ML16232A457: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
| Line 3: | Line 3: | ||
| issue date = 08/18/2016 | | issue date = 08/18/2016 | ||
| title = Ltr to R J Mccollum, Nuclear Energy Institute (Nei), Acknowledgement of the August 8, 2016, NEI Letter Summarizing the Meeting with NRC Pertaining to NEI 12-04 Guidelines for 10 CFR 72.48 Implementation, Revision 0 | | title = Ltr to R J Mccollum, Nuclear Energy Institute (Nei), Acknowledgement of the August 8, 2016, NEI Letter Summarizing the Meeting with NRC Pertaining to NEI 12-04 Guidelines for 10 CFR 72.48 Implementation, Revision 0 | ||
| author name = Silva P | | author name = Silva P | ||
| author affiliation = NRC/NMSS/DSFM/IOB | | author affiliation = NRC/NMSS/DSFM/IOB | ||
| addressee name = | | addressee name = Mccollum R | ||
| addressee affiliation = Nuclear Energy Institute (NEI) | | addressee affiliation = Nuclear Energy Institute (NEI) | ||
| docket = | | docket = | ||
| license number = | | license number = | ||
| contact person = Wharton L | | contact person = Wharton L | ||
| case reference number = NEI 12-04, Rev. 0 | | case reference number = NEI 12-04, Rev. 0 | ||
| document type = Letter | | document type = Letter | ||
Revision as of 23:19, 19 June 2019
| ML16232A457 | |
| Person / Time | |
|---|---|
| Issue date: | 08/18/2016 |
| From: | Patricia Silva NRC/NMSS/DSFM/IOB |
| To: | Mccollum R Nuclear Energy Institute |
| Wharton L | |
| References | |
| NEI 12-04, Rev. 0 | |
| Download: ML16232A457 (2) | |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 August 18, 2016
Rodney J. McCullum, Senior Director, Used Fuel and Decommission Programs
Nuclear Energy Institute
1201 F Street NW, Suite 1100 Washington, DC 20004
SUBJECT:
ACKNOWLEDG EMENT OF THE AUGUST 8, 2016, NEI LETTER SUMMARIZING THE MEETING WITH NRC PERTAINING TO NEI 12-04 "GUIDELINES FOR 10 CFR 72.48 IMPLEMENTATION," REVISION 0
Dear Mr. McCullum:
The Nuclear Regulatory Commission (NRC) staff acknowledges receipt of your letter dated August 8, 2016. In the letter you summarized the March 3, 2016, meeting with the NRC and
provided a reply to the NRC comments (Agencywide Document Access Management System (ADAMS) Accession No. ML1511A197) on Nuclear Energy Institute (NEI) 12-04, "Guidelines for 10 CFR 72.48 Implementation," Revision 0 (ML12258A356). The NRC staff is reviewing the letter and its attachment in preparation for a full response.
We appreciate the noteworthy effort that NEI and the industry has expended to move this subject forward. We will continue to be open and transparent in our dialogue and interactions with NEI on the industry implementation guidance document.
However, due to priorities of our current work load, we will not be able to complete our review and provide a full written response to the fundamental and key issues described in your letter by the date you requested. Based on the level of effort, other higher priority items, and available staff resources, we plan to respond by October 14, 2016.
If you have any questions regarding the staff review, please contact Raynard Wharton. He can be reached at (301) 415-7497.
Sincerely, /RA/ Patricia A. Silva, Chief Inspections and Operations Branch Division of Spent Fuel Management Office of Nuclear Material Safety and Safeguards
cc: Kristopher Cummings, NEI
Rodney J. McCullum, August 18, 2016 Senior Director, Used Fuel and Decommission Programs
Nuclear Energy Institute
1201 F Street NW, Suite 1100 Washington, DC 20004
SUBJECT:
ACKNOWLEDGEMENT OF THE AUGUST 8, 2016, NEI LETTER SUMMARIZING THE MEETING WITH NRC PERTAINING TO NEI 12-04 "GUIDELINES FOR 10 CFR 72.48 IMPLEMENTATION," REVISION 0
Dear Mr. McCullum:
The Nuclear Regulatory Commission (NRC) staff acknowledges receipt of your letter dated August 8, 2016. In the letter you summarized the March 3, 2016, meeting with the NRC and
provided a reply to the NRC comments (Agencywide Document Access Management System (ADAMS) Accession No. ML1511A197) on Nuclear Energy Institute (NEI) 12-04, "Guidelines for 10 CFR 72.48 Implementation," Revision 0 (ML12258A356). The NRC staff is reviewing the letter and its attachment in preparation for a full response.
We appreciate the noteworthy effort that NEI and the industry has expended to move this subject forward. We will continue to be open and transparent in our dialogue and interactions with NEI on the industry implementation guidance document.
However, due to priorities of our current work load, we will not be able to complete our review and provide a full written response to the fundamental and key issues described in your letter by the date you requested. Based on the level of e ffort, other higher priority items, and available staff resources, we plan to respond by October 14, 2016.
If you have any questions regarding the staff review, please contact Raynard Wharton. He can be reached at (301) 415-7497.
Sincerely,
Patricia A. Silva, Chief Inspections and Operations Branch Division of Spent Fuel Management Office of Nuclear Material Safety and Safeguards
cc: Kristopher Cummings, NEI
Distribution: SFM r/f JWise RWharton MCall ABarto PJehle HLindsay ELove JGoshen BTripathi ADAMS Letter:ML16232A457 OFC SFM:PM SFM:LA SFM:BC NAME RWharton WWheatley via e-mail MDavis for PSilva DATE 8/17/16 8/15/16 8/18/16 OFFICIAL RECORD COPY