ML102700185: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
| Line 25: | Line 25: | ||
We will review the implementation of your corrective actions during a future inspection to determine that full compliance has been achieved and will be maintained. | We will review the implementation of your corrective actions during a future inspection to determine that full compliance has been achieved and will be maintained. | ||
In accordance with Title 10 of the Code of Federal Regulations, Part 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspections in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRC's document system (ADAMS). ADAMS is accessible from the NRC Web Site at http://www.nrc.gov/reading-rm/adams.html(the Public Electronic Reading Room). Sincerely, Paul G. Krohn, Chief Projects Branch 4 Division of Reactor Projects cc: Distribution via ListServ EA-09-007 EA..Q9-05fl Mr. | In accordance with Title 10 of the Code of Federal Regulations, Part 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspections in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRC's document system (ADAMS). ADAMS is accessible from the NRC Web Site at http://www.nrc.gov/reading-rm/adams.html(the Public Electronic Reading Room). Sincerely, Paul G. Krohn, Chief Projects Branch 4 Division of Reactor Projects cc: Distribution via ListServ EA-09-007 EA..Q9-05fl Mr. | ||
J. Pacilio Senior Vic,s President, Exelon Generating Company. LlC President | J. Pacilio Senior Vic,s President, Exelon Generating Company. LlC President | ||
:and Chief Nuclear Officer, Exelon Nuclear 4300 Winfield Road I L 60555 PEACH BOTTOM RESPONSE TO CONFIRMATORY NRC INVESTIGATION REPORT NOS. 1-2008-023, 1-2008-004 | :and Chief Nuclear Officer, Exelon Nuclear 4300 Winfield Road I L 60555 PEACH BOTTOM RESPONSE TO CONFIRMATORY NRC INVESTIGATION REPORT NOS. 1-2008-023, 1-2008-004 | ||
Revision as of 21:25, 30 April 2019
| ML102700185 | |
| Person / Time | |
|---|---|
| Site: | Peach Bottom |
| Issue date: | 09/27/2010 |
| From: | Krohn P G Reactor Projects Region 1 Branch 4 |
| To: | Pacilio M J Exelon Nuclear, Exelon Generation Co |
| KROHN P G, RI/DRP/PB4/610-337-5120 | |
| References | |
| 1-2008-004, 1-2008-023, EA-09-007, EA-09-059 | |
| Download: ML102700185 (1) | |
Text
UNITED NUCLEAR REGULATORY REGION 475 ALLENDAlE KING OF PRUSSIA, PA September 27, 2010
- EA-09-00J Mr. Michael J. Pacilio Senior Vice President, Exelon Generating Company, llC President and Chief Nuclear Officer, Exelon Nuclear 4300 Winfield Road Warrenville, Il 60555 PEACH BOTTOM RESPONSE TO CONFIRMATORY NRC INVESTIGATION REPORT NOS. 1-2008-023,
Dear Mr. Pacilio:
Thank you for your letter of July 23, 2010 (Ml1 02150454) in response to our December 1, 2009, letter and Confirmatory Order regarding two former Reach Bottom employees who deliberately violated NRC requirements by reporting inaccurate information in one instance, and failing to inform Exelon of information required to be reported in the other. We . acknowledge that the actions required in Section V.A of the Confirmatory Order have been completed.
We will review the implementation of your corrective actions during a future inspection to determine that full compliance has been achieved and will be maintained.
In accordance with Title 10 of the Code of Federal Regulations, Part 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspections in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRC's document system (ADAMS). ADAMS is accessible from the NRC Web Site at http://www.nrc.gov/reading-rm/adams.html(the Public Electronic Reading Room). Sincerely, Paul G. Krohn, Chief Projects Branch 4 Division of Reactor Projects cc: Distribution via ListServ EA-09-007 EA..Q9-05fl Mr.
J. Pacilio Senior Vic,s President, Exelon Generating Company. LlC President
- and Chief Nuclear Officer, Exelon Nuclear 4300 Winfield Road I L 60555 PEACH BOTTOM RESPONSE TO CONFIRMATORY NRC INVESTIGATION REPORT NOS. 1-2008-023, 1-2008-004
Dear Mr. Pacilio:
Thank you for your letter of July 23, 2010 (ML 102150454) in response to our December 1, 2009, letter and Confirmatory Order regarding two former Peach Bottom employees who deliberately violated NRC requirements by reporting inaccurate information in one instance, and failing to inform Exelon of information required to be reported in the other. We acknowledge that the actions required in Section V.A of the Confirmatory Order have been completed.
We will review the implementation of your corrective actions during a future inspection to determine that full compliance has been achieved and will be maintained.
In accordance with Title 10 of the Code of Federal Regulations, Part 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspections in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRC's document system (ADAMS). ADAMS is accessible from the NRC Web Site at http://www.nrc.qovtreading-rm/adams.html(the Public Electronic Reading Room). Sincerely, IRN Paul G. Krohn, Chief Projects Branch 4 Division of Reactor Projects co: Distribution via ListServ Distribution w/encl:(via E-mail) J. Clifford, DRP D. COllins, DRP P. Krohn, DRP A. Rosebrook.
DRP E. Torres, DRP J. Bream. DRP F. Bower, DRP, SRI M. Mclaughlin, ORA D. Holody, ORA F. Bower, DRP, SRI A. Ziedonis, DRP, Rr S. Schmitt, DRP, OA SUNSI Review Complete:
AAR (Reviewer'S ML 102700185 DOC NAME: G:\DRP\BRANCH4\
PEACH BOTTOM\ACKNOWlEDGMENT LETTER CONFIRMATORY ORDER RESPONSE DOCX After declaring this document uAn Official Agency Record" it be released to the Public. To receive a ropy of this document, indicate in the box:'C'::
Copy without atlachmenllenclosure "E' :: Copy wlattachmenllenclosure'N'::;
No oopy AARf 09/27/10 OFFICIAL USE ONLY