| number = | | number = ML19067A189 | ||
| issue date = | | issue date = 03/07/2019 | ||
| title = Ltr. | | title = Ltr. 03/07/19 Revised NCV - Palisades Nuclear Plant NRC Integrated IR 05000255/2015003 (NCV 05000255/2015003-01; Failure to Justify Continued Service of Safety-Related Electrolytic Capacitors Installed Beyond Their Service Life (DRS-N.Feliz | ||
| author name = | | author name = O'Brien K | ||
| author affiliation = NRC/RGN-III/DRS | | author affiliation = NRC/RGN-III/DRS | ||
| addressee name = | | addressee name = Arnone C | ||
| addressee affiliation = Entergy Nuclear Operations, Inc | | addressee affiliation = Entergy Nuclear Operations, Inc | ||
| docket = 05000255 | | docket = 05000255 | ||
| Line 13: | Line 13: | ||
| document report number = IR 2015003 | | document report number = IR 2015003 | ||
| document type = Letter | | document type = Letter | ||
| page count = | | page count = 8 | ||
}} | }} | ||
| Line 19: | Line 19: | ||
=Text= | =Text= | ||
{{#Wiki_filter: | {{#Wiki_filter: | ||
[[Issue date::March 7, 2019]] | |||
EA-1 5-264 Mr. Charles Arnone Vice President, Operations Entergy Nuclear Operations, Inc. | |||
Palisades Nuclear Plant 27780 Blue Star Memorial Highway Covert, MI 49043-9530 | |||
SUBJECT: REVISED NON-CITED VIOLATION | |||
-PALISADES NUCLEAR PLANT NRC INTEGRATED INSPECTION REPORT 05000255/2015003 (NCV 05000255/2015003 | |||
- | -01; FAILURE TO JUSTIFY CONTINUED SERVICE OF SAFETY-RELATED ELECTROLYTIC CAPACITORS INSTALLED BEYOND THEIR SERVICE LIFE) | ||
of | ==Dear Mr. Arnone:== | ||
On November 30, 2015, Palisades Nuclear Plant (PNP) provided a written response to U.S. Nuclear Regulatory Commission (NRC) Inspection Report 05000255/2015003 | |||
, which was issued on October 30, 2015. Specifically, the lette r contested Non | |||
-Cited Violation 05000255/2015003 | |||
-01 associated with the failure to justify continued service of safety-related containment floor level indicating transmitter electrolytic capacitors installed beyond their service life. The letter explained PNP agreed a performance deficiency occurred but disagreed the deficiency was associated with a violation of Title 10 of the Code of Federal Regulations | |||
, Part 50, Appendix B, Criterion III, "Design Control," as stated in the inspection report. The letter further stated PNP believed the performance deficiency was associated with 10 CFR Part 50, Appendix B, Criterion V, "Instructions, Procedures, and Drawings." | |||
The NRC carefully reviewed PNP's reply and determined the Non-Cited Violation should be changed to a violation of Technical Specifications Section 5.4.1, "Procedures | |||
," as shown in the enclosed report. | |||
Technical Specifications Section 5.4.1 | |||
, requires, in part, the establishment, implementation, and maintenance of written procedures recommended in Regulatory Guide 1.33, Revision 2, Appendix A, February 1978. Section 9 of the Regulatory Guide requires the development of preventive maintenance schedules and associated procedure s for the inspection or replacement of parts that have a specific lifetime. | |||
The bases for the staff's conclusion are detailed in the enclosed report. This letter, its enclosure, PNP's November 30, 2015, response, and your response (if any) | |||
will be made available for public inspection and copying at http://www.nrc.gov/reading | |||
-rm/adams.html and at the NRC Public Document Room in accordance with 10 CFR 2.390, "Public Inspections, Exemptions, Requests for Withholding." | |||
Sincerely,/RA/ Kenneth O'Brien, Director Division of Reactor Safety Docket No. 50 | |||
Sincerely,/RA/ | |||
-255 License No. DPR | -255 License No. DPR | ||
-20 | -20 | ||
===Enclosure:=== | |||
NRC Staff Assessment of Disputed NCV 05000255/2015003 | |||
-01 cc: Distribution via LISTSERV | |||
}} | }} | ||
Revision as of 19:10, 7 April 2019
| ML19067A189 | |
| Person / Time | |
|---|---|
| Site: | Palisades |
| Issue date: | 03/07/2019 |
| From: | O'Brien K Division of Reactor Safety III |
| To: | Arnone C Entergy Nuclear Operations |
| References | |
| EA-15-264 IR 2015003 | |
| Download: ML19067A189 (8) | |
Text
March 7, 2019
EA-1 5-264 Mr. Charles Arnone Vice President, Operations Entergy Nuclear Operations, Inc.
Palisades Nuclear Plant 27780 Blue Star Memorial Highway Covert, MI 49043-9530
SUBJECT: REVISED NON-CITED VIOLATION
-PALISADES NUCLEAR PLANT NRC INTEGRATED INSPECTION REPORT 05000255/2015003 (NCV 05000255/2015003
-01; FAILURE TO JUSTIFY CONTINUED SERVICE OF SAFETY-RELATED ELECTROLYTIC CAPACITORS INSTALLED BEYOND THEIR SERVICE LIFE)
Dear Mr. Arnone:
On November 30, 2015, Palisades Nuclear Plant (PNP) provided a written response to U.S. Nuclear Regulatory Commission (NRC) Inspection Report 05000255/2015003
, which was issued on October 30, 2015. Specifically, the lette r contested Non
-Cited Violation 05000255/2015003
-01 associated with the failure to justify continued service of safety-related containment floor level indicating transmitter electrolytic capacitors installed beyond their service life. The letter explained PNP agreed a performance deficiency occurred but disagreed the deficiency was associated with a violation of Title 10 of the Code of Federal Regulations
, Part 50, Appendix B, Criterion III, "Design Control," as stated in the inspection report. The letter further stated PNP believed the performance deficiency was associated with 10 CFR Part 50, Appendix B, Criterion V, "Instructions, Procedures, and Drawings."
The NRC carefully reviewed PNP's reply and determined the Non-Cited Violation should be changed to a violation of Technical Specifications Section 5.4.1, "Procedures
," as shown in the enclosed report.
Technical Specifications Section 5.4.1
, requires, in part, the establishment, implementation, and maintenance of written procedures recommended in Regulatory Guide 1.33, Revision 2, Appendix A, February 1978. Section 9 of the Regulatory Guide requires the development of preventive maintenance schedules and associated procedure s for the inspection or replacement of parts that have a specific lifetime.
The bases for the staff's conclusion are detailed in the enclosed report. This letter, its enclosure, PNP's November 30, 2015, response, and your response (if any)
will be made available for public inspection and copying at http://www.nrc.gov/reading
-rm/adams.html and at the NRC Public Document Room in accordance with 10 CFR 2.390, "Public Inspections, Exemptions, Requests for Withholding."
Sincerely,/RA/ Kenneth O'Brien, Director Division of Reactor Safety Docket No. 50
-255 License No. DPR
-20
Enclosure:
NRC Staff Assessment of Disputed NCV 05000255/2015003
-01 cc: Distribution via LISTSERV