IR 05000400/2017404: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 2: Line 2:
| number = ML17179A211
| number = ML17179A211
| issue date = 06/27/2017
| issue date = 06/27/2017
| title = Shearon Harris Nuclear Power Plant - U.S. Nuclear Regulatory Commission Security Inspection Report 05000400/2017404 OUO Removed
| title = U.S. Nuclear Regulatory Commission Security Inspection Report 05000400/2017404 OUO Removed
| author name = Smith O
| author name = Smith O
| author affiliation = NRC/RGN-II/DRS/PSB2
| author affiliation = NRC/RGN-II/DRS/PSB2

Revision as of 14:51, 2 April 2019

U.S. Nuclear Regulatory Commission Security Inspection Report 05000400/2017404 OUO Removed
ML17179A211
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 06/27/2017
From: Otis Smith
NRC/RGN-II/DRS/PSB2
To: Faulk L
Duke Energy Progress
References
IR 2017404
Download: ML17179A211 (4)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 June 27, 2017 Mr. Linwood Faulk Director, Nuclear Plant Security Shearon Harris Nuclear Power Plant 5413 Shearon Harris Road New Hill, NC 27562

SUBJECT: SHEARON HARRIS NUCLEAR POWER PLANT - U.S. NUCLEAR REGULATORY COMMISSION SECURITY INSPECTION REPORT 05000400/2017404

Dear Mr. Faulk:

On June 8, 2017 the U.S. Nuclear Regulatory Commission (NRC) completed a security inspection at your Shearon Harris Nuclear Power Plant, Unit 1. On June 15, 2017 the NRC inspectors discussed the results of this inspection with Mr. P. Fisk and members of your staff. The results of this inspection are documented in the enclosed report.

The NRC inspectors did not identify any finding or violation of more than minor significance.

This letter will be made available for public inspection and copying at https://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with 10 CFR 2.390, "Public Inspections, Exemptions, Requests for Withholding."

However, the enclosed report contains Security-Related Information, so the enclosed report will not be made publicly available in accordance with 10 CFR 2.390(d)(1). If you choose to provide a response that contains Security-Related Information, please mark your entire response "Security-Related Information-Withhold from public disclosure under 10 CFR 2.390" in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). The NRC is waiving the affidavit requirements for your response in accordance with 10 CFR 2.390(b)(1)(ii).

Sincerely,/RA/

Otis Smith Jr., Acting Chief Plant Support Branch 2 Division of Reactor Safety Docket No. 50-400 License No. NPF-63

Enclosure:

NRC IR 05000400/2017404

w/Attachment:

Supplemental Information (OUO)

cc: (See page 3) cc: Mr. Edward T. O'Neil General Manager, Nuclear Protective Services Duke Energy (EC5ZD)

526 South Church Street Charlotte, NC 28202

_____________________ SUNSI REVIEW COMPLETE FORM 665 ATTACHED OFFICE RII/ DRS/PSB2 RII/DRS/PSB2 RII/DRS/PSB2 RII/DRS/PSB2 RII/DRP RII/DRS/PSB2 SIGNATURE JDG4 ICH JPT OXS1 SDR2 OXS1 NAME D. Golden I. Hall J. Tornow O. Smith S. Rose O. Smith DATE 6/26/2017 6/26/2017 6/26/2017 6/27/2017 6/27/2017 6/27/2017 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO