IR 05000458/2017405: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 3: Line 3:
| issue date = 05/31/2017
| issue date = 05/31/2017
| title = NRC Security Inspection Report 05000458/2017405
| title = NRC Security Inspection Report 05000458/2017405
| author name = Groom J R
| author name = Groom J
| author affiliation = NRC/RGN-IV/DRS/PSB-1
| author affiliation = NRC/RGN-IV/DRS/PSB-1
| addressee name = Maguire W F
| addressee name = Maguire W
| addressee affiliation = Entergy Operations, Inc
| addressee affiliation = Entergy Operations, Inc
| docket = 05000458
| docket = 05000458
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:May 31, 2017  
{{#Wiki_filter:May 31, 2017


Mr. William F. Maguire, Site Vice President Entergy Operations, Inc.
==SUBJECT:==
 
RIVER BEND STATION, NRC SECURITY INSPECTION REPORT 05000458/2017405
River Bend Station
 
5485 US Highway 61N St. Francisville, LA 70775
 
SUBJECT: RIVER BEND STATION, NRC SECURITY INSPECTION REPORT 05000458/2017405


==Dear Mr. Maguire:==
==Dear Mr. Maguire:==

Revision as of 12:00, 19 June 2019

NRC Security Inspection Report 05000458/2017405
ML17151B100
Person / Time
Site: River Bend Entergy icon.png
Issue date: 05/31/2017
From: Jeremy Groom
Plant Support Branch-1
To: Maguire W
Entergy Operations
References
IR 2017405
Download: ML17151B100 (3)


Text

May 31, 2017

SUBJECT:

RIVER BEND STATION, NRC SECURITY INSPECTION REPORT 05000458/2017405

Dear Mr. Maguire:

On April 27, 2017, the U.S. Nuclear Regulatory Commission (NRC) completed a security inspection at your River Bend Station, and the NRC inspectors discussed the results of this inspection with Mr. M. Chase, Director, Regulatory and Performance Improvement, and other members of your staff. The results of this inspection are documented in the enclosed report.

NRC inspectors documented one finding of very low security significance (Green) in this report. The NRC is treating this violation as a non-cited violation (NCV) consistent with Section 2.3.2.a

of the Enforcement Policy.

If you contest the violation or significance of the NCV, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555-0001; with copies to the Regional Administrator, Region IV; the Director, Office of Enforcement; the Director, Office of Nuclear Security and Incident Response; and the NRC resident inspectors at the River Bend Station.

If you disagree with a cross-cutting aspect assignment in this report, you should provide a response within 30 days of the date of this inspection report, with the basis for your disagreement, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555-0001; with copies to the Regional Administrator, Region IV and the NRC resident inspectors at River Bend Station.

A cross-cutting aspect is assigned to this finding in the area of problem identification and resolution, evaluation. Specifically, the licensee failed to thoroughly evaluate issues to ensure that resolutions address causes and extent of conditions commensurate with their safety significance (P.2).

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION IV 1600 E. LAMAR BLVD ARLINGTON, TX 76011-4511 In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, "Public Inspections, Exemptions, Requests for Withhol ding," of the NRC's "Rules of Practice and Procedure," a copy of this letter will be available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding.

However, the enclosed report contains Security-Related Information, so the enclosed report will not be made publically available in accordance with 10 CFR 2.390(d)(1). If you choose to provide a response that contains Security-Related Information, please mark your entire response "Security-Related Information - Withhold from Public Disclosure under 10 CFR 2.390" in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). The NRC is waiving the affidavit requirements for your response in accordance with 10 CFR 2.390(b)(1)(ii).

Sincerely,

/RA/

Jeremy R. Groom, Chief Plant Support Branch 1 Division of Reactor Safety

Docket No. 50-458 License No. NPF-47

Nonpublic Enclosure: Inspection Report 05000458/2017405 w/Attachment

Electronic Copy for River Bend Station

ML17151B095 Entire Report: ADAMS: Non-Publicly Available Non-Sensitive Keyword: SUNSI Review By: Yes No Publicly Available Sensitive _______MD 3.4 A.3 ADAMS ACCESSION NUMBER: ML17151B100 Cover Letter Only: ADAMS: Non-Publicly Available Non-Sensitive Keyword: SUNSI Review By: Yes No Publicly Available Sensitive NRC-002 OFFICE SPSI:PSB1 PSI:PSB1 C:PSB1 C:PBC C:PSB1 NAME DHolman JBuchanan JGroom JKozal JGroom SIGNATURE /RA/ /RA/ /RA/ /RA/ /RA/ DATE 5/12/17 5/12/17 5/24/17 5/30/17 5/31/17