IR 05000498/2018002: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:April 24, 2018
{{#Wiki_filter:/RA/


==subject==
**


documentatio **
***
*
 
,
 
The following information should be provided in electronic format (Certrec IMS preferred), to the attention of Alfred Sanchez by April 24, 2018. The specific items selected from the lists shall be available and ready for review on the day indicated in this reques *Please provide requested documentation electronically in "pdf" files, Excel, or other searchable formats, if possibl The information should contain descriptive names, and be indexed and hyperlinked to facilitate ease of us Information in "lists" should contain enough information to be easily understood by someone who has knowledge of pressurized water reactor technolog If requested documents are large and/or only hard copy formats are available, please inform me and provide subject documentatio **
**
**



Revision as of 22:15, 25 May 2019

NRC Integrated Inspection Report 05000498/2018002 and 0500499/2018002 and Independent Spent Fuel Storage Installation Inspection Report 07201041/2018001
ML18221A385
Person / Time
Site: South Texas, 07201041  STP Nuclear Operating Company icon.png
Issue date: 08/08/2018
From: Taylor N H
NRC/RGN-IV/DRP/RPB-B
To: Powell G T
South Texas
References
IR 2018001
Download: ML18221A385 (34)


Text

/RA/

,

The following information should be provided in electronic format (Certrec IMS preferred), to the attention of Alfred Sanchez by April 24, 2018. The specific items selected from the lists shall be available and ready for review on the day indicated in this reques *Please provide requested documentation electronically in "pdf" files, Excel, or other searchable formats, if possibl The information should contain descriptive names, and be indexed and hyperlinked to facilitate ease of us Information in "lists" should contain enough information to be easily understood by someone who has knowledge of pressurized water reactor technolog If requested documents are large and/or only hard copy formats are available, please inform me and provide subject documentatio **

AAS