: During the week of May 9, 2016, the NRC administered operator licensing examinations to one Senior Reactor Operator Upgrade (SROU), one Senior Operator Instant SROI and four Reactor Operator candidates. One of the Reactor Operator candidates failed one section of the written examination. All other candidates passed the examinations and will be issued a license to operate the Idaho State University reactor. | : During the week of May 9, 2016, the NRC administered operator licensing examinations to one Senior Reactor Operator Upgrade (SROU), one Senior Operator Instant SROI and four Reactor Operator candidates. One of the Reactor Operator candidates failed one section of the written examination. All other candidates passed the examinations and will be issued a license to operate the Idaho State University reactor. | ||
REPORT DETAILS 1. Examiner: Phillip T. Young, Chief Examiner | REPORT DETAILS 1. Examiner: Phillip T. Young, Chief Examiner | ||
: 2. Results: | : 2. Results: | ||
RO PASS/FAIL SRO PASS/FAIL TOTAL PASS/FAIL Written 3/1 1/0 4/1 Operating Tests 4/0 2/0 6/0 Overall 3/1 2/0 5/1 3. Exit Meeting: | RO PASS/FAIL SRO PASS/FAIL TOTAL PASS/FAIL Written 3/1 1/0 4/1 Operating Tests 4/0 2/0 6/0 Overall 3/1 2/0 5/1 3. Exit Meeting: | ||
| Line 83: | Line 83: | ||
INSTRUCTIONS TO CANDIDATE: Answers are to be written on the answer sheet provided. Attach the answer sheets to the examination. Points for each question are indicated in brackets for each question. A 70% in each section is required to pass the examination. Examinations will be picked up three (3) hours after the examination starts. | INSTRUCTIONS TO CANDIDATE: Answers are to be written on the answer sheet provided. Attach the answer sheets to the examination. Points for each question are indicated in brackets for each question. A 70% in each section is required to pass the examination. Examinations will be picked up three (3) hours after the examination starts. | ||
Category Value % of Total % of Candidates Score Category Value Category 18.00 38.3 A. Reactor Theory, Thermodynamics and Facility Operating Characteristics 16.00 15.00 33.3 31.9 B. Normal and Emergency Operating Procedures and Radiological Controls 14.00 29.2 29.8 C. Facility and Radiation Monitoring Systems 48.00 47.00 100.0 TOTALS All work done on this examination is my own. I have neither given nor received aid. | Category Value % of Total % of Candidates Score Category Value Category 18.00 38.3 A. Reactor Theory, Thermodynamics and Facility Operating Characteristics 16.00 15.00 33.3 31.9 B. Normal and Emergency Operating Procedures and Radiological Controls 14.00 29.2 29.8 C. Facility and Radiation Monitoring Systems 48.00 47.00 100.0 TOTALS All work done on this examination is my own. I have neither given nor received aid. | ||
Candidate's Signature NRC RULES AND GUIDELINES FOR LICENSE EXAMINATIONS During the administration of this examination the following rules apply: | Candidate's Signature NRC RULES AND GUIDELINES FOR LICENSE EXAMINATIONS During the administration of this examination the following rules apply: | ||
: 1. Cheating on the examination means an automatic denial of your application and could result in more severe penalties. | : 1. Cheating on the examination means an automatic denial of your application and could result in more severe penalties. | ||
: 2. After the examination has been completed, you must sign the statement on the cover sheet indicating that the work is your own and you have neither received nor given assistance in completing the examination. This must be done after you complete the examination. | : 2. After the examination has been completed, you must sign the statement on the cover sheet indicating that the work is your own and you have neither received nor given assistance in completing the examination. This must be done after you complete the examination. | ||
: 3. Restroom trips are to be limited and only one candidate at a time may leave. You must avoid all contacts with anyone outside the examination room to avoid even the appearance or possibility of cheating. | : 3. Restroom trips are to be limited and only one candidate at a time may leave. You must avoid all contacts with anyone outside the examination room to avoid even the appearance or possibility of cheating. | ||
: 4. Use black ink or dark pencil only to facilitate legible reproductions. | : 4. Use black ink or dark pencil only to facilitate legible reproductions. | ||
: 5. Print your name in the blank provided in the upper right-hand corner of the examination cover sheet and each answer sheet. | : 5. Print your name in the blank provided in the upper right-hand corner of the examination cover sheet and each answer sheet. | ||
: 6. Mark your answers on the answer sheet provided. USE ONLY THE PAPER PROVIDED AND DO NOT WRITE ON THE BACK SIDE OF THE PAGE. | : 6. Mark your answers on the answer sheet provided. USE ONLY THE PAPER PROVIDED AND DO NOT WRITE ON THE BACK SIDE OF THE PAGE. | ||
: 7. The point value for each question is indicated in [brackets] after the question. | : 7. The point value for each question is indicated in [brackets] after the question. | ||
: 8. If the intent of a question is unclear, ask questions of the examiner only. | : 8. If the intent of a question is unclear, ask questions of the examiner only. | ||
: 9. When turning in your examination, assemble the completed examination with examination questions, examination aids and answer sheets. In addition turn in all scrap paper. | : 9. When turning in your examination, assemble the completed examination with examination questions, examination aids and answer sheets. In addition turn in all scrap paper. | ||
: 10. Ensure all information you wish to have evaluated as part of your answer is on your answer sheet. Scrap paper will be disposed of immediately following the examination. | : 10. Ensure all information you wish to have evaluated as part of your answer is on your answer sheet. Scrap paper will be disposed of immediately following the examination. | ||
: 11. To pass the examination you must achieve a grade of 70 percent or greater in each category. | : 11. To pass the examination you must achieve a grade of 70 percent or greater in each category. | ||
: 12. There is a time limit of three (3) hours for completion of the examination. | : 12. There is a time limit of three (3) hours for completion of the examination. | ||
: 13. When you have completed and turned in you examination, leave the examination area. If you are observed in this area while the examination is still in progress, your license may be denied or revoked. | : 13. When you have completed and turned in you examination, leave the examination area. If you are observed in this area while the examination is still in progress, your license may be denied or revoked. | ||
| Line 103: | Line 103: | ||
* eff*- + = K 1)-K ( = eff eff K x k K - K = eff eff eff eff 2 1 1 2 0.693 = T e DR= DR t-0 R 6CiE(n) = DR 2 d DR = d DR 2 2 2 1 2 1 Section A - Reacto r Theory, ThermodynamicsandFacilityOperating Characteristics NegativePoint B PointAPositive Question A.001 [1.00 point] {1.0} Which ONE of the following is the reason for operating with thermal neutrons rather than fast | * eff*- + = K 1)-K ( = eff eff K x k K - K = eff eff eff eff 2 1 1 2 0.693 = T e DR= DR t-0 R 6CiE(n) = DR 2 d DR = d DR 2 2 2 1 2 1 Section A - Reacto r Theory, ThermodynamicsandFacilityOperating Characteristics NegativePoint B PointAPositive Question A.001 [1.00 point] {1.0} Which ONE of the following is the reason for operating with thermal neutrons rather than fast | ||
neutrons? | neutrons? | ||
: a. Probability of fission is increased since thermal neutrons are less likely to leak out of the core. | : a. Probability of fission is increased since thermal neutrons are less likely to leak out of the core. | ||
: b. As neutron energy increases, neutron absorption in non-fuel materials increases exponentially. | : b. As neutron energy increases, neutron absorption in non-fuel materials increases exponentially. | ||
: c. The absorption cross-section of U-235 is much higher for thermal neutrons. | : c. The absorption cross-section of U-235 is much higher for thermal neutrons. | ||
: d. The fuel temperature coefficient becomes positive as neutron energy increases. | : d. The fuel temperature coefficient becomes positive as neutron energy increases. | ||
| Line 114: | Line 114: | ||
DOE Fundamentals Handbook, Module 2, page 9. | DOE Fundamentals Handbook, Module 2, page 9. | ||
Question A.002 [1.00 point] {2.0} Two critical reactors at low power are identical except that Reactor 1 has a beta fraction of 0.0072 and Reactor 2 has a beta fraction of 0.0060. An equal amount of positive reactivity is inserted into both reactors. Which ONE of the following will be the response of Reactor 2 compared to Reactor 1? | Question A.002 [1.00 point] {2.0} Two critical reactors at low power are identical except that Reactor 1 has a beta fraction of 0.0072 and Reactor 2 has a beta fraction of 0.0060. An equal amount of positive reactivity is inserted into both reactors. Which ONE of the following will be the response of Reactor 2 compared to Reactor 1? | ||
: a. The resulting power level will be lower. b. The resulting power level will be higher. | : a. The resulting power level will be lower. b. The resulting power level will be higher. | ||
: c. The resulting period will be longer. | : c. The resulting period will be longer. | ||
: d. The resulting period will be shorter. | : d. The resulting period will be shorter. | ||
Answer: A.02 d. | Answer: A.02 d. | ||
| Line 125: | Line 125: | ||
Question A.003 [1.00 point] {3.0} Shown below is a trace of reactor period as a function of time. Between points A and B reactor | Question A.003 [1.00 point] {3.0} Shown below is a trace of reactor period as a function of time. Between points A and B reactor | ||
power is: | power is: | ||
: a. continually increasing. b. continually decreasing. | : a. continually increasing. b. continually decreasing. | ||
: c. increasing, then decreasing. d. constant. | : c. increasing, then decreasing. d. constant. | ||
| Line 134: | Line 134: | ||
Standard NRC Question 1 | Standard NRC Question 1 | ||
Section A - Reacto r Theory, ThermodynamicsandFacilityOperating Characteristics Question A.004 (1.00 point) {4.0} A thin foil target of 10% copper and 90% aluminum is in a thermal neutron beam. Given a Cu = 3.79 barns, a Al = 0.23 barns, s Cu = 7.90 barns, and s Al =1.49 barns, which ONE of the following reactions has the highest probability of occurring? A neutron | Section A - Reacto r Theory, ThermodynamicsandFacilityOperating Characteristics Question A.004 (1.00 point) {4.0} A thin foil target of 10% copper and 90% aluminum is in a thermal neutron beam. Given a Cu = 3.79 barns, a Al = 0.23 barns, s Cu = 7.90 barns, and s Al =1.49 barns, which ONE of the following reactions has the highest probability of occurring? A neutron | ||
: a. scattering reaction with aluminum b. scattering reaction with copper | : a. scattering reaction with aluminum b. scattering reaction with copper | ||
: c. absorption in aluminum d. absorption in copper | : c. absorption in aluminum d. absorption in copper | ||
| Line 143: | Line 143: | ||
DOE Fundamentals Handbook, Nuclear Physics and Reactor Theory, | DOE Fundamentals Handbook, Nuclear Physics and Reactor Theory, | ||
Question A.005 [1 point] {5.0} The neutron microscopic cross-section for absorption, a, generally: a. increases as neutron energy increases. | Question A.005 [1 point] {5.0} The neutron microscopic cross-section for absorption, a, generally: a. increases as neutron energy increases. | ||
: b. decreases as neutron energy increases. c. increases as the mass of the target nucleus increases. d. decreases as the mass of the target nucleus increases. | : b. decreases as neutron energy increases. c. increases as the mass of the target nucleus increases. d. decreases as the mass of the target nucleus increases. | ||
Answer: A.05 b. | Answer: A.05 b. | ||
| Line 150: | Line 150: | ||
DOE Fundamentals Handbook, Volume 1, Module 2, Enabling Objective 2.3. | DOE Fundamentals Handbook, Volume 1, Module 2, Enabling Objective 2.3. | ||
Question: A.006 [1.0 point] {6.0} ELASTIC SCATTERING is the process by which a neutron collides with a nucleus -. | Question: A.006 [1.0 point] {6.0} ELASTIC SCATTERING is the process by which a neutron collides with a nucleus -. | ||
: a. and the nucleus recoil with the same total kinetic energy as the neutron and nucleus had prior to the collision. | : a. and the nucleus recoil with the same total kinetic energy as the neutron and nucleus had prior to the collision. | ||
: b. and the nucleus recoil with less total kinetic energy than the neutron and nucleus had prior to the collision with the nucleus emitting a gamma ray. | : b. and the nucleus recoil with less total kinetic energy than the neutron and nucleus had prior to the collision with the nucleus emitting a gamma ray. | ||
: c. is absorbed, with the nucleus emitting a gamma ray. | : c. is absorbed, with the nucleus emitting a gamma ray. | ||
: d. and the nucleus recoil with a higher total kinetic energy than the neutron and nucleus had prior to the collision with the nucleus emitting a gamma ray. | : d. and the nucleus recoil with a higher total kinetic energy than the neutron and nucleus had prior to the collision with the nucleus emitting a gamma ray. | ||
| Line 161: | Line 161: | ||
DOE Fundamentals Handbook, Nuclear Physics and Reactor Theory, | DOE Fundamentals Handbook, Nuclear Physics and Reactor Theory, | ||
Section A - Reacto r Theory, ThermodynamicsandFacilityOperating Characteristics Question A.007 [1.0 point] {7.0} Which ONE of the following is the major source of energy released during fission? a. Absorption of prompt gamma rays b. Slowing down of fission fragments | Section A - Reacto r Theory, ThermodynamicsandFacilityOperating Characteristics Question A.007 [1.0 point] {7.0} Which ONE of the following is the major source of energy released during fission? a. Absorption of prompt gamma rays b. Slowing down of fission fragments | ||
: c. Neutrino interactions d. Fission neutron scattering | : c. Neutrino interactions d. Fission neutron scattering | ||
| Line 169: | Line 169: | ||
DOE Fundamentals Handbook, Nuclear Physics and Reactor Theory, | DOE Fundamentals Handbook, Nuclear Physics and Reactor Theory, | ||
Question A.008 [1.0 point] {8.0} Which ONE of the following elements will slow down fast neutrons most quickly, i.e. produces the greatest energy loss per collision. | Question A.008 [1.0 point] {8.0} Which ONE of the following elements will slow down fast neutrons most quickly, i.e. produces the greatest energy loss per collision. | ||
: a. Oxygen-16 b. Uranium-238 c. Hydrogen-1 d. Boron-10 | : a. Oxygen-16 b. Uranium-238 c. Hydrogen-1 d. Boron-10 | ||
| Line 177: | Line 177: | ||
DOE Fundamentals Handbook, Volume 1, Module 2, Enabling Objective 2.12. Exam 2 | DOE Fundamentals Handbook, Volume 1, Module 2, Enabling Objective 2.12. Exam 2 | ||
Question A.009 [1.0 point] {9.0} The initial conditions for a reactor startup are count rate = 45 cps and K eff = 0.980. When the count rate reaches 90 cps, the new K eff will be: | Question A.009 [1.0 point] {9.0} The initial conditions for a reactor startup are count rate = 45 cps and K eff = 0.980. When the count rate reaches 90 cps, the new K eff will be: | ||
: a. 0.986. b. 0.988 | : a. 0.986. b. 0.988 | ||
: c. 0.990. d. 0.992 | : c. 0.990. d. 0.992 | ||
| Line 186: | Line 186: | ||
DOE Fundamentals Handbook, Volume 2, Module 4, Enabling Objective 1.3. | DOE Fundamentals Handbook, Volume 2, Module 4, Enabling Objective 1.3. | ||
Section A - Reacto r Theory, ThermodynamicsandFacilityOperating Characteristics Question A.010 [1.0 point] {10.0} By definition, you may make an exactly critical reactor PROMPT CRITICAL by adding positive reactivity equal to - | Section A - Reacto r Theory, ThermodynamicsandFacilityOperating Characteristics Question A.010 [1.0 point] {10.0} By definition, you may make an exactly critical reactor PROMPT CRITICAL by adding positive reactivity equal to - | ||
: a. the shutdown margin b. the Kexcess margin c. the eff value d. 1.0 %K/K Answer: A.10 c. | : a. the shutdown margin b. the Kexcess margin c. the eff value d. 1.0 %K/K Answer: A.10 c. | ||
| Line 192: | Line 192: | ||
DOE Fundamentals Handbook, Volume 2, Module 4, Enabling Objective 2.8. Exam 7 | DOE Fundamentals Handbook, Volume 2, Module 4, Enabling Objective 2.8. Exam 7 | ||
Question A.011 [1.0 point] {11.0} Which one of the following statements correctly describes the property of a GOOD MODERATOR? | Question A.011 [1.0 point] {11.0} Which one of the following statements correctly describes the property of a GOOD MODERATOR? | ||
: a. It slows down fast neutrons to thermal energy levels via a large number of collisions. b. It reduces gamma radiation to thermal ener gy levels via a small number of collisions. c. It slows down fast neutrons to thermal energy levels via a small number of collisions. d. It reduces gamma radiation to thermal energy levels via a large number of collisions. | : a. It slows down fast neutrons to thermal energy levels via a large number of collisions. b. It reduces gamma radiation to thermal ener gy levels via a small number of collisions. c. It slows down fast neutrons to thermal energy levels via a small number of collisions. d. It reduces gamma radiation to thermal energy levels via a large number of collisions. | ||
| Line 201: | Line 201: | ||
Question A.012 [1.0 point] {12.0} | Question A.012 [1.0 point] {12.0} | ||
Which of the following factors has the LEAST effect on rod worth? a. number and location of adjacent rods. b. temperature of the moderator. | Which of the following factors has the LEAST effect on rod worth? a. number and location of adjacent rods. b. temperature of the moderator. | ||
: c. temperature of the fuel. d. core age. | : c. temperature of the fuel. d. core age. | ||
| Line 209: | Line 209: | ||
Standard NRC Question | Standard NRC Question | ||
Section A - Reacto r Theory, ThermodynamicsandFacilityOperating Characteristics Question A.013 [1.0 point] {13.0} Reactor power is increasing by a factor of 10 every minute. The reactor period is: a. 65 seconds. b. 52 seconds. | Section A - Reacto r Theory, ThermodynamicsandFacilityOperating Characteristics Question A.013 [1.0 point] {13.0} Reactor power is increasing by a factor of 10 every minute. The reactor period is: a. 65 seconds. b. 52 seconds. | ||
: c. 26 seconds. d. 13 seconds. | : c. 26 seconds. d. 13 seconds. | ||
| Line 218: | Line 218: | ||
P = P 0 e t/ = 60/ln(10) = 26.06 | P = P 0 e t/ = 60/ln(10) = 26.06 | ||
Question A.014 [1.0 point] {14.0} While the reactor is shutdown you place an experiment into the glory hole to determine its worth. The reactor is shutdown by 2% K/K. Before insertion of the experiment, Channel #1 reads 70 cps. After insertion of the experiment, Channel #1 reads 35 cps. What is the worth of the experiment? | Question A.014 [1.0 point] {14.0} While the reactor is shutdown you place an experiment into the glory hole to determine its worth. The reactor is shutdown by 2% K/K. Before insertion of the experiment, Channel #1 reads 70 cps. After insertion of the experiment, Channel #1 reads 35 cps. What is the worth of the experiment? | ||
: a. -2.1% K/K b. -1.05% K/K c. -0.21% K/K d. -0.105% K/K Answer: A.14 a. | : a. -2.1% K/K b. -1.05% K/K c. -0.21% K/K d. -0.105% K/K Answer: A.14 a. | ||
| Line 226: | Line 226: | ||
= 0.02081 | = 0.02081 | ||
Section A - Reacto r Theory, ThermodynamicsandFacilityOperating Characteristics Question A.015 [1.0 point] {15.0} A reactor has a shutdown margin of 0.0526 K/K. Adding a reactor experiment increases the indicated count rate from 10 cps to 20 cps. Which one of the following is the new K eff of the reactor? | Section A - Reacto r Theory, ThermodynamicsandFacilityOperating Characteristics Question A.015 [1.0 point] {15.0} A reactor has a shutdown margin of 0.0526 K/K. Adding a reactor experiment increases the indicated count rate from 10 cps to 20 cps. Which one of the following is the new K eff of the reactor? | ||
: a. 0.53 b. 0.90 | : a. 0.53 b. 0.90 | ||
: c. 0.975 d. 1.001 Answer: A.15 c. | : c. 0.975 d. 1.001 Answer: A.15 c. | ||
| Line 233: | Line 233: | ||
DOE Fundamentals Handbook, Nuclear Physics and Reactor Theory Volume 2, Module 4, Enabling Objective 3.6, p. 28. SDM = 1-K eff/K eff Keff = 1/SDM + 1 K eff = 1/0.0526 + 1 K eff = .95 CR 1/CR 2 = (1 - K eff2) / (1 - K eff1) 10/20 = (1 - K eff2) / (1 - 0.95) (0.5) x (0.05) = (1 - K eff2) K eff2 = 1 - (0.5)(0.05) = 0.975 | DOE Fundamentals Handbook, Nuclear Physics and Reactor Theory Volume 2, Module 4, Enabling Objective 3.6, p. 28. SDM = 1-K eff/K eff Keff = 1/SDM + 1 K eff = 1/0.0526 + 1 K eff = .95 CR 1/CR 2 = (1 - K eff2) / (1 - K eff1) 10/20 = (1 - K eff2) / (1 - 0.95) (0.5) x (0.05) = (1 - K eff2) K eff2 = 1 - (0.5)(0.05) = 0.975 | ||
Question A.016 [1.0 point] {16.0} Which ONE of the following causes reactor period to stabilize shortly after a reactor scram from full power? Assume normal system/component operation and no maintenance activity. | Question A.016 [1.0 point] {16.0} Which ONE of the following causes reactor period to stabilize shortly after a reactor scram from full power? Assume normal system/component operation and no maintenance activity. | ||
: a. Xenon removal by decay at a constant rate. b. Longest lived delayed neutron precursor. | : a. Xenon removal by decay at a constant rate. b. Longest lived delayed neutron precursor. | ||
: c. Decay of compensating voltage at low power levels. d. Power level dropping below the minimum detectable level. | : c. Decay of compensating voltage at low power levels. d. Power level dropping below the minimum detectable level. | ||
| Line 242: | Line 242: | ||
Nuclear Reactor Theory, LaMarsh | Nuclear Reactor Theory, LaMarsh | ||
Question A.017 [1.0 point] {17.0} A reactor is operating at criticality. Instantaneously, all of the delayed neutrons are suddenly removed from the reactor. The K eff of the reactor in this state would be approximately: | Question A.017 [1.0 point] {17.0} A reactor is operating at criticality. Instantaneously, all of the delayed neutrons are suddenly removed from the reactor. The K eff of the reactor in this state would be approximately: | ||
: a. 1.007 b. 1.000 c. 0.993 d. 0.000 | : a. 1.007 b. 1.000 c. 0.993 d. 0.000 | ||
| Line 250: | Line 250: | ||
DOE Fundamentals Handbook, Module 2, page 30. | DOE Fundamentals Handbook, Module 2, page 30. | ||
Section A - Reacto r Theory, ThermodynamicsandFacilityOperating Characteristics Question A.018 [1.0 points 0.25 each] {18.0} Using the drawing of the Integral Rod Worth Curve provided, identify each of the following reactivity worth's. | Section A - Reacto r Theory, ThermodynamicsandFacilityOperating Characteristics Question A.018 [1.0 points 0.25 each] {18.0} Using the drawing of the Integral Rod Worth Curve provided, identify each of the following reactivity worth's. | ||
: a. Total Rod Worth 1. B - A b. Actual Shutdown Margin 2. C - A | : a. Total Rod Worth 1. B - A b. Actual Shutdown Margin 2. C - A | ||
: c. Technical Specification Shutdown Margin Limit 3. C - B d. Excess Reactivity 4. D - C 5. E - C | : c. Technical Specification Shutdown Margin Limit 3. C - B d. Excess Reactivity 4. D - C 5. E - C | ||
: 6. E - D 7. E - A | : 6. E - D 7. E - A | ||
| Line 260: | Line 260: | ||
Standard NRC Question | Standard NRC Question | ||
END OF SECTION A Critical Rod HeightRod fully outIntegral RodWorth Curve H C HCMax A BWorth of Most Reactive Control ElementWorth of Most Reactive Control Element D C E Section B. - Normal & EmergOperatingProcedures&Radiological Controls Question B.001 [1.0 point, 0.25 each] {1.0} Identify each of the following values as either a Safety Limit (SL), a Limited Safety Setting (LSSS) or a Limiting Condition for Operation (LCO). | END OF SECTION A Critical Rod HeightRod fully outIntegral RodWorth Curve H C HCMax A BWorth of Most Reactive Control ElementWorth of Most Reactive Control Element D C E Section B. - Normal & EmergOperatingProcedures&Radiological Controls Question B.001 [1.0 point, 0.25 each] {1.0} Identify each of the following values as either a Safety Limit (SL), a Limited Safety Setting (LSSS) or a Limiting Condition for Operation (LCO). | ||
: a. Power 100 watts b. Temperature 120 °C c. Excess Reactivity 0.65% k/k (corrected to 20 °C) d. Safety Rod with a reactivity addition rate of 0.065% k/k. Answer: B.01 a. = SL; b. = LSSS; c. = LCO; d. = LCO | : a. Power 100 watts b. Temperature 120 °C c. Excess Reactivity 0.65% k/k (corrected to 20 °C) d. Safety Rod with a reactivity addition rate of 0.065% k/k. Answer: B.01 a. = SL; b. = LSSS; c. = LCO; d. = LCO | ||
| Line 267: | Line 267: | ||
ISU TS §§ 2.1, 2.2 and 3.0 | ISU TS §§ 2.1, 2.2 and 3.0 | ||
Question B.002 [1 point] {2.0} In accordance with Emergency procedures, in the event of a fire, which ONE of the following actions should the reactor operator perform immediately after securing the reactor? | Question B.002 [1 point] {2.0} In accordance with Emergency procedures, in the event of a fire, which ONE of the following actions should the reactor operator perform immediately after securing the reactor? | ||
: a. Notify the Pocatello Police Department. b. Notify the U.S. NRC Operations Center. | : a. Notify the Pocatello Police Department. b. Notify the U.S. NRC Operations Center. | ||
: c. Initiate a building evacuation. d. Notify the Reactor Supervisor. | : c. Initiate a building evacuation. d. Notify the Reactor Supervisor. | ||
| Line 276: | Line 276: | ||
Emergency Plan, Section 4, "Fire or Explosion" | Emergency Plan, Section 4, "Fire or Explosion" | ||
Question B.003 [1 point] {3.0} Temporary procedures which do NOT change the intent of the original procedure or involve an unreviewed safety question may be approved as a MINIMUM by the: | Question B.003 [1 point] {3.0} Temporary procedures which do NOT change the intent of the original procedure or involve an unreviewed safety question may be approved as a MINIMUM by the: | ||
: a. Reactor Operator. b. Reactor Supervisor. c. Reactor Safety Committee. d. Dean of the College of Engineering. | : a. Reactor Operator. b. Reactor Supervisor. c. Reactor Safety Committee. d. Dean of the College of Engineering. | ||
| Line 285: | Line 285: | ||
Section B. - Normal & EmergOperatingProcedures&Radiological Controls Question B.004 [1 point] {4.0} | Section B. - Normal & EmergOperatingProcedures&Radiological Controls Question B.004 [1 point] {4.0} | ||
A reactor sample has a disintegration rate of 2 X 10 12 disintegrations per second and emits a 0.6 Mev . The expected dose rate from this sample at a distance of 10 feet would be approximately: (Assume a point source) | A reactor sample has a disintegration rate of 2 X 10 12 disintegrations per second and emits a 0.6 Mev . The expected dose rate from this sample at a distance of 10 feet would be approximately: (Assume a point source) | ||
: a. 100 mR/hr b. 325 mR/hr c. 2 R/hr d. 7.5 R/hr Answer: B.04 c. | : a. 100 mR/hr b. 325 mR/hr c. 2 R/hr d. 7.5 R/hr Answer: B.04 c. | ||
| Line 291: | Line 291: | ||
Glasstone & Sesonke, Sect 9.41, p 525. DR = 6CE/f*2 R/hr, =6(2 X 10*12/3.7X10*10)(0.6)/10*2, =1.9459 R/hr | Glasstone & Sesonke, Sect 9.41, p 525. DR = 6CE/f*2 R/hr, =6(2 X 10*12/3.7X10*10)(0.6)/10*2, =1.9459 R/hr | ||
Question B.005 [1.0 point] {5.0} You performed a startup this morning with the pneumatic tube terminus and no experiment in the reactor. After shutting down, one hour later, you removed the tube. No other changes were made to the reactor. During a new startup the new core excess will be - | Question B.005 [1.0 point] {5.0} You performed a startup this morning with the pneumatic tube terminus and no experiment in the reactor. After shutting down, one hour later, you removed the tube. No other changes were made to the reactor. During a new startup the new core excess will be - | ||
: a. larger than the previous startup. b. smaller than the previous startup. c. the same as the previous startup. d. dependent on the time of shutdown. | : a. larger than the previous startup. b. smaller than the previous startup. c. the same as the previous startup. d. dependent on the time of shutdown. | ||
| Line 299: | Line 299: | ||
ISU Experimental Plan No. 19 Sample Transfer by Pneumatic Tube, Safety Analysis p. 3 | ISU Experimental Plan No. 19 Sample Transfer by Pneumatic Tube, Safety Analysis p. 3 | ||
Question B.006 [1 point] {6.0} The shutdown margin, required by Technical Specifications, with the most reactive safety or control rod fully inserted and the fine control rod fully inserted shall be at least: | Question B.006 [1 point] {6.0} The shutdown margin, required by Technical Specifications, with the most reactive safety or control rod fully inserted and the fine control rod fully inserted shall be at least: | ||
: a. 0.29 % k/k b. 0.65 % k/k c. 1.00 % k/k d. 1.25 % k/k Answer: B.06 c. | : a. 0.29 % k/k b. 0.65 % k/k c. 1.00 % k/k d. 1.25 % k/k Answer: B.06 c. | ||
| Line 305: | Line 305: | ||
ISU Technical Specifications, 3.1.b, page 8. | ISU Technical Specifications, 3.1.b, page 8. | ||
Section B. - Normal & EmergOperatingProcedures&Radiological Controls Question B.007 [1.0 point] {7.0} You have evacuated the EPZ. Which ONE of the following ISU staff positions is responsible (by title) for authorizing reentry? | Section B. - Normal & EmergOperatingProcedures&Radiological Controls Question B.007 [1.0 point] {7.0} You have evacuated the EPZ. Which ONE of the following ISU staff positions is responsible (by title) for authorizing reentry? | ||
: a. The Senior Reactor Operator b. The Reactor Supervisor | : a. The Senior Reactor Operator b. The Reactor Supervisor | ||
: c. The Director of Emergency Operations | : c. The Director of Emergency Operations | ||
: d. The ISU Radiation Safety Officer Answer: B.07 c. | : d. The ISU Radiation Safety Officer Answer: B.07 c. | ||
==Reference:== | ==Reference:== | ||
Emergency Plan, Nuclear Emergency p. 13. | Emergency Plan, Nuclear Emergency p. 13. | ||
Question B.008 [1 point] {8.0] The reason for allowing only one control rod at a time to be removed and disassembled during control rod maintenance is to: | Question B.008 [1 point] {8.0] The reason for allowing only one control rod at a time to be removed and disassembled during control rod maintenance is to: | ||
: a. prevent inadvertent reactor criticality. b. limit the radiation exposure to personnel. | : a. prevent inadvertent reactor criticality. b. limit the radiation exposure to personnel. | ||
: c. prevent the inadvertent interchange of parts. d. limit the number of maintenance operations being performed concurrently. | : c. prevent the inadvertent interchange of parts. d. limit the number of maintenance operations being performed concurrently. | ||
| Line 322: | Line 322: | ||
-201 ROD MAINTENA NCE PROCEDURE) | -201 ROD MAINTENA NCE PROCEDURE) | ||
Question B.009 [1 point] {9.0} The Technical Specification basis for the MAXIMUM core temperature limit is to prevent: | Question B.009 [1 point] {9.0} The Technical Specification basis for the MAXIMUM core temperature limit is to prevent: | ||
: a. breakdown of the graphite reflector. b. instrument inaccuracies. c. release of fission products. d. boiling of the shield water. | : a. breakdown of the graphite reflector. b. instrument inaccuracies. c. release of fission products. d. boiling of the shield water. | ||
| Line 335: | Line 335: | ||
Emergency Plan, 2.0 DEFINITIONS, 2.8 | Emergency Plan, 2.0 DEFINITIONS, 2.8 | ||
Section B. - Normal & EmergOperatingProcedures&Radiological Controls Question B.011 [1.0 point] {11.0} The dose rate from a mixed beta-gamma point source is 100 mrem/hour at a distance of one (1) foot, and is 0.1 mrem/hour at a distance of twenty (20) feet. At one (1) foot what percentage of the source consists of beta radiation? | Section B. - Normal & EmergOperatingProcedures&Radiological Controls Question B.011 [1.0 point] {11.0} The dose rate from a mixed beta-gamma point source is 100 mrem/hour at a distance of one (1) foot, and is 0.1 mrem/hour at a distance of twenty (20) feet. At one (1) foot what percentage of the source consists of beta radiation? | ||
: a. 20% b. 40% | : a. 20% b. 40% | ||
: c. 60% d. 80% | : c. 60% d. 80% | ||
Answer: B.11 c | Answer: B.11 c | ||
| Line 343: | Line 343: | ||
10CFR20. At 20 feet, there is no beta radiation. Gamma at 20 feet = 0.1 mrem/hour, gamma at 1 foot = 40 mrem/hour. Therefore beta at 1 foot = 60 mrem/hour = 60%. | 10CFR20. At 20 feet, there is no beta radiation. Gamma at 20 feet = 0.1 mrem/hour, gamma at 1 foot = 40 mrem/hour. Therefore beta at 1 foot = 60 mrem/hour = 60%. | ||
Question B.012 [1 point] (12.0) The total scram withdrawal time of the coarse control rod and the safety rods must be less than: | Question B.012 [1 point] (12.0) The total scram withdrawal time of the coarse control rod and the safety rods must be less than: | ||
: a. 200 milliseconds. b. 500 milliseconds. c. 800 milliseconds. d. 1000 milliseconds. | : a. 200 milliseconds. b. 500 milliseconds. c. 800 milliseconds. d. 1000 milliseconds. | ||
| Line 351: | Line 351: | ||
ISU Technical Specification 3.2.a | ISU Technical Specification 3.2.a | ||
Question B.013 [1 point] (13.0) To prevent damage to the reactor or excessive release of radioactive materials in the event of an experiment failure, experiments containing corrosive materials shall: | Question B.013 [1 point] (13.0) To prevent damage to the reactor or excessive release of radioactive materials in the event of an experiment failure, experiments containing corrosive materials shall: | ||
: a. be doubly encapsulated. b. be limited to less than 10 grams. | : a. be doubly encapsulated. b. be limited to less than 10 grams. | ||
: c. not be inserted into the reactor or stored at the facility. | : c. not be inserted into the reactor or stored at the facility. | ||
: d. have a TEDE of less than 500 mrem over two hours from the beginning of the release. | : d. have a TEDE of less than 500 mrem over two hours from the beginning of the release. | ||
Answer: B.13 a. | Answer: B.13 a. | ||
| Line 360: | Line 360: | ||
ISU Technical Specifications, 3.3.a, page 11 | ISU Technical Specifications, 3.3.a, page 11 | ||
Section B. - Normal & EmergOperatingProcedures&Radiological Controls Question B.014 [1.0 point] {14.0} A radiation survey of an area reveals a general radiation reading of 1 mRem/hr. However, a small section of pipe (point source) reads 10 mRem/hr at one (1) meter. Which ONE of the following is the posting requirement for the area, in accordance with 10 CFR Part 20? | Section B. - Normal & EmergOperatingProcedures&Radiological Controls Question B.014 [1.0 point] {14.0} A radiation survey of an area reveals a general radiation reading of 1 mRem/hr. However, a small section of pipe (point source) reads 10 mRem/hr at one (1) meter. Which ONE of the following is the posting requirement for the area, in accordance with 10 CFR Part 20? | ||
: a. "CAUTION - RADIATION AREA" | : a. "CAUTION - RADIATION AREA" | ||
: b. "CAUTION - HIGH RADIATION AREA" | : b. "CAUTION - HIGH RADIATION AREA" | ||
| Line 371: | Line 371: | ||
10 CFR 20.1003 For a point source, 10 mrem/hr at 100 cm (1 meter) = 111.1 mrem/hr at 30 cm. | 10 CFR 20.1003 For a point source, 10 mrem/hr at 100 cm (1 meter) = 111.1 mrem/hr at 30 cm. | ||
Question B.015 [1.0 point] {15.0} As a licensed reactor operator at the AGN-201 facility, who is allowed to operate the controls of the reactor under your direction? | Question B.015 [1.0 point] {15.0} As a licensed reactor operator at the AGN-201 facility, who is allowed to operate the controls of the reactor under your direction? | ||
: a. A local college newspaper reporter who wants to write a story on the safety of nuclear reactors. | : a. A local college newspaper reporter who wants to write a story on the safety of nuclear reactors. | ||
: b. A new student participating in a nuclear engineering laboratory course. | : b. A new student participating in a nuclear engineering laboratory course. | ||
: c. A health physicist who is trying to gain a certified health physicist (CHP) license. | : c. A health physicist who is trying to gain a certified health physicist (CHP) license. | ||
: d. An NRC inspector trying to make sure that all set points of the reactor are the same as those in the technical specifications. | : d. An NRC inspector trying to make sure that all set points of the reactor are the same as those in the technical specifications. | ||
Answer: B.15 b. | Answer: B.15 b. | ||
| Line 388: | Line 388: | ||
END OF SECTION B | END OF SECTION B | ||
Section C | Section C | ||
- FacilityandRadiationMonitoringSystems Question C.001 [1 point] {1.0} The shield tank level trip shall be set to scram the reactor if shield water level falls ____ below the highest point on the reactor shield tank manhole opening. | - FacilityandRadiationMonitoringSystems Question C.001 [1 point] {1.0} The shield tank level trip shall be set to scram the reactor if shield water level falls ____ below the highest point on the reactor shield tank manhole opening. | ||
: a. 8 inches b. 10 inches | : a. 8 inches b. 10 inches | ||
: c. 12 inches | : c. 12 inches | ||
: d. 20 inches Answer: C.01 b. | : d. 20 inches Answer: C.01 b. | ||
| Line 403: | Line 403: | ||
ISU General Information, AGN - 201 Reactor, Access Ports & Glory Hole. | ISU General Information, AGN - 201 Reactor, Access Ports & Glory Hole. | ||
Question C.003 [1.0 point] {3.0} When using the movable tank on the top of the reactor as a Thermal Neutron column, it is filled with - | Question C.003 [1.0 point] {3.0} When using the movable tank on the top of the reactor as a Thermal Neutron column, it is filled with - | ||
: a. Water b. Beryllium | : a. Water b. Beryllium | ||
: c. Graphite d. Heavy Water | : c. Graphite d. Heavy Water | ||
| Line 413: | Line 413: | ||
Section C | Section C | ||
- FacilityandRadiationMonitoringSystems Question C.004 [1 point] {4.0} The shield tank water temperature interlock prevents reactor operation: a. during periods of high thermal stress. b. in the event of a high temperature condition. | - FacilityandRadiationMonitoringSystems Question C.004 [1 point] {4.0} The shield tank water temperature interlock prevents reactor operation: a. during periods of high thermal stress. b. in the event of a high temperature condition. | ||
: c. during a condition that will produce excess radiation levels. d. from a reactivity addition due to a temperature decrease. | : c. during a condition that will produce excess radiation levels. d. from a reactivity addition due to a temperature decrease. | ||
| Line 420: | Line 420: | ||
==Reference:== | ==Reference:== | ||
ISU Tech. Spec's., 3.2 Basis, page 10. | ISU Tech. Spec's., 3.2 Basis, page 10. | ||
Question C.005 [1 point] {5.0} The U-235 fuel in the AGN is contained in fuel disks and control rods. Of the total fuel in the reactor, approximately how much is contained in the control and safety rods? | Question C.005 [1 point] {5.0} The U-235 fuel in the AGN is contained in fuel disks and control rods. Of the total fuel in the reactor, approximately how much is contained in the control and safety rods? | ||
: a. 9%. b. 24%. c. 55% d. 78%. | : a. 9%. b. 24%. c. 55% d. 78%. | ||
Answer: C.05 a. | Answer: C.05 a. | ||
| Line 427: | Line 427: | ||
Safety Analysis Report, dated November 23, 1995, pg. 46-47 | Safety Analysis Report, dated November 23, 1995, pg. 46-47 | ||
Question C.006 [1 point] {6.0} Which ONE of the following trips/conditions is associated with the safety chassis interlock bus? a. period trip. | Question C.006 [1 point] {6.0} Which ONE of the following trips/conditions is associated with the safety chassis interlock bus? a. period trip. | ||
: b. water level. | : b. water level. | ||
: c. manual scram. d. low sensitrol temperature. | : c. manual scram. d. low sensitrol temperature. | ||
| Line 437: | Line 437: | ||
Section C | Section C | ||
- FacilityandRadiationMonitoringSystems Question C.007 [1 point] {7.0} Which ONE of the following describes the design purpose of the space in the top section of the core tank above the reactor core and the reflector? | - FacilityandRadiationMonitoringSystems Question C.007 [1 point] {7.0} Which ONE of the following describes the design purpose of the space in the top section of the core tank above the reactor core and the reflector? | ||
: a. Ensures free fall of the bottom half of the core during the most severe transient. b. Prevents core damage during the design basis earthquake and 6 cm. displacements. | : a. Ensures free fall of the bottom half of the core during the most severe transient. b. Prevents core damage during the design basis earthquake and 6 cm. displacements. | ||
: c. Allows for accumulation of fission product gases created during reactor operation. | : c. Allows for accumulation of fission product gases created during reactor operation. | ||
: d. Increases the fast neutron population in the vicinity of experiments placed in the access ports. | : d. Increases the fast neutron population in the vicinity of experiments placed in the access ports. | ||
Answer; C.07 c. | Answer; C.07 c. | ||
| Line 446: | Line 446: | ||
Safety Analysis Report, dated November 23, 1995, pg. 41 | Safety Analysis Report, dated November 23, 1995, pg. 41 | ||
Question C.008 [1 point] {8.0} Which ONE of the following is NOT true when considering the advantages of using fueled control rods over poison rods: | Question C.008 [1 point] {8.0} Which ONE of the following is NOT true when considering the advantages of using fueled control rods over poison rods: | ||
: a. larger reactor size. b. more symmetrical flux distribution at power. c. no critical mass assembled when shutdown. d. simplification of calculations for a homogeneous reactor. | : a. larger reactor size. b. more symmetrical flux distribution at power. c. no critical mass assembled when shutdown. d. simplification of calculations for a homogeneous reactor. | ||
| Line 454: | Line 454: | ||
Previous ISU Exam | Previous ISU Exam | ||
Question C.009 [1 point] {9.0} The shield tank is designed to provide shielding from: a. the glory hole area. | Question C.009 [1 point] {9.0} The shield tank is designed to provide shielding from: a. the glory hole area. | ||
: b. high energy radiation. c. high energy radiation. d. fast neutron radiation. | : b. high energy radiation. c. high energy radiation. d. fast neutron radiation. | ||
| Line 463: | Line 463: | ||
Section C | Section C | ||
- FacilityandRadiationMonitoringSystems Question C.010 [1 point] {10.0} Which one of the following materials will have a positive effect on reactivity when inserted into the Glory Hole? | - FacilityandRadiationMonitoringSystems Question C.010 [1 point] {10.0} Which one of the following materials will have a positive effect on reactivity when inserted into the Glory Hole? | ||
: a. Borated Polyethylene b. Polyethylene | : a. Borated Polyethylene b. Polyethylene | ||
: c. Natural Uranium | : c. Natural Uranium | ||
: d. Gold Answer: C.10 b. | : d. Gold Answer: C.10 b. | ||
| Line 478: | Line 478: | ||
ISU SAR Section 4.3.2 Instrumentation System, Figure 4.3-8 | ISU SAR Section 4.3.2 Instrumentation System, Figure 4.3-8 | ||
Question C.012 [1 point] {12.0} Which ONE of the following statements describes the design/operation of the control rod drive assemblies? | Question C.012 [1 point] {12.0} Which ONE of the following statements describes the design/operation of the control rod drive assemblies? | ||
: a. The dashpots consist of a foam cushion to reduce rod impact following a scram. b. The fine control rod does not have a dashpot since it does not scram. c. The course control rod dashpot uses magnetic force to slow the rod down before impact on a scram. d. Dashpots are only associated with the safety rods since these rods have been raised against spring tension to assist in driving these rods down on a scram. | : a. The dashpots consist of a foam cushion to reduce rod impact following a scram. b. The fine control rod does not have a dashpot since it does not scram. c. The course control rod dashpot uses magnetic force to slow the rod down before impact on a scram. d. Dashpots are only associated with the safety rods since these rods have been raised against spring tension to assist in driving these rods down on a scram. | ||
| Line 487: | Line 487: | ||
Section C | Section C | ||
- FacilityandRadiationMonitoringSystems Question C.013 [1 point] {13.0} Which ONE of the following does NOT automatically cause a reactor scram? a. Reactor period. b. Radiation level. | - FacilityandRadiationMonitoringSystems Question C.013 [1 point] {13.0} Which ONE of the following does NOT automatically cause a reactor scram? a. Reactor period. b. Radiation level. | ||
: c. Water level. d. Power failure. | : c. Water level. d. Power failure. | ||
| Line 495: | Line 495: | ||
ISU Safety Analysis Report, dated January 2003, Instrument Sys. 4.3.2 | ISU Safety Analysis Report, dated January 2003, Instrument Sys. 4.3.2 | ||
Question C.014 [1 point] {14.0} What type of detector is used for the Low temperature switch? a. A simple bi-metallic thermal switch | Question C.014 [1 point] {14.0} What type of detector is used for the Low temperature switch? a. A simple bi-metallic thermal switch | ||
: b. A precision platinum wound resistance temperature detector (RTD) c. A chromel-alumel (Type K) thermocouple. d. A copper-constantan (Type T) thermocouple Answer: C.14 a. | : b. A precision platinum wound resistance temperature detector (RTD) c. A chromel-alumel (Type K) thermocouple. d. A copper-constantan (Type T) thermocouple Answer: C.14 a. | ||
| Line 560: | Line 560: | ||
==SUMMARY== | ==SUMMARY== | ||
: During the week of May 9, 2016, the NRC administered operator licensing examinations to one Senior Reactor Operator Upgrade (SROU), one Senior Operator Instant SROI and four Reactor Operator candidates. One of the Reactor Operator candidates failed one section of the written examination. All other candidates passed the examinations and will be issued a license to operate the Idaho State University reactor. | : During the week of May 9, 2016, the NRC administered operator licensing examinations to one Senior Reactor Operator Upgrade (SROU), one Senior Operator Instant SROI and four Reactor Operator candidates. One of the Reactor Operator candidates failed one section of the written examination. All other candidates passed the examinations and will be issued a license to operate the Idaho State University reactor. | ||
REPORT DETAILS 1. Examiner: Phillip T. Young, Chief Examiner | REPORT DETAILS 1. Examiner: Phillip T. Young, Chief Examiner | ||
: 2. Results: | : 2. Results: | ||
RO PASS/FAIL SRO PASS/FAIL TOTAL PASS/FAIL Written 3/1 1/0 4/1 Operating Tests 4/0 2/0 6/0 Overall 3/1 2/0 5/1 3. Exit Meeting: | RO PASS/FAIL SRO PASS/FAIL TOTAL PASS/FAIL Written 3/1 1/0 4/1 Operating Tests 4/0 2/0 6/0 Overall 3/1 2/0 5/1 3. Exit Meeting: | ||
| Line 568: | Line 568: | ||
INSTRUCTIONS TO CANDIDATE: Answers are to be written on the answer sheet provided. Attach the answer sheets to the examination. Points for each question are indicated in brackets for each question. A 70% in each section is required to pass the examination. Examinations will be picked up three (3) hours after the examination starts. | INSTRUCTIONS TO CANDIDATE: Answers are to be written on the answer sheet provided. Attach the answer sheets to the examination. Points for each question are indicated in brackets for each question. A 70% in each section is required to pass the examination. Examinations will be picked up three (3) hours after the examination starts. | ||
Category Value % of Total % of Candidates Score Category Value Category 18.00 38.3 A. Reactor Theory, Thermodynamics and Facility Operating Characteristics 16.00 15.00 33.3 31.9 B. Normal and Emergency Operating Procedures and Radiological Controls 14.00 29.2 29.8 C. Facility and Radiation Monitoring Systems 48.00 47.00 100.0 TOTALS All work done on this examination is my own. I have neither given nor received aid. | Category Value % of Total % of Candidates Score Category Value Category 18.00 38.3 A. Reactor Theory, Thermodynamics and Facility Operating Characteristics 16.00 15.00 33.3 31.9 B. Normal and Emergency Operating Procedures and Radiological Controls 14.00 29.2 29.8 C. Facility and Radiation Monitoring Systems 48.00 47.00 100.0 TOTALS All work done on this examination is my own. I have neither given nor received aid. | ||
Candidate's Signature NRC RULES AND GUIDELINES FOR LICENSE EXAMINATIONS During the administration of this examination the following rules apply: | Candidate's Signature NRC RULES AND GUIDELINES FOR LICENSE EXAMINATIONS During the administration of this examination the following rules apply: | ||
: 1. Cheating on the examination means an automatic denial of your application and could result in more severe penalties. | : 1. Cheating on the examination means an automatic denial of your application and could result in more severe penalties. | ||
: 2. After the examination has been completed, you must sign the statement on the cover sheet indicating that the work is your own and you have neither received nor given assistance in completing the examination. This must be done after you complete the examination. | : 2. After the examination has been completed, you must sign the statement on the cover sheet indicating that the work is your own and you have neither received nor given assistance in completing the examination. This must be done after you complete the examination. | ||
: 3. Restroom trips are to be limited and only one candidate at a time may leave. You must avoid all contacts with anyone outside the examination room to avoid even the appearance or possibility of cheating. | : 3. Restroom trips are to be limited and only one candidate at a time may leave. You must avoid all contacts with anyone outside the examination room to avoid even the appearance or possibility of cheating. | ||
: 4. Use black ink or dark pencil only to facilitate legible reproductions. | : 4. Use black ink or dark pencil only to facilitate legible reproductions. | ||
: 5. Print your name in the blank provided in the upper right-hand corner of the examination cover sheet and each answer sheet. | : 5. Print your name in the blank provided in the upper right-hand corner of the examination cover sheet and each answer sheet. | ||
: 6. Mark your answers on the answer sheet provided. USE ONLY THE PAPER PROVIDED AND DO NOT WRITE ON THE BACK SIDE OF THE PAGE. | : 6. Mark your answers on the answer sheet provided. USE ONLY THE PAPER PROVIDED AND DO NOT WRITE ON THE BACK SIDE OF THE PAGE. | ||
: 7. The point value for each question is indicated in [brackets] after the question. | : 7. The point value for each question is indicated in [brackets] after the question. | ||
: 8. If the intent of a question is unclear, ask questions of the examiner only. | : 8. If the intent of a question is unclear, ask questions of the examiner only. | ||
: 9. When turning in your examination, assemble the completed examination with examination questions, examination aids and answer sheets. In addition turn in all scrap paper. | : 9. When turning in your examination, assemble the completed examination with examination questions, examination aids and answer sheets. In addition turn in all scrap paper. | ||
: 10. Ensure all information you wish to have evaluated as part of your answer is on your answer sheet. Scrap paper will be disposed of immediately following the examination. | : 10. Ensure all information you wish to have evaluated as part of your answer is on your answer sheet. Scrap paper will be disposed of immediately following the examination. | ||
: 11. To pass the examination you must achieve a grade of 70 percent or greater in each category. | : 11. To pass the examination you must achieve a grade of 70 percent or greater in each category. | ||
: 12. There is a time limit of three (3) hours for completion of the examination. | : 12. There is a time limit of three (3) hours for completion of the examination. | ||
: 13. When you have completed and turned in you examination, leave the examination area. If you are observed in this area while the examination is still in progress, your license may be denied or revoked. | : 13. When you have completed and turned in you examination, leave the examination area. If you are observed in this area while the examination is still in progress, your license may be denied or revoked. | ||
| Line 588: | Line 588: | ||
* eff*- + = K 1)-K ( = eff eff K x k K - K = eff eff eff eff 2 1 1 2 0.693 = T e DR= DR t-0 R 6CiE(n) = DR 2 d DR = d DR 2 2 2 1 2 1 Section A - Reacto r Theory, ThermodynamicsandFacilityOperating Characteristics NegativePoint B PointAPositive Question A.001 [1.00 point] {1.0} Which ONE of the following is the reason for operating with thermal neutrons rather than fast | * eff*- + = K 1)-K ( = eff eff K x k K - K = eff eff eff eff 2 1 1 2 0.693 = T e DR= DR t-0 R 6CiE(n) = DR 2 d DR = d DR 2 2 2 1 2 1 Section A - Reacto r Theory, ThermodynamicsandFacilityOperating Characteristics NegativePoint B PointAPositive Question A.001 [1.00 point] {1.0} Which ONE of the following is the reason for operating with thermal neutrons rather than fast | ||
neutrons? | neutrons? | ||
: a. Probability of fission is increased since thermal neutrons are less likely to leak out of the core. | : a. Probability of fission is increased since thermal neutrons are less likely to leak out of the core. | ||
: b. As neutron energy increases, neutron absorption in non-fuel materials increases exponentially. | : b. As neutron energy increases, neutron absorption in non-fuel materials increases exponentially. | ||
: c. The absorption cross-section of U-235 is much higher for thermal neutrons. | : c. The absorption cross-section of U-235 is much higher for thermal neutrons. | ||
: d. The fuel temperature coefficient becomes positive as neutron energy increases. | : d. The fuel temperature coefficient becomes positive as neutron energy increases. | ||
| Line 599: | Line 599: | ||
DOE Fundamentals Handbook, Module 2, page 9. | DOE Fundamentals Handbook, Module 2, page 9. | ||
Question A.002 [1.00 point] {2.0} Two critical reactors at low power are identical except that Reactor 1 has a beta fraction of 0.0072 and Reactor 2 has a beta fraction of 0.0060. An equal amount of positive reactivity is inserted into both reactors. Which ONE of the following will be the response of Reactor 2 compared to Reactor 1? | Question A.002 [1.00 point] {2.0} Two critical reactors at low power are identical except that Reactor 1 has a beta fraction of 0.0072 and Reactor 2 has a beta fraction of 0.0060. An equal amount of positive reactivity is inserted into both reactors. Which ONE of the following will be the response of Reactor 2 compared to Reactor 1? | ||
: a. The resulting power level will be lower. b. The resulting power level will be higher. | : a. The resulting power level will be lower. b. The resulting power level will be higher. | ||
: c. The resulting period will be longer. | : c. The resulting period will be longer. | ||
: d. The resulting period will be shorter. | : d. The resulting period will be shorter. | ||
Answer: A.02 d. | Answer: A.02 d. | ||
| Line 610: | Line 610: | ||
Question A.003 [1.00 point] {3.0} Shown below is a trace of reactor period as a function of time. Between points A and B reactor | Question A.003 [1.00 point] {3.0} Shown below is a trace of reactor period as a function of time. Between points A and B reactor | ||
power is: | power is: | ||
: a. continually increasing. b. continually decreasing. | : a. continually increasing. b. continually decreasing. | ||
: c. increasing, then decreasing. d. constant. | : c. increasing, then decreasing. d. constant. | ||
| Line 619: | Line 619: | ||
Standard NRC Question 1 | Standard NRC Question 1 | ||
Section A - Reacto r Theory, ThermodynamicsandFacilityOperating Characteristics Question A.004 (1.00 point) {4.0} A thin foil target of 10% copper and 90% aluminum is in a thermal neutron beam. Given a Cu = 3.79 barns, a Al = 0.23 barns, s Cu = 7.90 barns, and s Al =1.49 barns, which ONE of the following reactions has the highest probability of occurring? A neutron | Section A - Reacto r Theory, ThermodynamicsandFacilityOperating Characteristics Question A.004 (1.00 point) {4.0} A thin foil target of 10% copper and 90% aluminum is in a thermal neutron beam. Given a Cu = 3.79 barns, a Al = 0.23 barns, s Cu = 7.90 barns, and s Al =1.49 barns, which ONE of the following reactions has the highest probability of occurring? A neutron | ||
: a. scattering reaction with aluminum b. scattering reaction with copper | : a. scattering reaction with aluminum b. scattering reaction with copper | ||
: c. absorption in aluminum d. absorption in copper | : c. absorption in aluminum d. absorption in copper | ||
| Line 628: | Line 628: | ||
DOE Fundamentals Handbook, Nuclear Physics and Reactor Theory, | DOE Fundamentals Handbook, Nuclear Physics and Reactor Theory, | ||
Question A.005 [1 point] {5.0} The neutron microscopic cross-section for absorption, a, generally: a. increases as neutron energy increases. | Question A.005 [1 point] {5.0} The neutron microscopic cross-section for absorption, a, generally: a. increases as neutron energy increases. | ||
: b. decreases as neutron energy increases. c. increases as the mass of the target nucleus increases. d. decreases as the mass of the target nucleus increases. | : b. decreases as neutron energy increases. c. increases as the mass of the target nucleus increases. d. decreases as the mass of the target nucleus increases. | ||
Answer: A.05 b. | Answer: A.05 b. | ||
| Line 635: | Line 635: | ||
DOE Fundamentals Handbook, Volume 1, Module 2, Enabling Objective 2.3. | DOE Fundamentals Handbook, Volume 1, Module 2, Enabling Objective 2.3. | ||
Question: A.006 [1.0 point] {6.0} ELASTIC SCATTERING is the process by which a neutron collides with a nucleus -. | Question: A.006 [1.0 point] {6.0} ELASTIC SCATTERING is the process by which a neutron collides with a nucleus -. | ||
: a. and the nucleus recoil with the same total kinetic energy as the neutron and nucleus had prior to the collision. | : a. and the nucleus recoil with the same total kinetic energy as the neutron and nucleus had prior to the collision. | ||
: b. and the nucleus recoil with less total kinetic energy than the neutron and nucleus had prior to the collision with the nucleus emitting a gamma ray. | : b. and the nucleus recoil with less total kinetic energy than the neutron and nucleus had prior to the collision with the nucleus emitting a gamma ray. | ||
: c. is absorbed, with the nucleus emitting a gamma ray. | : c. is absorbed, with the nucleus emitting a gamma ray. | ||
: d. and the nucleus recoil with a higher total kinetic energy than the neutron and nucleus had prior to the collision with the nucleus emitting a gamma ray. | : d. and the nucleus recoil with a higher total kinetic energy than the neutron and nucleus had prior to the collision with the nucleus emitting a gamma ray. | ||
| Line 646: | Line 646: | ||
DOE Fundamentals Handbook, Nuclear Physics and Reactor Theory, | DOE Fundamentals Handbook, Nuclear Physics and Reactor Theory, | ||
Section A - Reacto r Theory, ThermodynamicsandFacilityOperating Characteristics Question A.007 [1.0 point] {7.0} Which ONE of the following is the major source of energy released during fission? a. Absorption of prompt gamma rays b. Slowing down of fission fragments | Section A - Reacto r Theory, ThermodynamicsandFacilityOperating Characteristics Question A.007 [1.0 point] {7.0} Which ONE of the following is the major source of energy released during fission? a. Absorption of prompt gamma rays b. Slowing down of fission fragments | ||
: c. Neutrino interactions d. Fission neutron scattering | : c. Neutrino interactions d. Fission neutron scattering | ||
| Line 654: | Line 654: | ||
DOE Fundamentals Handbook, Nuclear Physics and Reactor Theory, | DOE Fundamentals Handbook, Nuclear Physics and Reactor Theory, | ||
Question A.008 [1.0 point] {8.0} Which ONE of the following elements will slow down fast neutrons most quickly, i.e. produces the greatest energy loss per collision. | Question A.008 [1.0 point] {8.0} Which ONE of the following elements will slow down fast neutrons most quickly, i.e. produces the greatest energy loss per collision. | ||
: a. Oxygen-16 b. Uranium-238 c. Hydrogen-1 d. Boron-10 | : a. Oxygen-16 b. Uranium-238 c. Hydrogen-1 d. Boron-10 | ||
| Line 662: | Line 662: | ||
DOE Fundamentals Handbook, Volume 1, Module 2, Enabling Objective 2.12. Exam 2 | DOE Fundamentals Handbook, Volume 1, Module 2, Enabling Objective 2.12. Exam 2 | ||
Question A.009 [1.0 point] {9.0} The initial conditions for a reactor startup are count rate = 45 cps and K eff = 0.980. When the count rate reaches 90 cps, the new K eff will be: | Question A.009 [1.0 point] {9.0} The initial conditions for a reactor startup are count rate = 45 cps and K eff = 0.980. When the count rate reaches 90 cps, the new K eff will be: | ||
: a. 0.986. b. 0.988 | : a. 0.986. b. 0.988 | ||
: c. 0.990. d. 0.992 | : c. 0.990. d. 0.992 | ||
| Line 671: | Line 671: | ||
DOE Fundamentals Handbook, Volume 2, Module 4, Enabling Objective 1.3. | DOE Fundamentals Handbook, Volume 2, Module 4, Enabling Objective 1.3. | ||
Section A - Reacto r Theory, ThermodynamicsandFacilityOperating Characteristics Question A.010 [1.0 point] {10.0} By definition, you may make an exactly critical reactor PROMPT CRITICAL by adding positive reactivity equal to - | Section A - Reacto r Theory, ThermodynamicsandFacilityOperating Characteristics Question A.010 [1.0 point] {10.0} By definition, you may make an exactly critical reactor PROMPT CRITICAL by adding positive reactivity equal to - | ||
: a. the shutdown margin b. the Kexcess margin c. the eff value d. 1.0 %K/K Answer: A.10 c. | : a. the shutdown margin b. the Kexcess margin c. the eff value d. 1.0 %K/K Answer: A.10 c. | ||
| Line 677: | Line 677: | ||
DOE Fundamentals Handbook, Volume 2, Module 4, Enabling Objective 2.8. Exam 7 | DOE Fundamentals Handbook, Volume 2, Module 4, Enabling Objective 2.8. Exam 7 | ||
Question A.011 [1.0 point] {11.0} Which one of the following statements correctly describes the property of a GOOD MODERATOR? | Question A.011 [1.0 point] {11.0} Which one of the following statements correctly describes the property of a GOOD MODERATOR? | ||
: a. It slows down fast neutrons to thermal energy levels via a large number of collisions. b. It reduces gamma radiation to thermal ener gy levels via a small number of collisions. c. It slows down fast neutrons to thermal energy levels via a small number of collisions. d. It reduces gamma radiation to thermal energy levels via a large number of collisions. | : a. It slows down fast neutrons to thermal energy levels via a large number of collisions. b. It reduces gamma radiation to thermal ener gy levels via a small number of collisions. c. It slows down fast neutrons to thermal energy levels via a small number of collisions. d. It reduces gamma radiation to thermal energy levels via a large number of collisions. | ||
| Line 686: | Line 686: | ||
Question A.012 [1.0 point] {12.0} | Question A.012 [1.0 point] {12.0} | ||
Which of the following factors has the LEAST effect on rod worth? a. number and location of adjacent rods. b. temperature of the moderator. | Which of the following factors has the LEAST effect on rod worth? a. number and location of adjacent rods. b. temperature of the moderator. | ||
: c. temperature of the fuel. d. core age. | : c. temperature of the fuel. d. core age. | ||
| Line 694: | Line 694: | ||
Standard NRC Question | Standard NRC Question | ||
Section A - Reacto r Theory, ThermodynamicsandFacilityOperating Characteristics Question A.013 [1.0 point] {13.0} Reactor power is increasing by a factor of 10 every minute. The reactor period is: a. 65 seconds. b. 52 seconds. | Section A - Reacto r Theory, ThermodynamicsandFacilityOperating Characteristics Question A.013 [1.0 point] {13.0} Reactor power is increasing by a factor of 10 every minute. The reactor period is: a. 65 seconds. b. 52 seconds. | ||
: c. 26 seconds. d. 13 seconds. | : c. 26 seconds. d. 13 seconds. | ||
| Line 703: | Line 703: | ||
P = P 0 e t/ = 60/ln(10) = 26.06 | P = P 0 e t/ = 60/ln(10) = 26.06 | ||
Question A.014 [1.0 point] {14.0} While the reactor is shutdown you place an experiment into the glory hole to determine its worth. The reactor is shutdown by 2% K/K. Before insertion of the experiment, Channel #1 reads 70 cps. After insertion of the experiment, Channel #1 reads 35 cps. What is the worth of the experiment? | Question A.014 [1.0 point] {14.0} While the reactor is shutdown you place an experiment into the glory hole to determine its worth. The reactor is shutdown by 2% K/K. Before insertion of the experiment, Channel #1 reads 70 cps. After insertion of the experiment, Channel #1 reads 35 cps. What is the worth of the experiment? | ||
: a. -2.1% K/K b. -1.05% K/K c. -0.21% K/K d. -0.105% K/K Answer: A.14 a. | : a. -2.1% K/K b. -1.05% K/K c. -0.21% K/K d. -0.105% K/K Answer: A.14 a. | ||
| Line 711: | Line 711: | ||
= 0.02081 | = 0.02081 | ||
Section A - Reacto r Theory, ThermodynamicsandFacilityOperating Characteristics Question A.015 [1.0 point] {15.0} A reactor has a shutdown margin of 0.0526 K/K. Adding a reactor experiment increases the indicated count rate from 10 cps to 20 cps. Which one of the following is the new K eff of the reactor? | Section A - Reacto r Theory, ThermodynamicsandFacilityOperating Characteristics Question A.015 [1.0 point] {15.0} A reactor has a shutdown margin of 0.0526 K/K. Adding a reactor experiment increases the indicated count rate from 10 cps to 20 cps. Which one of the following is the new K eff of the reactor? | ||
: a. 0.53 b. 0.90 | : a. 0.53 b. 0.90 | ||
: c. 0.975 d. 1.001 Answer: A.15 c. | : c. 0.975 d. 1.001 Answer: A.15 c. | ||
| Line 718: | Line 718: | ||
DOE Fundamentals Handbook, Nuclear Physics and Reactor Theory Volume 2, Module 4, Enabling Objective 3.6, p. 28. SDM = 1-K eff/K eff Keff = 1/SDM + 1 K eff = 1/0.0526 + 1 K eff = .95 CR 1/CR 2 = (1 - K eff2) / (1 - K eff1) 10/20 = (1 - K eff2) / (1 - 0.95) (0.5) x (0.05) = (1 - K eff2) K eff2 = 1 - (0.5)(0.05) = 0.975 | DOE Fundamentals Handbook, Nuclear Physics and Reactor Theory Volume 2, Module 4, Enabling Objective 3.6, p. 28. SDM = 1-K eff/K eff Keff = 1/SDM + 1 K eff = 1/0.0526 + 1 K eff = .95 CR 1/CR 2 = (1 - K eff2) / (1 - K eff1) 10/20 = (1 - K eff2) / (1 - 0.95) (0.5) x (0.05) = (1 - K eff2) K eff2 = 1 - (0.5)(0.05) = 0.975 | ||
Question A.016 [1.0 point] {16.0} Which ONE of the following causes reactor period to stabilize shortly after a reactor scram from full power? Assume normal system/component operation and no maintenance activity. | Question A.016 [1.0 point] {16.0} Which ONE of the following causes reactor period to stabilize shortly after a reactor scram from full power? Assume normal system/component operation and no maintenance activity. | ||
: a. Xenon removal by decay at a constant rate. b. Longest lived delayed neutron precursor. | : a. Xenon removal by decay at a constant rate. b. Longest lived delayed neutron precursor. | ||
: c. Decay of compensating voltage at low power levels. d. Power level dropping below the minimum detectable level. | : c. Decay of compensating voltage at low power levels. d. Power level dropping below the minimum detectable level. | ||
| Line 727: | Line 727: | ||
Nuclear Reactor Theory, LaMarsh | Nuclear Reactor Theory, LaMarsh | ||
Question A.017 [1.0 point] {17.0} A reactor is operating at criticality. Instantaneously, all of the delayed neutrons are suddenly removed from the reactor. The K eff of the reactor in this state would be approximately: | Question A.017 [1.0 point] {17.0} A reactor is operating at criticality. Instantaneously, all of the delayed neutrons are suddenly removed from the reactor. The K eff of the reactor in this state would be approximately: | ||
: a. 1.007 b. 1.000 c. 0.993 d. 0.000 | : a. 1.007 b. 1.000 c. 0.993 d. 0.000 | ||
| Line 735: | Line 735: | ||
DOE Fundamentals Handbook, Module 2, page 30. | DOE Fundamentals Handbook, Module 2, page 30. | ||
Section A - Reacto r Theory, ThermodynamicsandFacilityOperating Characteristics Question A.018 [1.0 points 0.25 each] {18.0} Using the drawing of the Integral Rod Worth Curve provided, identify each of the following reactivity worth's. | Section A - Reacto r Theory, ThermodynamicsandFacilityOperating Characteristics Question A.018 [1.0 points 0.25 each] {18.0} Using the drawing of the Integral Rod Worth Curve provided, identify each of the following reactivity worth's. | ||
: a. Total Rod Worth 1. B - A b. Actual Shutdown Margin 2. C - A | : a. Total Rod Worth 1. B - A b. Actual Shutdown Margin 2. C - A | ||
: c. Technical Specification Shutdown Margin Limit 3. C - B d. Excess Reactivity 4. D - C 5. E - C | : c. Technical Specification Shutdown Margin Limit 3. C - B d. Excess Reactivity 4. D - C 5. E - C | ||
: 6. E - D 7. E - A | : 6. E - D 7. E - A | ||
| Line 745: | Line 745: | ||
Standard NRC Question | Standard NRC Question | ||
END OF SECTION A Critical Rod HeightRod fully outIntegral RodWorth Curve H C HCMax A BWorth of Most Reactive Control ElementWorth of Most Reactive Control Element D C E Section B. - Normal & EmergOperatingProcedures&Radiological Controls Question B.001 [1.0 point, 0.25 each] {1.0} Identify each of the following values as either a Safety Limit (SL), a Limited Safety Setting (LSSS) or a Limiting Condition for Operation (LCO). | END OF SECTION A Critical Rod HeightRod fully outIntegral RodWorth Curve H C HCMax A BWorth of Most Reactive Control ElementWorth of Most Reactive Control Element D C E Section B. - Normal & EmergOperatingProcedures&Radiological Controls Question B.001 [1.0 point, 0.25 each] {1.0} Identify each of the following values as either a Safety Limit (SL), a Limited Safety Setting (LSSS) or a Limiting Condition for Operation (LCO). | ||
: a. Power 100 watts b. Temperature 120 °C c. Excess Reactivity 0.65% k/k (corrected to 20 °C) d. Safety Rod with a reactivity addition rate of 0.065% k/k. Answer: B.01 a. = SL; b. = LSSS; c. = LCO; d. = LCO | : a. Power 100 watts b. Temperature 120 °C c. Excess Reactivity 0.65% k/k (corrected to 20 °C) d. Safety Rod with a reactivity addition rate of 0.065% k/k. Answer: B.01 a. = SL; b. = LSSS; c. = LCO; d. = LCO | ||
| Line 752: | Line 752: | ||
ISU TS §§ 2.1, 2.2 and 3.0 | ISU TS §§ 2.1, 2.2 and 3.0 | ||
Question B.002 [1 point] {2.0} In accordance with Emergency procedures, in the event of a fire, which ONE of the following actions should the reactor operator perform immediately after securing the reactor? | Question B.002 [1 point] {2.0} In accordance with Emergency procedures, in the event of a fire, which ONE of the following actions should the reactor operator perform immediately after securing the reactor? | ||
: a. Notify the Pocatello Police Department. b. Notify the U.S. NRC Operations Center. | : a. Notify the Pocatello Police Department. b. Notify the U.S. NRC Operations Center. | ||
: c. Initiate a building evacuation. d. Notify the Reactor Supervisor. | : c. Initiate a building evacuation. d. Notify the Reactor Supervisor. | ||
| Line 761: | Line 761: | ||
Emergency Plan, Section 4, "Fire or Explosion" | Emergency Plan, Section 4, "Fire or Explosion" | ||
Question B.003 [1 point] {3.0} Temporary procedures which do NOT change the intent of the original procedure or involve an unreviewed safety question may be approved as a MINIMUM by the: | Question B.003 [1 point] {3.0} Temporary procedures which do NOT change the intent of the original procedure or involve an unreviewed safety question may be approved as a MINIMUM by the: | ||
: a. Reactor Operator. b. Reactor Supervisor. c. Reactor Safety Committee. d. Dean of the College of Engineering. | : a. Reactor Operator. b. Reactor Supervisor. c. Reactor Safety Committee. d. Dean of the College of Engineering. | ||
| Line 770: | Line 770: | ||
Section B. - Normal & EmergOperatingProcedures&Radiological Controls Question B.004 [1 point] {4.0} | Section B. - Normal & EmergOperatingProcedures&Radiological Controls Question B.004 [1 point] {4.0} | ||
A reactor sample has a disintegration rate of 2 X 10 12 disintegrations per second and emits a 0.6 Mev . The expected dose rate from this sample at a distance of 10 feet would be approximately: (Assume a point source) | A reactor sample has a disintegration rate of 2 X 10 12 disintegrations per second and emits a 0.6 Mev . The expected dose rate from this sample at a distance of 10 feet would be approximately: (Assume a point source) | ||
: a. 100 mR/hr b. 325 mR/hr c. 2 R/hr d. 7.5 R/hr Answer: B.04 c. | : a. 100 mR/hr b. 325 mR/hr c. 2 R/hr d. 7.5 R/hr Answer: B.04 c. | ||
| Line 776: | Line 776: | ||
Glasstone & Sesonke, Sect 9.41, p 525. DR = 6CE/f*2 R/hr, =6(2 X 10*12/3.7X10*10)(0.6)/10*2, =1.9459 R/hr | Glasstone & Sesonke, Sect 9.41, p 525. DR = 6CE/f*2 R/hr, =6(2 X 10*12/3.7X10*10)(0.6)/10*2, =1.9459 R/hr | ||
Question B.005 [1.0 point] {5.0} You performed a startup this morning with the pneumatic tube terminus and no experiment in the reactor. After shutting down, one hour later, you removed the tube. No other changes were made to the reactor. During a new startup the new core excess will be - | Question B.005 [1.0 point] {5.0} You performed a startup this morning with the pneumatic tube terminus and no experiment in the reactor. After shutting down, one hour later, you removed the tube. No other changes were made to the reactor. During a new startup the new core excess will be - | ||
: a. larger than the previous startup. b. smaller than the previous startup. c. the same as the previous startup. d. dependent on the time of shutdown. | : a. larger than the previous startup. b. smaller than the previous startup. c. the same as the previous startup. d. dependent on the time of shutdown. | ||
| Line 784: | Line 784: | ||
ISU Experimental Plan No. 19 Sample Transfer by Pneumatic Tube, Safety Analysis p. 3 | ISU Experimental Plan No. 19 Sample Transfer by Pneumatic Tube, Safety Analysis p. 3 | ||
Question B.006 [1 point] {6.0} The shutdown margin, required by Technical Specifications, with the most reactive safety or control rod fully inserted and the fine control rod fully inserted shall be at least: | Question B.006 [1 point] {6.0} The shutdown margin, required by Technical Specifications, with the most reactive safety or control rod fully inserted and the fine control rod fully inserted shall be at least: | ||
: a. 0.29 % k/k b. 0.65 % k/k c. 1.00 % k/k d. 1.25 % k/k Answer: B.06 c. | : a. 0.29 % k/k b. 0.65 % k/k c. 1.00 % k/k d. 1.25 % k/k Answer: B.06 c. | ||
| Line 790: | Line 790: | ||
ISU Technical Specifications, 3.1.b, page 8. | ISU Technical Specifications, 3.1.b, page 8. | ||
Section B. - Normal & EmergOperatingProcedures&Radiological Controls Question B.007 [1.0 point] {7.0} You have evacuated the EPZ. Which ONE of the following ISU staff positions is responsible (by title) for authorizing reentry? | Section B. - Normal & EmergOperatingProcedures&Radiological Controls Question B.007 [1.0 point] {7.0} You have evacuated the EPZ. Which ONE of the following ISU staff positions is responsible (by title) for authorizing reentry? | ||
: a. The Senior Reactor Operator b. The Reactor Supervisor | : a. The Senior Reactor Operator b. The Reactor Supervisor | ||
: c. The Director of Emergency Operations | : c. The Director of Emergency Operations | ||
: d. The ISU Radiation Safety Officer Answer: B.07 c. | : d. The ISU Radiation Safety Officer Answer: B.07 c. | ||
==Reference:== | ==Reference:== | ||
Emergency Plan, Nuclear Emergency p. 13. | Emergency Plan, Nuclear Emergency p. 13. | ||
Question B.008 [1 point] {8.0] The reason for allowing only one control rod at a time to be removed and disassembled during control rod maintenance is to: | Question B.008 [1 point] {8.0] The reason for allowing only one control rod at a time to be removed and disassembled during control rod maintenance is to: | ||
: a. prevent inadvertent reactor criticality. b. limit the radiation exposure to personnel. | : a. prevent inadvertent reactor criticality. b. limit the radiation exposure to personnel. | ||
: c. prevent the inadvertent interchange of parts. d. limit the number of maintenance operations being performed concurrently. | : c. prevent the inadvertent interchange of parts. d. limit the number of maintenance operations being performed concurrently. | ||
| Line 807: | Line 807: | ||
-201 ROD MAINTENA NCE PROCEDURE) | -201 ROD MAINTENA NCE PROCEDURE) | ||
Question B.009 [1 point] {9.0} The Technical Specification basis for the MAXIMUM core temperature limit is to prevent: | Question B.009 [1 point] {9.0} The Technical Specification basis for the MAXIMUM core temperature limit is to prevent: | ||
: a. breakdown of the graphite reflector. b. instrument inaccuracies. c. release of fission products. d. boiling of the shield water. | : a. breakdown of the graphite reflector. b. instrument inaccuracies. c. release of fission products. d. boiling of the shield water. | ||
| Line 820: | Line 820: | ||
Emergency Plan, 2.0 DEFINITIONS, 2.8 | Emergency Plan, 2.0 DEFINITIONS, 2.8 | ||
Section B. - Normal & EmergOperatingProcedures&Radiological Controls Question B.011 [1.0 point] {11.0} The dose rate from a mixed beta-gamma point source is 100 mrem/hour at a distance of one (1) foot, and is 0.1 mrem/hour at a distance of twenty (20) feet. At one (1) foot what percentage of the source consists of beta radiation? | Section B. - Normal & EmergOperatingProcedures&Radiological Controls Question B.011 [1.0 point] {11.0} The dose rate from a mixed beta-gamma point source is 100 mrem/hour at a distance of one (1) foot, and is 0.1 mrem/hour at a distance of twenty (20) feet. At one (1) foot what percentage of the source consists of beta radiation? | ||
: a. 20% b. 40% | : a. 20% b. 40% | ||
: c. 60% d. 80% | : c. 60% d. 80% | ||
Answer: B.11 c | Answer: B.11 c | ||
| Line 828: | Line 828: | ||
10CFR20. At 20 feet, there is no beta radiation. Gamma at 20 feet = 0.1 mrem/hour, gamma at 1 foot = 40 mrem/hour. Therefore beta at 1 foot = 60 mrem/hour = 60%. | 10CFR20. At 20 feet, there is no beta radiation. Gamma at 20 feet = 0.1 mrem/hour, gamma at 1 foot = 40 mrem/hour. Therefore beta at 1 foot = 60 mrem/hour = 60%. | ||
Question B.012 [1 point] (12.0) The total scram withdrawal time of the coarse control rod and the safety rods must be less than: | Question B.012 [1 point] (12.0) The total scram withdrawal time of the coarse control rod and the safety rods must be less than: | ||
: a. 200 milliseconds. b. 500 milliseconds. c. 800 milliseconds. d. 1000 milliseconds. | : a. 200 milliseconds. b. 500 milliseconds. c. 800 milliseconds. d. 1000 milliseconds. | ||
| Line 836: | Line 836: | ||
ISU Technical Specification 3.2.a | ISU Technical Specification 3.2.a | ||
Question B.013 [1 point] (13.0) To prevent damage to the reactor or excessive release of radioactive materials in the event of an experiment failure, experiments containing corrosive materials shall: | Question B.013 [1 point] (13.0) To prevent damage to the reactor or excessive release of radioactive materials in the event of an experiment failure, experiments containing corrosive materials shall: | ||
: a. be doubly encapsulated. b. be limited to less than 10 grams. | : a. be doubly encapsulated. b. be limited to less than 10 grams. | ||
: c. not be inserted into the reactor or stored at the facility. | : c. not be inserted into the reactor or stored at the facility. | ||
: d. have a TEDE of less than 500 mrem over two hours from the beginning of the release. | : d. have a TEDE of less than 500 mrem over two hours from the beginning of the release. | ||
Answer: B.13 a. | Answer: B.13 a. | ||
| Line 845: | Line 845: | ||
ISU Technical Specifications, 3.3.a, page 11 | ISU Technical Specifications, 3.3.a, page 11 | ||
Section B. - Normal & EmergOperatingProcedures&Radiological Controls Question B.014 [1.0 point] {14.0} A radiation survey of an area reveals a general radiation reading of 1 mRem/hr. However, a small section of pipe (point source) reads 10 mRem/hr at one (1) meter. Which ONE of the following is the posting requirement for the area, in accordance with 10 CFR Part 20? | Section B. - Normal & EmergOperatingProcedures&Radiological Controls Question B.014 [1.0 point] {14.0} A radiation survey of an area reveals a general radiation reading of 1 mRem/hr. However, a small section of pipe (point source) reads 10 mRem/hr at one (1) meter. Which ONE of the following is the posting requirement for the area, in accordance with 10 CFR Part 20? | ||
: a. "CAUTION - RADIATION AREA" | : a. "CAUTION - RADIATION AREA" | ||
: b. "CAUTION - HIGH RADIATION AREA" | : b. "CAUTION - HIGH RADIATION AREA" | ||
| Line 856: | Line 856: | ||
10 CFR 20.1003 For a point source, 10 mrem/hr at 100 cm (1 meter) = 111.1 mrem/hr at 30 cm. | 10 CFR 20.1003 For a point source, 10 mrem/hr at 100 cm (1 meter) = 111.1 mrem/hr at 30 cm. | ||
Question B.015 [1.0 point] {15.0} As a licensed reactor operator at the AGN-201 facility, who is allowed to operate the controls of the reactor under your direction? | Question B.015 [1.0 point] {15.0} As a licensed reactor operator at the AGN-201 facility, who is allowed to operate the controls of the reactor under your direction? | ||
: a. A local college newspaper reporter who wants to write a story on the safety of nuclear reactors. | : a. A local college newspaper reporter who wants to write a story on the safety of nuclear reactors. | ||
: b. A new student participating in a nuclear engineering laboratory course. | : b. A new student participating in a nuclear engineering laboratory course. | ||
: c. A health physicist who is trying to gain a certified health physicist (CHP) license. | : c. A health physicist who is trying to gain a certified health physicist (CHP) license. | ||
: d. An NRC inspector trying to make sure that all set points of the reactor are the same as those in the technical specifications. | : d. An NRC inspector trying to make sure that all set points of the reactor are the same as those in the technical specifications. | ||
Answer: B.15 b. | Answer: B.15 b. | ||
| Line 873: | Line 873: | ||
END OF SECTION B | END OF SECTION B | ||
Section C | Section C | ||
- FacilityandRadiationMonitoringSystems Question C.001 [1 point] {1.0} The shield tank level trip shall be set to scram the reactor if shield water level falls ____ below the highest point on the reactor shield tank manhole opening. | - FacilityandRadiationMonitoringSystems Question C.001 [1 point] {1.0} The shield tank level trip shall be set to scram the reactor if shield water level falls ____ below the highest point on the reactor shield tank manhole opening. | ||
: a. 8 inches b. 10 inches | : a. 8 inches b. 10 inches | ||
: c. 12 inches | : c. 12 inches | ||
: d. 20 inches Answer: C.01 b. | : d. 20 inches Answer: C.01 b. | ||
| Line 888: | Line 888: | ||
ISU General Information, AGN - 201 Reactor, Access Ports & Glory Hole. | ISU General Information, AGN - 201 Reactor, Access Ports & Glory Hole. | ||
Question C.003 [1.0 point] {3.0} When using the movable tank on the top of the reactor as a Thermal Neutron column, it is filled with - | Question C.003 [1.0 point] {3.0} When using the movable tank on the top of the reactor as a Thermal Neutron column, it is filled with - | ||
: a. Water b. Beryllium | : a. Water b. Beryllium | ||
: c. Graphite d. Heavy Water | : c. Graphite d. Heavy Water | ||
| Line 898: | Line 898: | ||
Section C | Section C | ||
- FacilityandRadiationMonitoringSystems Question C.004 [1 point] {4.0} The shield tank water temperature interlock prevents reactor operation: a. during periods of high thermal stress. b. in the event of a high temperature condition. | - FacilityandRadiationMonitoringSystems Question C.004 [1 point] {4.0} The shield tank water temperature interlock prevents reactor operation: a. during periods of high thermal stress. b. in the event of a high temperature condition. | ||
: c. during a condition that will produce excess radiation levels. d. from a reactivity addition due to a temperature decrease. | : c. during a condition that will produce excess radiation levels. d. from a reactivity addition due to a temperature decrease. | ||
| Line 905: | Line 905: | ||
==Reference:== | ==Reference:== | ||
ISU Tech. Spec's., 3.2 Basis, page 10. | ISU Tech. Spec's., 3.2 Basis, page 10. | ||
Question C.005 [1 point] {5.0} The U-235 fuel in the AGN is contained in fuel disks and control rods. Of the total fuel in the reactor, approximately how much is contained in the control and safety rods? | Question C.005 [1 point] {5.0} The U-235 fuel in the AGN is contained in fuel disks and control rods. Of the total fuel in the reactor, approximately how much is contained in the control and safety rods? | ||
: a. 9%. b. 24%. c. 55% d. 78%. | : a. 9%. b. 24%. c. 55% d. 78%. | ||
Answer: C.05 a. | Answer: C.05 a. | ||
| Line 912: | Line 912: | ||
Safety Analysis Report, dated November 23, 1995, pg. 46-47 | Safety Analysis Report, dated November 23, 1995, pg. 46-47 | ||
Question C.006 [1 point] {6.0} Which ONE of the following trips/conditions is associated with the safety chassis interlock bus? a. period trip. | Question C.006 [1 point] {6.0} Which ONE of the following trips/conditions is associated with the safety chassis interlock bus? a. period trip. | ||
: b. water level. | : b. water level. | ||
: c. manual scram. d. low sensitrol temperature. | : c. manual scram. d. low sensitrol temperature. | ||
| Line 922: | Line 922: | ||
Section C | Section C | ||
- FacilityandRadiationMonitoringSystems Question C.007 [1 point] {7.0} Which ONE of the following describes the design purpose of the space in the top section of the core tank above the reactor core and the reflector? | - FacilityandRadiationMonitoringSystems Question C.007 [1 point] {7.0} Which ONE of the following describes the design purpose of the space in the top section of the core tank above the reactor core and the reflector? | ||
: a. Ensures free fall of the bottom half of the core during the most severe transient. b. Prevents core damage during the design basis earthquake and 6 cm. displacements. | : a. Ensures free fall of the bottom half of the core during the most severe transient. b. Prevents core damage during the design basis earthquake and 6 cm. displacements. | ||
: c. Allows for accumulation of fission product gases created during reactor operation. | : c. Allows for accumulation of fission product gases created during reactor operation. | ||
: d. Increases the fast neutron population in the vicinity of experiments placed in the access ports. | : d. Increases the fast neutron population in the vicinity of experiments placed in the access ports. | ||
Answer; C.07 c. | Answer; C.07 c. | ||
| Line 931: | Line 931: | ||
Safety Analysis Report, dated November 23, 1995, pg. 41 | Safety Analysis Report, dated November 23, 1995, pg. 41 | ||
Question C.008 [1 point] {8.0} Which ONE of the following is NOT true when considering the advantages of using fueled control rods over poison rods: | Question C.008 [1 point] {8.0} Which ONE of the following is NOT true when considering the advantages of using fueled control rods over poison rods: | ||
: a. larger reactor size. b. more symmetrical flux distribution at power. c. no critical mass assembled when shutdown. d. simplification of calculations for a homogeneous reactor. | : a. larger reactor size. b. more symmetrical flux distribution at power. c. no critical mass assembled when shutdown. d. simplification of calculations for a homogeneous reactor. | ||
| Line 939: | Line 939: | ||
Previous ISU Exam | Previous ISU Exam | ||
Question C.009 [1 point] {9.0} The shield tank is designed to provide shielding from: a. the glory hole area. | Question C.009 [1 point] {9.0} The shield tank is designed to provide shielding from: a. the glory hole area. | ||
: b. high energy radiation. c. high energy radiation. d. fast neutron radiation. | : b. high energy radiation. c. high energy radiation. d. fast neutron radiation. | ||
| Line 948: | Line 948: | ||
Section C | Section C | ||
- FacilityandRadiationMonitoringSystems Question C.010 [1 point] {10.0} Which one of the following materials will have a positive effect on reactivity when inserted into the Glory Hole? | - FacilityandRadiationMonitoringSystems Question C.010 [1 point] {10.0} Which one of the following materials will have a positive effect on reactivity when inserted into the Glory Hole? | ||
: a. Borated Polyethylene b. Polyethylene | : a. Borated Polyethylene b. Polyethylene | ||
: c. Natural Uranium | : c. Natural Uranium | ||
: d. Gold Answer: C.10 b. | : d. Gold Answer: C.10 b. | ||
| Line 963: | Line 963: | ||
ISU SAR Section 4.3.2 Instrumentation System, Figure 4.3-8 | ISU SAR Section 4.3.2 Instrumentation System, Figure 4.3-8 | ||
Question C.012 [1 point] {12.0} Which ONE of the following statements describes the design/operation of the control rod drive assemblies? | Question C.012 [1 point] {12.0} Which ONE of the following statements describes the design/operation of the control rod drive assemblies? | ||
: a. The dashpots consist of a foam cushion to reduce rod impact following a scram. b. The fine control rod does not have a dashpot since it does not scram. c. The course control rod dashpot uses magnetic force to slow the rod down before impact on a scram. d. Dashpots are only associated with the safety rods since these rods have been raised against spring tension to assist in driving these rods down on a scram. | : a. The dashpots consist of a foam cushion to reduce rod impact following a scram. b. The fine control rod does not have a dashpot since it does not scram. c. The course control rod dashpot uses magnetic force to slow the rod down before impact on a scram. d. Dashpots are only associated with the safety rods since these rods have been raised against spring tension to assist in driving these rods down on a scram. | ||
| Line 972: | Line 972: | ||
Section C | Section C | ||
- FacilityandRadiationMonitoringSystems Question C.013 [1 point] {13.0} Which ONE of the following does NOT automatically cause a reactor scram? a. Reactor period. b. Radiation level. | - FacilityandRadiationMonitoringSystems Question C.013 [1 point] {13.0} Which ONE of the following does NOT automatically cause a reactor scram? a. Reactor period. b. Radiation level. | ||
: c. Water level. d. Power failure. | : c. Water level. d. Power failure. | ||
| Line 980: | Line 980: | ||
ISU Safety Analysis Report, dated January 2003, Instrument Sys. 4.3.2 | ISU Safety Analysis Report, dated January 2003, Instrument Sys. 4.3.2 | ||
Question C.014 [1 point] {14.0} What type of detector is used for the Low temperature switch? a. A simple bi-metallic thermal switch | Question C.014 [1 point] {14.0} What type of detector is used for the Low temperature switch? a. A simple bi-metallic thermal switch | ||
: b. A precision platinum wound resistance temperature detector (RTD) c. A chromel-alumel (Type K) thermocouple. d. A copper-constantan (Type T) thermocouple Answer: C.14 a. | : b. A precision platinum wound resistance temperature detector (RTD) c. A chromel-alumel (Type K) thermocouple. d. A copper-constantan (Type T) thermocouple Answer: C.14 a. | ||
Revision as of 04:16, 27 April 2019
| ML16159A008 | |
| Person / Time | |
|---|---|
| Site: | Idaho State University |
| Issue date: | 06/21/2016 |
| From: | Mendiola A J Division of Policy and Rulemaking |
| To: | Dunzik-Gougar M L Idaho State University |
| Mendiola A J | |
| Shared Package | |
| ML15265A151 | List: |
| References | |
| 50-284/OL-16-001 | |
| Download: ML16159A008 (30) | |
Text
June 21, 2016
Dr. Mary Lou Dunzik-Gougar, Reactor Administrator Professor and Chair of Nuclear Engineering College of Science and Engineering
Idaho State University Pocatello, ID 83209-8060
SUBJECT:
EXAMINATION REPORT NO. 50-284/OL-16-01, IDAHO STATE UNIVERSITY
Dear Dr. Dunzik-Gougar:
During the week of May 9, 2016, the U.S. Nuclear Regulatory Commission (NRC) administered an operator licensing examination at your Idaho State University AGN reactor. The examination was conducted according to NUREG-1478, "Operator Licensing Examiner Standards for Research and Test Reactors," Revision 2, published in June 2007. Examination questions and preliminary findings were discussed at the conclusion of the examination with Adam Mallicoat, Reactor Supervisor.
In accordance with Section 2.390 of Title 10 of the Code of Federal Regulations, a copy of this letter and the enclosures will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records component of NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). The NRC is forwarding the individual grades to you in a separate letter which will not be released publicly. If you have any questions concerning the examination, please contact Phillip T. Young at 301-415-4094 or via email at Phillip.young@nrc.gov.
Sincerely, /RA/ Anthony J. Mendiola, Chief Research and Test Reactors Oversight Branch Division of Policy and Rulemaking Office of Nuclear Reactor Regulation Docket No. 50-284
Enclosures:
- 1. Examination Report No. 50-284/OL-16-01 2. Written Examination cc: Adam Mallicoat, Reactor Supervisor, Idaho State University cc: w/o enclosures: See next page
Idaho State University Docket No. 50-284 cc:
Dr. Wendland Beezhold Idaho State University Department Chair of Physics Nuclear and Electrical Engineering Physics Department Campus Box 8060 Pocatello, ID 83209-8106
Dr. Cornelis J. Van der Schyf
Idaho State University Vice President for Research and Dean of the Graduate School
Mail Stop 8130 Pocatello, ID 83209-8060
Dr. Peter Farina, Director Idaho State University
Radiation Safety Officer Technical Safety Office P.O. Box 8106 Pocatello, ID 83209-8106
Director Idaho Dept. of Environmental Quality
1410 North Hilton
Boise, ID 83606 Test, Research and Training
Reactor Newsletter 202 Nuclear Sciences Center University of Florida Gainesville, FL 32611
Dr. Mary Lou Dunzik-Gougar, Reactor Administrator June 21, 2016 Professor and Chair of Nuclear Engineering College of Science and Engineering
Idaho State University Pocatello, ID 83209-8060
SUBJECT:
EXAMINATION REPORT NO. 50-284/OL-15-01, IDAHO STATE UNIVERSITY
Dear Dr. Dunzik-Gougar:
During the week of May 9, 2016, the U.S. Nuclear Regulatory Commission (NRC) administered an operator licensing examination at your Idaho State University AGN reactor. The examination was conducted according to NUREG-1478, "Operator Licensing Examiner Standards for Research and Test Reactors," Revision 2, published in June 2007. Examination questions and preliminary findings were discussed at the conclusion of the examination with Adam Mallicoat, Reactor Supervisor.
In accordance with Section 2.390 of Title 10 of the Code of Federal Regulations, a copy of this letter and the enclosures will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records component of NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). The NRC is forwarding the individual grades to you in a separate letter which will not be released publicly. If you have any questions concerning the examination, please contact Phillip T. Young at 301-415-4094 or via email at Phillip.young@nrc.gov.
Sincerely,
/RA/ Anthony J. Mendiola, Chief Research and Test Reactors Oversight Branch Division of Policy and Rulemaking Office of Nuclear Reactor Regulation Docket No. 50-284
Enclosures:
- 1. Examination Report No. 50-284/OL-16-01 2. Written Examination cc: Adam Mallicoat, Reactor Supervisor, Idaho State University cc: w/o enclosures: See next page DISTRIBUTION w/ encls.: PUBLIC AMendiola MMorlang AAdams PBoyle ADAMS Accession No.: ML16159A008 OFFICE NRR/DPR/PROB/CE NRR/DPR/PROB/OLA NRR/DPR/PROB/ABC NRR/DPR/PROB/BC NAME PYoung CRevelle EReed AMendiola DATE 06/08/2016 06/07/2016 06/10/2016 06/21/2016 ENCLOSURE 1 EXAMINATION REPORT NO: 50-284/OL-16-01 FACILITY: Idaho State University FACILITY DOCKET NO.: 50-284 FACILITY LICENSE NO.: R-110 SUBMITTED BY:
/RA/
5/23/16_ Phillip T. Young, Chief Examiner Date
SUMMARY
- During the week of May 9, 2016, the NRC administered operator licensing examinations to one Senior Reactor Operator Upgrade (SROU), one Senior Operator Instant SROI and four Reactor Operator candidates. One of the Reactor Operator candidates failed one section of the written examination. All other candidates passed the examinations and will be issued a license to operate the Idaho State University reactor.
REPORT DETAILS 1. Examiner: Phillip T. Young, Chief Examiner
- 2. Results:
RO PASS/FAIL SRO PASS/FAIL TOTAL PASS/FAIL Written 3/1 1/0 4/1 Operating Tests 4/0 2/0 6/0 Overall 3/1 2/0 5/1 3. Exit Meeting:
Adam Mallicoat, Idaho State University Phillip T. Young, NRC, Examiner The NRC Examiner thanked the facility for their support in the administration of the examinations and noted how well the candidates were prepared.
ENCLOSURE 2 U. S. NUCLEAR REGULATORY COMMISSION NON-POWER INITIAL REACTOR LICENSE EXAMINATION FACILITY: Idaho State University AGN-201M Reactor REACTOR TYPE: AGN-201M DATE ADMINISTERED: 5/10/2016 CANDIDATE:
INSTRUCTIONS TO CANDIDATE: Answers are to be written on the answer sheet provided. Attach the answer sheets to the examination. Points for each question are indicated in brackets for each question. A 70% in each section is required to pass the examination. Examinations will be picked up three (3) hours after the examination starts.
Category Value % of Total % of Candidates Score Category Value Category 18.00 38.3 A. Reactor Theory, Thermodynamics and Facility Operating Characteristics 16.00 15.00 33.3 31.9 B. Normal and Emergency Operating Procedures and Radiological Controls 14.00 29.2 29.8 C. Facility and Radiation Monitoring Systems 48.00 47.00 100.0 TOTALS All work done on this examination is my own. I have neither given nor received aid.
Candidate's Signature NRC RULES AND GUIDELINES FOR LICENSE EXAMINATIONS During the administration of this examination the following rules apply:
- 1. Cheating on the examination means an automatic denial of your application and could result in more severe penalties.
- 2. After the examination has been completed, you must sign the statement on the cover sheet indicating that the work is your own and you have neither received nor given assistance in completing the examination. This must be done after you complete the examination.
- 3. Restroom trips are to be limited and only one candidate at a time may leave. You must avoid all contacts with anyone outside the examination room to avoid even the appearance or possibility of cheating.
- 4. Use black ink or dark pencil only to facilitate legible reproductions.
- 5. Print your name in the blank provided in the upper right-hand corner of the examination cover sheet and each answer sheet.
- 6. Mark your answers on the answer sheet provided. USE ONLY THE PAPER PROVIDED AND DO NOT WRITE ON THE BACK SIDE OF THE PAGE.
- 7. The point value for each question is indicated in [brackets] after the question.
- 8. If the intent of a question is unclear, ask questions of the examiner only.
- 9. When turning in your examination, assemble the completed examination with examination questions, examination aids and answer sheets. In addition turn in all scrap paper.
- 10. Ensure all information you wish to have evaluated as part of your answer is on your answer sheet. Scrap paper will be disposed of immediately following the examination.
- 11. To pass the examination you must achieve a grade of 70 percent or greater in each category.
- 12. There is a time limit of three (3) hours for completion of the examination.
- 13. When you have completed and turned in you examination, leave the examination area. If you are observed in this area while the examination is still in progress, your license may be denied or revoked.
EQUATION SHEET
DR - Rem, Ci - curies, E - Mev, R - feet Peak)-( = Peak)-(1 1 2 2 2 2 1 Curie = 3.7 x 10 10 dis/sec 1 kg = 2.21 lbm 1 Horsepower = 2.54 x 10 3 BTU/hr 1 Mw = 3.41 x 10 6 BTU/hr 1 BTU = 778 ft-lbf ºF = 9/5 C + 32 1 gal (H 2O) . 8 lbm ºC = 5/9 (F - 32) c P = 1.0 BTU/hr/lbm/F c p = 1 cal/sec/gm/C T UA = H m = T c m = Q p&&& K-1 S -S = SCR eff )(-CR = )(-CR)K-(1 CR = )K-(1 CR 2 2 1 1 eff 2 eff 1 2 1 seconds 0.1 = -1 eff -26.06 = SUR eff K-1 K-1 = M eff eff 1 0 CR CR = K-1 1 = M 2 1 eff e P = P t 0 P -)-(1 = P 0 10 P = P SUR(t)0 K)K-(1 = SDM eff eff - =
- eff*- + = K 1)-K ( = eff eff K x k K - K = eff eff eff eff 2 1 1 2 0.693 = T e DR= DR t-0 R 6CiE(n) = DR 2 d DR = d DR 2 2 2 1 2 1 Section A - Reacto r Theory, ThermodynamicsandFacilityOperating Characteristics NegativePoint B PointAPositive Question A.001 [1.00 point] {1.0} Which ONE of the following is the reason for operating with thermal neutrons rather than fast
neutrons?
- a. Probability of fission is increased since thermal neutrons are less likely to leak out of the core.
- b. As neutron energy increases, neutron absorption in non-fuel materials increases exponentially.
- c. The absorption cross-section of U-235 is much higher for thermal neutrons.
- d. The fuel temperature coefficient becomes positive as neutron energy increases.
Answer: A.01 c.
Reference:
DOE Fundamentals Handbook, Module 2, page 9.
Question A.002 [1.00 point] {2.0} Two critical reactors at low power are identical except that Reactor 1 has a beta fraction of 0.0072 and Reactor 2 has a beta fraction of 0.0060. An equal amount of positive reactivity is inserted into both reactors. Which ONE of the following will be the response of Reactor 2 compared to Reactor 1?
- a. The resulting power level will be lower. b. The resulting power level will be higher.
- c. The resulting period will be longer.
- d. The resulting period will be shorter.
Answer: A.02 d.
Reference:
R. R. Burn, Introduction to Nuclear Reactor Operations, page 4-9.
Question A.003 [1.00 point] {3.0} Shown below is a trace of reactor period as a function of time. Between points A and B reactor
power is:
- a. continually increasing. b. continually decreasing.
- c. increasing, then decreasing. d. constant.
Answer: A.03 a.
Reference:
Standard NRC Question 1
Section A - Reacto r Theory, ThermodynamicsandFacilityOperating Characteristics Question A.004 (1.00 point) {4.0} A thin foil target of 10% copper and 90% aluminum is in a thermal neutron beam. Given a Cu = 3.79 barns, a Al = 0.23 barns, s Cu = 7.90 barns, and s Al =1.49 barns, which ONE of the following reactions has the highest probability of occurring? A neutron
Answer: A.04 a.
Reference:
DOE Fundamentals Handbook, Nuclear Physics and Reactor Theory,
Question A.005 [1 point] {5.0} The neutron microscopic cross-section for absorption, a, generally: a. increases as neutron energy increases.
- b. decreases as neutron energy increases. c. increases as the mass of the target nucleus increases. d. decreases as the mass of the target nucleus increases.
Answer: A.05 b.
Reference:
DOE Fundamentals Handbook, Volume 1, Module 2, Enabling Objective 2.3.
Question: A.006 [1.0 point] {6.0} ELASTIC SCATTERING is the process by which a neutron collides with a nucleus -.
- a. and the nucleus recoil with the same total kinetic energy as the neutron and nucleus had prior to the collision.
- b. and the nucleus recoil with less total kinetic energy than the neutron and nucleus had prior to the collision with the nucleus emitting a gamma ray.
- c. is absorbed, with the nucleus emitting a gamma ray.
- d. and the nucleus recoil with a higher total kinetic energy than the neutron and nucleus had prior to the collision with the nucleus emitting a gamma ray.
Answer: A.06 a.
Reference:
DOE Fundamentals Handbook, Nuclear Physics and Reactor Theory,
Section A - Reacto r Theory, ThermodynamicsandFacilityOperating Characteristics Question A.007 [1.0 point] {7.0} Which ONE of the following is the major source of energy released during fission? a. Absorption of prompt gamma rays b. Slowing down of fission fragments
- c. Neutrino interactions d. Fission neutron scattering
Answer: A.07 b.
Reference:
DOE Fundamentals Handbook, Nuclear Physics and Reactor Theory,
Question A.008 [1.0 point] {8.0} Which ONE of the following elements will slow down fast neutrons most quickly, i.e. produces the greatest energy loss per collision.
- a. Oxygen-16 b. Uranium-238 c. Hydrogen-1 d. Boron-10
Answer: A.08 c.
Reference:
DOE Fundamentals Handbook, Volume 1, Module 2, Enabling Objective 2.12. Exam 2
Question A.009 [1.0 point] {9.0} The initial conditions for a reactor startup are count rate = 45 cps and K eff = 0.980. When the count rate reaches 90 cps, the new K eff will be:
- a. 0.986. b. 0.988
- c. 0.990. d. 0.992
Answer: A.09 c.
Reference:
DOE Fundamentals Handbook, Volume 2, Module 4, Enabling Objective 1.3.
Section A - Reacto r Theory, ThermodynamicsandFacilityOperating Characteristics Question A.010 [1.0 point] {10.0} By definition, you may make an exactly critical reactor PROMPT CRITICAL by adding positive reactivity equal to -
- a. the shutdown margin b. the Kexcess margin c. the eff value d. 1.0 %K/K Answer: A.10 c.
Reference:
DOE Fundamentals Handbook, Volume 2, Module 4, Enabling Objective 2.8. Exam 7
Question A.011 [1.0 point] {11.0} Which one of the following statements correctly describes the property of a GOOD MODERATOR?
- a. It slows down fast neutrons to thermal energy levels via a large number of collisions. b. It reduces gamma radiation to thermal ener gy levels via a small number of collisions. c. It slows down fast neutrons to thermal energy levels via a small number of collisions. d. It reduces gamma radiation to thermal energy levels via a large number of collisions.
Answer: A.11 c.
Reference:
DOE Fundamentals Handbook, Volume 1, Module 2, Enabling Objective 2.13. Exam
Question A.012 [1.0 point] {12.0}
Which of the following factors has the LEAST effect on rod worth? a. number and location of adjacent rods. b. temperature of the moderator.
- c. temperature of the fuel. d. core age.
Answer: A.12 c.
Reference:
Standard NRC Question
Section A - Reacto r Theory, ThermodynamicsandFacilityOperating Characteristics Question A.013 [1.0 point] {13.0} Reactor power is increasing by a factor of 10 every minute. The reactor period is: a. 65 seconds. b. 52 seconds.
- c. 26 seconds. d. 13 seconds.
Answer: A.13 c.
Reference:
Reference 1, Volume 2, Module 4, Reactor Kinetics, page 17. Reactor Period = 26/Startup Rate. Exam 3.
P = P 0 e t/ = 60/ln(10) = 26.06
Question A.014 [1.0 point] {14.0} While the reactor is shutdown you place an experiment into the glory hole to determine its worth. The reactor is shutdown by 2% K/K. Before insertion of the experiment, Channel #1 reads 70 cps. After insertion of the experiment, Channel #1 reads 35 cps. What is the worth of the experiment?
- a. -2.1% K/K b. -1.05% K/K c. -0.21% K/K d. -0.105% K/K Answer: A.14 a.
Reference:
SDM = (1 - K eff)/K eff K eff = 1/(1 + SDM) Given SDM = 0.2 K eff = 1/(1 + 0.2) = 1/1.02 Initial K eff = .9804 CR 1/ CR 2 = (1 - K eff1)/(1 - K eff2) Rearranging: K eff2 = 1 - (1 - K eff1) x CR 2/CR 1 K eff2 = 1 - [(1 - 0.9804) x 35/70] = 1 - 0.0196 x 2 = 1 - 0.0392 = 0.9608
= (K eff2 -K eff1)/Keff2 Keff2 = (0.9804 - 0.9608)/(0.9804 x 0.9608) = 0.0196/ 0.94197
= 0.02081
Section A - Reacto r Theory, ThermodynamicsandFacilityOperating Characteristics Question A.015 [1.0 point] {15.0} A reactor has a shutdown margin of 0.0526 K/K. Adding a reactor experiment increases the indicated count rate from 10 cps to 20 cps. Which one of the following is the new K eff of the reactor?
- a. 0.53 b. 0.90
- c. 0.975 d. 1.001 Answer: A.15 c.
Reference:
DOE Fundamentals Handbook, Nuclear Physics and Reactor Theory Volume 2, Module 4, Enabling Objective 3.6, p. 28. SDM = 1-K eff/K eff Keff = 1/SDM + 1 K eff = 1/0.0526 + 1 K eff = .95 CR 1/CR 2 = (1 - K eff2) / (1 - K eff1) 10/20 = (1 - K eff2) / (1 - 0.95) (0.5) x (0.05) = (1 - K eff2) K eff2 = 1 - (0.5)(0.05) = 0.975
Question A.016 [1.0 point] {16.0} Which ONE of the following causes reactor period to stabilize shortly after a reactor scram from full power? Assume normal system/component operation and no maintenance activity.
- a. Xenon removal by decay at a constant rate. b. Longest lived delayed neutron precursor.
- c. Decay of compensating voltage at low power levels. d. Power level dropping below the minimum detectable level.
Answer: A.16 b.
Reference:
Nuclear Reactor Theory, LaMarsh
Question A.017 [1.0 point] {17.0} A reactor is operating at criticality. Instantaneously, all of the delayed neutrons are suddenly removed from the reactor. The K eff of the reactor in this state would be approximately:
- a. 1.007 b. 1.000 c. 0.993 d. 0.000
Answer: A.17 c.
Reference:
DOE Fundamentals Handbook, Module 2, page 30.
Section A - Reacto r Theory, ThermodynamicsandFacilityOperating Characteristics Question A.018 [1.0 points 0.25 each] {18.0} Using the drawing of the Integral Rod Worth Curve provided, identify each of the following reactivity worth's.
- a. Total Rod Worth 1. B - A b. Actual Shutdown Margin 2. C - A
- c. Technical Specification Shutdown Margin Limit 3. C - B d. Excess Reactivity 4. D - C 5. E - C
- 6. E - D 7. E - A
Answer: A.18 a. = 7; b. = 2; c. = 1; d. = 5
Reference:
Standard NRC Question
END OF SECTION A Critical Rod HeightRod fully outIntegral RodWorth Curve H C HCMax A BWorth of Most Reactive Control ElementWorth of Most Reactive Control Element D C E Section B. - Normal & EmergOperatingProcedures&Radiological Controls Question B.001 [1.0 point, 0.25 each] {1.0} Identify each of the following values as either a Safety Limit (SL), a Limited Safety Setting (LSSS) or a Limiting Condition for Operation (LCO).
- a. Power 100 watts b. Temperature 120 °C c. Excess Reactivity 0.65% k/k (corrected to 20 °C) d. Safety Rod with a reactivity addition rate of 0.065% k/k. Answer: B.01 a. = SL; b. = LSSS; c. = LCO; d. = LCO
Reference:
ISU TS §§ 2.1, 2.2 and 3.0
Question B.002 [1 point] {2.0} In accordance with Emergency procedures, in the event of a fire, which ONE of the following actions should the reactor operator perform immediately after securing the reactor?
- a. Notify the Pocatello Police Department. b. Notify the U.S. NRC Operations Center.
- c. Initiate a building evacuation. d. Notify the Reactor Supervisor.
Answer: B.02 c.
Reference:
Emergency Plan, Section 4, "Fire or Explosion"
Question B.003 [1 point] {3.0} Temporary procedures which do NOT change the intent of the original procedure or involve an unreviewed safety question may be approved as a MINIMUM by the:
- a. Reactor Operator. b. Reactor Supervisor. c. Reactor Safety Committee. d. Dean of the College of Engineering.
Answer: B.03 b.
Reference:
ISU Technical Specifications, 6.6, page 26
Section B. - Normal & EmergOperatingProcedures&Radiological Controls Question B.004 [1 point] {4.0}
A reactor sample has a disintegration rate of 2 X 10 12 disintegrations per second and emits a 0.6 Mev . The expected dose rate from this sample at a distance of 10 feet would be approximately: (Assume a point source)
- a. 100 mR/hr b. 325 mR/hr c. 2 R/hr d. 7.5 R/hr Answer: B.04 c.
Reference:
Glasstone & Sesonke, Sect 9.41, p 525. DR = 6CE/f*2 R/hr, =6(2 X 10*12/3.7X10*10)(0.6)/10*2, =1.9459 R/hr
Question B.005 [1.0 point] {5.0} You performed a startup this morning with the pneumatic tube terminus and no experiment in the reactor. After shutting down, one hour later, you removed the tube. No other changes were made to the reactor. During a new startup the new core excess will be -
- a. larger than the previous startup. b. smaller than the previous startup. c. the same as the previous startup. d. dependent on the time of shutdown.
Answer: B.05 c.
Reference:
ISU Experimental Plan No. 19 Sample Transfer by Pneumatic Tube, Safety Analysis p. 3
Question B.006 [1 point] {6.0} The shutdown margin, required by Technical Specifications, with the most reactive safety or control rod fully inserted and the fine control rod fully inserted shall be at least:
- a. 0.29 % k/k b. 0.65 % k/k c. 1.00 % k/k d. 1.25 % k/k Answer: B.06 c.
Reference:
ISU Technical Specifications, 3.1.b, page 8.
Section B. - Normal & EmergOperatingProcedures&Radiological Controls Question B.007 [1.0 point] {7.0} You have evacuated the EPZ. Which ONE of the following ISU staff positions is responsible (by title) for authorizing reentry?
- a. The Senior Reactor Operator b. The Reactor Supervisor
- c. The Director of Emergency Operations
- d. The ISU Radiation Safety Officer Answer: B.07 c.
Reference:
Emergency Plan, Nuclear Emergency p. 13.
Question B.008 [1 point] {8.0] The reason for allowing only one control rod at a time to be removed and disassembled during control rod maintenance is to:
- a. prevent inadvertent reactor criticality. b. limit the radiation exposure to personnel.
- c. prevent the inadvertent interchange of parts. d. limit the number of maintenance operations being performed concurrently.
Answer: B.08 c.
Reference:
ISU MP-1, step 4.b, p 3. (AGN
-201 ROD MAINTENA NCE PROCEDURE)
Question B.009 [1 point] {9.0} The Technical Specification basis for the MAXIMUM core temperature limit is to prevent:
- a. breakdown of the graphite reflector. b. instrument inaccuracies. c. release of fission products. d. boiling of the shield water.
Answer: B.09 c.
Reference:
ISU Technical Specifications, 2.1 Basis, page 6
Question B.010 [1.0 point] {10.0} Deleted during the examination Per the emergency plan the EMERGENCY PLANNING ZONE (EPZ) is - a. rooms 19 and 20. b. rooms 20 and 23. c. rooms 15, 16, 18, 19, 20, 22, 23 and 24 d. the entire Lillibridge Engineering Laboratory basement. Answer: B.10 b
Reference:
Emergency Plan, 2.0 DEFINITIONS, 2.8
Section B. - Normal & EmergOperatingProcedures&Radiological Controls Question B.011 [1.0 point] {11.0} The dose rate from a mixed beta-gamma point source is 100 mrem/hour at a distance of one (1) foot, and is 0.1 mrem/hour at a distance of twenty (20) feet. At one (1) foot what percentage of the source consists of beta radiation?
- a. 20% b. 40%
- c. 60% d. 80%
Answer: B.11 c
Reference:
10CFR20. At 20 feet, there is no beta radiation. Gamma at 20 feet = 0.1 mrem/hour, gamma at 1 foot = 40 mrem/hour. Therefore beta at 1 foot = 60 mrem/hour = 60%.
Question B.012 [1 point] (12.0) The total scram withdrawal time of the coarse control rod and the safety rods must be less than:
- a. 200 milliseconds. b. 500 milliseconds. c. 800 milliseconds. d. 1000 milliseconds.
Answer: B.12 d.
Reference:
ISU Technical Specification 3.2.a
Question B.013 [1 point] (13.0) To prevent damage to the reactor or excessive release of radioactive materials in the event of an experiment failure, experiments containing corrosive materials shall:
- a. be doubly encapsulated. b. be limited to less than 10 grams.
- c. not be inserted into the reactor or stored at the facility.
- d. have a TEDE of less than 500 mrem over two hours from the beginning of the release.
Answer: B.13 a.
Reference:
ISU Technical Specifications, 3.3.a, page 11
Section B. - Normal & EmergOperatingProcedures&Radiological Controls Question B.014 [1.0 point] {14.0} A radiation survey of an area reveals a general radiation reading of 1 mRem/hr. However, a small section of pipe (point source) reads 10 mRem/hr at one (1) meter. Which ONE of the following is the posting requirement for the area, in accordance with 10 CFR Part 20?
- a. "CAUTION - RADIATION AREA"
- b. "CAUTION - HIGH RADIATION AREA"
- c. "CAUTION - RADIOACTIVE MATERIAL"
- d. "CAUTION - AIRBORNE RADIOACTIVITY AREA"
Answer: B.14 b.
Reference:
10 CFR 20.1003 For a point source, 10 mrem/hr at 100 cm (1 meter) = 111.1 mrem/hr at 30 cm.
Question B.015 [1.0 point] {15.0} As a licensed reactor operator at the AGN-201 facility, who is allowed to operate the controls of the reactor under your direction?
- a. A local college newspaper reporter who wants to write a story on the safety of nuclear reactors.
- b. A new student participating in a nuclear engineering laboratory course.
- c. A health physicist who is trying to gain a certified health physicist (CHP) license.
- d. An NRC inspector trying to make sure that all set points of the reactor are the same as those in the technical specifications.
Answer: B.15 b.
Reference:
General Operating Rules, Revision 4, dated September 19, 1994. and 10 CFR 55.13 Question B.016 [1 point] {10.0} During a reactor startup the low level scram on Channel #1 ensures: a. protection for a rod drop event. b. an operating neutron monitor channel. c. protection for a temperature excursion. d. the minimum number of period trips are available for startup.
Answer: B.16 b.
Reference:
TS 3.2 Basis, page 10
END OF SECTION B
Section C
- FacilityandRadiationMonitoringSystems Question C.001 [1 point] {1.0} The shield tank level trip shall be set to scram the reactor if shield water level falls ____ below the highest point on the reactor shield tank manhole opening.
- a. 8 inches b. 10 inches
- c. 12 inches
- d. 20 inches Answer: C.01 b.
Reference:
ISU Tech. Spec's 3.2.e.
Question C.002 [1.0 point] {2.0} The Idaho State University reactor Access Ports pass through the steel tank: a. up to the reflector. b. then the lead shield, up to the reflector. c. then the lead shield, the graphite reflector and then back out again. d. then the lead shield, graphite reflector, and the core and then back out again.
Answer: C.02 c.
Reference:
ISU General Information, AGN - 201 Reactor, Access Ports & Glory Hole.
Question C.003 [1.0 point] {3.0} When using the movable tank on the top of the reactor as a Thermal Neutron column, it is filled with -
- a. Water b. Beryllium
- c. Graphite d. Heavy Water
Answer: C.03 c.
Reference:
ISU SAR, § 4.1
Section C
- FacilityandRadiationMonitoringSystems Question C.004 [1 point] {4.0} The shield tank water temperature interlock prevents reactor operation: a. during periods of high thermal stress. b. in the event of a high temperature condition.
- c. during a condition that will produce excess radiation levels. d. from a reactivity addition due to a temperature decrease.
Answer: C.04 d.
Reference:
ISU Tech. Spec's., 3.2 Basis, page 10.
Question C.005 [1 point] {5.0} The U-235 fuel in the AGN is contained in fuel disks and control rods. Of the total fuel in the reactor, approximately how much is contained in the control and safety rods?
- a. 9%. b. 24%. c. 55% d. 78%.
Answer: C.05 a.
Reference:
Safety Analysis Report, dated November 23, 1995, pg. 46-47
Question C.006 [1 point] {6.0} Which ONE of the following trips/conditions is associated with the safety chassis interlock bus? a. period trip.
- b. water level.
- c. manual scram. d. low sensitrol temperature.
Answer: C.06 b.
Reference:
ISU SAR Section 4.3.2 Instrumentation System, Figure 4.3-8
Section C
- FacilityandRadiationMonitoringSystems Question C.007 [1 point] {7.0} Which ONE of the following describes the design purpose of the space in the top section of the core tank above the reactor core and the reflector?
- a. Ensures free fall of the bottom half of the core during the most severe transient. b. Prevents core damage during the design basis earthquake and 6 cm. displacements.
- c. Allows for accumulation of fission product gases created during reactor operation.
- d. Increases the fast neutron population in the vicinity of experiments placed in the access ports.
Answer; C.07 c.
Reference:
Safety Analysis Report, dated November 23, 1995, pg. 41
Question C.008 [1 point] {8.0} Which ONE of the following is NOT true when considering the advantages of using fueled control rods over poison rods:
- a. larger reactor size. b. more symmetrical flux distribution at power. c. no critical mass assembled when shutdown. d. simplification of calculations for a homogeneous reactor.
Answer: C.08 a.
Reference:
Previous ISU Exam
Question C.009 [1 point] {9.0} The shield tank is designed to provide shielding from: a. the glory hole area.
- b. high energy radiation. c. high energy radiation. d. fast neutron radiation.
Answer: C.09 d.
Reference:
ISU Tech. Spec's, 5.1.d., page 18.
Section C
- FacilityandRadiationMonitoringSystems Question C.010 [1 point] {10.0} Which one of the following materials will have a positive effect on reactivity when inserted into the Glory Hole?
- a. Borated Polyethylene b. Polyethylene
- c. Natural Uranium
- d. Gold Answer: C.10 b.
Reference:
NRC Examination Question Bank
Question C.011 [1 point] {11.0} Which ONE of the following statements describes the control rod interlocks? a. The safety rods cannot be inserted unless the course control rod is "DISENGAGED".
- b. The fine control rod cannot be inserted until the safety rods are "FULLY INSERTED". c. The fine control rod cannot be inserted unless the course control rod is "DISENGAGED".
- d. The safety rods must be fully inserted before their drive motors will operate in the "LOWER" position. Answer: C.11 b.
Reference:
ISU SAR Section 4.3.2 Instrumentation System, Figure 4.3-8
Question C.012 [1 point] {12.0} Which ONE of the following statements describes the design/operation of the control rod drive assemblies?
- a. The dashpots consist of a foam cushion to reduce rod impact following a scram. b. The fine control rod does not have a dashpot since it does not scram. c. The course control rod dashpot uses magnetic force to slow the rod down before impact on a scram. d. Dashpots are only associated with the safety rods since these rods have been raised against spring tension to assist in driving these rods down on a scram.
Answer: C.12 b.
Reference:
ISU General Information, AGN - 201 Reactor, Control Rods
Section C
- FacilityandRadiationMonitoringSystems Question C.013 [1 point] {13.0} Which ONE of the following does NOT automatically cause a reactor scram? a. Reactor period. b. Radiation level.
- c. Water level. d. Power failure.
Answer: C.13 b.
Reference:
ISU Safety Analysis Report, dated January 2003, Instrument Sys. 4.3.2
Question C.014 [1 point] {14.0} What type of detector is used for the Low temperature switch? a. A simple bi-metallic thermal switch
- b. A precision platinum wound resistance temperature detector (RTD) c. A chromel-alumel (Type K) thermocouple. d. A copper-constantan (Type T) thermocouple Answer: C.14 a.
Reference:
ISU Safety Analysis Report (SAR) § 4.3.4, Interlock System.
END OF SECTION C END OF WRITTEN EXAMINATION
June 21, 2016
Dr. Mary Lou Dunzik-Gougar, Reactor Administrator Professor and Chair of Nuclear Engineering College of Science and Engineering
Idaho State University Pocatello, ID 83209-8060
SUBJECT:
EXAMINATION REPORT NO. 50-284/OL-16-01, IDAHO STATE UNIVERSITY
Dear Dr. Dunzik-Gougar:
During the week of May 9, 2016, the U.S. Nuclear Regulatory Commission (NRC) administered an operator licensing examination at your Idaho State University AGN reactor. The examination was conducted according to NUREG-1478, "Operator Licensing Examiner Standards for Research and Test Reactors," Revision 2, published in June 2007. Examination questions and preliminary findings were discussed at the conclusion of the examination with Adam Mallicoat, Reactor Supervisor.
In accordance with Section 2.390 of Title 10 of the Code of Federal Regulations, a copy of this letter and the enclosures will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records component of NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). The NRC is forwarding the individual grades to you in a separate letter which will not be released publicly. If you have any questions concerning the examination, please contact Phillip T. Young at 301-415-4094 or via email at Phillip.young@nrc.gov.
Sincerely, /RA/ Anthony J. Mendiola, Chief Research and Test Reactors Oversight Branch Division of Policy and Rulemaking Office of Nuclear Reactor Regulation Docket No. 50-284
Enclosures:
- 1. Examination Report No. 50-284/OL-16-01 2. Written Examination cc: Adam Mallicoat, Reactor Supervisor, Idaho State University cc: w/o enclosures: See next page
Idaho State University Docket No. 50-284 cc:
Dr. Wendland Beezhold Idaho State University Department Chair of Physics Nuclear and Electrical Engineering Physics Department Campus Box 8060 Pocatello, ID 83209-8106
Dr. Cornelis J. Van der Schyf
Idaho State University Vice President for Research and Dean of the Graduate School
Mail Stop 8130 Pocatello, ID 83209-8060
Dr. Peter Farina, Director Idaho State University
Radiation Safety Officer Technical Safety Office P.O. Box 8106 Pocatello, ID 83209-8106
Director Idaho Dept. of Environmental Quality
1410 North Hilton
Boise, ID 83606 Test, Research and Training
Reactor Newsletter 202 Nuclear Sciences Center University of Florida Gainesville, FL 32611
Dr. Mary Lou Dunzik-Gougar, Reactor Administrator June 21, 2016 Professor and Chair of Nuclear Engineering College of Science and Engineering
Idaho State University Pocatello, ID 83209-8060
SUBJECT:
EXAMINATION REPORT NO. 50-284/OL-15-01, IDAHO STATE UNIVERSITY
Dear Dr. Dunzik-Gougar:
During the week of May 9, 2016, the U.S. Nuclear Regulatory Commission (NRC) administered an operator licensing examination at your Idaho State University AGN reactor. The examination was conducted according to NUREG-1478, "Operator Licensing Examiner Standards for Research and Test Reactors," Revision 2, published in June 2007. Examination questions and preliminary findings were discussed at the conclusion of the examination with Adam Mallicoat, Reactor Supervisor.
In accordance with Section 2.390 of Title 10 of the Code of Federal Regulations, a copy of this letter and the enclosures will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records component of NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). The NRC is forwarding the individual grades to you in a separate letter which will not be released publicly. If you have any questions concerning the examination, please contact Phillip T. Young at 301-415-4094 or via email at Phillip.young@nrc.gov.
Sincerely,
/RA/ Anthony J. Mendiola, Chief Research and Test Reactors Oversight Branch Division of Policy and Rulemaking Office of Nuclear Reactor Regulation Docket No. 50-284
Enclosures:
- 1. Examination Report No. 50-284/OL-16-01 2. Written Examination cc: Adam Mallicoat, Reactor Supervisor, Idaho State University cc: w/o enclosures: See next page DISTRIBUTION w/ encls.: PUBLIC AMendiola MMorlang AAdams PBoyle ADAMS Accession No.: ML16159A008 OFFICE NRR/DPR/PROB/CE NRR/DPR/PROB/OLA NRR/DPR/PROB/ABC NRR/DPR/PROB/BC NAME PYoung CRevelle EReed AMendiola DATE 06/08/2016 06/07/2016 06/10/2016 06/21/2016 ENCLOSURE 1 EXAMINATION REPORT NO: 50-284/OL-16-01 FACILITY: Idaho State University FACILITY DOCKET NO.: 50-284 FACILITY LICENSE NO.: R-110 SUBMITTED BY:
/RA/
5/23/16_ Phillip T. Young, Chief Examiner Date
SUMMARY
- During the week of May 9, 2016, the NRC administered operator licensing examinations to one Senior Reactor Operator Upgrade (SROU), one Senior Operator Instant SROI and four Reactor Operator candidates. One of the Reactor Operator candidates failed one section of the written examination. All other candidates passed the examinations and will be issued a license to operate the Idaho State University reactor.
REPORT DETAILS 1. Examiner: Phillip T. Young, Chief Examiner
- 2. Results:
RO PASS/FAIL SRO PASS/FAIL TOTAL PASS/FAIL Written 3/1 1/0 4/1 Operating Tests 4/0 2/0 6/0 Overall 3/1 2/0 5/1 3. Exit Meeting:
Adam Mallicoat, Idaho State University Phillip T. Young, NRC, Examiner The NRC Examiner thanked the facility for their support in the administration of the examinations and noted how well the candidates were prepared.
ENCLOSURE 2 U. S. NUCLEAR REGULATORY COMMISSION NON-POWER INITIAL REACTOR LICENSE EXAMINATION FACILITY: Idaho State University AGN-201M Reactor REACTOR TYPE: AGN-201M DATE ADMINISTERED: 5/10/2016 CANDIDATE:
INSTRUCTIONS TO CANDIDATE: Answers are to be written on the answer sheet provided. Attach the answer sheets to the examination. Points for each question are indicated in brackets for each question. A 70% in each section is required to pass the examination. Examinations will be picked up three (3) hours after the examination starts.
Category Value % of Total % of Candidates Score Category Value Category 18.00 38.3 A. Reactor Theory, Thermodynamics and Facility Operating Characteristics 16.00 15.00 33.3 31.9 B. Normal and Emergency Operating Procedures and Radiological Controls 14.00 29.2 29.8 C. Facility and Radiation Monitoring Systems 48.00 47.00 100.0 TOTALS All work done on this examination is my own. I have neither given nor received aid.
Candidate's Signature NRC RULES AND GUIDELINES FOR LICENSE EXAMINATIONS During the administration of this examination the following rules apply:
- 1. Cheating on the examination means an automatic denial of your application and could result in more severe penalties.
- 2. After the examination has been completed, you must sign the statement on the cover sheet indicating that the work is your own and you have neither received nor given assistance in completing the examination. This must be done after you complete the examination.
- 3. Restroom trips are to be limited and only one candidate at a time may leave. You must avoid all contacts with anyone outside the examination room to avoid even the appearance or possibility of cheating.
- 4. Use black ink or dark pencil only to facilitate legible reproductions.
- 5. Print your name in the blank provided in the upper right-hand corner of the examination cover sheet and each answer sheet.
- 6. Mark your answers on the answer sheet provided. USE ONLY THE PAPER PROVIDED AND DO NOT WRITE ON THE BACK SIDE OF THE PAGE.
- 7. The point value for each question is indicated in [brackets] after the question.
- 8. If the intent of a question is unclear, ask questions of the examiner only.
- 9. When turning in your examination, assemble the completed examination with examination questions, examination aids and answer sheets. In addition turn in all scrap paper.
- 10. Ensure all information you wish to have evaluated as part of your answer is on your answer sheet. Scrap paper will be disposed of immediately following the examination.
- 11. To pass the examination you must achieve a grade of 70 percent or greater in each category.
- 12. There is a time limit of three (3) hours for completion of the examination.
- 13. When you have completed and turned in you examination, leave the examination area. If you are observed in this area while the examination is still in progress, your license may be denied or revoked.
EQUATION SHEET
DR - Rem, Ci - curies, E - Mev, R - feet Peak)-( = Peak)-(1 1 2 2 2 2 1 Curie = 3.7 x 10 10 dis/sec 1 kg = 2.21 lbm 1 Horsepower = 2.54 x 10 3 BTU/hr 1 Mw = 3.41 x 10 6 BTU/hr 1 BTU = 778 ft-lbf ºF = 9/5 C + 32 1 gal (H 2O) . 8 lbm ºC = 5/9 (F - 32) c P = 1.0 BTU/hr/lbm/F c p = 1 cal/sec/gm/C T UA = H m = T c m = Q p&&& K-1 S -S = SCR eff )(-CR = )(-CR)K-(1 CR = )K-(1 CR 2 2 1 1 eff 2 eff 1 2 1 seconds 0.1 = -1 eff -26.06 = SUR eff K-1 K-1 = M eff eff 1 0 CR CR = K-1 1 = M 2 1 eff e P = P t 0 P -)-(1 = P 0 10 P = P SUR(t)0 K)K-(1 = SDM eff eff - =
- eff*- + = K 1)-K ( = eff eff K x k K - K = eff eff eff eff 2 1 1 2 0.693 = T e DR= DR t-0 R 6CiE(n) = DR 2 d DR = d DR 2 2 2 1 2 1 Section A - Reacto r Theory, ThermodynamicsandFacilityOperating Characteristics NegativePoint B PointAPositive Question A.001 [1.00 point] {1.0} Which ONE of the following is the reason for operating with thermal neutrons rather than fast
neutrons?
- a. Probability of fission is increased since thermal neutrons are less likely to leak out of the core.
- b. As neutron energy increases, neutron absorption in non-fuel materials increases exponentially.
- c. The absorption cross-section of U-235 is much higher for thermal neutrons.
- d. The fuel temperature coefficient becomes positive as neutron energy increases.
Answer: A.01 c.
Reference:
DOE Fundamentals Handbook, Module 2, page 9.
Question A.002 [1.00 point] {2.0} Two critical reactors at low power are identical except that Reactor 1 has a beta fraction of 0.0072 and Reactor 2 has a beta fraction of 0.0060. An equal amount of positive reactivity is inserted into both reactors. Which ONE of the following will be the response of Reactor 2 compared to Reactor 1?
- a. The resulting power level will be lower. b. The resulting power level will be higher.
- c. The resulting period will be longer.
- d. The resulting period will be shorter.
Answer: A.02 d.
Reference:
R. R. Burn, Introduction to Nuclear Reactor Operations, page 4-9.
Question A.003 [1.00 point] {3.0} Shown below is a trace of reactor period as a function of time. Between points A and B reactor
power is:
- a. continually increasing. b. continually decreasing.
- c. increasing, then decreasing. d. constant.
Answer: A.03 a.
Reference:
Standard NRC Question 1
Section A - Reacto r Theory, ThermodynamicsandFacilityOperating Characteristics Question A.004 (1.00 point) {4.0} A thin foil target of 10% copper and 90% aluminum is in a thermal neutron beam. Given a Cu = 3.79 barns, a Al = 0.23 barns, s Cu = 7.90 barns, and s Al =1.49 barns, which ONE of the following reactions has the highest probability of occurring? A neutron
Answer: A.04 a.
Reference:
DOE Fundamentals Handbook, Nuclear Physics and Reactor Theory,
Question A.005 [1 point] {5.0} The neutron microscopic cross-section for absorption, a, generally: a. increases as neutron energy increases.
- b. decreases as neutron energy increases. c. increases as the mass of the target nucleus increases. d. decreases as the mass of the target nucleus increases.
Answer: A.05 b.
Reference:
DOE Fundamentals Handbook, Volume 1, Module 2, Enabling Objective 2.3.
Question: A.006 [1.0 point] {6.0} ELASTIC SCATTERING is the process by which a neutron collides with a nucleus -.
- a. and the nucleus recoil with the same total kinetic energy as the neutron and nucleus had prior to the collision.
- b. and the nucleus recoil with less total kinetic energy than the neutron and nucleus had prior to the collision with the nucleus emitting a gamma ray.
- c. is absorbed, with the nucleus emitting a gamma ray.
- d. and the nucleus recoil with a higher total kinetic energy than the neutron and nucleus had prior to the collision with the nucleus emitting a gamma ray.
Answer: A.06 a.
Reference:
DOE Fundamentals Handbook, Nuclear Physics and Reactor Theory,
Section A - Reacto r Theory, ThermodynamicsandFacilityOperating Characteristics Question A.007 [1.0 point] {7.0} Which ONE of the following is the major source of energy released during fission? a. Absorption of prompt gamma rays b. Slowing down of fission fragments
- c. Neutrino interactions d. Fission neutron scattering
Answer: A.07 b.
Reference:
DOE Fundamentals Handbook, Nuclear Physics and Reactor Theory,
Question A.008 [1.0 point] {8.0} Which ONE of the following elements will slow down fast neutrons most quickly, i.e. produces the greatest energy loss per collision.
- a. Oxygen-16 b. Uranium-238 c. Hydrogen-1 d. Boron-10
Answer: A.08 c.
Reference:
DOE Fundamentals Handbook, Volume 1, Module 2, Enabling Objective 2.12. Exam 2
Question A.009 [1.0 point] {9.0} The initial conditions for a reactor startup are count rate = 45 cps and K eff = 0.980. When the count rate reaches 90 cps, the new K eff will be:
- a. 0.986. b. 0.988
- c. 0.990. d. 0.992
Answer: A.09 c.
Reference:
DOE Fundamentals Handbook, Volume 2, Module 4, Enabling Objective 1.3.
Section A - Reacto r Theory, ThermodynamicsandFacilityOperating Characteristics Question A.010 [1.0 point] {10.0} By definition, you may make an exactly critical reactor PROMPT CRITICAL by adding positive reactivity equal to -
- a. the shutdown margin b. the Kexcess margin c. the eff value d. 1.0 %K/K Answer: A.10 c.
Reference:
DOE Fundamentals Handbook, Volume 2, Module 4, Enabling Objective 2.8. Exam 7
Question A.011 [1.0 point] {11.0} Which one of the following statements correctly describes the property of a GOOD MODERATOR?
- a. It slows down fast neutrons to thermal energy levels via a large number of collisions. b. It reduces gamma radiation to thermal ener gy levels via a small number of collisions. c. It slows down fast neutrons to thermal energy levels via a small number of collisions. d. It reduces gamma radiation to thermal energy levels via a large number of collisions.
Answer: A.11 c.
Reference:
DOE Fundamentals Handbook, Volume 1, Module 2, Enabling Objective 2.13. Exam
Question A.012 [1.0 point] {12.0}
Which of the following factors has the LEAST effect on rod worth? a. number and location of adjacent rods. b. temperature of the moderator.
- c. temperature of the fuel. d. core age.
Answer: A.12 c.
Reference:
Standard NRC Question
Section A - Reacto r Theory, ThermodynamicsandFacilityOperating Characteristics Question A.013 [1.0 point] {13.0} Reactor power is increasing by a factor of 10 every minute. The reactor period is: a. 65 seconds. b. 52 seconds.
- c. 26 seconds. d. 13 seconds.
Answer: A.13 c.
Reference:
Reference 1, Volume 2, Module 4, Reactor Kinetics, page 17. Reactor Period = 26/Startup Rate. Exam 3.
P = P 0 e t/ = 60/ln(10) = 26.06
Question A.014 [1.0 point] {14.0} While the reactor is shutdown you place an experiment into the glory hole to determine its worth. The reactor is shutdown by 2% K/K. Before insertion of the experiment, Channel #1 reads 70 cps. After insertion of the experiment, Channel #1 reads 35 cps. What is the worth of the experiment?
- a. -2.1% K/K b. -1.05% K/K c. -0.21% K/K d. -0.105% K/K Answer: A.14 a.
Reference:
SDM = (1 - K eff)/K eff K eff = 1/(1 + SDM) Given SDM = 0.2 K eff = 1/(1 + 0.2) = 1/1.02 Initial K eff = .9804 CR 1/ CR 2 = (1 - K eff1)/(1 - K eff2) Rearranging: K eff2 = 1 - (1 - K eff1) x CR 2/CR 1 K eff2 = 1 - [(1 - 0.9804) x 35/70] = 1 - 0.0196 x 2 = 1 - 0.0392 = 0.9608
= (K eff2 -K eff1)/Keff2 Keff2 = (0.9804 - 0.9608)/(0.9804 x 0.9608) = 0.0196/ 0.94197
= 0.02081
Section A - Reacto r Theory, ThermodynamicsandFacilityOperating Characteristics Question A.015 [1.0 point] {15.0} A reactor has a shutdown margin of 0.0526 K/K. Adding a reactor experiment increases the indicated count rate from 10 cps to 20 cps. Which one of the following is the new K eff of the reactor?
- a. 0.53 b. 0.90
- c. 0.975 d. 1.001 Answer: A.15 c.
Reference:
DOE Fundamentals Handbook, Nuclear Physics and Reactor Theory Volume 2, Module 4, Enabling Objective 3.6, p. 28. SDM = 1-K eff/K eff Keff = 1/SDM + 1 K eff = 1/0.0526 + 1 K eff = .95 CR 1/CR 2 = (1 - K eff2) / (1 - K eff1) 10/20 = (1 - K eff2) / (1 - 0.95) (0.5) x (0.05) = (1 - K eff2) K eff2 = 1 - (0.5)(0.05) = 0.975
Question A.016 [1.0 point] {16.0} Which ONE of the following causes reactor period to stabilize shortly after a reactor scram from full power? Assume normal system/component operation and no maintenance activity.
- a. Xenon removal by decay at a constant rate. b. Longest lived delayed neutron precursor.
- c. Decay of compensating voltage at low power levels. d. Power level dropping below the minimum detectable level.
Answer: A.16 b.
Reference:
Nuclear Reactor Theory, LaMarsh
Question A.017 [1.0 point] {17.0} A reactor is operating at criticality. Instantaneously, all of the delayed neutrons are suddenly removed from the reactor. The K eff of the reactor in this state would be approximately:
- a. 1.007 b. 1.000 c. 0.993 d. 0.000
Answer: A.17 c.
Reference:
DOE Fundamentals Handbook, Module 2, page 30.
Section A - Reacto r Theory, ThermodynamicsandFacilityOperating Characteristics Question A.018 [1.0 points 0.25 each] {18.0} Using the drawing of the Integral Rod Worth Curve provided, identify each of the following reactivity worth's.
- a. Total Rod Worth 1. B - A b. Actual Shutdown Margin 2. C - A
- c. Technical Specification Shutdown Margin Limit 3. C - B d. Excess Reactivity 4. D - C 5. E - C
- 6. E - D 7. E - A
Answer: A.18 a. = 7; b. = 2; c. = 1; d. = 5
Reference:
Standard NRC Question
END OF SECTION A Critical Rod HeightRod fully outIntegral RodWorth Curve H C HCMax A BWorth of Most Reactive Control ElementWorth of Most Reactive Control Element D C E Section B. - Normal & EmergOperatingProcedures&Radiological Controls Question B.001 [1.0 point, 0.25 each] {1.0} Identify each of the following values as either a Safety Limit (SL), a Limited Safety Setting (LSSS) or a Limiting Condition for Operation (LCO).
- a. Power 100 watts b. Temperature 120 °C c. Excess Reactivity 0.65% k/k (corrected to 20 °C) d. Safety Rod with a reactivity addition rate of 0.065% k/k. Answer: B.01 a. = SL; b. = LSSS; c. = LCO; d. = LCO
Reference:
ISU TS §§ 2.1, 2.2 and 3.0
Question B.002 [1 point] {2.0} In accordance with Emergency procedures, in the event of a fire, which ONE of the following actions should the reactor operator perform immediately after securing the reactor?
- a. Notify the Pocatello Police Department. b. Notify the U.S. NRC Operations Center.
- c. Initiate a building evacuation. d. Notify the Reactor Supervisor.
Answer: B.02 c.
Reference:
Emergency Plan, Section 4, "Fire or Explosion"
Question B.003 [1 point] {3.0} Temporary procedures which do NOT change the intent of the original procedure or involve an unreviewed safety question may be approved as a MINIMUM by the:
- a. Reactor Operator. b. Reactor Supervisor. c. Reactor Safety Committee. d. Dean of the College of Engineering.
Answer: B.03 b.
Reference:
ISU Technical Specifications, 6.6, page 26
Section B. - Normal & EmergOperatingProcedures&Radiological Controls Question B.004 [1 point] {4.0}
A reactor sample has a disintegration rate of 2 X 10 12 disintegrations per second and emits a 0.6 Mev . The expected dose rate from this sample at a distance of 10 feet would be approximately: (Assume a point source)
- a. 100 mR/hr b. 325 mR/hr c. 2 R/hr d. 7.5 R/hr Answer: B.04 c.
Reference:
Glasstone & Sesonke, Sect 9.41, p 525. DR = 6CE/f*2 R/hr, =6(2 X 10*12/3.7X10*10)(0.6)/10*2, =1.9459 R/hr
Question B.005 [1.0 point] {5.0} You performed a startup this morning with the pneumatic tube terminus and no experiment in the reactor. After shutting down, one hour later, you removed the tube. No other changes were made to the reactor. During a new startup the new core excess will be -
- a. larger than the previous startup. b. smaller than the previous startup. c. the same as the previous startup. d. dependent on the time of shutdown.
Answer: B.05 c.
Reference:
ISU Experimental Plan No. 19 Sample Transfer by Pneumatic Tube, Safety Analysis p. 3
Question B.006 [1 point] {6.0} The shutdown margin, required by Technical Specifications, with the most reactive safety or control rod fully inserted and the fine control rod fully inserted shall be at least:
- a. 0.29 % k/k b. 0.65 % k/k c. 1.00 % k/k d. 1.25 % k/k Answer: B.06 c.
Reference:
ISU Technical Specifications, 3.1.b, page 8.
Section B. - Normal & EmergOperatingProcedures&Radiological Controls Question B.007 [1.0 point] {7.0} You have evacuated the EPZ. Which ONE of the following ISU staff positions is responsible (by title) for authorizing reentry?
- a. The Senior Reactor Operator b. The Reactor Supervisor
- c. The Director of Emergency Operations
- d. The ISU Radiation Safety Officer Answer: B.07 c.
Reference:
Emergency Plan, Nuclear Emergency p. 13.
Question B.008 [1 point] {8.0] The reason for allowing only one control rod at a time to be removed and disassembled during control rod maintenance is to:
- a. prevent inadvertent reactor criticality. b. limit the radiation exposure to personnel.
- c. prevent the inadvertent interchange of parts. d. limit the number of maintenance operations being performed concurrently.
Answer: B.08 c.
Reference:
ISU MP-1, step 4.b, p 3. (AGN
-201 ROD MAINTENA NCE PROCEDURE)
Question B.009 [1 point] {9.0} The Technical Specification basis for the MAXIMUM core temperature limit is to prevent:
- a. breakdown of the graphite reflector. b. instrument inaccuracies. c. release of fission products. d. boiling of the shield water.
Answer: B.09 c.
Reference:
ISU Technical Specifications, 2.1 Basis, page 6
Question B.010 [1.0 point] {10.0} Deleted during the examination Per the emergency plan the EMERGENCY PLANNING ZONE (EPZ) is - a. rooms 19 and 20. b. rooms 20 and 23. c. rooms 15, 16, 18, 19, 20, 22, 23 and 24 d. the entire Lillibridge Engineering Laboratory basement. Answer: B.10 b
Reference:
Emergency Plan, 2.0 DEFINITIONS, 2.8
Section B. - Normal & EmergOperatingProcedures&Radiological Controls Question B.011 [1.0 point] {11.0} The dose rate from a mixed beta-gamma point source is 100 mrem/hour at a distance of one (1) foot, and is 0.1 mrem/hour at a distance of twenty (20) feet. At one (1) foot what percentage of the source consists of beta radiation?
- a. 20% b. 40%
- c. 60% d. 80%
Answer: B.11 c
Reference:
10CFR20. At 20 feet, there is no beta radiation. Gamma at 20 feet = 0.1 mrem/hour, gamma at 1 foot = 40 mrem/hour. Therefore beta at 1 foot = 60 mrem/hour = 60%.
Question B.012 [1 point] (12.0) The total scram withdrawal time of the coarse control rod and the safety rods must be less than:
- a. 200 milliseconds. b. 500 milliseconds. c. 800 milliseconds. d. 1000 milliseconds.
Answer: B.12 d.
Reference:
ISU Technical Specification 3.2.a
Question B.013 [1 point] (13.0) To prevent damage to the reactor or excessive release of radioactive materials in the event of an experiment failure, experiments containing corrosive materials shall:
- a. be doubly encapsulated. b. be limited to less than 10 grams.
- c. not be inserted into the reactor or stored at the facility.
- d. have a TEDE of less than 500 mrem over two hours from the beginning of the release.
Answer: B.13 a.
Reference:
ISU Technical Specifications, 3.3.a, page 11
Section B. - Normal & EmergOperatingProcedures&Radiological Controls Question B.014 [1.0 point] {14.0} A radiation survey of an area reveals a general radiation reading of 1 mRem/hr. However, a small section of pipe (point source) reads 10 mRem/hr at one (1) meter. Which ONE of the following is the posting requirement for the area, in accordance with 10 CFR Part 20?
- a. "CAUTION - RADIATION AREA"
- b. "CAUTION - HIGH RADIATION AREA"
- c. "CAUTION - RADIOACTIVE MATERIAL"
- d. "CAUTION - AIRBORNE RADIOACTIVITY AREA"
Answer: B.14 b.
Reference:
10 CFR 20.1003 For a point source, 10 mrem/hr at 100 cm (1 meter) = 111.1 mrem/hr at 30 cm.
Question B.015 [1.0 point] {15.0} As a licensed reactor operator at the AGN-201 facility, who is allowed to operate the controls of the reactor under your direction?
- a. A local college newspaper reporter who wants to write a story on the safety of nuclear reactors.
- b. A new student participating in a nuclear engineering laboratory course.
- c. A health physicist who is trying to gain a certified health physicist (CHP) license.
- d. An NRC inspector trying to make sure that all set points of the reactor are the same as those in the technical specifications.
Answer: B.15 b.
Reference:
General Operating Rules, Revision 4, dated September 19, 1994. and 10 CFR 55.13 Question B.016 [1 point] {10.0} During a reactor startup the low level scram on Channel #1 ensures: a. protection for a rod drop event. b. an operating neutron monitor channel. c. protection for a temperature excursion. d. the minimum number of period trips are available for startup.
Answer: B.16 b.
Reference:
TS 3.2 Basis, page 10
END OF SECTION B
Section C
- FacilityandRadiationMonitoringSystems Question C.001 [1 point] {1.0} The shield tank level trip shall be set to scram the reactor if shield water level falls ____ below the highest point on the reactor shield tank manhole opening.
- a. 8 inches b. 10 inches
- c. 12 inches
- d. 20 inches Answer: C.01 b.
Reference:
ISU Tech. Spec's 3.2.e.
Question C.002 [1.0 point] {2.0} The Idaho State University reactor Access Ports pass through the steel tank: a. up to the reflector. b. then the lead shield, up to the reflector. c. then the lead shield, the graphite reflector and then back out again. d. then the lead shield, graphite reflector, and the core and then back out again.
Answer: C.02 c.
Reference:
ISU General Information, AGN - 201 Reactor, Access Ports & Glory Hole.
Question C.003 [1.0 point] {3.0} When using the movable tank on the top of the reactor as a Thermal Neutron column, it is filled with -
- a. Water b. Beryllium
- c. Graphite d. Heavy Water
Answer: C.03 c.
Reference:
ISU SAR, § 4.1
Section C
- FacilityandRadiationMonitoringSystems Question C.004 [1 point] {4.0} The shield tank water temperature interlock prevents reactor operation: a. during periods of high thermal stress. b. in the event of a high temperature condition.
- c. during a condition that will produce excess radiation levels. d. from a reactivity addition due to a temperature decrease.
Answer: C.04 d.
Reference:
ISU Tech. Spec's., 3.2 Basis, page 10.
Question C.005 [1 point] {5.0} The U-235 fuel in the AGN is contained in fuel disks and control rods. Of the total fuel in the reactor, approximately how much is contained in the control and safety rods?
- a. 9%. b. 24%. c. 55% d. 78%.
Answer: C.05 a.
Reference:
Safety Analysis Report, dated November 23, 1995, pg. 46-47
Question C.006 [1 point] {6.0} Which ONE of the following trips/conditions is associated with the safety chassis interlock bus? a. period trip.
- b. water level.
- c. manual scram. d. low sensitrol temperature.
Answer: C.06 b.
Reference:
ISU SAR Section 4.3.2 Instrumentation System, Figure 4.3-8
Section C
- FacilityandRadiationMonitoringSystems Question C.007 [1 point] {7.0} Which ONE of the following describes the design purpose of the space in the top section of the core tank above the reactor core and the reflector?
- a. Ensures free fall of the bottom half of the core during the most severe transient. b. Prevents core damage during the design basis earthquake and 6 cm. displacements.
- c. Allows for accumulation of fission product gases created during reactor operation.
- d. Increases the fast neutron population in the vicinity of experiments placed in the access ports.
Answer; C.07 c.
Reference:
Safety Analysis Report, dated November 23, 1995, pg. 41
Question C.008 [1 point] {8.0} Which ONE of the following is NOT true when considering the advantages of using fueled control rods over poison rods:
- a. larger reactor size. b. more symmetrical flux distribution at power. c. no critical mass assembled when shutdown. d. simplification of calculations for a homogeneous reactor.
Answer: C.08 a.
Reference:
Previous ISU Exam
Question C.009 [1 point] {9.0} The shield tank is designed to provide shielding from: a. the glory hole area.
- b. high energy radiation. c. high energy radiation. d. fast neutron radiation.
Answer: C.09 d.
Reference:
ISU Tech. Spec's, 5.1.d., page 18.
Section C
- FacilityandRadiationMonitoringSystems Question C.010 [1 point] {10.0} Which one of the following materials will have a positive effect on reactivity when inserted into the Glory Hole?
- a. Borated Polyethylene b. Polyethylene
- c. Natural Uranium
- d. Gold Answer: C.10 b.
Reference:
NRC Examination Question Bank
Question C.011 [1 point] {11.0} Which ONE of the following statements describes the control rod interlocks? a. The safety rods cannot be inserted unless the course control rod is "DISENGAGED".
- b. The fine control rod cannot be inserted until the safety rods are "FULLY INSERTED". c. The fine control rod cannot be inserted unless the course control rod is "DISENGAGED".
- d. The safety rods must be fully inserted before their drive motors will operate in the "LOWER" position. Answer: C.11 b.
Reference:
ISU SAR Section 4.3.2 Instrumentation System, Figure 4.3-8
Question C.012 [1 point] {12.0} Which ONE of the following statements describes the design/operation of the control rod drive assemblies?
- a. The dashpots consist of a foam cushion to reduce rod impact following a scram. b. The fine control rod does not have a dashpot since it does not scram. c. The course control rod dashpot uses magnetic force to slow the rod down before impact on a scram. d. Dashpots are only associated with the safety rods since these rods have been raised against spring tension to assist in driving these rods down on a scram.
Answer: C.12 b.
Reference:
ISU General Information, AGN - 201 Reactor, Control Rods
Section C
- FacilityandRadiationMonitoringSystems Question C.013 [1 point] {13.0} Which ONE of the following does NOT automatically cause a reactor scram? a. Reactor period. b. Radiation level.
- c. Water level. d. Power failure.
Answer: C.13 b.
Reference:
ISU Safety Analysis Report, dated January 2003, Instrument Sys. 4.3.2
Question C.014 [1 point] {14.0} What type of detector is used for the Low temperature switch? a. A simple bi-metallic thermal switch
- b. A precision platinum wound resistance temperature detector (RTD) c. A chromel-alumel (Type K) thermocouple. d. A copper-constantan (Type T) thermocouple Answer: C.14 a.
Reference:
ISU Safety Analysis Report (SAR) § 4.3.4, Interlock System.