ML093520050: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
Line 3: Line 3:
| issue date = 12/18/2009
| issue date = 12/18/2009
| title = Letter - Regulatory Conference with Entergy
| title = Letter - Regulatory Conference with Entergy
| author name = Clark J A
| author name = Clark J
| author affiliation = NRC/RGN-IV/DRP/RPB-E
| author affiliation = NRC/RGN-IV/DRP/RPB-E
| addressee name = Kowalewski J
| addressee name = Kowalewski J
Line 38: Line 38:


==Enclosures:==
==Enclosures:==
: 1. Attendance List  
: 1. Attendance List
: 2. Presentation Slides UNITED STATESNUCLEAR REGULATORY COMMISSIONREGION IV612 EAST LAMAR BLVD, SUITE 400ARLINGTON, TEXAS 76011-4125 Entergy Operations, Inc.
: 2. Presentation Slides UNITED STATESNUCLEAR REGULATORY COMMISSIONREGION IV612 EAST LAMAR BLVD, SUITE 400ARLINGTON, TEXAS 76011-4125 Entergy Operations, Inc.
DISTRIBUTION:
DISTRIBUTION:

Revision as of 14:27, 11 July 2019

Letter - Regulatory Conference with Entergy
ML093520050
Person / Time
Site: Waterford Entergy icon.png
Issue date: 12/18/2009
From: Clark J
NRC/RGN-IV/DRP/RPB-E
To: Kowalewski J
Entergy Operations
References
Download: ML093520050 (3)


Text

December 18, 2009

Joseph Kowalewski, Vice President, Operations Entergy Operations, Inc.

Waterford Steam Electric Station, Unit 3

17265 River Road Killona, LA 70057-3093

SUBJECT:

REGULATORY CONFERENCE WITH ENTERGY

Dear Mr. Kowalewski:

This refers to our meeting conducted at the U.S. Nuclear Regulatory Commission, Region IV Office, Technical Conference Room located in Arlington, Texas on December 14, 2009. At the meeting, NRC and Entergy discussed the significance, cause, and corrective actions associated with an apparent violation involving the inoperability of the Train B vital Battery at Waterford Steam Electric Station, Unit 3.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosures will be available electronically for public inspection in the NRC's Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADA MS). ADAMS is accessible from the NRC web site at http://www.nrc.gov/reading-rm/adams.html (The Public Electronic Reading Room).

Should you have any questions concerning this matter, we will be pleased to discuss them with you.

Sincerely, /RA/ Jeff Clark, P.E

., Chief Project Branch E Division of Reactor Projects

Docket: 50-382 License: NPF-38

Enclosures:

1. Attendance List
2. Presentation Slides UNITED STATESNUCLEAR REGULATORY COMMISSIONREGION IV612 EAST LAMAR BLVD, SUITE 400ARLINGTON, TEXAS 76011-4125 Entergy Operations, Inc.

DISTRIBUTION:

Senior Vice President Entergy Nuclear Operations P. O. Box 31995 Jackson, MS 39286-1995

Senior Vice President and Chief Operating Officer Entergy Operations, Inc. P. O. Box 31995 Jackson, MS 39286-1995

Vice President, Operations Support Entergy Services, Inc. P. O. Box 31995 Jackson, MS 39286-1995

Senior Manager, Nuclear Safety and Licensing Entergy Services, Inc.

P. O. Box 31995 Jackson, MS 39286-1995

Director Nuclear Safety Assurance Entergy Operations, Inc.

17265 River Road Killona, LA 70057-3093

General Manager, Plant Operations Waterford 3 SES Entergy Operations, Inc.

17265 River Road Killona, LA 70057-3093

Manager, Licensing Entergy Operations, Inc.

17265 River Road Killona, LA 70057-3093

Chairman Louisiana Public Service Commission P. O. Box 91154

Baton Rouge, LA 70821-9154

Parish President Council St. Charles Parish P. O. Box 302 Hahnville, LA 70057

Director, Nuclear Safety & Licensing Entergy, Operations, Inc.

440 Hamilton Avenue White Plains, NY 10601

Louisiana Department of Environmental Quality, Radiological Emergency Planning and Response Division P. O. Box 4312 Baton Rouge, LA 70821-4312

Chief, Technological Hazards

Branch FEMA Region VI 800 North Loop 288

Federal Regional Center Denton, TX 76209

Institute of Nuclear Power Operations (INPO) Records Center

700 Galleria Parkway SE, Suite 100

Atlanta, GA 30339 Entergy Operations, Inc.

E-Mail To:

Regional Administrator (Elmo.Collins@nrc.gov)

Deputy Regional Administrator (Chuck.Casto@nrc.gov) DRP Director (Dwight.Chamberlain@nrc.gov) DRP Deputy Director (Anton.Vegel@nrc.gov)

DRS Director (Roy.Caniano@nrc.gov)

DRS Deputy Director (Troy.Pruett@nrc.gov)

Senior Resident Inspector (Mark.Haire@nrc.gov)

Resident Inspector (Dean.Overland@nrc.gov) Branch Chief, DRP/E (Jeff.Clark@nrc.gov) Senior Project Engineer, DRP/E (Ray.Azua@nrc.gov)

Site Administrative Assistant, DRP/E (Linda.Dufrene@nrc.gov)

Public Affairs Officer (Victor.Dricks@nrc.gov)

Team Leader, DRP/TSS (Chuck.Paulk@nrc.gov) RITS Coordinator (Marisa.Herrera@nrc.gov) Regional Counsel (Karla.Fuller@nrc.gov)

Congressional Affairs Officer (Jenny.Weil@nrc.gov)

OEMail Resource OEDO RIV Coordinator, (Leigh.Trocine@nrc.gov) ROPreports

R:\_REACTORS\WAT\WAT Reg Conf MS 12-14-2009.doc ADAMS ML SUNSI Rev Compl. Yes No ADAMS Yes No Reviewer Initials CJP Publicly Avail Yes No Sensitive Yes No Sens. Type Initials CJP RIV/DRS/TSB C:DRS/TSB C:DRP/E CPaulk MHay JClark /RA/ /RA CPaulk for/ /RA/ 12/16/2009 12/16/2009 12/18/2009 OFFICIAL RECORD COPY T=Telephone E=E-mail F=Fax