IR 05000313/2019014: Difference between revisions
Jump to navigation
Jump to search
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
| Line 2: | Line 2: | ||
| number = ML19094B867 | | number = ML19094B867 | ||
| issue date = 04/04/2019 | | issue date = 04/04/2019 | ||
| title = | | title = NRC Confirmatory Order (EA 17 132 and EA 17-153) Follow-Up Inspection Report 05000416/2019012; Arkansas Nuclear One, Units 1 and 2-Nrc Confirmatory Order (EA 17 132 and Ea-17-153) Follow-Up Inspection Report 05000313/2019014 | ||
| author name = Vegel A T | | author name = Vegel A T | ||
| author affiliation = NRC/RGN-IV/DRP | | author affiliation = NRC/RGN-IV/DRP | ||
Revision as of 20:26, 8 April 2019
| ML19094B867 | |
| Person / Time | |
|---|---|
| Site: | Grand Gulf, Arkansas Nuclear, River Bend, Waterford |
| Issue date: | 04/04/2019 |
| From: | Vegel A T NRC/RGN-IV/DRP |
| To: | Ventosa J A Entergy Nuclear Operations |
| References | |
| EA-17-132, EA-17-153 IR 2019012, IR 2019013, IR 2019014 | |
| Download: ML19094B867 (22) | |
Text
/RA Michael C. Hay Acting for/
- o
o
o*
o o
o
- o o*
oooo*
for