IR 05000348/2018014: Difference between revisions
Jump to navigation
Jump to search
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
| Line 2: | Line 2: | ||
| number = ML18144A934 | | number = ML18144A934 | ||
| issue date = 05/24/2018 | | issue date = 05/24/2018 | ||
| title = | | title = Inspection Report 05000348/2018014 and 050003642018014 Investigation Report No. 2-2017-014; and Notice of Violations | ||
| author name = Blamey A J | | author name = Blamey A J | ||
| author affiliation = NRC/RGN-II/DRP/RPB2 | | author affiliation = NRC/RGN-II/DRP/RPB2 | ||
Revision as of 04:49, 1 April 2019
| ML18144A934 | |
| Person / Time | |
|---|---|
| Site: | Farley |
| Issue date: | 05/24/2018 |
| From: | Blamey A J NRC/RGN-II/DRP/RPB2 |
| To: | Madison D R Southern Nuclear Operating Co |
| References | |
| EA-17-204 IR 2018014, OI 2-2017-014 | |
| Download: ML18144A934 (19) | |
Text
/RA/
- oooo
- oooo
- oooo
- oooo