| title = Responds to NRC 970912 Ltr Re Violations Noted in Insp Repts 50-528/97-15,50-529/97-15 & 50-530/97-15.Corrective Actions: Responsible Engineer Was Coached on Procedural Use & Adherence | | title = Responds to NRC 970912 Ltr Re Violations Noted in Insp Repts 50-528/97-15,50-529/97-15 & 50-530/97-15.Corrective Actions: Responsible Engineer Was Coached on Procedural Use & Adherence | ||
| author name = | | author name = Levine J | ||
| author affiliation = ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR | | author affiliation = ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR | ||
| addressee name = | | addressee name = | ||
Revision as of 17:39, 18 June 2019
| ML17312B724 | |
| Person / Time | |
|---|---|
| Site: | Palo Verde |
| Issue date: | 10/10/1997 |
| From: | James M. Levine ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| 102-04030-JML-A, 102-4030-JML-A, 50-528-97-15, 50-529-97-15, 50-530-97-15, NUDOCS 9710170031 | |
| Download: ML17312B724 (16) | |
See also: IR 05000528/1997015
Text
REGULATORY
INFORMATION
DISTRIBUTION
SYSTEM (RIDS)CESSION NBR: 9710170031
DOC.DATE: 97/10/10 NOTARIZED:
NO DOCKET FACIL: STN-50-528
Palo Verde Nuclear Stations Unit 1.Arizona Publi 05000528 STN-50-529
Pa l o Verde Nuc lear Sta t i one Uni t 2i Ar i zona Pub l i 05000529 STN 50 530 Palo Verde Nuclear Stations Unit 3.Arizona Publi 05000530 AUTH.NAME AUTHOR AFFILIATION
LEVINE'.M.Arizona Public Service Co.(formerly Arizona Nuclear Pouper RECIP.NAME REC IP IENT AFFILIATION
Document Control Branch (Document Control Desk)SUBJECT: Responds to NRC 970912 ltr re violations
noted in insp repts 50-528/97-15
50-529/97-15
5 50-530/97-15
respectively.
Corrective
actions: responsible
engineer coached on procedural
use 8.adherence.
DISTRIBUTION
CODE: IE01D COPIES RECEIVED: LTR ENCL SIZE: TITLE: General (50 Dkt)-Insp Rept/Notice
of Violation Response NOTES:STANDARDIZED
PLANT Standardized
plant.Standardi zed plant.05000528 05000529 05000530 RECIPIENT ID CODE/NAME PD4-2 PD TERNAL: ACRS RR/DRCH/HHFB
NRR/DRPM/PERH
OE D IR RGN4 FILE 01 EXTERNAL: L ITCQ BRYCEi J H NRC PDR COPIES LTTR ENCL 1 1 2 2 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 RECIPIENT ID CODE/NAME THOMAS'AEOD/SPD/RAB
DEDRO NRR/D I SP/P IP 8 NRR/DRPM/PECB
NUDOCS-ABSTRACT
QGC/HDS2 NOAC NUDQCS FULLTEXT COPIES LTTR ENCL 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 D 0 C N NOTE TO ALL"RIDS" RECIPlENTS:
PLEASE HELP US TO REDUCE WASTE.TO HAVE YOUR NAME OR ORGANIZATION
REMOVED FROM DISTRIBUTION
LISTS OR REDUCE THE NUMBER OF COPIES RECEZVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD)ON EXTENSION 415-2083 TOTAL NUMBER OF COP I ES REQUIRED: LTTR, 20 ENCL 20
i I
Commitment.
Innmerfon.
Fneryy.Pa'lo Verde Nuclear Generating
Station James M.Levine Senior Vice President Nuclear TEL (602)393-5300
FAX (602)393-6077
Mail Station 7602 P.O.Box 52034 Phoenix, AZ 65072-2034
102-04030-JML/AKK/DLK
October 10, 1997 U.S.Nuclear Regulatory
Commission
ATTN: Document Control Desk Mail Station: P1-37 Washington, DC 20555-0001
Dear Sirs: Subject: Palo Verde Nuclear Generating
Station (PVNGS)Units 1,2, and 3 Docket Nos.STN 50-528/529/530
Reply to Notice of Violation 50-529/97-15-03
Arizona Public Service Company (APS)has reviewed NRC Inspection
Report 50-528/529/530/97-15
and the Notices of Violation (NOV)dated September 12, 1997.APS agrees that the report accurately
reflects our corrective
actions and position relative to NOV nA" and accepts the option of not responding
to the violation.
Pursuant to the provisions
of 10 CFR 2.201, APS'esponse
to NOV"B" is enclosed.Enclosure 1 to this letter is a restatement
is provided in Enclosure 2.Should you have any further questions, please contact Ms.Angela K.Krainik at (602)393-5421.Sincerely, J ML/AKK/DLK/m
ah Enclosures
1.Restatement
of Notice of Violation 2.Reply to Notice of Violation cc: E.W.Merschoff K.E.Perkins K.M.Thomas J.H.Moorman 9710170031
971010 PDR ADOCK 05000528 8 PDR Il!II!IIII!IIIIIIIIIIIIIIIIIIIIIIII
I
Cl
ENCLOSURE 1 RESTATEMENT
OF NOTICE OF VIOLATION"B" 50-529/97-15-03
NRC INSPECTION
CONDUCTED JULY 27 THROUGH SEPTEMBER 6, 1997 INSP ECTION REPORT NO.50-528/529/530/97-15
W1
RESTATEMENT
OF NOTICE OF VIOLATION"B" 50-529/97-15-03
During an NRC inspection
conducted on July 27 through September 6, 1997, two violations
of NRC requirements
were identified.
In accordance
with the"General Statement of Policy and Procedure for NRC Enforcement
Actions," NUREG-1600, violation"B" is listed below.(Note-'o response to Violation"A" is required.)
Technical Specification 6.8.1 requires, in part, that written procedures
shall be established, implemented, and maintained
covering the applicable
procedures
recommended
in Appendix A of Regulatory
Guide 1.33, Revision 2, February 1978.Regulatory
Guide 1.33, Revision 2, Appendix A, requires, in part, written procedures
for procedural
adherence.
Procedure 01DP-OAP01,"Procedure
Process," Revision 4, Step 7.2, required, in part, that procedure users are responsible
for adhering to the requirements
of the procedure.
Contrary to the above, on July 23, 1997, licensee personnel failed to adhere to the requirements
of Procedure 70TI-9SP03, Chemical Passivation
Of Spray Pond Piping, Revision 0.Specifically, Step 4.2 which required the control room supervisor/shift
supervisor
to be briefed on the test procedure and that the work group obtain permission
to proceed with the test.These requirements
were not performed.
Also, Step 5.8, which required a pretest briefing to be conducted, was not performed.
.This is a Severity Level IV violation (Supplement
1)50-529/97-15-03.
1 i
ENCLOSURE 2 REPLY TO NOTICE OF VIOLATION"B" 50-529/97-15-03
NRC INSPECTION
CONDUCTED JULY 27 THROUGH SEPTEMBER 6, 1997 INSPECTION
REPORT NO.50-528/529/530/97-15
I
REPLY TO NOTICE OF VIOLATION"B" 50-529/97-15-03
Reason For The Violation On July 23, 1997, temporary piping was installed by divers in the Unit 2 spray pond.The procedure used to install the temporary piping was test and inspection
procedure 70TI-9SP03,"Chemical Passivation
of Spray Pond Piping." The prerequisite
and initial condition sections of 70TI-9SP03
included individual
signoffs for obtaining Shift Supervisor
authorization
and performing
a prejob briefing.The Project Manager discussed the test plan with the Work Control Senior Reactor Operator and afterwards
briefed the diving crew;however, the engineer responsible
for conducting
the test did not contact the Shift Supervisor
and obtain authorization
nor did he conduct and document a thorough prejob briefing with all appropriate
personnel.
Failing to notify the Shift Supervisor
and conduct a thorough prejob briefing resulted in missed opportunities
to prevent events that compromised
the personal safety of the divers.Specifically, a valve that was being used as a safety boundary during installation
of the temporary piping was cycled open while divers were in the spray pond and unmonitored
service air was used by some divers as a breathing air source during diving operations.
Failing to complete the prerequisite
and initial conditions
of 70TI-9SP03
prior to installing
the temporary piping in the spray pond was contrary to approved station procedures
and was a violation of Technical Specification 6.8.1.
Palo Verde's significant
investigations
of the event determined
the reason for the violation was poor work practices on the part of the responsible
engineer.A contributing
factor was poor communications
between operations, engineering, maintenance, and scheduling.
Corrective
Ste s That Have Been Taken and Results Achieved Significant
investigations
were performed in accordance
with Palo Verde's corrective
action program.Based on the results of the investigations, the responsible
engineer was coached on procedural
use and adherence.
Corrective
Ste s That Will Be Taken To Avoid Further Violations
A newsletter
will be issued by strategic communications
on procedure use and adherence and procedure implementation, including responsibilities
for impact reviews C and training for affected personnel by October 30, 1997.Training will be provided to all engineering
support personnel on procedure use and adherence, procedure preparation
and implementation, including responsibilities
for impact reviews and training for affected personnel by January 31, 1998
Date When Full Com liance Will Be Achieved Full compliance
was achieved on July 23, 1997 after the first phase of temporary piping was installed and 70TI-9SP03
suspended.
On September 12, 1997, prior to continuing
work under 70TI-9SP03, a thorough prejob briefing was conducted and the Shift (Supervisor's
authorization
was obtained.