IR 05000289/2017005: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 34: Line 34:
Please contact me at 610-337-5046 with any questions you have regarding this letter.
Please contact me at 610-337-5046 with any questions you have regarding this letter.


Sincerely,/RA/
Sincerely,
/RA/
Silas R. Kennedy, Chief Reactor Projects Branch 6
Silas R. Kennedy, Chief Reactor Projects Branch 6


Line 43: Line 44:
50-2 89 License Nos.
50-2 89 License Nos.


DPR-50  
DPR-50 Enclosure: Three Mile Island Inspection Plan
 
===Enclosure:===
Three Mile Island Inspection Plan


cc: Distribution via ListServ
cc: Distribution via ListServ

Revision as of 03:25, 10 May 2019

Updated Inspection Plan for Three Mile Island Station, Unit 1, with Report 22 (Report 05000289/2017005)
ML17240A015
Person / Time
Site: Crane Constellation icon.png
Issue date: 08/28/2017
From: Kennedy S R
NRC/RGN-I/DRP/PB6
To: Bryan Hanson
Exelon Generation Co, Exelon Nuclear
Kennedy S R
References
IR 2017005
Download: ML17240A015 (5)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 2100 RENAISSANCE BLVD.

KING OF PRUSSIA, PA 19406

-2713 August 28, 2017 Mr. Bryan Hanson Senior Vice President, Exelon Generation, LLC President and Chief Nuclear Officer, Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555

SUBJECT: UPDATED INSPECTION PLAN FOR THREE MILE ISLAND STATION , UNIT 1 (REPORT 05000289/2017005

)

Dear Mr. H anson:

The enclosed inspection plan lists the inspections scheduled through June 30, 20 19 , for Three Mile Island, Unit 1

. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last twelve months of the inspection plan are tentative and may be revised. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include the plan for security

-related inspections, which will be sent via separate, non

-publicly available correspondence.

Please contact me at 610-337-5046 with any questions you have regarding this letter.

Sincerely,

/RA/

Silas R. Kennedy, Chief Reactor Projects Branch 6

Division of Reactor Projects

Docket Nos.

50-2 89 License Nos.

DPR-50 Enclosure: Three Mile Island Inspection Plan

cc: Distribution via ListServ

ML17240A015 SUNSI Review Non-Sensitive Sensitive Publicly Available Non-Publicly Available OFFICE RI/DRP RI/DRP NAME CSafouri/CF SKennedy/SRK DATE 8/22/17 8/28 17 Report 22 Unit NumberPlanned Dates Start EndInspection ActivityTitle No. of Staff on Site Three Mile IslandInspection / Activity Plan 07/01/2017

-06/30/2019 Page 1 of 3 08/09/2017 12:56:546/26EXAM-TMI INITIAL OL EXAM 4 1 FY17-TMI INITIAL OPERATOR LICENSING EXAM U01944 06/26/2017 07/07/2017TI-191-FUKUSHIMA LESSONS LEARNED 4 1 IP Inspection of Licensee's Responses to Order EA-12-049, EA-12-051 & EP Info Request March 12, 2012 2515/191 07/24/2017 07/28/201771124-REMP 1 1 IP Radiological Environmental Monitoring Program71124.07 08/28/2017 09/01/2017 1 IP RETS/ODCM Radiological Effluent Occurrences71151-PR01 08/28/2017 09/01/201771124-HP INSPECTION 1 1 IP Radiological Hazard Assessment and Exposure Controls71124.01 09/25/2017 09/29/2017 1 IP Occupational ALARA Planning and Controls71124.02 09/25/2017 09/29/2017 1 IP In-Plant Airborne Radioactivity Control and Mitigation71124.03 09/25/2017 09/29/2017 1 IP Occupational Dose Assessment71124.04 09/25/2017 09/29/20177111108P-INSERVICE INSPECTION 1 1 IP Inservice Inspection Activities - PWR7111108P 09/25/2017 10/06/201771124.08-RADWASTE 1 1 IP Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation71124.0811/06/201711/10/201771124-HP INSPECTION 1 1 IP Radiological Hazard Assessment and Exposure Controls71124.0111/13/201711/17/2017 1 IP Occupational ALARA Planning and Controls71124.0211/13/201711/17/2017 1 IP In-Plant Airborne Radioactivity Control and Mitigation71124.0311/13/201711/17/2017 1 IP Occupational Dose Assessment71124.0411/13/201711/17/2017 1 IP Occupational Exposure Control Effectiveness71151-OR0111/13/201711/17/2017 EP-EP PROGRAM INSPECTION 1 1 IP A lert and Notification System Testing7111402 03/05/2018 03/09/2018 1 IP Emergency Preparedness Organization Staffing and Augmentation System7111403 03/05/2018 03/09/2018 1 IP Correction of Emergency Preparedness Weaknesses and Deficiencies7111405 03/05/2018 03/09/2018 1 IP Performance Indicator Verification71151 03/05/2018 03/09/201871124-RAD SAFETY INSP 1 1 IP Radioactive Gaseous and Liquid Effluent Treatment71124.06 02/12/2018 02/16/2018 1 IP RETS/ODCM Radiological Effluent Occurrences71151-PR01 02/12/2018 02/16/20187111121M-DESIGN BASES ASSURANCE INSPECTION (TEAM)

6 1 IP Design Bases Assurance Inspection (Teams)7111121M 03/12/2018 03/16/2018 1 IP Design Bases Assurance Inspection (Teams)7111121M 03/26/2018 03/30/2018 This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.

Report 22 Unit NumberPlanned Dates Start EndInspection ActivityTitle No. of Staff on Site Three Mile IslandInspection / Activity Plan 07/01/2017

-06/30/2019 Page 2 of 3 08/09/2017 12:56:5471152B-PI&R BIENNIAL 1 1 IP Problem Identification and Resolution71152B 04/30/2018 05/04/2018 1 IP Problem Identification and Resolution71152B 05/14/2018 05/18/201871124-RAD SAFETY INSP 1 1 IP Radiological Hazard Assessment and Exposure Controls71124.0106/11/2018 06/15/2018 1 IP Occupational ALARA Planning and Controls71124.0206/11/2018 06/15/2018 1 IP In-Plant Airborne Radioactivity Control and Mitigation71124.0306/11/2018 06/15/2018 1 IP Occupational Dose Assessment71124.0406/11/2018 06/15/201871124-RAD INSTRUMENTATION 1 1 IP Radiation Monitoring Instrumentation71124.05 09/10/2018 09/14/20186/24EXAM-TMI INITIAL OL EXAM 4 1 FY19 TM I EXAM (JUNE 2019)

U01976 05/27/2019 05/31/2019 1 FY19 TM I EXAM (JUNE 2019)

U01976 06/24/2019 06/28/201971124-RAD SAFETY INSPECTION 1 1 IP Radiological Hazard Assessment and Exposure Controls71124.0111/12/201811/16/2018 1 IP Occupational ALARA Planning and Controls71124.0211/12/201811/16/2018 1 IP In-Plant Airborne Radioactivity Control and Mitigation71124.0311/12/201811/16/2018 1 IP Occupational Dose Assessment71124.0411/12/201811/16/2018 1 IP Occupational Exposure Control Effectiveness71151-OR0111/12/201811/16/2018REQUAL-TMI REQUAL INSP WITH P/F RESULTS 2 1 IP Licensed Operator Requalification Program - Annual Review7111111A 03/18/2019 03/22/2019 1 IP Licensed Operator Requalification Program7111111B 03/18/2019 03/22/20197111121N-EQ PROGRAM 3 1 IP Design Bases Assurance Inspection (Programs)7111121N 01/28/2019 02/01/2019 1 IP Design Bases Assurance Inspection (Programs)7111121N02/11/2019 02/15/201971124-RAD SAFETY 01,02,03,04 1 1 IP Radiological Hazard Assessment and Exposure Controls71124.0102/11/2019 02/15/2019 1 IP Occupational ALARA Planning and Controls71124.0202/11/2019 02/15/2019 1 IP In-Plant Airborne Radioactivity Control and Mitigation71124.0302/11/2019 02/15/2019 1 IP Occupational Dose Assessment71124.0402/11/2019 02/15/2019 EP-EP EXERCISE INSPECTION 5 1 IP Exercise Evaluation7111401 05/06/2019 05/10/2019 1 IP Performance Indicator Verification71151 05/06/2019 05/10/2019 This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.

Report 22 Unit NumberPlanned Dates Start EndInspection ActivityTitle No. of Staff on Site Three Mile IslandInspection / Activity Plan 07/01/2017

-06/30/2019 Page 3 of 3 08/09/2017 12:56:5471124.07-RAD SAFETY REMP 1 1 IP Radiological Environmental Monitoring Program71124.07 06/10/2019 06/14/2019 1 IP RETS/ODCM Radiological Effluent Occurrences71151-PR01 06/10/2019 06/14/2019 This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.