ML16081A393: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
| Line 2: | Line 2: | ||
| number = ML16081A393 | | number = ML16081A393 | ||
| issue date = 03/21/2016 | | issue date = 03/21/2016 | ||
| title = | | title = Level of Financial Protection, Annual Reporting Requirement | ||
| author name = Gregoire D W | | author name = Gregoire D W | ||
| author affiliation = Energy Northwest | | author affiliation = Energy Northwest | ||
Revision as of 03:13, 3 April 2019
| ML16081A393 | |
| Person / Time | |
|---|---|
| Site: | Columbia |
| Issue date: | 03/21/2016 |
| From: | Gregoire D W Energy Northwest |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| Download: ML16081A393 (1) | |
Text
E N E RGV Donald W.Gregoire\P.O.Box 968, PE2O.,'J-N 0 RI H W ESI eire@enerqwest.com 10 CFR 50.54(w)(3)
G02-1 6-053 U.S.Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C.20555-0001
Subject:
COLUMBIA GENERATING STATION, DOCKET NO.50-397 LEVEL OF FINANCIAL PROTECTON-ANNUAL REPORTING REQUIREMENT
Dear Sir or Madam:
In accordance with the 1 0 CFR 50.54(w)(3) requirement to report the sources and amount of financial protection (i.e., nuclear property insurance) carried by operating facilities, the following information is submitted for insurance coverage obtained through Nuclear Electric Insurance Limited (NEIL)for the Columbia Generating Station: Insurer/Insurance Policy Title Policy Limits Number NEIL-Primary Property and Decontamination Liability P1 5-073$1.50 Billion NEIL-Decontamination Liability, Decommissioning Liability and Excess Property Xl 5-056$1.25 Billion NEIL-Accidental Outage El 5-056$0.49 Billion Total Nuclear Property Insurance$3.24 Billion There are no new commitments being made to the NRC by this letter.Should you have any questions, please call D.M.Wolfgramm, Regulatory Compliance Supervisor, at (509)377-4792.espec u y DW Gregoire Manager, Regulatory AffairsandPerformance Improvementcc:NRC Region IV Administrator CD Sonoda-BPN1 399NRCNRR Project Manager WA Horin-Winston&StrawnNRCSr.Resident Inspector-988C E N E RGV Donald W.Gregoire\P.O.Box 968, PE2O.,'J-N 0 RI H W ESI eire@enerqwest.com 10 CFR 50.54(w)(3)
G02-1 6-053 U.S.Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C.20555-0001
Subject:
COLUMBIA GENERATING STATION, DOCKET NO.50-397 LEVEL OF FINANCIAL PROTECTON-ANNUAL REPORTING REQUIREMENT
Dear Sir or Madam:
In accordance with the 1 0 CFR 50.54(w)(3) requirement to report the sources and amount of financial protection (i.e., nuclear property insurance) carried by operating facilities, the following information is submitted for insurance coverage obtained through Nuclear Electric Insurance Limited (NEIL)for the Columbia Generating Station: Insurer/Insurance Policy Title Policy Limits Number NEIL-Primary Property and Decontamination Liability P1 5-073$1.50 Billion NEIL-Decontamination Liability, Decommissioning Liability and Excess Property Xl 5-056$1.25 Billion NEIL-Accidental Outage El 5-056$0.49 Billion Total Nuclear Property Insurance$3.24 Billion There are no new commitments being made to the NRC by this letter.Should you have any questions, please call D.M.Wolfgramm, Regulatory Compliance Supervisor, at (509)377-4792.espec u y DW Gregoire Manager, Regulatory AffairsandPerformance Improvementcc:NRC Region IV Administrator CD Sonoda-BPN1 399NRCNRR Project Manager WA Horin-Winston&StrawnNRCSr.Resident Inspector-988C