ML091950413: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
| Line 3: | Line 3: | ||
| issue date = 07/24/2009 | | issue date = 07/24/2009 | ||
| title = 06/30/2009 Summary of Telephone Conference Call Between the U.S. Nuclear Regulatory Commission and Entergy Operations, Inc. Regarding Progress on National Fire Protection Association (NFPA) Standard 805 Transition Activities | | title = 06/30/2009 Summary of Telephone Conference Call Between the U.S. Nuclear Regulatory Commission and Entergy Operations, Inc. Regarding Progress on National Fire Protection Association (NFPA) Standard 805 Transition Activities | ||
| author name = Chawla M | | author name = Chawla M | ||
| author affiliation = NRC/NRR/DORL/LPLIII-1 | | author affiliation = NRC/NRR/DORL/LPLIII-1 | ||
| addressee name = | | addressee name = | ||
| Line 9: | Line 9: | ||
| docket = 05000255 | | docket = 05000255 | ||
| license number = DPR-020 | | license number = DPR-020 | ||
| contact person = Chawla M | | contact person = Chawla M, NRR/DORL, 415-8371 | ||
| document type = Conference/Symposium/Workshop Paper, Meeting Summary | | document type = Conference/Symposium/Workshop Paper, Meeting Summary | ||
| page count = 4 | | page count = 4 | ||
Revision as of 20:46, 11 July 2019
| ML091950413 | |
| Person / Time | |
|---|---|
| Site: | Palisades |
| Issue date: | 07/24/2009 |
| From: | Mahesh Chawla Plant Licensing Branch III |
| To: | Entergy Operations |
| Chawla M, NRR/DORL, 415-8371 | |
| References | |
| Download: ML091950413 (4) | |
Text
UNITED NUCLEAR REGULATORY WASHINGTON, D.C. 20555-0001 July 24, 2009 LICENSEE:
Entergy Operations, Inc. FACILITIES:
Palisades Nuclear Plant
SUBJECT:
SUMMARY
OF TELEPHONE CONFERENCE CALL HELD ON JUNE 30, 2009, BETWEEN THE U.S. NUCLEAR REGULATORY COMMISSION AND ENTERGY OPERATIONS, INC. REGARDING PROGRESS ON NATIONAL FIRE PROTECTION ASSOCIATION STANDARD 805 TRANSITION ACTIVITIES A teleconference was held between representatives of Entergy Nuclear Operations, Inc. (ENO) and the Nuclear Regulatory Commission (NRC) staff to discuss progress on the Palisades Nuclear Plant (PNP) National Fire Protection Association (NFPA) 805 transition activities. ENO submitted "Palisades NFPA 805 Project Milestones" table (see enclosure 1) which provides the list of NFPA 805 transition activities and their status. The licensee stated that all the tasks are on track and at present there are no significant barriers and no scope additions. Based on the progress of the transition so far, the NRC staff has decided to temporarily scale back on these teleconferences from monthly to every two months. However, if the need arises to go back to monthly teleconferences, the licensee will be duly informed. The licensee was in agreement with this approach to monitor the progress. Enclosure 2 provides the list of all attendees.
Background On December 9, 2008 (Agencywide Documents Access and Management System (ADAMS)
Accession Number ML083260577), NRC staff granted additional enforcement discretion to Palisades. ENO in its letter dated November 25, 2008 (ADAMS Accession Number ML083370155) made a commitment to conduct monthly teleconference with the NRC staff to discuss progress on the Palisades Nuclear Plant NFPA 805 transition activities.
Sincerely, Mahesh Chawla, Project Manager Plant Licensing Branch 111-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-255
Enclosures:
1: Table -Palisades NFPA 805 Project Milestones 2: Table -List of Attendees cc w/encls:
Distribution via ListServ
__6/2912009 Palisades NFPA 80LS Project Milestones Net Tellk No. ntllI Mlleatone Oete' Status! Start Date' TaslI 1: TlllIlSlIio/'l 01 NueJeIlf Safety Perfol'ma/'lC8 Crileria IU"el 04-02 Table 8-2.1 00130109 See Comme/'lls Task 2: FlJfldamIII'ltal Fife Proteoction Program & Oesigl'l I Elements 07124109 sea Cornmel"lls Task 3; Aadioacllve Relea5ll Transition 07/31/09 On Track TaSll 4: Nuclear Safely Analy$is Tr!l/l$ltion NEI 04-02 Table B*31 09I30I09 On Track ST 4.1.1 Off-Site Power Cable Seleclion and AnElIy$ls 08114109 sea Comments ST 4.1.2 Other Power Cable Selection and Analy!lis 031'15109 Complete . ST 4.1.3 SubS$QU9nt Cable/Instrument ldentlhcallon
& Analysis 091'11109 On Track Task 5: Non*Power OperatiOOllJ Modes NEt 04-02 Table F*lI On Track Task 6: Internal EVII/'lls PRA 02/17/10 On TraCk ST 6.2.1 PrllparllLERf Model 07131109 On Track ST62.2 Update Flooding Analysis 07131109 On Track ST6,3 Therma!
AnalysiS 'Of MSOIHRA 11116109 On Track 6T 6.* INema! Evenls PRA Peer Review 1013Q(09 No4 Started 10126109 Task 7: F'Q PM 12122109 On Track -ST 7.6.4 A3 Intemsl EV6/'lts Model 05,10ll09 COmplete -ST 7.7 Quantification Risk Screening 06121109 On Track ST7,8 $oop4ng lor Fire Modeling 07/15109 OnT'lICk ST 7.9110 Circuit Faiju!e Mode Uke-Ilhood Analy!liS 09I30I09 OnT,ack ST7.12 Post Fire HRA 10113109 , 0r1 Track ST7.13 811lSmioc Fire Interaction Assessment 07131109 On Track 5T7.14 Fire Risk OuanCiflcatlon 10/07109 See Comments 06f2l:lI09 ST 7.15 lJncertainty and 5e-nsltivily Analysis 09125109 See Comments ST7.17 Fire PRA Peer Review 01122110 Not Slarled 01118110 Task 8: NFPA 805 Chanoe Eva'uations 02/01110 On Track ST B 1 Change Evaluations 12/01/09 On Track 5T82 Risk Evaluations 12101/09 S-Comments 10!08I09 Task 9: Palisades MapI'in9 of Post Transrtion Procedures
& Document ReviSions 01108110 Not Slaned 11l02*'OQ Task 10: T ransillon Report W18'10 Sa. Comments 09128/09 Task 11: UCen5ll Amendmenl Request (LAR) 03l1W10 See Commeotll sterted 'I n*.'Jt'V/ItfWJ __,.. Jl'\.p em S1-1 WIFe 12troVOlt.-a ifill aIDfeCt T'l'\e Itt"MIdiAO 11:>>5 S5-j\' 08JUN -()III,."._.....,.
u8datlld be on t"# bell:w'e ....dttn. Id-.rnliId f'OroTI"Idr*,.,.,...
..........
..
ratIt..,..
..... u.** .-.....' ..'3.f¥I....
Wftma_lJn:I 14U' It1"ill JImt. E:-'1IJfl'1{
lhI"'*""". boompllJloo \Ij _ lIl'CII rn.r .........
W*.8ted UILL' &-2Table Reo.......ing longer ",,'" o<!QInioDy P....
._alo_ Iuk.J.l.1 Pa_tllom\._ lAk"'lllonger 11\." ..pec1t<l10 obo..... III1L.Z.U P__"...Il.d """
dat&O. IIIi.lJ.t Pr_"'" ""rnploollon IaIIL.Li' P_IIOI"'*""d Ill**Iatl aal*.
11>0 1MIlJlI: P_.MOf pushed "'" .w. dQle. ComoIotion
,....-.. III 1AIIU1' Ki<_ meeting be_n LAR__I.£....ong eooeo '" ''1IJrlg In 68"Y ,tall '" lI'1io Enclosure 1
TELEPHONE CONFERENCE ON NFPA 805 TRANSITION PROGRESS U.S. NUCLEAR REGULATORY AND ENTERGY OPERATIONS, LIST OF JUNE 30, PARTICIPANTS TITLE/POSITION AFFILIATIONS U.S. NUCLEAR REGULATORY COMMISSION (NRC) Mahesh Chawla Proiect Manaaer HEADQUARTERS Alex Klein Branch Chief John Ellegood Senior Resident Inspector REGION 3 ENTERGY Alan Blind Acting Director of Engineering PALISADES NUCLEAR PLANT Bob VanWagner Program Engineering Manager Paula Anderson Licensing Manager Brian Brogan Probabilistic Safety Assessment Engineer Tom Swiecicki Fire Protection Engineer Roger Stobert Contract Project Manager NFPA 805 Jim Kuemin Licensing Engineer Enclosure 2 july 24, 2009 Entergy Operations, Inc. Palisades Nuclear Plant
SUMMARY
OF TELEPHONE CONFERENCE CALL HELD ON JUNE 30, 2009, BETWEEN THE U.S. NUCLEAR REGULATORY COMMISSION AND ENTERGY OPERATIONS, INC. REGARDING PROGRESS ON NATIONAL FIRE PROTECTION ASSOCIATION STANDARD 805 TRANSITION ACTIVITIES A teleconference was held between representatives of Entergy Nuclear Operations, Inc. (ENO) and the Nuclear Regulatory Commission (NRC) staff to discuss progress on the Palisades Nuclear Plant (PNP) National Fire Protection Association (NFPA) 805 transition activities. ENO submitted "Palisades NFPA 805 Project Milestones" table (see enclosure 1) which provides the list of NFPA 805 transition activities and their status. The licensee stated that all the tasks are on track and at present there are no significant barriers and no scope additions. Based on the progress of the transition so far, the NRC staff has decided to temporarily scale back on these teleconferences from monthly to every two months. However, if the need arises to go back to monthly teleconferences, the licensee will be duly informed. The licensee was in agreement with this approach to monitor the progress. Enclosure 2 provides the list of all attendees.
Background On December 9, 2008 (Agencywide Documents Access and Management System (ADAMS)
Accession Number ML083260577), NRC staff granted additional enforcement discretion to Palisades. ENO in its letter dated November 25,2008 (ADAMS Accession Number ML083370155) made a commitment to conduct monthly teleconference with the NRC staff to discuss progress on the Palisades Nuclear Plant NFPA 805 transition activities.
Sincerely, IRAJ Mahesh Chawla, Project Manager Plant Licensing Branch 111-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-255
Enclosures:
1: Table -Palisades NFPA 805 Project Milestones 2: Table -List of Attendees cc w/encls: Distribution via ListServ Distribution: PUBLIC LPL3-1 r/f RidsNrrDorLpl3-1 Resource RidsNrrPMPalisades Resource RidsNrrLABTully RidsRgn3MailCenter Resource RidsNrrPMANO Resource JEliegood, Rill AKlein, NRR MVaaler, NRR Paul Lain, NRR JGeissner, Rill naylor, Rill HBarrett ADAMS Accession No'.. ML091950413 OFFICE LPL3-1/PM LPL3-1/LA DRAlAFPB/BC LPL3-1/BC NAME MChawla BTuily AKlein LJames DATE 07/16/09 07/16/09 07/15/09 07/24/09 OFFICIAL RECORD COPY