IR 05000333/2014201: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 24: Line 24:
298 Lake Road-East  
298 Lake Road-East  


Lycoming, NY 13093
Lycoming, NY 13093  


SUBJECT: JAMES A. FITZPATRICK NUCLEAR POWER PLANT - NRC SECURITY INSPECTION REPORT 05000333/2014201
SUBJECT: JAMES A. FITZPATRICK NUCLEAR POWER PLANT - NRC SECURITY INSPECTION REPORT 05000333/2014201

Revision as of 05:19, 18 May 2019

IR 05000333/2014201, on 11/21/2014, James A. Fitzpatrick Nuclear Power Plant - NRC Security Inspection Report
ML14357A367
Person / Time
Site: FitzPatrick Constellation icon.png
Issue date: 01/20/2015
From: Johnson R C
NRC/NSIR/DSO/DDSO/SPEB
To: Brian Sullivan
Entergy Nuclear Northeast
References
IR-2014201
Download: ML14357A367 (3)


Text

SAFEGUARDS INFORMATION January 20, 2015

Mr. Brian Sullivan Site Vice President Entergy Nuclear Northeast, Inc. James A. FitzPatrick Nuclear Power Plant

298 Lake Road-East

Lycoming, NY 13093

SUBJECT: JAMES A. FITZPATRICK NUCLEAR POWER PLANT - NRC SECURITY INSPECTION REPORT 05000333/2014201

Dear Mr. Sullivan:

On November 21, 2014, the U.S. Nuclear Regulatory Commission (NRC) completed a security inspection at your James A. Fitzpatrick Nuclear Power Plant. On December 11, 2014, the NRC inspectors discussed the results of this inspection, via telephone, with Mr. Dave Poulin and other members of your staff. Inspectors documented the results of this inspection in the enclosed inspection report.

NRC inspectors documented two findings of very low security significance (Green) in this report. These findings involved violations of NRC require ments. The NRC is treating these violations as non-cited violations (NCVs) consistent with 2.3.2.a of the NRC Enforcement Policy.

If you contest the violations or the significance of these NCVs, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington DC 20555-0001; with copies to the Regional Administrator, Region I, the Director, Office of Nuclear Security and Incident Response, and the Director, Office of Enforcement, U.S. Nuclear

Regulatory Commission, Washington, DC 20555-0001; and the NRC Resident Inspector at the

James A. Fitzpatrick Nuclear Power Plant.

If you disagree with a cross-cutting aspect assignment in this report, you should provide a response within 30 days of the date of this inspection report, with the basis for your disagreement, to the Regional Administrator, Region 1, the Director, Office of Nuclear Security and Incident Response, and the NRC Resident Inspector at the James A. Fitzpatrick Nuclear Power Plant. SAFEGUARDS INFORMATION In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, "Public Inspections, Exemptions, Requests for Withholding,"

of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

However, the material enclosed herewith contains Safeguards Information as defined by 10 CFR 73.21, "Protection of Safeguards Information: Performance Requirements," and its disclosure to unauthorized individuals is prohibited by Section 147 of the Atomic Energy Act of 1954, as amended. Therefore, the material in the enclosure will not be made available electronically for public inspection in the NRC Public Document Room or from the PARS component of NRC's ADAMS. If you choose to provide a response and Safeguards Information

is necessary to provide an acceptable response, please provide the level of protection described in 10 CFR 73.21. Otherwise, if Security-Related Information is necessary to provide an acceptable response, please mark your entire response "Security-Related Information - Withhold from Public Disclosure Under 10 CFR 2.390" in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). In accordance with

10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response.

Sincerely,

/RA by Joshua Berry for/

Robert C. Johnson, Chief

Security Performance Evaluation Branch Division of Security Operations Office of Nuclear Security and Incident Response

Docket No. 50-333 License No. DPR-59

Nonpublic Enclosure: Inspection Report 05000333/2014201 w/Attachments: Supplemental Information

cc w/encl: T. Redfearn, Manager, Nuclear Security A. Peterson, State Liaison Office Designee, NY State Energy, Research & Development Authority J. Hauer, Commissioner, NY State Div. of Homeland Security and Emergency Services

ML14357A367 OFFICE NSIR/DSO/SPEB NSIR/DSONSIR/DSO/SPEBRINSIR/DSO/SPEBNAME R. Dexte r J. Curr yD. CardenasA. DimitriadisC. Johnson DATE 12/17 /14 12

/18/141/23/141/9/151/20/15