| title = Environmental Project Manager Change for the License Renewal of Indian Point Nuclear Generating Unit Nos. 2 and 3
| title = Environmental Project Manager Change for the License Renewal of Indian Point Nuclear Generating Unit Nos. 2 and 3
| author name = Wittick B D
| author name = Wittick B
| author affiliation = NRC/NRR/DLR/RPB2
| author affiliation = NRC/NRR/DLR/RPB2
| addressee name =  
| addressee name =  
Line 9: Line 9:
| docket = 05000247, 05000286
| docket = 05000247, 05000286
| license number =  
| license number =  
| contact person = Wentzel M J, 301-287-659
| contact person = Wentzel M, 301-287-659
| case reference number = TAC MD5411, TAC MD5412
| case reference number = TAC MD5411, TAC MD5412
| document type = Letter
| document type = Letter

Revision as of 09:39, 21 June 2019

Environmental Project Manager Change for the License Renewal of Indian Point Nuclear Generating Unit Nos. 2 and 3
ML14220A317
Person / Time
Site: Indian Point  Entergy icon.png
Issue date: 08/20/2014
From: Brian Wittick
License Renewal Projects Branch 2
To:
Entergy Nuclear Operations
Wentzel M, 301-287-659
References
TAC MD5411, TAC MD5412
Download: ML14220A317 (3)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555

-0001 August 20, 2014 Vice President, Operations Entergy Nuclear Operations, Inc.

Indian Point Energy Center 450 Broadway, GSB P.O. Box 249 Buchanan, NY 10511

-0249

SUBJECT:

ENVIRONMENTAL PROJECT MANAGER CHANGE FOR THE LICENSE RENEWAL OF INDIAN POINT NUCLEAR GENERATING UNIT NOS. 2 AND 3 (TAC NOS. MD5411 AND MD5412)

Dear Sir or Madam:

This letter is to inform you that

, effective immediately, the U.S. Nuclear Regulatory Commission Environmental Project Manager responsibility for the Indian Point Units 2 and 3, license renewal review is transferred from Ms. Lois James to Mr. Michael Wentzel

.

All correspondence for the Project Manager associated with the environmental review should be sent to: M r. Michael Wentzel , Project Manager Projects Branch 2 Division of License Renewal Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Mail Stop O

-11F1 Washington, DC 20555 M r. Wentzel may be reached at 301-415-6459 or by e-mail at michael.wentzel@nrc.gov

. Sincerely,

/RA/ Brian D. Wittick , Chief Projects Branch 2 Division of License Renewal Office of Nuclear Reactor Regulation

Docket Nos. 50

-247 and 5 0-286 cc: Listserv

ML14220A317

  • concurrence via e

-mail OFFICE PM:RPB 2:DLR LA:DLR BC:RPB 2:DLR NAME MWentzel IKing BWittick DATE 8/13/14 8/12/14 8/20/14 Letter to Vice President, Operations, Entergy from B. Wittick dated August 20, 2014

SUBJECT:

ENVIRONMENTAL PROJECT MANAGER CHANGE FOR THE LICENSE RENEWAL OF INDIAN POINT NUCLEAR GENERATING UNIT NOS. 2 AND 3 (TAC NOS. MD5411 AND MD5412)

DISTRIBUTION

HARD COPY: DLR RF E-MAIL: PUBLIC RidsNrrDlr Resource RidsNrrDlrRpb1 Resource RidsNrrDlrRpb2 Resource RidsNrrDlrRarb Resource RidsNrrDlrRasb Resource RidsNrrDlrRapb Resource RidsNrrDlrRerb Resource RidsNrrDlrRsrg Resource RidsNrrDraAfpb Resource

RidsOgcMailCenter Resource


MWentzel KGreen BWittick DWrona YDiaz DPickett STurk, OGC BMizuno, OGC DRoth, OGC BHarris, OGC SBurnell, OPA DMcIntyre, OPA EDacus, OCA MGray, RI ABurritt, RI DonaldJackson, RI GMeyer, RI MModes, RI NSheehan, RI OPA DScrenci, RI OPA DTifft, RI NMcNamara, RI GNewman, RI JSStewart, RI A miPatel, RI