IR 05000261/2017404: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
| Line 3: | Line 3: | ||
| issue date = 06/12/2017 | | issue date = 06/12/2017 | ||
| title = Cyber Security Implementation Inspection Report 05000261/2017404 - OUO Removed | | title = Cyber Security Implementation Inspection Report 05000261/2017404 - OUO Removed | ||
| author name = Shaeffer S | | author name = Shaeffer S | ||
| author affiliation = NRC/RGN-II/DRS/EB2 | | author affiliation = NRC/RGN-II/DRS/EB2 | ||
| addressee name = Remick J | | addressee name = Remick J | ||
| Line 18: | Line 18: | ||
=Text= | =Text= | ||
{{#Wiki_filter: | {{#Wiki_filter:June 12, 2017 | ||
SUBJECT: H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT 2 - CYBER SECURITY FOLLOW-UP INSPECTION REPORT 05000261/2017404 | ==SUBJECT:== | ||
H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT 2 - CYBER SECURITY FOLLOW-UP INSPECTION REPORT 05000261/2017404 | |||
==Dear Mr. Remick:== | ==Dear Mr. Remick:== | ||
Revision as of 11:24, 19 June 2019
| ML17167A002 | |
| Person / Time | |
|---|---|
| Site: | Robinson |
| Issue date: | 06/12/2017 |
| From: | Scott Shaeffer NRC/RGN-II/DRS/EB2 |
| To: | Remick J Duke Energy Progress |
| References | |
| IR 2017404 | |
| Download: ML17167A002 (4) | |
Text
June 12, 2017
SUBJECT:
H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT 2 - CYBER SECURITY FOLLOW-UP INSPECTION REPORT 05000261/2017404
Dear Mr. Remick:
On May 4, 2017, the U.S. Nuclear Regulatory Commission (NRC) completed a security inspection at your H. B. Robinson Steam Electric Plant, Unit 2 and discussed the results of this inspection with Mr. Chris Nolan and other members of your staff. The results of this inspection are documented in the enclosed report.
The NRC inspectors did not identify any finding or violation of more than minor significance.
This letter will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with 10 CFR 2.390, "Public Inspections, Exemptions, Requests for Withholding."
However, the enclosed report contains Security-Related Information, so the enclosed report will not be made publically available in accordance with 10 CFR 2.390(d)(1). If you choose to provide a response that contains Security-Related Information, please mark your entire response "Security-Related Information-Withhold from public disclosure under 10 CFR 2.390." In accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). The NRC is waiving the affidavit requirements for your response in accordance with 10 CFR 2.390(b)(1)(ii).
Sincerely,
/RA/ Scott M. Shaeffer, Chief Engineering Branch 2
Division of Reactor Safety Docket No.: 50-261 License No.: DPR-23
Enclosure: Inspection Report 05000261/2017404 w/Attachment: Supplemental Information (OUO)
cc: (See page 3) cc: Edward T. O'Neil, GM Nuclear Protective Services Duke Energy Corporation
526 South Church Street, Phase II, EC5ZD
Charlotte, NC 28202
___
____ SUNSI REVIEW COMPLETE FORM 665 ATTACHED OFFICE RII:DRS RII:DRS RII:DRP RII:DRS SIGNATURE PJB4 JJP3 SDR2 SMS NAME P. Braaten J. Patel S. Rose S. Shaeffer DATE 6/ 8 /2017 6/ 8 /2017 6/12 /2017 6/8 & 12 /2017 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO