved: 10/25/2015 (iv) The plant-specific Construction Action Matrix used in the EOC summary meeting that details the timeline and consideration of inspection findings in the assessment program.

3. NRO will provide NRR the following information for inclusion in the notebook:

(a) A presentation of the self-assessment of the cROP, including lessons learned and recommended program adjustments. An annual report, prepared in accordance with IMC 2522, Construction Reactor Oversight Process Self-Assessment Program, may be referenced for the AARM but will be included in the AARM notebook provided to the Commission. This process is intended to assess the effectiveness of the cROP and to develop recommendations for improvement.

(b) All cROP Construction Action Matrix deviations to ensure that the causes for the deviations are understood and to identify any necessary changes to the cROP to improve the guidance documents. (This specific aspect of the self-assessment must be discussed at the AARM, and the Commissioners must also be briefed on this evaluation.)

(c) Other information, as necessary or as specified by the EDO.

F. Final AARM Preparations for Materials Licensees, Including Fuel Cycle Facilities

1. The Office of Nuclear Material Safety and Safeguards (NMSS), in collaboration with the regions and the Agreement States, will prepare briefing documents regarding nuclear materials licensees. Headquarters and regional staff will work together to develop the information to be used at the AARM. The staff will distribute the briefing documents to AARM participants in advance of the meeting, as applicable. NRR will assemble this information into the AARM notebook, which will include (a) A presentation of nuclear materials licensee(s) with significant performance issues that meet the criteria described in SECY-11-0132, Revision of the Criteria for Identifying Nuclear Materials Licensees for Discussion at the Agency Action Review Meeting, as appropriate, and (b) A presentation of the nuclear materials and waste programs performance and trending analysis.
2. NMSS and the regional offices will limit the performance discussion to those nuclear materials licensees that meet one of the following criteria as described in SECY-11-0132:

(a) The licensee has an event that results in the failure to meet a Strategic Outcome for Safety or Security in the NRC Strategic Plan (NUREG-1614).

(b) The licensees performance has unique or unusual aspects that required or will likely require additional NRC oversight (e.g., a significant event warranting an incident investigation team or augmented inspection team), and the licensee has an issue or event that results or will likely result in (i) An Abnormal Occurrence Report to Congress (in accordance with MD 8.1, Abnormal Occurrence Reporting Procedure),

For the latest version of any NRC directive or handbook, see the online MD Catalog. 6

DH 8.14 AGENCY ACTION REVIEW MEETING Date Approved: 10/25/2015 (ii) A Severity Level I or II violation 4 (including equivalent violations dispositioned by Alternative Dispute Resolution), or (iii) A Level 3 or higher International Nuclear Event Scale Report to the International Atomic Energy Agency (in accordance with MD 5.12, International Nuclear and Radiological Event Scale (INES) Participation).

(c) The licensees performance has unique or unusual aspects that required or will likely require additional NRC oversight (e.g., an oversight panel formed for order implementation), and the licensee has or will likely have (i) Multiple and/or repetitive significant program issues identified over more than one inspection or inspection period, and (ii) The issues are supported by a Severity Level I, II, or III violation (including equivalent violations dispositioned by Alternative Dispute Resolution).

(d) The licensees corrective actions did not address or were ineffective in correcting the underlying issues that were discussed at the previous AARM.

3. The cognizant regional office will prepare a narrative summary of licensee performance for each nuclear materials licensee to be discussed at the AARM.
4. NMSS, in collaboration with the regions and the Agreement States, will prepare an annual report that analyzes the significant nuclear materials issues and adverse licensee performance trends in the nuclear materials and waste programs. The annual report may be referenced for the AARM, but will be included in the AARM notebook provided to the Commission. This process will ensure that trends in industry and licensee performance are recognized and appropriately addressed.

G. AARM Notebook Distribution

1. The AARM notebooks will be distributed to AARM participants in advance of the meeting. The notebooks will be provided to the Commission after the AARM as part of background material for the Commission briefing.
2. The staff ensures that sensitive information used in the AARM and in the notebooks is appropriately controlled based on information security requirements.
3. The staff coordinates with the Office of the General Counsel (OGC) before distribution of the AARM materials to the Commission to ensure conformance to the separation of functions rules in Title 10 of the Code of Federal Regulations (10 CFR) 2.348, Separation of Functions, pertaining to communications related to contested adjudicatory matters.

4 As defined in the NRC Enforcement Policy.

For the latest version of any NRC directive or handbook, see the online MD Catalog. 7

DH 8.14 AGENCY ACTION REVIEW MEETING Date Approved: 10/25/2015 II. CONDUCT OF THE AGENCY ACTION REVIEW MEETING (AARM) AND COMMISSION BRIEFING A. General

1. The AARM is part of an integrated evaluative process used by the agency to ensure the operational safety, construction safety, and security performance of nuclear licensees. The AARM includes management reviews according to the objectives as described in Section II of this directive.
2. Since the AARM serves as a forum to review overall industry trends and the effectiveness of the ROP, the cROP, and the nuclear materials and waste programs, the AARM is conducted on an annual basis regardless of whether any individual licensees are scheduled to be discussed.
3. The EDO directs the conduct of the AARM. Participation will vary, depending on the portion of the AARM involved. The attendees typically will include, at varying times, the Deputy Executive Director for Reactor and Preparedness Programs (DEDR); the Deputy Executive Director for Materials, Waste, Research, State, Tribal, Compliance, Administration, and Human Capital (DEDM); the Directors of NMSS, NRO, NRR, Office of Nuclear Security and Incident Response (NSIR), Office of Enforcement (OE), Office of Investigations (OI), Office of Nuclear Regulatory Research (RES), the regional administrators (RAs); and other support personnel, such as OGC, as directed. Participation in each portion of the AARM will be as noted in the relevant sections of this handbook or as determined by the EDO.
4. The AARM is conducted annually and occurs when all necessary inputs from Section I of this handbook are complete. If discussion of classified, Safeguards, or Sensitive Unclassified Non-Safeguards Information is necessary to achieve AARM objectives, a separate, closed session will be conducted among senior NRC managers with a need-to-know. The results of that meeting will be summarized by the EDO or designee during the AARM, ensuring that sensitive content remains undisclosed.
5. Following each AARM, licensees are informed of any NRC decisions or actions that differ from those previously conveyed (if any agency actions change as a result of the senior managers discussions). The Commission is briefed on the AARM results at a public meeting.

B. Operating Reactor Plant Performance Discussions and Review of Agency Actions

1. The discussions of plant performance are led by the cognizant RA. Plant performance discussions are limited to those plants that meet the criteria outlined in Section I.C of this handbook, Final AARM Preparations for Operating Reactor Licensees.
2. Primary participants in the plant performance discussion portion of the AARM include the EDO, the DEDR, the Director of NRR, and the RAs. OGC and the Directors of OE, OI, NRO, NSIR, and RES, also may participate if issues relative to their areas of responsibility will be discussed.

For the latest version of any NRC directive or handbook, see the online MD Catalog. 8

DH 8.14 AGENCY ACTION REVIEW MEETING Date Approved: 10/25/2015

3. As noted in IMC 0305, agency actions based on licensee performance are expected to be in accordance with the ROP Action Matrix. The ROP Action Matrix provides for a range of actions for NRC to take to appropriately address plant performance issues. Because actions would be taken on an ongoing basis, the role of the AARM is more informational and confirmatory. The senior managers will review the agencys actions that have been planned or completed to confirm their appropriateness. This step may include discussion of possible improvements or enhancements to the ROP.
4. The staff ensures that safeguards and other sensitive unclassified information is appropriately controlled and not released to the public. Furthermore, attendance of personnel must be controlled as necessary when sensitive information is being discussed, with additional focus on control of Safeguards Information.
5. As a result of AARM discussions, the senior managers may identify additional or alternate actions and/or allocation of agencywide resources. These actions should all be encompassed by and in accordance with the ROP Action Matrix or approved deviations from the Action Matrix. This step may include conducting a special team inspection to ascertain the causes of the performance problems, holding discussions between senior officials of both NRC and the licensee to further enhance the quality of communications, or convening a meeting with the Commission to review plant performance and licensee plans to improve performance.
6. Any or all of the actions discussed in the applicable sections of IMC 0305 are appropriate for plants that are discussed. The objective of these actions is to ensure that the licensee establishes a plan for improvement that incorporates measurable goals to determine when performance has improved. Whether and when to take any one of these actions is a determination that will be made at the NRCs sole discretion. The contents of this handbook and IMC 0305 do not restrict NRC from taking any necessary actions to fulfill its responsibilities under any applicable law.

C. Operating Reactor Oversight Process Self-Assessment

1. The ROP annual self-assessment report is discussed by NRR at the AARM. The ROP self-assessment program is implemented in accordance with IMC 0307, Reactor Oversight Process Self-Assessment Program. This program is conducted to assess the effectiveness of the ROP and develop recommendations for improvement.
2. NRR prepares a report on an annual basis that includes a ROP self-assessment, analysis of the metrics, and other relevant information. These reports form the basis for discussions during the AARM regarding the ROP self-assessment and will be provided to the Commission. Also, Action Matrix deviations must be discussed at the AARM, and the Commissioners must also be briefed on this evaluation. 5
3. Participants in the ROP self-assessment portion of the AARM include the EDO; the DEDR; the Directors of NRR, NSIR, RES, and OE; and the RAs. Other office directors may also participate as applicable and at the discretion of the EDO.

5 As directed in Staff Requirement Memorandum dated May 27, 2004, reference M040504B.

For the latest version of any NRC directive or handbook, see the online MD Catalog. 9

DH 8.14 AGENCY ACTION REVIEW MEETING Date Approved: 10/25/2015 D. Analysis of Operating Reactor Industry Trends

1. The industry trends annual report is discussed by NRR at the AARM. This report is prepared in accordance with IMC 0313 and is intended to ensure that trends in industry and licensee performance are recognized and appropriately addressed. The report will be used as the basis for discussions during the AARM regarding the analysis of industry trends and will be provided to the Commission.
2. Participants in the industry trends portion of the AARM will include the EDO, the DEDR, the Directors of NRR and RES, and the RAs. OGC and the Directors of OE and OI may also participate as applicable and at the discretion of the EDO.

E. Reactor Construction Performance Discussions and Review of Agency Actions

1. The discussions of reactor construction performance are led by the Region II RA.

Construction performance discussions are limited to those plants that met the criteria outlined in Section I.E of this handbook, Final AARM Preparations for Reactor Construction Licensees.

2. Primary participants in the plant performance discussion portion of the AARM will include the EDO, the DEDR, the Director of NRO, and the RAs. In addition, OGC and the Directors of OE, OI, NRR, NSIR, and RES, may also participate if issues relative to their areas of responsibility will be discussed.
3. As noted in IMC 2505, agency actions based on licensee performance are expected to be in accordance with the cROP Construction Action Matrix. The cROP Construction Action Matrix provides for a range of actions for NRC to take to appropriately address plant performance issues. Because actions would be taken on an ongoing basis, the role of the AARM is more informational and confirmatory. The senior managers will review the agencys actions that have been planned or completed to confirm their appropriateness. This step may include discussion of possible improvements or enhancements to the cROP.
4. The staff ensures that safeguards and other sensitive unclassified information is appropriately controlled and not released to the public. Furthermore, attendance of personnel must be controlled as necessary when sensitive information is being discussed, with additional focus on control of Safeguards Information.
5. As a result of AARM discussions, the senior managers may identify additional or alternate actions and/or allocation of agencywide resources. These actions should all be encompassed by and in accordance with the cROP Construction Action Matrix or approved deviations from the Construction Action Matrix. This step may include conducting a special team inspection to ascertain the causes of the performance problems, holding discussions between senior officials of both NRC and the licensee to further enhance the quality of communications, or convening a meeting with the Commission to review construction performance and licensee plans to improve performance.
6. Any or all of the actions discussed in the applicable sections of IMC 2505 are appropriate for plants that are discussed. The objective of these actions is to ensure that the licensee establishes a plan for improvement that incorporates measurable For the latest version of any NRC directive or handbook, see the online MD Catalog. 10

DH 8.14 AGENCY ACTION REVIEW MEETING Date Approved: 10/25/2015 goals to determine when performance has improved. Whether and when to take any one of these actions is a determination that will be made at the NRCs sole discretion. The contents of this handbook and IMC 2505 do not restrict NRC from taking any necessary actions to fulfill its responsibilities under any applicable law.

F. Construction Reactor Oversight Process Self-Assessment NRO will conduct an annual self-assessment to assess the effectiveness of the cROP, resource utilization, and to develop recommendations for improvement. An annual report will be prepared and used as the basis for discussion during the AARM. This report will be provided to the Commission and made publicly available.

G. Discussion of Materials Facilities, Including Fuel Cycle Facilities

1. The Director of NMSS or the RAs, as directed by the EDO, will lead the discussion of performance for any materials licensees, including categories of licensees that have significant safety, security, or safeguards performance issues. Primary participants in these discussions will include the EDO, the DEDM, the Director of NMSS, and the RAs. In addition, other office directors may participate as appropriate and at the discretion of the EDO.
2. The staff ensures that classified, safeguards, and other sensitive unclassified information is appropriately controlled and not released to the public. Furthermore, attendance of personnel must be controlled as necessary when sensitive information is being discussed, with additional focus on control of Safeguards Information.
3. The senior managers will review the agencys actions that have been planned or completed to confirm their appropriateness. As a result of AARM discussions, the senior managers may recommend additional or alternate actions and/or allocation of agencywide resources.

H. Analysis of Materials Licensee Performance Trends

1. NMSS, in collaboration with the regional offices and the Agreement States, will analyze the nuclear materials licensee performance trends. Data for this trending analysis will be obtained from operating experience associated with reportable events and generic issues affecting the industry.
2. The data will be compiled and examined for any significant trends in performance, particularly adverse trends. If any statistically significant trends 6 are identified, NRC will conduct further examination of the data to determine what, if any, actions may be appropriate.
3. A report will be prepared on an annual basis that includes the analysis of the nuclear materials licensee performance trends. This report will be used as the basis for discussion during the AARM regarding the analysis of performance trends. This report will be provided to the Commission and made publicly available.

6 As defined in IMC 0313 Appendix C, Long-Term Trending.

For the latest version of any NRC directive or handbook, see the online MD Catalog. 11

DH 8.14 AGENCY ACTION REVIEW MEETING Date Approved: 10/25/2015 I. Correspondence Following the AARM

1. In addition to the annual assessment letters to power reactor licensees, regional offices will issue separate letters to those reactor plants discussed during the AARM if any agency actions change as a result of the senior managers discussions. These letters are issued within 1 week following completion of the AARM, and at least 2 weeks before the Commission briefing. For materials licensees, the agency will evaluate the need to issue a letter to individual licensees or categories of licensees on a case-by-case basis.
2. For Agreement State licensees, regional offices will consult on a case-by-case basis with the Agreement State Radiation Control Program Director when evaluating the need to issue a letter to individual licensees or categories of licensees.
3. Meeting minutes that summarize the key discussions and conclusions from the AARM are issued by the EDO. The AARM meeting minutes will be provided to the Commission as part of the briefing background material. The staff will coordinate with OGC on potential separation of functions issues before such distribution.

J. Commission Briefing

1. The staff will brief the Commission on the AARM results at a public meeting, approximately 4 to 6 weeks following completion of the AARM. The staff delivering the briefing will typically include the EDO and the appropriate office directors or RAs, as directed by the EDO. The staff will consult with OGC to ensure the briefing is consistent with the NRCs separation of functions rules in 10 CFR 2.348.
2. The public briefing will include discussions of those plants and nuclear materials licensees that have significant performance problems and that were discussed during the AARM, if applicable. The staffs briefing will also include discussions of the results of the staffs self-assessment of the ROP and cROP, including lessons learned and recommended policy adjustments, changes to the ROP and/or the cROP as a result of evaluating Action Matrix deviations, and an analysis of reactor and materials industry performance trends.
3. A separate public meeting or session between the Commission and the licensee may be convened for reactor and nuclear materials licensees that are discussed at the AARM Commission meeting, if deemed appropriate by the EDO or the Commission.

These licensees should present their plans for improving performance at their facilities. 7 The chief nuclear officer of a licensee of a new multiple/repetitive degraded cornerstone column plant will typically be invited to brief the Commission on the activities the licensee will be taking to improve the operation of the unit within 6 months of entering into the multiple/repetitive degraded cornerstone column.

Similarly, the chief nuclear officer of a licensee of a new multiple/repetitive degraded cornerstone column plant under construction will typically, within 6 months of entering into the multiple/repetitive degraded cornerstone column, will be invited to 7 Staff Requirements Memorandum dated June 30, 2005, reference M050525B, and Staff Requirements Memorandum COMSECY-07-0005, Discussion of Plants in the Multiple/Repetitive Degraded Cornerstone Column of the Reactor Oversight Process Action Matrix.

For the latest version of any NRC directive or handbook, see the online MD Catalog. 12

DH 8.14 AGENCY ACTION REVIEW MEETING Date Approved: 10/25/2015 brief the Commission on the activities the licensee will be taking to improve the construction of the unit(s). The time of the meeting will be based on a determination by the Commission informed by a recommendation from the EDO. In addition, any reactor licensee that remains in the degraded cornerstone column for 3 or more years should be invited to meet with the Commission. 8

4. Information regarding licensee performance that is not publicly available will not be discussed at the public meeting. As necessary, the Commissioners will be briefed on non-public/sensitive discussion topics from the AARM in a separate non-public meeting.

8 The Commission will then evaluate the need for subsequent briefings by the licensee with senior agency management after the AARM.

For the latest version of any NRC directive or handbook, see the online MD Catalog. 13