IR 05000413/2018003: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 3: Line 3:
| issue date = 10/18/2018
| issue date = 10/18/2018
| title = NRC Integrated Inspection Report 05000413/2018003 and 05000414/2018003
| title = NRC Integrated Inspection Report 05000413/2018003 and 05000414/2018003
| author name = Ehrhardt F J
| author name = Ehrhardt F
| author affiliation = NRC/RGN-II/DRP/RPB1
| author affiliation = NRC/RGN-II/DRP/RPB1
| addressee name = Simril T
| addressee name = Simril T

Revision as of 19:56, 12 June 2019

NRC Integrated Inspection Report 05000413/2018003 and 05000414/2018003
ML18292A675
Person / Time
Site: Catawba  Duke Energy icon.png
Issue date: 10/18/2018
From: Frank Ehrhardt
NRC/RGN-II/DRP/RPB1
To: Simril T
Duke Energy Corp
References
IR 2018003
Download: ML18292A675 (14)


Text

/RA/