{{#Wiki_filter:September 2, 2014 | {{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 2100 RENAISSANCE BLVD., SUITE 100 KING OF PRUSSIA, PA 19406-2713 September 2, 2014 Mr. David Heacock President and Chief Nuclear Officer Dominion Resources 5000 Dominion Boulevard | ||
Glen Allen, VA 23060-6711 SUBJECT: MID-CYCLE ASSESSMENT LETTER FOR MILLSTONE POWER STATION UNITS 2 AND 3 (REPORT 05000336/2014006 AND 05000423/2014006) | |||
MID-CYCLE ASSESSMENT LETTER FOR MILLSTONE POWER STATION UNITS 2 AND 3 (REPORT 05000336/2014006 AND 05000423/2014006) | |||
==Dear Mr Heacock:== | ==Dear Mr Heacock:== | ||
Revision as of 18:39, 14 July 2019
| ML14241A020 | |
| Person / Time | |
|---|---|
| Site: | Millstone |
| Issue date: | 09/02/2014 |
| From: | Raymond Mckinley NRC/RGN-I/DRP/PB5 |
| To: | Heacock D Dominion Resources |
| McKinley R | |
| References | |
| IR-2014-006 | |
| Download: ML14241A020 (6) | |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 2100 RENAISSANCE BLVD., SUITE 100 KING OF PRUSSIA, PA 19406-2713 September 2, 2014 Mr. David Heacock President and Chief Nuclear Officer Dominion Resources 5000 Dominion Boulevard
Glen Allen, VA 23060-6711 SUBJECT: MID-CYCLE ASSESSMENT LETTER FOR MILLSTONE POWER STATION UNITS 2 AND 3 (REPORT 05000336/2014006 AND 05000423/2014006)
Dear Mr Heacock:
On August 12, 2014, the U.S. Nuclear Regulatory Commission (NRC) completed its mid-cycle performance review of Millstone Power Station, Units 2 and 3 (Millstone). The NRC reviewed the most recent quarterly performance indicators in addition to inspection results and enforcement actions from July 1, 2013 through June 30, 2014. This letter informs you of the NRC's assessment of your facility during this period and its plans for future inspections at your facility.
The NRC determined that overall, Dominion operat ed Millstone in a manner that preserved public health and safety and met all cornerstone objectives. The NRC determined the performance at Millstone during the most recent quarter was within the Licensee Response
Column of the NRC's Reactor Oversight Process (ROP) Action Matrix because all inspection findings had very low (i.e., green) safety significance, and all performance indicators
demonstrated that your performance was within the nominal, expected range (i.e., green). Therefore, the NRC plans to conduct ROP baseline inspections at your facility.
Although plant performance was within the Licensee Response Column, the NRC has not yet finalized the significance of a preliminary White finding (NCV 05000423/2014008-001, Failure to Maintain Adequate Maintenance Instructions for the Turbine Driven Auxiliary Feedwater Pump Governor Control Valve Linkage) documented in NRC inspection report 05000423/2014008. The final safety significance determination may affect the NRC's assessment of plant performance and the enclosed inspection plan.
Additionally, the NRC has not finalized the severity of a preliminary Severity Level III traditional enforcement apparent violation (AV 05000336 & 05000423/2014011-01, Failure to Complete a 10 CFR 50.59 Evaluation for Removal of the Severe Line Outage Detection System) documented in NRC inspection report 05000336/2014011 and 05000423/2014011.
As a result of the Safety Culture Common Language Initiative, the terminology and coding of cross-cutting aspects were revised. All cross-cutting aspects identified during inspections conducted in calendar year 2014 reflect this revision to Inspection Manual Chapter (IMC) 0310. Cross-cutting aspects identified in 2013 using the 2013 terminology were converted to the latest revision in accordance with the cross-reference in IMC 0310 during the mid-cycle assessment review and evaluated for cross-cutting themes and potential substantive cross-cutting issues in accordance with IMC 0305.
The enclosed inspection plan lists the inspections scheduled through December 31, 2015.
Routine inspections performed by resident inspectors are not included in the inspection plan.
In addition to baseline inspections, the NRC will perform Inspection Procedure (IP) 71003,
"Post-Approval Site Inspection for License Renewal," IP 60855, "Operation of an Independent Spent Fuel Storage Installation (ISFSI)," and IP 60855.1, "Operation of an ISFSI at Operating Plant." The inspections listed during the last nine months of the inspection plan are tentative and may be revised at the end-of-cycle performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include security-related inspections, which will be sent via separate, non-publicly available correspondence.
Additionally, during this assessment period, the NRC issued an inspection report dated June 24, 2014 (ADAMS Accession No. ML14175A464), which documented a Green violation related to Dominion's failure on two previous occasions to identify the issue. As a result, the NRC plans to conduct IP 92702, "Follow-up on Corrective Actions for Violations and Deviations," to follow-up
on your actions related to the Notice of Violation. The NRC tentatively plans to perform IP 92702 in May of 2015.
In accordance with Title 10 of the Code of Federal Regulations (10 CFR), Part 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records component of the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Please contact me at (610)337-5150 with any questions you have regarding this letter.
Sincerely,
/RA/ Raymond R. McKinley, Chief Reactor Projects Branch 5
Division of Reactor Projects Docket Nos. 50-336 and 50-423 License Nos. DPR-65 and NPF-49
Enclosure: Millstone Inspection/Activity Plan
cc w/encl: Distribution via ListServ
ML14175A464), which documented a Green violation related to Dominion's failure on two previous occasions to identify the issue. As a result, the NRC plans to conduct IP 92702, "Follow-up on Corrective Actions for Violations and Deviations," to follow-up
on your actions related to the Notice of Violation. The NRC tentatively plans to perform IP 92702 in May of 2015.
In accordance with Title 10 of the Code of Federal Regulations (10 CFR), Part 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records component of the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Please contact me at (610)337-5150 with any questions you have regarding this letter.
Sincerely,
/RA/ Raymond R. McKinley, Chief Reactor Projects Branch 5
Division of Reactor Projects Docket Nos. 50-336 and 50-423 License Nos. DPR-65 and NPF-49
Enclosure: Millstone Inspection/Activity Plan
cc w/encl: Distribution via ListServ Distribution w/encl: (via email) See next page DOCUMENT NAME: S:\ROP Assessment Meetings\ROP-15 Mid-Cycle Review\Branch 5\Millstone\2014 MC Letter Millstone final.docx ADAMS ACCESSION NUMBER:
ML14241A020 SUNSI Review Non-Sensitive Sensitive Publicly Available Non-Publicly Available OFFICE RI/DRP RI/DRP NAME SShaffer/SWS RMcKinley/RRM DATE 08/25/14 09/02/14
Letter to David Heacock from Raymond McKinley dated September 2, 2014
SUBJECT: MID-CYCLE ASSESSMENT LETTER FOR MILLSTONE POWER STATION UNITS 2 AND 3 (REPORT 05000336/2014006 AND 05000423/2014006)
Distribution w/encl: (via email) W. Dean, RA D. Lew, DRA H. Nieh, DRP M. Scott, DRP J. Trapp, DRS B. Welling, DRS R. McKinley, DRP
S. Shaffer, DRP J. DeBoer, DRP J. Ambrosini, DRP, SRI B. Haagensen, DRP, RI N. Day, DRP, RI (Actg)
A. Bowers, RI OEDO RidsNrrPMMillstone Resource RidsNrrDorlLpl1-1 Resource ROPReports Resources A. Dimitriadis, DRS
J. Noggle, DRS M. Gray, DRS C. Cahill, DRS J. Rogge, DRS D. Jackson, DRS D. Screnci, PAO,
N. Sheehan, PAO N. McNamara, SLO D. Tifft, SLO ROPassessment Resource
RidsNrrDirslpabResource
Page 1 of 2 08/27/2014 15:25:36 Report 22 Unit NumberPlanned Dates Start EndInspection ActivityTitle No. of Staff on Site MillstoneInspection / Activity Plan 07/01/2014-12/31/20159/29EXAM-U2 INITIAL OL EXAM 4 2 FY14-MILLSTONE 2 INITIAL OPERATOR LICENSING EXAM U01891 09/01/2014 09/05/2014 2 FY14-MILLSTONE 2 INITIAL OPERATOR LICENSING EXAM U01891 09/29/2014 10/03/201471152B-PI&R BIENNIAL 4 2, 3 IP Problem Identification and Resolution71152B 07/14/2014 07/18/2014 2, 3 IP Problem Identification and Resolution71152B 07/28/2014 08/01/20147111111B-U2 REQUAL INSPECTION WITH P/F RESULTS 2 2 IP Licensed Operator Requalification Program7111111B 09/15/2014 09/19/2014EP EXER-EP EXERCISE INSPECTION 1 2, 3 IP Exercise Evaluation - Hostile Action (HA) Event7111407 09/08/2014 09/12/201471124-RADIATION SAFETY 1 2 IP Occupational ALARA Planning and Controls71124.02 10/20/2014 10/24/2014 2 IP In-Plant Airborne Radioactivity Control and Mitigation71124.03 10/20/2014 10/24/2014 2 IP Occupational Dose Assessment71124.04 10/20/2014 10/24/20147111108P-U3 INSERVICE INSPECTION 1 3 IP Inservice Inspection Activities - PWR7111108P 10/20/2014 10/31/201471124-RADIATION SAFETY - RETS 1 2, 3 IP Radiation Monitoring Instrumentation71124.0511/17/201411/21/2014 2, 3 IP Radioactive Gaseous and Liquid Effluent Treatment71124.0611/17/201411/21/201471124-RADIATION SAFETY - INST 1 2, 3 IP Occupational ALARA Planning and Controls71124.02 12/15/2014 12/19/2014 2, 3 IP In-Plant Airborne Radioactivity Control and Mitigation71124.03 12/15/2014 12/19/2014 2, 3 IP Occupational Dose Assessment71124.04 12/15/2014 12/19/2014 2, 3 IP Radiation Monitoring Instrumentation71124.05 12/15/2014 12/19/2014 2, 3 IP71151-OR01 12/15/2014 12/19/2014 2, 3 IP71151-PR01 12/15/2014 12/19/201471124.08-RADWASTE 1 2, 3 IP Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation71124.08 01/12/2015 01/16/201571124-RADIATION SAFETY INSPECTION 1 2, 3 IP Radiological Hazard Assessment and Exposure Controls71124.01 03/09/2015 03/13/2015 CDBI-COMPONENT DESIGN BASIS INSPECTION 7 2, 3 IP Component Design Bases Inspection7111121 03/30/2015 04/03/2015 2, 3 IP Component Design Bases Inspection7111121 04/13/2015 04/17/2015 This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.
Page 2 of 2 08/27/2014 15:25:36 Report 22 Unit NumberPlanned Dates Start EndInspection ActivityTitle No. of Staff on Site MillstoneInspection / Activity Plan 07/01/2014-12/31/2015 CDBI-COMPONENT DESIGN BASIS INSPECTION 7 2, 3 IP Component Design Bases Inspection7111121 04/27/2015 05/01/2015 71003-U2 LR COMMITMENTS PHASE 2 INSP 4 2 IP Post-Approval Site Inspection for License Renewal 71003 05/04/2015 05/08/2015 2 IP Post-Approval Site Inspection for License Renewal 71003 05/18/2015 05/22/20159/7EXAM-U3 INITIAL OL EXAM 4 3 FY15-MS3 INITIAL OPERATOR LICENSING EXAM U01903 08/10/2015 08/14/2015 3 FY15-MS3 INITIAL OPERATOR LICENSING EXAM U01903 09/07/201509/11/201571124-RADIATION SAFETY INSPECTION - REMP 1 2, 3 IP Radiological Environmental Monitoring Program71124.07 06/01/2015 06/05/2015 ISFSI-ISFSI LOADING INSPECTION 1 2 IP Operation Of An ISFSI 60855 06/01/2015 08/31/2015 2 IP Operation of an Independent Spent Fuel Storage Installation at Operating Plants 60855.1 06/01/2015 08/31/201571124-RADIATION SAFETY INSPECTION - ALARA 1 2 IP Occupational ALARA Planning and Controls71124.02 07/27/2015 07/31/2015 EP-EP PROGRAM INSPECTION 1 2, 3 IP A lert and Notification System Testing7111402 08/10/2015 08/14/2015 2, 3 IP Emergency Preparedness Organization Staffing and Augmentation System7111403 08/10/2015 08/14/2015 2, 3 IP Correction of Emergency Preparedness Weaknesses and Deficiencies7111405 08/10/2015 08/14/20157111111B-U3 REQUAL INSP W/ P/F RESULTS 2 3 IP Licensed Operator Requalification Program7111111B 10/19/2015 10/23/201571124-RADIATION SAFETY INSPECTION 1 2 IP Radiological Hazard Assessment and Exposure Controls71124.01 10/05/2015 10/09/20157111108P-U2 INSERVICE INSPECTION 1 2 IP Inservice Inspection Activities - PWR7111108P 10/12/2015 10/23/201571124-RADIATION SAFETY INSPECTION - DOSE 1 2, 3 IP Occupational Dose Assessment71124.0411/16/201511/20/2015 2, 3 IP Performance Indicator Verification7115111/16/201511/20/2015 This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.