ML090770162: Difference between revisions
Jump to navigation
Jump to search
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
| Line 3: | Line 3: | ||
| issue date = 06/03/2009 | | issue date = 06/03/2009 | ||
| title = 03/16/09 TVA, Presentation Slides for Browns Ferry, Unit 1 | | title = 03/16/09 TVA, Presentation Slides for Browns Ferry, Unit 1 | ||
| author name = Brown E | | author name = Brown E | ||
| author affiliation = NRC/NRR/DORL/LPLII-2 | | author affiliation = NRC/NRR/DORL/LPLII-2 | ||
| addressee name = | | addressee name = | ||
Revision as of 01:17, 12 July 2019
| ML090770162 | |
| Person / Time | |
|---|---|
| Site: | Browns Ferry |
| Issue date: | 06/03/2009 |
| From: | Ellen Brown Plant Licensing Branch II |
| To: | |
| Brown E, NRR/DORL, 415-2315 | |
| Shared Package | |
| ML090770387 | List: |
| References | |
| TAC ME0438 | |
| Download: ML090770162 (8) | |
Text
Z JJ () CD CD ('") ::r ::J -L to .... 11-::J ...... OJ...., o :E ::::J en r-+...., CD < c:: CD
Q.)Q.) ("") Q.) (Q Q.)("")Q.)CO
--
Revised January 28 meeting -NRC requested that the submittal schedule be reviewed to determine best possible dates Areva and TVA have agreed on approach improve schedule -Preliminary core design work will be eliminated
-Final core design has commenced using best available energy plan estimate for current cycle -TVA review time for selected reload inputs and analyses will be accelerated Revised Schedule
- Areva will deliver all reload needed to support submittal by 1* TVA will require time to prepare final submittal package and complete internal reviews and approvals
-TVA will commit to a submittal date of 12/11/09
<
- LAR will be a complete package -No supplemental information planned to be submitted
- Will include the following reports: -Thermal Hydraulic Design Report -Mechanical Design Report -ANP-2637 (BWR Licensing Methodology Compendium)
-Fuel Cycle Design Report -Reload Safety Report
- Will not submit the LOCA break spectrum report -Will provide justification as to unit 1 applicability
- Will include the following Tech Spec related changes: -SLMCPR Tech Spec (if required)
-Tech Spec 5.6.5 update to add Areva analytical methods -Tech Spec Bases page changes LAR Contents