IR 05000440/2018004: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
Line 2: Line 2:
| number = ML19044A622
| number = ML19044A622
| issue date = 02/12/2019
| issue date = 02/12/2019
| title = Perry Nuclear Power Plant - NRC Integrated Inspection Report 05000440/2018004 and 07200069/2018001
| title = NRC Integrated Inspection Report 05000440/2018004 and 07200069/2018001
| author name = Szwarc D
| author name = Szwarc D
| author affiliation = NRC/RGN-III/DRP/B2
| author affiliation = NRC/RGN-III/DRP/B2

Revision as of 13:49, 31 March 2019

NRC Integrated Inspection Report 05000440/2018004 and 07200069/2018001
ML19044A622
Person / Time
Site: Perry, 07200069  FirstEnergy icon.png
Issue date: 02/12/2019
From: Dariusz Szwarc
NRC/RGN-III/DRP/B2
To: Hamilton D B
FirstEnergy Nuclear Operating Co
References
IR 2018001, IR 2018004
Download: ML19044A622 (24)


Text

/RA/

OFFICIAL RECORD COPY