IR 05000445/2008008: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
| (One intermediate revision by the same user not shown) | |||
| Line 1: | Line 1: | ||
{{Adams|number = | {{Adams | ||
| number = ML081630546 | |||
| issue date = 06/11/2008 | |||
| title = Site-Specific Implementation of B.5.B Phase 2 and 3 Mitigating Strategies Temporary Instruction Inspection (NRC Inspection Report 05000445/2008008 and 05000446/2008008) | |||
| author name = Lantz R E | |||
| author affiliation = NRC/RGN-IV/DRS/OB | |||
| addressee name = Blevins M | |||
| addressee affiliation = Luminant Generation Co, LLC | |||
| docket = 05000445, 05000446 | |||
| license number = NPF-087, NPF-089 | |||
| contact person = | |||
| document report number = IR-08-008 | |||
| document type = Letter | |||
| page count = 3 | |||
}} | |||
{{IR-Nav| site = 05000445 | year = 2008 | report number = 008 }} | {{IR-Nav| site = 05000445 | year = 2008 | report number = 008 }} | ||
| Line 5: | Line 19: | ||
=Text= | =Text= | ||
{{#Wiki_filter: | {{#Wiki_filter: | ||
[[Issue date:: | [[Issue date::June 11, 2008]] | ||
Mike Blevins, Executive Vice President and Chief Nuclear Officer Luminant Generation Company LLC ATTN: Regulatory Affairs Comanche Peak Steam Electric Station P.O. Box 1002 Glen Rose, TX 76043 | Mike Blevins, Executive Vice President and Chief Nuclear Officer Luminant Generation Company LLC ATTN: Regulatory Affairs Comanche Peak Steam Electric Station P.O. Box 1002 Glen Rose, TX 76043 | ||
SUBJECT: COMANCHE PEAK STEAM ELECTRIC STATION - | SUBJECT: COMANCHE PEAK STEAM ELECTRIC STATION - SITE-SPECIFIC IMPLEMENTATION OF B.5.B PHASE 2 AND 3 MITIGATING STRATEGIES TEMPORARY INSTRUCTION INSPECTION (NRC INSPECTION REPORT 05000445/2008008 AND 05000446/2008008) | ||
==Dear Mr. Blevins:== | ==Dear Mr. Blevins:== | ||
In a telephone conversation on June 2, 2008, Messrs. Neil Harris and John Kirkland made arrangements for the NRC to inspect the site-specific implementation of B.5.b Phase 2 and 3 mitigating strategies at the Comanche Peak Steam Electric Station. The inspection is planned for the week of July 7, 2008. | |||
In order for the NRC to adequately prepare for this inspection, please furnish the documents listed in Enclosure 1 to Mr. John Kirkland in electronic format no later than June 20, 2008. | |||
Please have available on site at the beginning of the inspection the arrangements and documents listed in Enclosure 2. Mr. Neil Harris has been advised of this request and provided with the name and address of the NRC lead inspector. | |||
=== | This letter contains information collections that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of Management and Budget, approval number 3150-0011. | ||
The public reporting burden for this collection of information is estimated to average 4 hours per response, including the time for reviewing instructions, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments on any Luminant Generation Company LLC 2 aspect of this collection of information, including suggestions for reducing the burden, to the Records and FOIA/Privacy Services Branch (T-5 F53), U.S. Nuclear Regulatory Commission, Washington, D.C. 20555-0001, or by Internet electronic mail to INFOCOLLECTS.Resource@NRC.GOV; and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0011), Office of Management and Budget, Washington, D.C. 20503-0001. | |||
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, because of the sensitive information contained in the enclosures, and in accordance with 10 CFR 2.390, a copy of this letter's enclosures will not be available for public inspection. | |||
Thank you for your cooperation in this matter. If you have any questions regarding this inspection, please contact John Kirkland at 402-426-9611, or me at 817 860-8159. | |||
Sincerely,/RA/ Ryan E. Lantz, Chief Operations Branch Division of Reactor Safety | |||
Dockets: 50-445; 50-446 Licenses: NPF-87; NPF-89 | |||
===Enclosures:=== | |||
1. Documentation Requested Prior to the Inspection 2. Arrangements/Documents Requested To Be Available Onsite during the Inspection Week Luminant Generation Company LLC 3 cc w/enclosure: Neil Harris Luminant Generation Company LLC P.O. Box 1002 Glen Rose, TX 76043 | |||
cc w/o enclosure: Fred W. Madden, Director Regulatory Affairs Luminant Generation Company LLC P.O. Box 1002 Glen Rose, TX 76043 | |||
}} | }} | ||
Latest revision as of 10:29, 17 April 2019
| ML081630546 | |
| Person / Time | |
|---|---|
| Site: | Comanche Peak |
| Issue date: | 06/11/2008 |
| From: | Lantz R E Operations Branch IV |
| To: | Blevins M Luminant Generation Co |
| References | |
| IR-08-008 | |
| Download: ML081630546 (3) | |
Text
June 11, 2008
Mike Blevins, Executive Vice President and Chief Nuclear Officer Luminant Generation Company LLC ATTN: Regulatory Affairs Comanche Peak Steam Electric Station P.O. Box 1002 Glen Rose, TX 76043
SUBJECT: COMANCHE PEAK STEAM ELECTRIC STATION - SITE-SPECIFIC IMPLEMENTATION OF B.5.B PHASE 2 AND 3 MITIGATING STRATEGIES TEMPORARY INSTRUCTION INSPECTION (NRC INSPECTION REPORT 05000445/2008008 AND 05000446/2008008)
Dear Mr. Blevins:
In a telephone conversation on June 2, 2008, Messrs. Neil Harris and John Kirkland made arrangements for the NRC to inspect the site-specific implementation of B.5.b Phase 2 and 3 mitigating strategies at the Comanche Peak Steam Electric Station. The inspection is planned for the week of July 7, 2008.
In order for the NRC to adequately prepare for this inspection, please furnish the documents listed in Enclosure 1 to Mr. John Kirkland in electronic format no later than June 20, 2008.
Please have available on site at the beginning of the inspection the arrangements and documents listed in Enclosure 2. Mr. Neil Harris has been advised of this request and provided with the name and address of the NRC lead inspector.
This letter contains information collections that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of Management and Budget, approval number 3150-0011.
The public reporting burden for this collection of information is estimated to average 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> per response, including the time for reviewing instructions, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments on any Luminant Generation Company LLC 2 aspect of this collection of information, including suggestions for reducing the burden, to the Records and FOIA/Privacy Services Branch (T-5 F53), U.S. Nuclear Regulatory Commission, Washington, D.C. 20555-0001, or by Internet electronic mail to INFOCOLLECTS.Resource@NRC.GOV; and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0011), Office of Management and Budget, Washington, D.C. 20503-0001.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, because of the sensitive information contained in the enclosures, and in accordance with 10 CFR 2.390, a copy of this letter's enclosures will not be available for public inspection.
Thank you for your cooperation in this matter. If you have any questions regarding this inspection, please contact John Kirkland at 402-426-9611, or me at 817 860-8159.
Sincerely,/RA/ Ryan E. Lantz, Chief Operations Branch Division of Reactor Safety
Dockets: 50-445; 50-446 Licenses: NPF-87; NPF-89
Enclosures:
1. Documentation Requested Prior to the Inspection 2. Arrangements/Documents Requested To Be Available Onsite during the Inspection Week Luminant Generation Company LLC 3 cc w/enclosure: Neil Harris Luminant Generation Company LLC P.O. Box 1002 Glen Rose, TX 76043
cc w/o enclosure: Fred W. Madden, Director Regulatory Affairs Luminant Generation Company LLC P.O. Box 1002 Glen Rose, TX 76043