Line 1: Line 1:
{{Adams|number = ML082970617}}
{{Adams
| number = ML081630546
| issue date = 06/11/2008
| title = Site-Specific Implementation of B.5.B Phase 2 and 3 Mitigating Strategies Temporary Instruction Inspection (NRC Inspection Report 05000445/2008008 and 05000446/2008008)
| author name = Lantz R E
| author affiliation = NRC/RGN-IV/DRS/OB
| addressee name = Blevins M
| addressee affiliation = Luminant Generation Co, LLC
| docket = 05000445, 05000446
| license number = NPF-087, NPF-089
| contact person =
| document report number = IR-08-008
| document type = Letter
| page count = 3
}}


{{IR-Nav| site = 05000445 | year = 2008 | report number = 008 }}
{{IR-Nav| site = 05000445 | year = 2008 | report number = 008 }}
Line 5: Line 19:
=Text=
=Text=
{{#Wiki_filter:
{{#Wiki_filter:
[[Issue date::October 21, 2008]]
[[Issue date::June 11, 2008]]


Mike Blevins, Executive Vice President and Chief Nuclear Officer Luminant Generation Company LLC ATTN: Regulatory Affairs Comanche Peak Steam Electric Station P.O. Box 1002 Glen Rose, TX 76043
Mike Blevins, Executive Vice President and Chief Nuclear Officer Luminant Generation Company LLC ATTN: Regulatory Affairs Comanche Peak Steam Electric Station P.O. Box 1002 Glen Rose, TX 76043


SUBJECT: COMANCHE PEAK STEAM ELECTRIC STATION - NRC INSPECTION SITE-SPECIFIC IMPLEMENTATION OF B.5.B PHASE 2 AND 3 MITIGATING STRATEGIES TEMPORARY INSTRUCTION INSPECTION REPORT 05000445/2008008 AND 05000446/2008008
SUBJECT: COMANCHE PEAK STEAM ELECTRIC STATION - SITE-SPECIFIC IMPLEMENTATION OF B.5.B PHASE 2 AND 3 MITIGATING STRATEGIES TEMPORARY INSTRUCTION INSPECTION (NRC INSPECTION REPORT 05000445/2008008 AND 05000446/2008008)


==Dear Mr. Blevins:==
==Dear Mr. Blevins:==
On July 10, 2008, the U.S. Nuclear Regulatory Commission (NRC) completed a site-specific implementation of B.5.b, Phase 2 and 3, temporary instruction team inspection of your Comanche Peak Steam Electric Station. The enclosed report documents the team's results, which were discussed on September 15, 2008, with Mr. Mitch Lucas and other members of your staff. The inspection examined activities conducted under your license as they relate to the implementation of B.5.b, Phase 2 and 3, mitigating strategies, your compliance with the Commission's rules and regulations, and with the condition of your operating license. Within these areas, the inspection involved examination of selected procedures and records, observation of activities, and interviews with station personnel.
In a telephone conversation on June 2, 2008, Messrs. Neil Harris and John Kirkland made arrangements for the NRC to inspect the site-specific implementation of B.5.b Phase 2 and 3 mitigating strategies at the Comanche Peak Steam Electric Station. The inspection is planned for the week of July 7, 2008.


This report documents one NRC-identified finding of very low safety significance (Green). This finding was determined to involve a violation of NRC requirements. Because of the very low safety significance and because this violation was entered into your corrective action program, the NRC is treating this finding as a noncited violation, in accordance with Section VI.A.1 of the NRC's Enforcement Policy. If you contest this noncited violation, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington DC 20555-0001; with copies to the Regional Administrator, Region IV; the Director, Office of Enforcement, United Luminant Generation Company LLC 2 States Nuclear Regulatory Commission, Washington, DC 20555-0001; and the NRC Resident Inspector at the Comanche Peak Steam Electric Station. In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, because of the sensitive information contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letter's enclosure will not be available for public inspection. If Safeguards Information is necessary to provide an acceptable response, please provide the level of protection described in 10 CFR 73.21. Otherwise, mark your entire response "Security-Related Information-Withhold Under 10 CFR 2.390" and follow the instructions for withholding in 10 CFR 2.390(b)(1).
In order for the NRC to adequately prepare for this inspection, please furnish the documents listed in Enclosure 1 to Mr. John Kirkland in electronic format no later than June 20, 2008.


Sincerely,/RA/
Please have available on site at the beginning of the inspection the arrangements and documents listed in Enclosure 2. Mr. Neil Harris has been advised of this request and provided with the name and address of the NRC lead inspector.
Ryan E. Lantz, Chief Operations Branch Division of Reactor Safety Dockets: 50-445; 50-446 Licenses: NPF-87; NPF-89


===Enclosure:===
This letter contains information collections that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of Management and Budget, approval number 3150-0011.
INSPECTION REPORT 05000445/2008008 AND 05000446/2008008 w/Attachment Supplemental Information cc w/o enclosure: Mr. Fred W. Madden, Director Regulatory Affairs Luminant Generation Company LLC P.O. Box 1002 Glen Rose, TX 76043
 
The public reporting burden for this collection of information is estimated to average 4 hours per response, including the time for reviewing instructions, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments on any Luminant Generation Company LLC 2 aspect of this collection of information, including suggestions for reducing the burden, to the Records and FOIA/Privacy Services Branch (T-5 F53), U.S. Nuclear Regulatory Commission, Washington, D.C. 20555-0001, or by Internet electronic mail to INFOCOLLECTS.Resource@NRC.GOV; and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0011), Office of Management and Budget, Washington, D.C. 20503-0001.
 
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, because of the sensitive information contained in the enclosures, and in accordance with 10 CFR 2.390, a copy of this letter's enclosures will not be available for public inspection.
 
Thank you for your cooperation in this matter. If you have any questions regarding this inspection, please contact John Kirkland at 402-426-9611, or me at 817 860-8159.
 
Sincerely,/RA/ Ryan E. Lantz, Chief Operations Branch Division of Reactor Safety
 
Dockets: 50-445; 50-446 Licenses: NPF-87; NPF-89
 
===Enclosures:===
1. Documentation Requested Prior to the Inspection 2. Arrangements/Documents Requested To Be Available Onsite during the Inspection Week Luminant Generation Company LLC 3 cc w/enclosure: Neil Harris Luminant Generation Company LLC P.O. Box 1002 Glen Rose, TX 76043
 
cc w/o enclosure: Fred W. Madden, Director Regulatory Affairs Luminant Generation Company LLC P.O. Box 1002 Glen Rose, TX 76043
}}
}}

Latest revision as of 10:29, 17 April 2019

Site-Specific Implementation of B.5.B Phase 2 and 3 Mitigating Strategies Temporary Instruction Inspection (NRC Inspection Report 05000445/2008008 and 05000446/2008008)
ML081630546
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 06/11/2008
From: Lantz R E
Operations Branch IV
To: Blevins M
Luminant Generation Co
References
IR-08-008
Download: ML081630546 (3)


Text

June 11, 2008

Mike Blevins, Executive Vice President and Chief Nuclear Officer Luminant Generation Company LLC ATTN: Regulatory Affairs Comanche Peak Steam Electric Station P.O. Box 1002 Glen Rose, TX 76043

SUBJECT: COMANCHE PEAK STEAM ELECTRIC STATION - SITE-SPECIFIC IMPLEMENTATION OF B.5.B PHASE 2 AND 3 MITIGATING STRATEGIES TEMPORARY INSTRUCTION INSPECTION (NRC INSPECTION REPORT 05000445/2008008 AND 05000446/2008008)

Dear Mr. Blevins:

In a telephone conversation on June 2, 2008, Messrs. Neil Harris and John Kirkland made arrangements for the NRC to inspect the site-specific implementation of B.5.b Phase 2 and 3 mitigating strategies at the Comanche Peak Steam Electric Station. The inspection is planned for the week of July 7, 2008.

In order for the NRC to adequately prepare for this inspection, please furnish the documents listed in Enclosure 1 to Mr. John Kirkland in electronic format no later than June 20, 2008.

Please have available on site at the beginning of the inspection the arrangements and documents listed in Enclosure 2. Mr. Neil Harris has been advised of this request and provided with the name and address of the NRC lead inspector.

This letter contains information collections that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of Management and Budget, approval number 3150-0011.

The public reporting burden for this collection of information is estimated to average 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> per response, including the time for reviewing instructions, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments on any Luminant Generation Company LLC 2 aspect of this collection of information, including suggestions for reducing the burden, to the Records and FOIA/Privacy Services Branch (T-5 F53), U.S. Nuclear Regulatory Commission, Washington, D.C. 20555-0001, or by Internet electronic mail to INFOCOLLECTS.Resource@NRC.GOV; and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0011), Office of Management and Budget, Washington, D.C. 20503-0001.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, because of the sensitive information contained in the enclosures, and in accordance with 10 CFR 2.390, a copy of this letter's enclosures will not be available for public inspection.

Thank you for your cooperation in this matter. If you have any questions regarding this inspection, please contact John Kirkland at 402-426-9611, or me at 817 860-8159.

Sincerely,/RA/ Ryan E. Lantz, Chief Operations Branch Division of Reactor Safety

Dockets: 50-445; 50-446 Licenses: NPF-87; NPF-89

Enclosures:

1. Documentation Requested Prior to the Inspection 2. Arrangements/Documents Requested To Be Available Onsite during the Inspection Week Luminant Generation Company LLC 3 cc w/enclosure: Neil Harris Luminant Generation Company LLC P.O. Box 1002 Glen Rose, TX 76043

cc w/o enclosure: Fred W. Madden, Director Regulatory Affairs Luminant Generation Company LLC P.O. Box 1002 Glen Rose, TX 76043