IR 05000397/2016006: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
| Line 43: | Line 43: | ||
Please contact me at (817) 200-1148 with any questions you have regarding this letter. | Please contact me at (817) 200-1148 with any questions you have regarding this letter. | ||
Sincerely,/RA/ Jeremy R. Groom, Chief Project Branch A Division of Reactor Projects Docket Nos. | Sincerely, | ||
/RA/ Jeremy R. Groom, Chief Project Branch A Division of Reactor Projects Docket Nos. | |||
05000397 License Nos. NPF-21 | 05000397 License Nos. NPF-21 Enclosure: Columbia Generating Station Inspection/ Activity Plan | ||
Columbia Generating Station Inspection/ Activity Plan | |||
SUNSI Review: ADAMS: Non-Publicly Available Non-Sensitive Keyword: By: RDA/dll Yes No Publicly Available Sensitive NRC-002 OFFICE SPE: DRP/A D:DRS D D:DRP C: DRP/A NAME RAlexander AVegel RLantz JGroom SIGNATURE /RA/ /RA JClark for/ /RA/ /RA/ DATE 02/16/2017 2/23/17 2/27/17 2/13/17 Columbia Generating StatiInspection / Activity Plan 01/01/2017 | SUNSI Review: ADAMS: Non-Publicly Available Non-Sensitive Keyword: By: RDA/dll Yes No Publicly Available Sensitive NRC-002 OFFICE SPE: DRP/A D:DRS D D:DRP C: DRP/A NAME RAlexander AVegel RLantz JGroom SIGNATURE /RA/ /RA JClark for/ /RA/ /RA/ DATE 02/16/2017 2/23/17 2/27/17 2/13/17 Columbia Generating StatiInspection / Activity Plan 01/01/2017 | ||
Revision as of 08:26, 10 May 2019
| ML17059D545 | |
| Person / Time | |
|---|---|
| Site: | Columbia |
| Issue date: | 03/01/2017 |
| From: | Groom J R NRC/RGN-IV/DRP/RPB-A |
| To: | Reddemann M E Energy Northwest |
| JEREMY GROOM | |
| References | |
| IR 2016006 | |
| Download: ML17059D545 (5) | |
Text
March 1, 2017
Mr. Mark Chief Executive Officer Energy Northwest MD 1023 76 North Power Plant Loop P.O. Box 968 Richland, WA 99352
SUBJECT: ANNUAL ASSESSMENT LETTER FOR COLUMBIA GENERATING STATION (REPORT 05000397/2016006)
Dear Mr. Reddemann:
On February 16, 2017, t he U.S. Nuclear Regulatory Commission (NRC)
completed its end-of-cycle performance assessment of Columbia Generating Station, reviewing performance indicators (PIs), inspection results, and enforcement actions from January 1, 2016, through December 31, 2016. This letter informs you of the NRC's assessment of your facility during this period and its plans for future inspections at your facility. The NRC concluded that overall performance at your facility preserved public health and safety.
T he NRC determined the performance at Columbia Generating Station, during the most recent quarter was within the Licensee Response Column, the highest performance category of the NRC's Reactor Oversight Process (ROP) Action Matrix, because all inspection findings had very low safety significance (i.e., Green), and all PIs were within the expected range (i.e., Green). Therefore, the NRC plans to conduct ROP baseline inspections at your facility.
The enclosed inspection plan lists the inspections scheduled through December 31, 2018. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last twelve months of the inspection plan are tentative and may be revised. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes.
This inspection plan does not include the plan for security
-related inspections, which will be sent via separate, non
-publicly available correspondence.
UNITED STATES NUCLEAR REGULATORY COMMISSION REGION IV 1600 E. LAMAR BLVD ARLINGTON, TX 76011
-4511 M. In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading
-rm/adams.html (the Public Electronic Reading Room).
Please contact me at (817) 200-1148 with any questions you have regarding this letter.
Sincerely,
/RA/ Jeremy R. Groom, Chief Project Branch A Division of Reactor Projects Docket Nos.
05000397 License Nos. NPF-21 Enclosure: Columbia Generating Station Inspection/ Activity Plan
SUNSI Review: ADAMS: Non-Publicly Available Non-Sensitive Keyword: By: RDA/dll Yes No Publicly Available Sensitive NRC-002 OFFICE SPE: DRP/A D:DRS D D:DRP C: DRP/A NAME RAlexander AVegel RLantz JGroom SIGNATURE /RA/ /RA JClark for/ /RA/ /RA/ DATE 02/16/2017 2/23/17 2/27/17 2/13/17 Columbia Generating StatiInspection / Activity Plan 01/01/2017
-12/31/2018 Unit Number Report 22 No. of Staff on SitePlanned Dates Start EndInspection ActivityTitle Page 1 of 202/23/2017 11:42:39 4EXAM-INITIAL EXAM 2 01/23/2017 01/27/2017 X02586INITIAL EXAM CGS (02/2017)
2 02/27/2017 03/09/2017 X02586INITIAL EXAM CGS (02/2017)
2SITSCRAM-SPECIAL INSP - SCRAM W/ COMPLICATIONS 2 01/08/2017 06/10/2017 IP 93812 Special Inspection 1 EP-1-BIENNIAL EP PROGRAM INSPECTION 2 01/30/2017 02/03/2017 IP7111402 Alert and Notification System Testing 2 01/30/2017 02/03/2017 IP7111403Emergency Preparedness Organization Staffing and Augmentation System 2 01/30/2017 02/03/2017 IP7111404Emergency Action Level and Emergency Plan Changes 2 01/30/2017 02/03/2017 IP7111405Correction of Emergency Preparedness Weaknesses and Deficiencies 1 EP-2-EP PERFORMANCE INDICATOR VERIFICATION 2 01/30/2017 02/03/2017 IP71151-EP01Drill/Exercise Performance 2 01/30/2017 02/03/2017 IP71151-EP02 ERO Readiness 2 01/30/2017 02/03/2017 IP71151-EP03 Alert & Notification System Reliabilit y 5TSB 52B-BIENNIAL PI&R 2 02/13/2017 02/17/2017 IP71152B Problem Identification and Resolution 2 02/27/2017 03/03/2017 IP71152B Problem Identification and Resolution 171111.08-INSERVICE INSPECTION 2 05/22/2017 05/26/2017 IP7111108G Inservice Inspection Activities - BWR 2 RS 12 PI-RADIATION SAFETY 2 05/22/2017 05/26/2017 IP71124.01Radiological Hazard Assessment and Exposure Controls 2 05/22/2017 05/26/2017 IP71124.02Occupational ALARA Planning and Controls 2 05/22/2017 05/26/2017 IP71151-OR01Occupational Exposure Control Effectiveness 2 05/22/2017 05/26/2017 IP71151-PR01RETS/ODCM Radiological Effluent Occurrences 4 RS 5678-RS TEAM 2 09/11/2017 09/15/2017 IP71124.05 Radiation Monitoring Instrumentation 2 09/11/2017 09/15/2017 IP71124.06 Radioactive Gaseous and Liquid Effluent Treatment 2 09/11/2017 09/15/2017 IP71124.07 Radiological Environmental Monitoring Program 2 09/11/2017 09/15/2017 IP71124.08Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation 3 EB1-17T-CGS 50.59 EVALUATIONS OF CHANGES, TEST, 2 10/02/2017 10/06/2017 IP7111117TEvaluations of Changes, Tests, and Exper iments and Permanent Plant Modifications 4 EB2-05T-TRIENNIAL FIRE PROTECTION INSPECTION 2 04/09/2018 04/13/2018 IP7111105TFire Protection [Triennial]
This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.
Columbia Generating StatiInspection / Activity Plan 01/01/2017
-12/31/2018 Unit Number Report 22 No. of Staff on SitePlanned Dates Start EndInspection ActivityTitle Page 2 of 202/23/2017 11:42:39 4 EB2-05T-TRIENNIAL FIRE PROTECTION INSPECTION 2 04/23/2018 04/27/2018 IP7111105TFire Protection [Triennial]
4 EP-1-EP EXERCISE INSPECTION 2 03/26/2018 03/30/2018 IP7111401 Exercise Evaluation 2 03/26/2018 03/30/2018 IP7111404Emergency Action Level and Emergency Plan Changes 1 EP-3-EP PERFORMANCE INDICATORS 2 03/26/2018 03/30/2018 IP71151-EP01Drill/Exercise Performance 2 03/26/2018 03/30/2018 IP71151-EP02 ERO Readiness 2 03/26/2018 03/30/2018 IP71151-EP03 Alert & Notification System Reliabilit y 1 EB1-07T-CGS HEAT SINK PERFORMANCE 2 05/14/2018 05/18/2018 IP7111107T Heat Sink Performance 2 RS 24-RAD SAFETY 2 05/21/2018 05/25/2018 IP71124.02Occupational ALARA Planning and Controls 2 05/21/2018 05/25/2018 IP71124.04Occupational Dose Assessment 2 RS 13PI-RAD SAFETY 2 09/10/2018 09/14/2018 IP71124.01Radiological Hazard Assessment and Exposure Controls 2 09/10/2018 09/14/2018 IP71124.03In-Plant Airborne Radioactivity Control and Mitigation 2 09/10/2018 09/14/2018 IP71151-OR01Occupational Exposure Control Effectiveness 2 09/10/2018 09/14/2018 IP71151-PR01RETS/ODCM Radiological Effluent Occurrences 3 BRQ-BRQ INSPECTION 2 10/15/2018 12/31/2018 IP7111111B Licensed Operator Requalification Program 3 EB1-21N-CGS DESIGN BASES PROGRAMS INSPECTION 2 10/22/201811/09/2018 IP7111121N Component Design Bases Inspection (Programs)
Comments: This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.