IR 05000413/2018003: Difference between revisions
Jump to navigation
Jump to search
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
| Line 3: | Line 3: | ||
| issue date = 10/18/2018 | | issue date = 10/18/2018 | ||
| title = NRC Integrated Inspection Report 05000413/2018003 and 05000414/2018003 | | title = NRC Integrated Inspection Report 05000413/2018003 and 05000414/2018003 | ||
| author name = Ehrhardt F | | author name = Ehrhardt F | ||
| author affiliation = NRC/RGN-II/DRP/RPB1 | | author affiliation = NRC/RGN-II/DRP/RPB1 | ||
| addressee name = Simril T | | addressee name = Simril T | ||
Revision as of 19:56, 12 June 2019
| ML18292A675 | |
| Person / Time | |
|---|---|
| Site: | Catawba |
| Issue date: | 10/18/2018 |
| From: | Frank Ehrhardt NRC/RGN-II/DRP/RPB1 |
| To: | Simril T Duke Energy Corp |
| References | |
| IR 2018003 | |
| Download: ML18292A675 (14) | |
Text
/RA/