Issue Date: 04/29/11 1 71111.12
ATTACHMENT 71111.12
INSPECTABLE AREA: Maintenance Effectiveness
CORNERSTONE: Initiating Events
Mitigating Systems
Barrier Integrity
INSPECTION BASES: The Maintenance Rule (MR) requires licensees to monitor the
performance or condition of structures, systems and
components (SSCs) within the scope of the rule against
licensee-established goals to provide reasonable assurance
that these SSCs are capable of fulfilling their intended
functions. These goals are to be commensurate with safety
and, where practical, should take into account industry-wide
operating experience.
NOTE: All words in italics are defined in Appendix C of this
procedure.
Reliability and availability of SSCs as monitored or
demonstrated under the MR directly affect the reactor safety
cornerstones listed above and are dependent upon
maintenance effectiveness (including work practices and
common cause problems). This baseline inspection
supplements the Unplanned Scrams, Unplanned Power
Changes, Safety System Functional Failure, and the Mitigating
System Performance Index performance indicators.
LEVEL OF EFFORT: Routine Maintenance Effectiveness Inspection. Review 8 to
10 maintenance effectiveness performance issues a year with
emphasis on high-risk-significant issues (review of a licensee’s
(a)(3) Periodic Evaluation can count as one of the required
samples). Although the number of required samples is an
annual goal, available work activities should be inspected
each quarter to ensure a reasonable distribution throughout
the year.
71111.12-01 INSPECTION OBJECTIVE
01.01 To supplement performance indicators by providing for independent oversight of
licensee maintenance effectiveness including MR activities, work practices, extent of
condition, common cause issues, and corrective actions.
Issue Date: 04/29/11 2 71111.12
01.02 To verify the licensee appropriately addresses SSC performance or condition
problems within the scope of the MR.
71111.12-02 INSPECTION REQUIREMENTS
02.01 Routine Maintenance Effectiveness Inspection.
a. Independently verify the licensee=s appropriate handling of SSC performance or
condition problems in terms of:
1. Appropriate work practices.
2. Identifying and addressing common cause failures.
3. Scoping in accordance with 10 CFR 50.65(b).
4. Characterizing reliability issues (performance).
5. Charging unavailability (performance).
6. Balancing reliability and unavailability (performance).
7. Trending key parameters (condition monitoring).
8. 10 CFR 50.65(a)(1) or (a)(2) classification and reclassification.
9. Appropriateness of performance criteria for SSCs/functions classified
(a)(2) and/or appropriateness and adequacy of goals and corrective
actions for SSCs/functions classified (a)(1).
NOTE: There are sources of information in the Inspection Guidance section
under Block 2 to assist inspectors in their review of maintenance effectiveness.
b. For the maintenance effectiveness attributes specified in Section 02.01.a above,
verify the licensee=s appropriate handling of the SSC=s degraded performance or
condition.
1. Identify and screen equipment problems for review using an
issue/problem-oriented approach.
(a) Problems can relate to reliability, availability, condition monitoring,
work practices, work control, or common cause failures.
(b) Concentrate on issues/problems associated with SSCs of highsafety-significance,
(1) SSCs not covered by performance indicators,
(2) SSCs with declining performance or condition trends, and
(3) SSCs with known equipment problems.
2. An alternative to the issue/problem-oriented approach would be to identify
and screen equipment problems for review using an SSC/functionoriented approach.
Issue Date: 04/29/11 3 71111.12
Focus on the performance or condition history (i.e., trends) of selected
safety significant SSCs/functions to identify degrading or declining
performance.
3. Based on the review of paragraphs 02.01.b.1 and 02.01.b.2, select 8 to 10
potentially risk-significant issues per year and perform detailed reviews.
NOTE: The inspector(s) have the option of reviewing the licensee’s
Periodic Evaluation (PE) as one of the required annual samples. Per 10
CFR 50.65(a)(3), the PE is required to be performed (at each unit) every
refueling outage cycle, not to exceed 24 months. Additional guidance
regarding the PE sample is provided in the Inspection Guidance Section 3
under Block 22.
4. In conjunction with the detailed review, assess the extent to which the
problem(s) may affect other trains, systems, units, or similar components
in other applications. For those problems recognized by the licensee,
assess the accuracy with which the licensee has identified the extent of
condition.
c. After the detailed review of the problem history and surrounding circumstances,
evaluate the role of work practices and common cause problems as follows:
1. For deficient work controls contributing to the degraded performance or
condition of the affected SSC(s):
(a) Determine the extent of condition.
(b) If work practices are implicated, observe affected and/or related
work activities, as appropriate.
(c) As necessary, discuss the issue with licensee personnel at the
appropriate level, and evaluate licensee corrective actions.
2. For those issues with common cause or generic implications:
(a) Determine the extent of condition.
(b) If the issues have the potential to result in, for example, failures of
multiple or diverse trains of SSCs, evaluate adequacy of licensee
corrective actions.
d. Evaluate the licensee's treatment of the SSCs/issues being reviewed under the
requirements of 10 CFR 50.65 and, where applicable, Appendix B to 10 CFR 50.
1. Determine whether the SSCs/functions of interest are within the licensee's
MR scope.
(a) If they are, evaluate the licensee's treatment of the issues under the
Issue Date: 04/29/11 4 71111.12
MR.
(b) If not, determine whether they should be in scope.
2. Independently evaluate SSC performance in terms of reliability and
availability.
(a) Compare documented functional failures with those being tracked by
the licensee under the MR.
(b) Compare unavailable hours (when required) to those being charged
by the licensee.
(c) For SSCs under condition monitoring, evaluate the effectiveness of
the licensee's tracking and trending SSC condition and recognition
of declining trends.
3. Evaluate licensee corrective action that may be required by the MR for
degraded SSC/function performance or condition.
(a) Appropriate corrective actions must be taken where established
goals under (a)(1) are not met. Appropriate means that (a)(1)
corrective actions should be broader than repair of the failed SSC
and address the cause of poor maintenance effectiveness.
(b) Evaluate any corrective action that may be required by 10 CFR Part
50, Appendix B, or licensee procedures.
(c) Evaluate use of industry operating experience.
4. Evaluate functional failures and unavailable hours against the licensee's
goals or performance criteria as applicable.
Determine, as applicable, if goals are being met or if SSC/function
performance or condition is being effectively controlled through the
performance of appropriate preventive maintenance.
5. Based on the performance and condition review above, determine if the
affected SSC(s) has/have been properly classified in terms of monitoring
under 50.65(a)(1) or effectively controlling performance by appropriate
preventive maintenance under (a)(2). (a)(1) is used to focus activities on
areas needing additional attention. The SSC may be transferred back to
(a)(2) if monitoring under (a)(1) demonstrated that performance has
improved and the cause of the failure has been corrected. See Appendix
C, (a)(2) Performance Criteria, for more explanation.
6. Determine if (a)(1) goals are (1) commensurate with safety, (2)
reasonable, and (3) take relevant industry operating experience into
account.
Issue Date: 04/29/11 5 71111.12
The licensee is required to set goals and monitor the performance or
condition of those SSCs handled under paragraph (a)(1) of the rule. The
licensee should consider monitoring SSCs under the requirements of
paragraph (a)(1) of the maintenance rule when failures occur,
performance criteria are not being met under paragraph (a)(2), adequate
preventive maintenance has not been established, or cause
determinations and corrective actions are needed to improve SSC
performance. If any of the above conditions exist, the licensee should
consider establishing goals commensurate with safety and relevant
industry operating experience.
7. Similarly, evaluate (a)(2) performance criteria for SSCs in (a)(2).
(a) Determine if effective preventive maintenance can be reasonably
demonstrated or degraded performance detected.
(b) The MR states that monitoring of an SSC as specified in (a)(1) is not
required if it has been demonstrated that the performance or
condition of the SSC is being effectively controlled through the
performance of appropriate preventive maintenance so that the SSC
remains capable of performing its intended function. The MR
Statements of Consideration (SOC) dated 1991 clarified that
licensees are not required to monitor under (a)(1) if they have
demonstrated that preventive maintenance has been effective or if
an SSC has inherent high reliability and availability.
02.02 Identification and Resolution of Problems. Inspection activities under this
procedure include independent verification that the licensee is identifying problems
related to this inspection area and entering them in the corrective action program. For a
sample of selected problems documented in the corrective action program, verify that
the corrective actions and resolutions are appropriate and adequate. See Inspection
Procedure 71152, “Identification and Resolution of Problems,” for additional guidance.
71111.12-03 INSPECTION GUIDANCE
03.01 Maintenance Effectiveness.
Reliability and availability of SSCs directly affect the reactor safety cornerstones, and
are dependent upon maintenance effectiveness (including proper work practices,
effective corrective actions, and the reduction of potential common-cause problems).
Appendix A of this procedure provides guidance on how to evaluate aspects of
maintenance effectiveness (including, but not limited to, adherence with applicable NRC
regulations). The steps referenced in this section provide guidance for completing the
corresponding blocks in the Appendix A flowchart.
Start
Issue Date: 04/29/11 6 71111.12
There are concerns involving degraded performance or condition of SSCs or the
licensee=s proposed corrective actions. These concerns may be inspector or licensee
identified. Place emphasis on SSCs with high safety significance.
Blocks 1 & 2 - Routine Inspection, Screening
Identify and screen equipment problems for review. Problems to be selected involve
concerns with reliability, availability, work practices, or common cause failures. Note
that these reviews are similar to and can be completed during performance of
Inspection Manual Chapter 2515, Appendix D, APlant Status.@
Block 1 - Issue/Problem-Oriented Approach
Identify problems with the performance (reliability and/or availability) or condition of
SSCs within the scope of the MR using the sources of information listed below (or
others as available).
Review instances that appear to have maintenance effectiveness implications, warrant
further assessment of work practices, and/or may be related to common cause failures,
independent of whether the licensee has identified them as such.
Block 2 - SSC/Function-Oriented Approach
Review the performance or condition history of selected SSCs to identify degraded or
declining performance or condition independent of licensee recognition.
Review instances that appear to have maintenance effectiveness implications, warrant
further assessment of work practices, and/or may be related to common cause failures,
independent of whether the licensee has identified them as such.
The SSCs may be selected and even scheduled for review. The more significant
maintenance effectiveness issues involving these SSCs should be considered for
further review, particularly those that may not have been recognized or appropriately
dispositioned by the licensee.
Sources of Information
The following list is not meant to be all-inclusive, but is intended to provide the inspector
with potential sources of information regarding equipment problems for evaluation:
$ Operating logs (manual and automated)
$ Plant event reports/condition reports
$ Technical specification action statement logs
$ System or component work order history
$ Safety system unavailability and unreliability performance indicator data
$ Other reliability and availability data (MR, PRA, INPO/WANO)
$ Periodic Evaluation per (a)(3)
$ Corrective action program documents
$ Operability evaluations or non-conformance reports
Issue Date: 04/29/11 7 71111.12
$ Temporary system modification documents
$ Maintenance (or component) history databases
$ System Ahealth@ reports
$ Predictive maintenance test or condition monitoring results (e.g.
thermography, lubricating oil analysis, vibration analysis, other in-service test
results)
$ Maintenance Rule program documents
$ Plant walkdown observations and plant status information
$ Licensee personnel interviews (e.g., maintenance personnel, work planning
staff, system engineers, operators)
$ Information discussed at licensee meetings
$ Industry operating experience (IOE) information
$ Operator workarounds log
$ Control room equipment deficiency log
The following are some sources of IOE information:
$ NRC generic communications
$ 10 CFR Part 21 notifications (and those posted on the NRC external website)
$ Notifications from the Institute for Nuclear Power Operations (INPO)
$ INPO=s Equipment Performance Information Exchange (EPIX)
$ Nuc Net
$ Vendor technical bulletins or other correspondence (Vendor Equipment
Technical Information Program (VETIP) - see also NRC Generic Letter 90-03)
$ Owners and users group information
$ IOE information published by the Electric Power Research Institute (EPRI)
$ NRC’s Office of Nuclear Reactor Regulation (NRR) Operating Experience
Branch
Consider the following when selecting samples:
$ the risk significance of the problems/issues or of the affected
SSC(s)/function(s),
$ the duration and frequency of the problem,
$ the impact of the problem on the SSC performance (i.e., reliability and
unavailability) or condition,
$ whether the problem results in frequent or repeated technical specification
limiting condition for operations entries,
$ the impact of the problem on the licensee=s organization (i.e., are operators
and maintenance personnel challenged by frequent emergent work activities
to resolve the issue?),
$ whether the apparent cause of the problem could result in a common cause
failure, and
$ the extent to which the problem has been previously inspected.
Block 3 - Detailed Historical Review
Detailed review includes examining work orders and associated records for corrective
and preventive maintenance and related corrective action documents. The inspector
Issue Date: 04/29/11 8 71111.12
should be able understand the duration and extent of the problem(s) being evaluated
and the effectiveness of the licensee=s corrective actions to improve SSC performance
or to correct the identified problem.
Obtaining an adequate understanding of the problem may require review of those
applicable work orders and/or corrective action documents generated in at least the
past 2 years. Reviews of up to 5 years may be considered for SSCs that are rarely
operated or tested.
Block 4 - Extent of Condition
In conjunction with the detailed historical review, independent review of the problem(s)
will enable the inspector to judge the accuracy with which the licensee has assessed
the extent of condition.
Block 5 - Work Practices Implicated
(Inspection in this path should be performed in parallel with review of the potential for
common cause or generic implications, as discussed in Block 8).
Deficient work practices can cause or contribute to an SSC performance or condition
problem. Note that the licensee's maintenance preventable functional failure (MPFF)
evaluations and/or root cause analyses, if any, may contain insights in this area. If work
practices are not implicated, continue inspecting for common cause implications.
Block 6 - Observation of Work Activities
If work practices are implicated, observation of affected and/or similar activities (as
necessary) will enable the inspector to assess the extent and/or the impact of the
maintenance problem. For instance, the inspector may determine that it is necessary to
review a specific activity such as motor alignments, or perhaps it may be necessary to
look more broadly at electrical maintenance activities to ensure that the nature and
extent of the maintenance problem is fully understood.
NOTE: Although it may require additional effort logistically, observing in progress
maintenance activities can add significant value to a sample. Being in the field during
maintenance activities can facilitate the assessment of the licensee’s procedural
preparation and execution of work practices.
Block 7 - Work Practices OK?
If work practices are not acceptable, then evaluate the issue of concern per IMC 0612,
Appendix B, “Issue Screening” and Appendix D of this inspection procedure. Continue
inspection in other paths as appropriate (including a review of the potential for common
cause or generic implications, as discussed in block 8).
Block 8 - Common Cause
(Inspection in this path should be performed in parallel with a review of the licensees
Issue Date: 04/29/11 9 71111.12
work practices, as discussed in Block 5).
For those issues with common cause or generic implications, determination of the
extent of condition will reveal the issues= potential to result in, for example, failures of
multiple or diverse trains of SSCs.
NOTE: Common cause problems may be related to maintenance support activities,
including plant design, application engineering, procurement and acceptance, material
control, and commercial-grade dedication. However, problems may occur that are
ultimately determined to be related to latent component design and manufacturing
deficiencies that were not or would not reasonably expected to be identified by the
licensee.
This distinction may become important in determining if any resultant MR functional
failures were maintenance preventable. If there are no apparent common cause
implications, continue the inspection in the MR implementation area. If there are,
proceed in this path.
Block 9 - Corrective Actions
Detailed review includes evaluation of the licensee's corrective actions for the common
cause problem(s). The licensee should ensure that the entire extent of condition is
identified and adequately addressed.
In addition, overall maintenance effectiveness is in part dependent upon feeding the
insights gained in dealing with common cause issues back into other maintenancerelated or support areas. If corrective actions are adequate, continue the inspection in
the MR implementation area. If not, then evaluate the issue of concern per IMC 0612,
Appendix B, “Issue Screening” and Appendix D of this inspection procedure; then
continue inspecting the licensee’s implementation of their MR program.
Block 10 - MR Scope Determination
Is/are the SSC(s) being reviewed classified by the licensee as being within the scope of
the MR? If so, continue inspecting and evaluating SSC/function performance (i.e.,
reliability and availability) or degraded condition issues if any. If not, go to block 11.
Block 11 - Should the SSC(s)/function(s) be in scope of the MR?
Determine if the SSCs in question should be in scope. Evaluate the SSC against the
criteria in 10 CFR 50.65(b) to determine if it should be in scope.
Since the maintenance rule is a performance-based regulation, licensees have the
flexibility to add or remove SSCs from the scope of 10 CFR 50.65(b) if an adequate
technical basis exists for including or excluding the SSC in questions. The references
provided in Section 06 of this procedure provide some additional insight on the criteria
listed in 10 CFR 50.65(b).
If it is determined that the SSC should be in the scope of the MR, then evaluate the
Issue Date: 04/29/11 10 71111.12
issue of concern per IMC 0612, Appendix B, “Issue Screening” and Appendix D of this
inspection procedure. Continue evaluating SSC performance (i.e., reliability and
availability) and/or condition.
If the SSC(s) in question are not required to be in scope, MR compliance is not a
regulatory issue. Go to Block 21.
Block 12 - Reliability
SSC reliability may be evaluated by reviewing failure history independent of the
licensee's recognition of failures as MR functional failures (MRFFs) (i.e., failures of one
or more functions for which the SSC was included in the MR scope).
$ Compare documented failures with those being tracked by the licensee under the
MR.
$ Evaluate these failures against the licensee=s reliability performance criteria for SSCs
in (a)(2), or goals for SSCs in (a)(1), and evaluate licensee corrective actions.
NOTE: For MR purposes, reliability or unreliability is tracked under all plant conditions
for which the scoped SSC(s) or function(s) are expected to start and run, or remain
running while meeting the appropriate success criteria for their required mission time.
Valid demands may include automatic or manual operation in-service or during testing.
When in doubt with regard to licensee recognition or categorization of functional
failures, inspectors are encouraged to consult with MR experts in the region and/or
NRR. If reliability is not an issue, then review availability/unavailability. If reliability is an
issue, continue in this flowchart path.
NOTE: For MR purposes, run-to-failure applies to SSCs that have little safety
significance, for which there is little or no meaningful preventive maintenance
established, for which conditions indicative of degradation prior to failure are not readily
detectable, have fairly predictable failure rates or expected limited service life, and for
which failure is self revealing so that the component can be promptly replaced (i.e., no
testing would be required to identify a failed component that could impact any function
important to safety were it to remain undetected and uncorrected). Examples would be
components such as light bulbs, fuses with blown-fuse indicators, etc. An SSC that is
inherently reliable applies to SSCs that, without preventative maintenance, have high
reliability (e.g., jet shields, raceways). For SSCs categorized as run-to-failure or
inherently reliable, the inspector may wish to review the categorization for
appropriateness.
Block 13 - Availability
Review the SSC(s) availability/unavailability to determine if availability is affected. If it
is, continue in this path. If neither availability nor reliability are affected, go to Block 21.
Block 14 - Exceed performance criteria?
Comparison of identified failures and unavailability with the licensee=s (a)(1)
Issue Date: 04/29/11 11 71111.12
SSC/function goals and/or (a)(2) SSC/function performance criteria (i.e., reliability and
availability) will enable the inspector to determine whether failures or unavailability
exceeded them as applicable.
a. If goals are not met or unreliability and/or unavailability goals are exceeded:
1. The licensee must take corrective actions under the MR for SSCs in
(a)(1).
2. Note that prompt corrective actions may also be required for SSCs in
(a)(2) by other regulations (e.g., Criterion XVI of 10 CFR Part 50,
Appendix B or technical specifications).
b. If there are MRFFs or MPFFs, and/or unavailability incurred for SSCs in (a)(2)
status, particularly if unreliability or unavailability performance criteria are
exceeded:
1. The licensee must determine whether effective control of SSC
performance or condition is being demonstrated.
2. If not, the licensee must at least consider placing (a)(2) SSCs into (a)(1).
SSCs experiencing repetitive MPFFs should be considered for (a)(1).
3. If reliability and availability performance criteria are being met, reliability
and/or availability are not an issue unless the performance criteria are
inappropriate and cannot be relied upon to identify degraded performance.
In this case, the validity of the (a)(2) demonstration may be in doubt even
when performance criteria are met. Whatever method the licensee uses
to demonstrate performance must be reasonable, technically justifiable,
and take into account availability and reliability.
4. If there are no issues of concern associated with reliability and availability,
go to Block 21; otherwise continue.
Block 15 - Licensee Aware?
a. Of exceeding unreliability goals or performance criteria, as applicable.
When the licensee miscounts failures and is unaware of exceeding unreliability
goals or performance criteria as applicable, or when the licensee counts
correctly, but still fails to recognize that goals or performance criteria have been
exceeded, then evaluate the issue of concern per IMC 0612, Appendix B, “Issue
Screening” and Appendix D of this inspection procedure; and continue
inspecting in this path.
b. Of exceeding unavailability goals or performance criteria as applicable
Actual unavailable hours (or as determined by the inspector from records and
applying applicable criteria) may not be consistent with those being tracked and
Issue Date: 04/29/11 12 71111.12
counted by the licensee. When the licensee incorrectly tracks unavailability but
is unaware that goals or performance criteria have been exceeded, or when the
accounting is correct but the licensee still fails to recognize that goals or
performance criteria have been exceeded, then evaluate the issue of concern
per IMC 0612, Appendix B, “Issue Screening” and Appendix D of this inspection
procedure; and continue inspecting in this path.
Block 16 - Licensee Actions
a. For exceeding unreliability goals or performance criteria as applicable.
If the SSC performance trend is poor and not improving, the licensee=s
corrective actions for this problem likely have not been timely and adequate. In
cases where an SSC has experienced an apparently high number of failures,
consult with a regional senior reactor analyst (SRA) to determine whether the
SSC reliability problems are likely to result in a significant risk increase. If
licensee actions are acceptable, proceed to assess availability.
b. For exceeding unavailability goals or performance criteria as applicable.
Unavailability trend data should show whether system performance is improving.
If performance is not improving,
1. Ideally the licensee should take timely and reasonable corrective actions
for this problem.
2. Depending on the circumstances, this situation may or may not amount to
a violation of 10 CFR 50.65, but it reflects negatively upon maintenance
effectiveness and should be evaluated per IMC 0612, Appendix B, “Issue
Screening” and Appendix D of this inspection procedure.
3. In cases where an SSC has experienced an apparently large amount of
unavailability, the licensee=s PRA may provide some insight as to the risk
significance of this condition.
4. Also, use of the SDP or consultation with a regional SRA may be
necessary to determine whether the SSC availability performance
problems are likely to result in a significant risk increase.
5. If licensee actions are not acceptable, then evaluate the issue of concern
per IMC 0612, Appendix B, “Issue Screening” and Appendix D of this
inspection procedure; and continue to review MR disposition of the
issue(s) in question.
Block 17 - MR Monitoring Category
If the SSC is already classified as (a)(1), continue to evaluate; if not, the inspector must
decide if it should have been in (a)(1).
Issue Date: 04/29/11 13 71111.12
The inspector should determine independently whether the licensee has demonstrated
effective control of SSC or function performance through appropriate preventive
maintenance for SSCs/functions in (a)(2).
Block 18 - Should it be?
If it is determined that the affected SSC should have been in (a)(1), but was instead was
being carried in (a)(2) status even when effective control of SSC performance or
condition was not being demonstrated, then evaluate the issue of concern per IMC
0612, Appendix B, “Issue Screening” and Appendix D of this inspection procedure.
Block 19 - Evaluate Goals and Corrective Actions
The (a)(1) monitoring goals must be appropriate, commensurate with safety and take
industry operating experience into account where practicable. Corrective actions must
be timely and must address the cause of the degraded performance or condition. For
example, in setting goals, the licensee (expert panel) should have considered:
a. Both reliability and availability
b. Balancing of reliability and availability
c. Industry operating experience (IOE) information
d. Actual performance history
e. Frequency of valid demands or expected operation within the monitoring period
f. PRA or some other reasonable risk/safety consideration(s)
If (a)(1) goals are not appropriate, not commensurate with safety, or did not take IOE
into account where practicable, then evaluate the issue of concern per IMC 0612,
Appendix B, “Issue Screening” and Appendix D of this inspection procedure.
If (a)(1) goals are satisfactory, but have not been met, evaluate the licensee=s corrective
actions. Repeated failure to meet goals may be indicative of inadequate corrective
action. However, note that failure to meet (a)(1) goals is not, by itself, an MR violation.
However, failure to take timely and adequate corrective action when (a)(1) goals are not
met (corrective action that addresses the cause(s) of the problem(s)) may constitute a
50.65(a)(1) violation (depending on the circumstances) in addition to any other safetysignificant findings.
Block 20 - Evaluate (a)(2) Performance Criteria
For SSCs that remain in (a)(2) following the current problem, the licensee=s
performance criteria should be appropriate, i.e., technically justifiable. They should be
sensitive enough to identify unacceptably degraded performance while allowing a
reasonable, technically defensible (in terms of both deterministic and risk factors) and
balanced amount of unreliability and/or unavailability without invalidating the (a)(2)
demonstration. In general, the licensee (expert panel) should consider factors similar to
those used to establish (a)(1) goals.
For example, it would be unreasonable if the number of MPFFs required to exceed the
Issue Date: 04/29/11 14 71111.12
reliability performance criterion or goal for a given SSC exceeds the number of
expected (or possible) valid demands during the monitoring period. In this case, the
goal or performance criterion could never be reached, let alone exceeded, despite
clearly degraded performance or condition of the affected SSC. After consultation with
appropriate regional and possibly headquarters staff, such issues can be addressed
with the licensee, who should have a sound technical basis for its goals and
performance criteria. This area, if suspect, may also be a candidate for further and
more in-depth examination of the licensee's (a)(3) periodic evaluation (PE) activities.
NOTE: Condition monitoring or predictive maintenance is generally desirable, but when
performance criteria allow no failures or unavailability during the monitoring period,
typically for very high safety-significant and/or Amission-critical@ SSCs, then the
condition of the SSC should be monitored or tracked using condition monitoring or
Apredictive maintenance@ parameters that, to the extent practicable, alert the licensee to
degradation in time for preventive maintenance prior to failure. For example, some
licensees allow no failures of either offsite power source and/or their in-plant distribution
SSCs. Therefore, they will track voltage and frequency of the offsite power sources
closely, particularly during periods of grid instability or heightened probability of loss of
offsite power.
In addition, licensees may designate certain SSCs in a so-called Arun-to-failure@
category. These are typically SSCs that are simple, of relatively low safety/risk
significance, for which there is little or no meaningful preventive maintenance
established, for which conditions indicative of degradation prior to failure are not readily
detectable, that have fairly predictable failure rates or expected limited service life, and
for which failure is self revealing so that the component can be promptly replaced, i.e.
no testing would be required to identify a failed component that could impact any
function important to safety were it to remain undetected and uncorrected. Examples
would be components such as light bulbs, fuses with blown-fuse indicators, etc.
For SSCs categorized as run-to-failure, the licensee can and should promptly,
commensurate with safety, repair or replace failed equipment, but adjustments to PM
program may not be necessary and monitoring under (a)(2) may be able to continue,
unless the affected component or batch of similar components appear to suffer
excessive or too frequent failures or significantly shortened service life compared to
vendor expectations and or industry norms. These circumstances even with usual runto-failure components warrant investigation. However, if an SSCs has a function which
caused it to be within the scope of the MR, it has some safety significance; therefore,
licensee should provide a sound technical justification which appropriately establishes a
run-to-failure determination. An SSC that is inherently reliable applies to SSCs that,
without preventative maintenance, have high reliability (e.g., jet shields, raceways). For
SSCs categorized as run-to-failure or inherently reliable, the inspector may wish to
review the categorization for appropriateness.
Block 21 - END - Develop Regulatory Position and Documentation
Block 22 - Periodic Evaluation (PE) (optional sample)
Performance Verification
Issue Date: 04/29/11 15 71111.12
a. Verify that PEs have been completed within the time constraints of the MR (i.e.,
once each refueling cycle, but not to exceed 24 months between PEs).
b. Verify that the licensee has reviewed its (a)(1) goals, (a)(2) performance criteria,
monitoring, and preventive maintenance activities, and effectiveness of
corrective actions.
c. Verify that industry operating experience (IOE) has been taken into account
where practicable.
d. Verify that the licensee makes appropriate adjustments as result of the PEs.
NOTE: The requirements for performing the PE can be satisfied through the use of
ongoing assessments combined with a higher level summary assessment performed
at least once per refueling cycle not to exceed 24 months between evaluations.
Balancing Verification
If applicable to the licensee’s Maintenance Program, verify that the licensee balanced
reliability and availability/unavailability (refer to NUMARC 93-01, Section 12.2.4).
Most licensees reevaluate the balance between a SSCs unavailability and reliability
when the performance criteria are exceeded. The licensee’s assessment of balance
should determine:
a. Whether preventive maintenance should be reduced if unavailability
performance criteria are exceeded with few MPFFs.
b. Whether preventive maintenance should be increased if reliability performance
criteria are exceeded with low unavailability.
NOTE: The PE and resulting adjustments should meet the MR requirement that the
objective of preventing failures of SSCs through maintenance is appropriately
balanced against the objective of minimizing unavailability of SSCs due to monitoring
or preventive maintenance.
03.02 Identification and Resolution of Problems. PI&R are integral and essential
elements of maintenance effectiveness; therefore the specific guidance in this
inspection procedure covers review of licensee PI&R in the maintenance effectiveness
area. Guidance on the conduct of PI&R inspections in general is contained in IP
711152.
71111.12-04 RESOURCE ESTIMATE
This inspection procedure is estimated to take 84 to 102 hours a year for the routine
maintenance effectiveness inspection.
Issue Date: 04/29/11 16 71111.12
71111.12-05 COMPLETION STATUS
Inspection of the minimum sample size will constitute completion of this procedure in
the Reactor Programs System (RPS). The minimum sample for routine inspection will
consist of 8 maintenance effectiveness issues (of high risk significance to the extent
available) annually per site.
71111.12-06 REFERENCES
NOTE: Selected references are available on the NRC public website
(http://www.nrc.gov/reactors/operating/ops-experience/maintenance-effectiveness.html).
NOTE: An internal NRC SharePoint site provides links to electronic versions of selected
references, along with the names and contact information for MR points of contact
(http://portal.nrc.gov/edo/nrr/dirs/irib/Working%20Group/Maintenance%20Rule/default.aspx).
Title 10 of the Code of Federal Regulations (10 CFR), Part 50, Section 50.65,
ARequirements for monitoring the effectiveness of maintenance at nuclear power plants@
(10 CFR 50.65)
Statements of Consideration for 10 CFR 50.65, Federal Register, Vol 56, No. 132, July
10, 1991, pages 31306 to 31324
Statements of Consideration for 10 CFR 50.65, Federal Register, Vol 64, No. 137, July
19, 1999, pages 38551 to 38557
NRC Regulatory Guide (RG) 1.160, Rev. 2, AMonitoring the Effectiveness of
Maintenance at Nuclear Power Plants@
Nuclear Energy Institute (NEI) (formerly Nuclear Management and Resources Council
(NUMARC)), NUMARC 93-01, Revision 2, AIndustry Guideline for Monitoring the
Effectiveness of Maintenance at Nuclear Power Plants@
NUREG-1648, ALessons Learned from Maintenance Rule Baseline Inspections@
NUREG-1526, “Lessons Learned from Early Implementation of the Maintenance Rule at
Nine Nuclear Power Plants”
NRC Inspection Manual Chapter (IMC) 0609, AReactor Safety Significance
Determination Process@
NRC IMC 0612, APower Reactor Inspection Reports@
Inspection Procedure (IP) 62706, AMaintenance Rule@
IP 71152, AIdentification and Resolution of Problems@
NRC Generic Letter 90-03, June 15, 1990, ARelaxation of Staff Position on Generic
Issue Date: 04/29/11 17 71111.12
Letter 83-28, Item 2.2, Part 2, Vendor Interface for Safety-Related Components@
NRC Enforcement Manual, Section 7.11, AActions Involving the Maintenance Rule@
NRC Inspection Manual, Part 9900, Technical Guidance, APreconditioning of Structures,
Systems, and Components (SSCs) Before Determining Operability@
END
Attachments:
Appendix A, ARoutine Maintenance Effectiveness Inspection Flowchart@
Appendix B, Deleted
Appendix C, AMaintenance Rule Terminology@
Appendix D, AMaintenance Issue Screening@
Appendix E, Deleted
Issue Date: 04/29/11 71111.12
APPENDIX A
Routine Maintenance Effectiveness Inspection Flowchart
FLOWCHART 1
START Maintenance Effectiveness Concerns 1
Issue/ Problem- Oriented Sample Selection 2 SSC/Train/ Function- Oriented Sample Selection Selected Items 3 Detailed Historical Review 4 Extent of Condition Item(s) Reviewed/ Evaluated 5 Work Practices Implicated? No Yes 8 Common Cause Implications?
Yes 6 Observe Work
7
Work Practices Ok? 9 Adequate CA? No IOC No Yes Yes
10 SSC in Scope? No 11 Should it be? No Go to 21 Yes Yes IOC 12 Reliability Affected? 13 Availability Affected? No
o 14 Exceeds PC?
Yes 14 Exceeds PC?
Yes No Go to 21 No 15 Licensee Aware?
Yes 15 Licensee Aware?
Yes
IOC 16 Licensee Actions OK? 16 Licensee Actions OK? Yes Yes No No
No
Yes Yes 17 In (a)(1)? 18 Should it be?
IOC
No Yes
19 Evaluate: 1) Goals 2) Corrective Actions 3) IOE 20 Evaluate: (a)(2) Performance Criteria 21 Develop Regulatory Position, Document
No Go to 17
Yes
22 Periodic Evaluation
Yes Yes
No No No IOC
Yes
Issue Date: 04/29/11 71111.12
APPENDIX B
DELETED
Issue Date: 04/29/11 C-1 71111.12
APPENDIX C
Maintenance Rule Terminology
NOTE: Terminology descriptions provided here are meant to aid NRC inspectors in
execution of this inspection procedure and in their review and understanding of how
potential issues of concern may be applicable to the maintenance rule. The regulations
and applicable source documents remain the overriding guidance documents for the
maintenance rule.
(a)(2) Performance Criteria- A means, established by the NRC-endorsed industry MR
guidance, NUMARC 93-01, by which licensees typically determine whether they are
demonstrating effective control of the performance of SSCs within the MR scope
through appropriate preventive maintenance. Note that (a)(2) performance criteria are
not required or even recognized per se by the MR. Meeting or not meeting (a)(2)
performance criteria is not, by itself, the sole test for a valid (a)(2) demonstration for MR
compliance with regard to those SSCs being carried in (a)(2) status, i.e., not being
monitored against goals in (a)(1) status. Therefore, not placing an SSC into (a)(1)
status for failing to meet (a)(2) performance criteria alone may not be sufficient grounds
for an (a)(1)/(a)(2) violation; just as meeting (a)(2) performance criteria alone may not
be sufficient demonstration of effective control of SSC performance in (a)(2).
If the inspector believes, on the basis of some objective standard (e.g., the plant=s PRA,
the EPRI PRA applications guide, or industry operating experience) that unavailability
and/or unreliability is excessive, even if the existing performance criteria (which may no
longer be valid) are not exceeded, there may be justification to conclude that the
licensee is not effectively controlling the performance of the affected SSC(s)/function(s)
through appropriate preventive maintenance. In such a case, the licensee should at
least be considering the affected SSC(s)/function(s) for monitoring under (a)(1).
However, not having recognized the unacceptable performance or condition, the
licensee will not have considered monitoring under (a)(1). This may be grounds for
identifying an (a)(2) violation, but this kind of issue may be highly subjective and would
require considerable objective evidence to support a violation or a risk-significant
finding.
Availability - Availability is often tracked by its numerical complement, unavailability,
and typically only for high-safety-significance (HSS) SSCs as provided for in the
endorsed industry guidance. Unavailability is the time an SSC is unavailable during
periods when the SSC was required to be available. Unavailability may also be
expressed as a fraction of the total time the SCC was required to be available. Under
the MR, unavailability is customarily charged from the time of a demand failure or
discovery of a degraded or failed condition until restoration. For the period prior to a
demand failure or discovery of a failed or degraded condition, additional unavailability
may be charged from when the condition first existed (i.e., fault exposure time) if the
fault exposure time can be determined. However, for MR purposes, if the fault
exposure time cannot be determined, additional unavailability need not be charged.
Nevertheless, as an alternative to charging unavailability for fault exposure time, the
licensee may impute a demand failure and count it against the unreliability performance
Issue Date: 04/29/11 C-2 71111.12
criterion. Treatment of very long fault exposure time resulting from long-standing latent
deficiencies (e.g., design deficiencies) depends on the circumstances. While the
condition should be promptly corrected (and extent of condition addressed), it may
legitimately be judged not to reflect adversely on current maintenance effectiveness or
on other aspects of the Ahealth@ of the affected SSC(s); hence, not be charged as
unavailability. Consultation with cognizant NRC staff in such instances is encouraged.
An SSC may be considered unavailable, even if deemed operable under technical
specifications, when it cannot meet the appropriate success criteria for one or more of
its MR-scoped functions. On the other hand, if the performance of the scoped function
is tracked at the system level, and not all trains of the system are unavailable (such that
the system can still meet scoped functional success criteria), then the licensee may
legitimately consider the system available. For MR purposes, support system
unavailability is not normally cascaded onto supported system(s) because it is indicative
only of the performance or condition (Ahealth@) of the support system, not that of the
supported system.
NUMARC 93-01 contains guidance on the restrictions for crediting operator recovery
actions. Note that required availability may vary widely under different plant conditions.
It may depend upon the licensee's relying on the SSC for alternate success paths to
preserve key safety functions.
With the assistance of regional and headquarters staff cognizant of the MR, the
inspector should be able to keep abreast of changes to industry guidance related to
maintenance effectiveness and the NRC positions with respect to that guidance. For
example, it is current industry practice to track unavailability of HSS SSCs or functions
for MR purposes under all plant conditions in which they are required. However, this
may not always be the case during shutdown. Also, there may be changes in the way
fault exposure time and discovered conditions are treated for MR purposes in the
interest of improved consistency with unavailability tracking for ROP performance
indicators and other reporting programs.
Common Cause Failures - Failure of two or more SSCs due to single specific event or
cause. For example, a design deficiency, operation and maintenance errors, a natural
phenomenon, personnel-induced event, or an unintended cascading effect from any
other operation or failure within the plant or a change in ambient conditions.
Common Mode Failure - Failure of two or more SSCs in the same manner or mode
due to a single event or cause (i.e., common mode failure is a type of common cause
failure in which the SSCs fails in the same way.)
Corrective Actions- Appropriate corrective actions must be taken where established
goals under (a)(1) are not met. AAppropriate@ means that (a)(1) corrective actions
should be broader than repair of the failed SSC and address the cause of poor
maintenance effectiveness.
Extent of Condition - The extent to which the problem(s) may affect other trains,
systems, units or plants, or similar components in other applications.
Issue Date: 04/29/11 C-3 71111.12
Inherently Reliable- Pertains to an SSC that, without preventative maintenance, has
high reliability. Inherently reliable SSCs could be included in the formal preventative
maintenance program under (a)(2) in which the condition could be monitored via visual
inspection during walkdowns. Inherently reliable SSCs are normally not placed in
(a)(1). However, the need to place an SSC under (a)(1) and establish goals may arise if
the inherently reliable SSC has experienced a failure. In such cases, the SSC cannot be
considered inherently reliable.
Examples of SSCs that are generally considered inherently reliable include, but are not
limited to, jet shields, raceways, and in some cases electrical cabling depending on
vendor specifications.
Maintenance Activities- All activities associated with the planning, scheduling,
accomplishment, post-maintenance testing, and return to service activities for
surveillances and preventive and corrective maintenance. These activities are
considered maintenance regardless of which organization performs the activity (e.g.,
maintenance, operations, and contractors). (Also, refer to discussion of maintenance
support activities in MR Reliability Performance Criteria in this Section.)
Maintenance Preventable Functional Failure- Failure of an SSC within the scope of
the MR to perform its intended function (i.e., the function performed by the SSC that
required its inclusion within the scope of the Rule), where the cause of the failure of the
SSC is attributable to a maintenance-related activity. The maintenance-related activity
is intended in the broad sense of maintenance.
For example, in general, repetitive MPFFs (i.e., multiple failures of the same SSC for
the same maintenance-related reason) can demonstrate that preventive maintenance is
not effective and may be sufficient cause for placing the affected SSC in (a)(1) even if
the performance criterion was not exceeded. By the same token, failures that are
technically MPFFs and that exceed the reliability performance criterion, but are not
related to the health of the SSC itself, may be reasonably judged by an expert panel not
to warrant the increased attention of (a)(1) status. (Also, refer to MR Reliability
Performance Criteria definition in this Section.)
Maintenance Rule Functional Failure- Failure of an SSC within the scope of the MR
to perform its intended function (i.e., the function performed by the SSC that required its
inclusion within the scope of the MR). Degraded performance may constitute a
functional failure, even without a complete loss of function. (Also, refer to MR Reliability
Performance Criteria definition in this Section.)
MR Reliability Performance Criteria (Block 12)- Reliability: may be defined in various
ways by the licensee, most of which are acceptable under the endorsed guidance.
However, the inspector should be aware of limitations. For example, a licensee who
defines reliability (or unreliability) in terms of MRFFs, may only consider a total loss of
those functions to be an MRFF. The licensee=s program may not recognize certain
degraded performance as an MRFF (e.g., reduction in capacity below the nominal
value). Nevertheless, it may be reasonable to consider, for example, that an affected
Issue Date: 04/29/11 C-4 71111.12
SSC which still retained its minimum design-basis capability did not suffer an MRFF,
particularly if there were no condition monitoring being done on the SSC in question.
Further, it may also be reasonable to consider some degraded performance not to be a
MRFF when the minimum capability assumed in the PRA (upon which performance
criteria are based in part) was maintained (i.e., PRA functional success criteria met)
even if design-basis capability was not. However, such rationalization to avoid
declaring MRFFs (or to avoid charging unavailability) may be counterproductive to
maintenance effectiveness because the practice may mask declining performance
trends that otherwise might be more promptly addressed, preferably before complete
failures occur. In addition, the inspector should consider not only the design basis
and/or PRA success criteria for the function(s) in question, but also the success criteria
for all the functions for which the SSC was scoped (e.g., use in the EOPs). If the
affected SSC cannot meet the appropriate functional success criteria for one or more of
the functions for which it was scoped, the reduced capability should ideally be
considered a MRFF. If it is not, then the inspector would be justified in questioning the
licensee=s basis for this determination, whether or not counting the degraded
performance as an MRFF would result in the need to consider putting the affected SSC
in (a)(1). While this situation may not result in an MR violation, there may be PI&R
and/or corrective action implications, in addition to some risk or safety significance that
could possibly be assessed through the significance determination process (SDP),
provided that a performance deficiency exists.
Some licensees define their reliability performance criteria in terms of maintenancepreventable functional failures (MPFFs) in a given number of valid demands or within
some time period, as opposed to merely MRFFs. This further distinction can become
very subjective. In evaluating the licensee's characterization of MRFFs as MPFFs (or
not), where circumstances warrant, the inspector should consider maintenance-related
contributing factors in a broad sense, not limited to work practices or other activities of
maintenance staff alone. For example, deficiencies in certain direct maintenance
support activities may cause or substantially contribute to failures, allow failures to occur
or fail to prevent them, or allow unsatisfactory conditions to persist. These activities can
include (but are not limited to) procurement; acceptance (including receiving and
commercial-grade dedication); material control and issue; engineering (including design
control, specifications, procedures and drawings, and poorly designed postmaintenance tests), work controls (including clearances, equipment lineups, etc.);
operators (reconfiguring systems and equipment in support of maintenance); and use of
vendor information and industry operating experience to keep instructions and
procedures up to date.
Even certain common cause problems related to design and/or manufacturing
deficiencies in replacement parts, component, or materials (e.g., sealants, adhesives,
lubricants, etc.) may be legitimately considered to render an MRFF maintenancepreventable (i.e., the MRFF would become an MPFF) if the deficiencies could or should
reasonably have been detected and screened out (or contained) by the licensee
applying generally acceptable industry standard practices in procurement, acceptance,
and comprehensive corrective action. These maintenance support activities can be
viewed as part of a more comprehensive concept of maintenance, and preventive
maintenance in particular.
Issue Date: 04/29/11 C-5 71111.12
However, the inspector should also recognize that while such factors may indicate the
need for improvements in maintenance and/or its support activities (e.g., re-training,
improved work practices, etc.), they may not necessarily reflect degraded health of the
affected SSC that would warrant monitoring. Contributing factors, such as certain
operator errors committed in direct support of maintenance (e.g., clearances, valve or
equipment lineups, etc.) may require a failure to be deemed a MPFF by the licensee=s
program. However, absent any indications of actual degraded performance or condition
of the SSC(s) involved, the licensee (typically an expert panel) may be justified in not
placing or retaining the affected SSC(s) in (a)(1), even if that operator error-related
MPFF caused the applicable performance criterion to be exceeded. It would be
reasonable in such a situation for the licensee to prescribe corrective action more
appropriate to the circumstances, such as remedial operator training or requalification.
The licensee should be expected to be able to defend such decisions. Although not
required by the MR to be documented, this sort of rationale may often be found
recorded in expert panel meeting minutes or similar documents.
Periodic Evaluation- An evaluation of maintenance activities at the unit which shall be
conducted at least once a refueling cycle, not to exceed 24 months between
evaluations. The evaluation shall take into account relevant industry experience.
Reliability- A measure of the expectation that an SSC will perform its function on
demand, at any future instant in time (assuming that the SSC is available). Reliability is
typically measured in terms of the number of failures in some pre-established number of
valid demands over a pre-established tracking or monitoring period. Along with
availability, reliability is a performance measure.
Run-to-Failure- Applies to SSCs that are typically simple, of relatively low safety/risk
significance, for which there is little or no meaningful preventive maintenance
established, for which conditions indicative of degradation prior to failure are not readily
detectable, that have fairly predictable failure rates or expected limited service life, and
for which failure is self revealing so that the component can be promptly replaced, i.e.
no testing would be required to identify a failed component that could impact any
function important to safety were it to remain undetected and uncorrected. Examples
would be components such as light bulbs, fuses with blown-fuse indicators (particularly
in standby SSCs), etc. For such SSCs, the inspector may wish to review the
categorization for appropriateness.
The licensee can and should promptly, commensurate with safety, repair or replace
failed equipment of this type, but adjustments to PM program may not be necessary and
monitoring under (a)(2) may be able to continue, unless the affected component or
batch of similar components appear to suffer excessive or too frequent failures or
significantly shortened service life compared to vendor expectations and or industry
norms. These circumstances even with usual run-to-failure components warrant
investigation. However, if an SSCs has a function which caused it to be within the
scope of the MR, it has some safety significance; therefore, licensee should provide a
sound technical justification which appropriately establishes a run-to-failure
determination. For such SSCs, the inspector may wish to review the categorization for
Issue Date: 04/29/11 C-6 71111.12
appropriateness.
Scope of the Maintenance Rule (Block 11)- SSCs/functions that have one or more of
the following attributes must be scoped into the maintenance rule program:
$ Safety-related SSCs/functions [50.65(b)(1)]
$ Non-safety-related SSCs that perform an accident or transient mitigation function
[50.65(b)(2)(i)] (as defined in the Final Safety Analysis Report)
$ Non-safety-related SSCs that are used in the emergency operating procedures
(EOPs) [50.65(b)(2)(i)]
$ Non-safety-related SSCs that could prevent the fulfillment of a safety-related function
[50.65(b)(2)(ii)]
$ Non-safety-related SSCs that could cause an unwanted reactor trip or engineered
safety feature (ESF) activation [50.65(b)(2)(iii)]
Since the maintenance rule is a performance-based regulation, licensees have the
flexibility to add or remove SSCs from the scope of 10 CFR 50.65(b) if an adequate
technical basis exists for including or excluding the SSC in questions.
Technically Justifiable- means justifiable in terms of logic for both qualitative and
quantitative considerations. For example, the reliability performance criterion for
emergency diesel generators (EDGs) is typically expressed in terms of the number of
failures to properly start and/or run on demand for some given number of attempts or
demands within the monitoring (or (a)(2) "tracking") period.
Technically justifiable criteria in terms of deterministic considerations would include, for
example, allowable demand failures that are consistent with industry operating
experience that are reasonably sensitive to declining performance (i.e., degraded
performance would be recognized before complete failure), but not be so restrictive as
to become unbalanced with availability. For example, the risk-informed EDG reliability
performance criteria discussed above might also be judged against operating
experience, among other deterministic considerations, by the expert panel to ensure
they made sense for the plant in terms of tracking SSC health and monitoring the
effectiveness of maintenance.
Performance criteria may need to be adjusted logically as well. For example, if the
industry average demand failures in a refueling cycle for some piece of equipment was
two, then a reliability performance criterion of two demand failures allowed might be
reasonable, except for a plant at which the equipment was never challenged more than
twice during the monitoring period. In that case, it could fail two times and never
exceed the performance criterion such that it would be considered for transition to (a)(1)
status. If the equipment in question were non-safety-related, there would be no
regulatory requirement to take corrective action.
In such a case, the prudent licensee would consider the operating history of the
equipment at its plant. If the equipment was more reliable historically than the industry
average, then it might be more prudent to set the reliability performance criterion at zero
or one in order to promptly flag degraded performance or establish condition monitoring
to detect declining trends.
Issue Date: 04/29/11 C-7 71111.12
If the inspector questions the performance criteria or a change in performance criteria
(or a shift from HSS to LSS status), then the licensee should be asked to explain the
basis for the criteria and/or change. If the inspector believes that the criteria or changes
are not reasonable, or that the justification is inadequate, then the inspector should
consider consulting with the regional SRA and MR contacts in the Region and NRR.
Note that having (a)(2) performance criteria that are not technically justifiable or that are
not commensurate with safety is not necessarily a violation of the rule. However, it
could be a contributing cause of the licensee's failure to demonstrate effective control of
performance or condition if there are an excessive number of functional failures or
excessive unavailability. Determining what is excessive may be difficult, and
inspector(s) should consider consulting cognizant MR staff in the region and NRR to
assist in evaluating the situation and making the case for a violation if warranted.
Trigger Values- A generic EDG reliability analysis was done that resulted in what were
known as "trigger values." The trigger values allowed (1) 3 failures to start or run in 20
attempts, (2) 4 in 50 attempts, and (3) 5 in 100. However, it was later determined that
the values were not technically justifiable from a risk standpoint (i.e., not commensurate
with safety), because they allowed an unacceptably high risk level to be reached before
the EDG would be considered for shifting into (a)(1) status. Instead, the more
conservative demand failure figures given in the EPRI PRA Applications Guide of (1) 2
in 20, (2) 3 in 50, and (3) 4 in 100, based on generic bounding PRA analyses would
keep the risk within acceptable limits. During the NRC MR baseline inspections, these
were deemed to be technically justifiable in terms of risk and hence, commensurate with
safety. (Also, refer to technically justifiable definition in this Section).
Unavailable Hours- The numerical complement of availability. The hours within a
period during which an SSC is required to be available when the SSC cannot perform
its function. An SSC that is required to be available for automatic operation must be
available and respond without human interaction. (See Availability in this Section).
Work Practices- The term Awork practices@ refers to the broad range of activities
performed to maintain SSCs, including (but not limited to) preventive maintenance
program requirements, maintenance procedures, field activities, system isolation and
restoration procedures and practices, and post-maintenance testing.
Issue Date: 04/29/11 D-1 71111.12
APPENDIX D
Maintenance Issue Screening
Issues of concern (IOCs) related to maintenance effectiveness should be screened in
accordance with IMC 0612, Appendix B, “Issue Screening.” The guidance provided
below supplements the guidance in IMC 0612, Appendix B for the specific block and
figure number provided.
Based on the results of the inspector=s reviews and discussions with the licensee, the
inspector should consider consulting with other knowledgeable sources, such as: other
inspectors on site, the senior resident inspector (SRI), regional supervision, regional
maintenance rule contact(s), regional enforcement specialist(s), the headquarters
maintenance rule staff in the Division of Inspection and Regional Support (DIRS), and
Office of Enforcement (OE) staff as necessary.
Block 6, Figure 2: Does the IOC involve a PERFORMANCE DEFICIENCY (PD)?
Performance deficiencies associated with maintenance issue(s) should be clearly
identified. A maintenance related PD can involve various types of licensee performance
problems, including, but not limited to: deficient procedures, instruments/measuring and
test equipment, tools or other equipment, deficient work practices, deficient
maintenance support activities (e.g., replacement parts procurement and dedication,
storage and material issue), inadequate recognition and handling of common cause
problems, or inadequate root-cause analysis and/or corrective actions for degraded
performance or condition of SSC(s)/function(s).
When answering the PD screening questions in IMC 0612, Appendix B, consider the
terminology descriptions provided in Appendix C of this inspection procedure for the
IOC. NUMARC 93-01 and RG 1.160 may provide some additional insight on properly
characterizing a potential PD; however, inspectors should note that these are not
regulatory requirements.
In some instances, an issue of concern (IOC) may cause or contribute to degraded
performance of an SSC or function within the scope of the maintenance rule (a SSC
IOC) and a separate issue of concern may cause or contribute to improper
consideration of that performance within the licensee’s maintenance program (a
Program IOC). In this case the SSC IOC should normally be screened separately from
the Program IOC.
Block 9, Figure 2: Is the PD More-than-Minor (e.g., Is it a FINDING)?
The identified performance deficiency (or deficiencies) should be screened against the
criteria in IMC 0612, Appendix B to determine whether they are minor or more than
minor. When answering the Minor screening questions in IMC 0612, Appendix B,
consider the terminology descriptions provided in Appendix C of this inspection
procedure for the applicable PD. A maintenance-related performance deficiency may
be more than minor if it results in a degraded performance or condition of an SSC that is
Issue Date: 04/29/11 D-2 71111.12
likely to adversely affect an associated cornerstone objective, regardless of whether the
degraded performance or condition has been recognized, appropriately categorized and
characterized by the licensee. In these instances, inspectors should consider how the
PD impacted the function of the SSC.
In cases where there is a SSC PD and a separate program PD (separate IOCs that
screen as performance deficiencies as discussed above), the program PD can often be
determined to be more than minor because actual problems with the equipment have
occurred.
Block 10, Figure 2: Does FINDING involve a non-Traditional Enforcement (TE)
VIOLATION?
One or more of the identified findings may constitute a violation of one or more NRC
regulations. It is possible that a licensee may take action to avoid a violation of 10 CFR
50.65; however, a violation of separate NRC regulations may exist and inspectors
should consider which requirements/regulations are applicable for each finding.
For guidance on what constitutes a potential MR violation, refer to Section 7.11 of the
Enforcement Manual. NUMARC 93-01, RG 1.160, and NUREG-1648 may provide
some additional insight on properly characterizing a potential MR violation; however,
inspectors should note that these documents are not regulatory requirements.
Block 14, Figure 3: Is the FINDING POTENTIALLY GREATER-THAN-GREEN?
All FINDINGS will be screened using the Phase 1, “Initial Screening and
Characterization” worksheet described in Attachment 4 to IMC 0609 to determine if they
are POTENTIALLY GREATER-THAN-GREEN.
The safety significance of the SSC(s) (as defined by the license’s maintenance rule
program) is a key factor in this screening process. This includes cases where there
exists a SSC FINDING and a separate maintenance rule program FINDING. This is
discussed in the IMC 0609 SDP phase I screening guidance.
Example of screening Maintenance Rule FINDING(s):
A high-safety-significant (HSS) SSC in (a)(2) status has suffered one or more MR
functional failures (MRFFs), i.e., failures of one or more of the functions for which it was
included in the scope of the licensee=s MR program. Typically one or more of the
following circumstances exist: (1) The inspector has determined that the MRFFs were
maintenance preventable (i.e., were MPFFs), but the licensee has not recognized this.
If counted appropriately as an MPFF, the latest MRFF would exceed the licenseeestablished (a)(2) unreliability performance criterion (PC); and/or (2) the latest MPFF
constituted a repetitive MPFF (i.e., same type of failure and same cause or type of
cause).
In either case, the circumstances may support an inspector determination that the
licensee has failed to demonstrate for the affected (a)(2) SSC that its performance or
Issue Date: 04/29/11 D-3 71111.12
condition has or is being effectively controlled through appropriate preventive
maintenance. This demonstration must be made in order for the affected SSC/function
to remain in (a)(2) status under the MR. But having failed to make this demonstration,
the licensee must set goals and monitor the performance or condition of the affected
SSC under (a)(1) to be in compliance with the MR.
In this scenario, it is possible that a performance deficiency and associated finding
exists without a violation of the maintenance rule. For instance, the licensee can
maintain the affected SSC in (a)(2) status and remain in compliance with the
maintenance rule as long as there is adequate justification (i.e., the root cause is being
corrected or is unrelated to the equipment itself (e.g., personnel issues only)). Or, if the
circumstances warrant monitoring the affected SSC/function under (a)(1), and the
licensee takes the necessary and appropriate actions under (a)(1) within a reasonable
amount of time, there has (thus far) been no violation of the maintenance rule.
However, if the inspector’s review determines the time that has passed since the
licensee=s first opportunity to comply with the maintenance rule is excessive, then a
violation may exist. In making this determination, consider the following:
When the inspector=s concerns are brought to the attention of the licensee, the
licensee may immediately recognize the situation, convene its expert panel and
consider putting the affected SSC into (a)(1). In this case, the licensee may have
avoided a MR violation unless an excessive amount of time has already passed
and/or the licensee has missed one or more reasonable opportunities to comply.
However, the inspector should also expect the licensee to take prompt corrective
action for the degraded performance or condition of the SSC regardless of the
maintenance rule disposition. In this case, a separate performance deficiency,
and associated finding may exist.
Another possibility is that the series of MPFFs that invalidated the (a)(2)
demonstration occurred some time ago (for example, before the licensee=s last
(a)(3) periodic evaluation, or previous expert panels have been convened without
addressing the issue, or more than one rolling MR monitoring period has gone
by) and the licensee has never recognized that the SSC in question should have
been in (a)(1). In this case, there is likely a violation of (a)(2) and/or (a)(1) in that
effective preventive maintenance was not demonstrated under (a)(2), yet the
SSC was never put in (a)(1) despite several opportunities for the licensee to
comply with the MR.
Issue Date: 04/29/11 E-1 71111.12
APPENDIX E
DELETED
Issue Date: 04/29/11 Att1-1 71111.12
ATTACHMENT
Revision History - IP 71111.12
Commitment
Tracking
Number
Issue Date Description of Change Training
Needed
Trainin
g
Comple
tion
Date
Comment
Resolution
Accession
Number
N/A 03/13/06 Completed Four-year historical review NO N/A N/A
N/A 07/01/2002
CN 02-025
Revised to clarify inspection objectives and to
improve effectiveness of this procedure based
on feedback and lessons learned from
implementation. This revision provides greater
focus on reviewing licensee's effectiveness at
performing routine maintenance. The revised
procedure also focuses on review of
equipment performance issues associated
with availability and reliability, preferably on
high-risk significant systems, maintenance
work practices, and common cause issues.
Sample size and inspection resource
requirements were revised based on
experience gained from four verification and
validation visits at one site in each region.
NO N/A N/A
Issue Date: 04/29/11 Att1-2 71111.12
N/A 01/05/2006 CN
06-001
Inspection frequency was changed from a
biennial to a triennial frequency based on a
mature industry maintenance program.
Additionally, estimated inspection hours were
changed to 36 hours every 3 years or
annualized estimate of 12 hours based on the
actual inspection resources expended to
complete this inspection procedure during last
several ROP cycles. Completed historical CN
search.
NO N/A N/A
NA 03/13/06
CN 06-006
IP71111-12 has been revised to clarify
inspection objectives and to improve
effectiveness of this procedure based on
feedback and lessons learned from
implementation.
NO N/A N/A
N/A 10/31/07 IP 71111.12 has been revised to reflect the
ROP FY-2007 realignment. The triennial
inspection was eliminated because it was
determined adequate oversight of licensee
performance in the area of maintenance can
be maintained through the quarterly portion of
IP 71111.12 and other inspection activities.
NO N/A N/A
N/A 01/31/08
CN 08-005
IP 71111.12 has been revised to clarify the
level of effort section in which the inspection
procedure clearly states that the samples are
not required on a quarterly basis.
NO N/A N/A
Issue Date: 04/29/11 Att1-3 71111.12
N/A 11/16/09
CN 09-027
IP 71111.12 has been revised to reflect the
ROP realignment 2009. The (a)(3) sample
previously removed from the biennial/triennial
portion of 71111.12 was added back as an
optional annual sample (see ROPFF
71111.12-1306). App D was revised to correct
inconsistencies with IMCs 0612, 0609, and
0305 (see ROPFF-71111.12-1422), the
flowchart and references were updated, NRR
MR lead contact info was changed from DRA
to DIRS, and ROPFF 71111.12-1407 was
incorporated. Inspection requirement
02.01.b.2 was added to remain consistent with
the current Block 2 of the guidance section.
Added definition of inherently reliable.
NO N/A ML093010331
N/A ML102910230
04/29/11
CN 11-008
IP 71111.12 has been revised to remove
guidance in that is redundant or contrary to
guidance in IMC 0612 and IMC 0609.
Guidance was also removed from the IP that
could be misinterpreted as establishing or
conveying an inaccurate regulatory position.
NO N/A ML11068A019

Latest revision as of 08:41, 18 March 2019

https://www.nrc.gov/docs/ML1029/ML102910230.pdf

Text

Issue Date: 04/29/11 1 71111.12 ATTACHMENT 71111.12 INSPECTABLE AREA: Maintenance Effectiveness CORNERSTONE: Initiating Events Mitigating Systems Barrier Integrity INSPECTION BASES: The Maintenance Rule (MR) requires licensees to monitor the performance or condition of structures, systems and components (SSCs) within the scope of the rule against licensee-established goals to provide reasonable assurance that these SSCs are capable of fulfilling their intended functions. These goals are to be commensurate with safety and, where practical, should take into account industry-wide operating experience. NOTE: All words in italics are defined in Appendix C of this procedure. Reliability and availability of SSCs as monitored or demonstrated under the MR directly affect the reactor safety cornerstones listed above and are dependent upon maintenance effectiveness (including work practices and common cause problems). This baseline inspection supplements the Unplanned Scrams, Unplanned Power Changes, Safety System Functional Failure, and the Mitigating System Performance Index performance indicators. LEVEL OF EFFORT: Routine Maintenance Effectiveness Inspection. Review 8 to 10 maintenance effectiveness performance issues a year with emphasis on high-risk-significant issues (review of a licensee’s (a)(3) Periodic Evaluation can count as one of the required samples). Although the number of required samples is an annual goal, available work activities should be inspected each quarter to ensure a reasonable distribution throughout the year. 71111.12-01 INSPECTION OBJECTIVE 01.01 To supplement performance indicators by providing for independent oversight of licensee maintenance effectiveness including MR activities, work practices, extent of condition, common cause issues, and corrective actions. Issue Date: 04/29/11 2 71111.12 01.02 To verify the licensee appropriately addresses SSC performance or condition problems within the scope of the MR. 71111.12-02 INSPECTION REQUIREMENTS 02.01 Routine Maintenance Effectiveness Inspection. a. Independently verify the licensee=s appropriate handling of SSC performance or condition problems in terms of: 1. Appropriate work practices. 2. Identifying and addressing common cause failures. 3. Scoping in accordance with 10 CFR 50.65(b). 4. Characterizing reliability issues (performance). 5. Charging unavailability (performance). 6. Balancing reliability and unavailability (performance). 7. Trending key parameters (condition monitoring). 8. 10 CFR 50.65(a)(1) or (a)(2) classification and reclassification. 9. Appropriateness of performance criteria for SSCs/functions classified (a)(2) and/or appropriateness and adequacy of goals and corrective actions for SSCs/functions classified (a)(1). NOTE: There are sources of information in the Inspection Guidance section under Block 2 to assist inspectors in their review of maintenance effectiveness. b. For the maintenance effectiveness attributes specified in Section 02.01.a above, verify the licensee=s appropriate handling of the SSC=s degraded performance or condition. 1. Identify and screen equipment problems for review using an issue/problem-oriented approach. (a) Problems can relate to reliability, availability, condition monitoring, work practices, work control, or common cause failures. (b) Concentrate on issues/problems associated with SSCs of highsafety-significance, (1) SSCs not covered by performance indicators, (2) SSCs with declining performance or condition trends, and (3) SSCs with known equipment problems. 2. An alternative to the issue/problem-oriented approach would be to identify and screen equipment problems for review using an SSC/functionoriented approach. Issue Date: 04/29/11 3 71111.12 Focus on the performance or condition history (i.e., trends) of selected safety significant SSCs/functions to identify degrading or declining performance. 3. Based on the review of paragraphs 02.01.b.1 and 02.01.b.2, select 8 to 10 potentially risk-significant issues per year and perform detailed reviews. NOTE: The inspector(s) have the option of reviewing the licensee’s Periodic Evaluation (PE) as one of the required annual samples. Per 10 CFR 50.65(a)(3), the PE is required to be performed (at each unit) every refueling outage cycle, not to exceed 24 months. Additional guidance regarding the PE sample is provided in the Inspection Guidance Section 3 under Block 22. 4. In conjunction with the detailed review, assess the extent to which the problem(s) may affect other trains, systems, units, or similar components in other applications. For those problems recognized by the licensee, assess the accuracy with which the licensee has identified the extent of condition. c. After the detailed review of the problem history and surrounding circumstances, evaluate the role of work practices and common cause problems as follows: 1. For deficient work controls contributing to the degraded performance or condition of the affected SSC(s): (a) Determine the extent of condition. (b) If work practices are implicated, observe affected and/or related work activities, as appropriate. (c) As necessary, discuss the issue with licensee personnel at the appropriate level, and evaluate licensee corrective actions. 2. For those issues with common cause or generic implications: (a) Determine the extent of condition. (b) If the issues have the potential to result in, for example, failures of multiple or diverse trains of SSCs, evaluate adequacy of licensee corrective actions. d. Evaluate the licensee's treatment of the SSCs/issues being reviewed under the requirements of 10 CFR 50.65 and, where applicable, Appendix B to 10 CFR 50. 1. Determine whether the SSCs/functions of interest are within the licensee's MR scope. (a) If they are, evaluate the licensee's treatment of the issues under the Issue Date: 04/29/11 4 71111.12 MR. (b) If not, determine whether they should be in scope. 2. Independently evaluate SSC performance in terms of reliability and availability. (a) Compare documented functional failures with those being tracked by the licensee under the MR. (b) Compare unavailable hours (when required) to those being charged by the licensee. (c) For SSCs under condition monitoring, evaluate the effectiveness of the licensee's tracking and trending SSC condition and recognition of declining trends. 3. Evaluate licensee corrective action that may be required by the MR for degraded SSC/function performance or condition. (a) Appropriate corrective actions must be taken where established goals under (a)(1) are not met. Appropriate means that (a)(1) corrective actions should be broader than repair of the failed SSC and address the cause of poor maintenance effectiveness. (b) Evaluate any corrective action that may be required by 10 CFR Part 50, Appendix B, or licensee procedures. (c) Evaluate use of industry operating experience. 4. Evaluate functional failures and unavailable hours against the licensee's goals or performance criteria as applicable. Determine, as applicable, if goals are being met or if SSC/function performance or condition is being effectively controlled through the performance of appropriate preventive maintenance. 5. Based on the performance and condition review above, determine if the affected SSC(s) has/have been properly classified in terms of monitoring under 50.65(a)(1) or effectively controlling performance by appropriate preventive maintenance under (a)(2). (a)(1) is used to focus activities on areas needing additional attention. The SSC may be transferred back to (a)(2) if monitoring under (a)(1) demonstrated that performance has improved and the cause of the failure has been corrected. See Appendix C, (a)(2) Performance Criteria, for more explanation. 6. Determine if (a)(1) goals are (1) commensurate with safety, (2) reasonable, and (3) take relevant industry operating experience into account. Issue Date: 04/29/11 5 71111.12 The licensee is required to set goals and monitor the performance or condition of those SSCs handled under paragraph (a)(1) of the rule. The licensee should consider monitoring SSCs under the requirements of paragraph (a)(1) of the maintenance rule when failures occur, performance criteria are not being met under paragraph (a)(2), adequate preventive maintenance has not been established, or cause determinations and corrective actions are needed to improve SSC performance. If any of the above conditions exist, the licensee should consider establishing goals commensurate with safety and relevant industry operating experience. 7. Similarly, evaluate (a)(2) performance criteria for SSCs in (a)(2). (a) Determine if effective preventive maintenance can be reasonably demonstrated or degraded performance detected. (b) The MR states that monitoring of an SSC as specified in (a)(1) is not required if it has been demonstrated that the performance or condition of the SSC is being effectively controlled through the performance of appropriate preventive maintenance so that the SSC remains capable of performing its intended function. The MR Statements of Consideration (SOC) dated 1991 clarified that licensees are not required to monitor under (a)(1) if they have demonstrated that preventive maintenance has been effective or if an SSC has inherent high reliability and availability. 02.02 Identification and Resolution of Problems. Inspection activities under this procedure include independent verification that the licensee is identifying problems related to this inspection area and entering them in the corrective action program. For a sample of selected problems documented in the corrective action program, verify that the corrective actions and resolutions are appropriate and adequate. See Inspection Procedure 71152, “Identification and Resolution of Problems,” for additional guidance. 71111.12-03 INSPECTION GUIDANCE 03.01 Maintenance Effectiveness. Reliability and availability of SSCs directly affect the reactor safety cornerstones, and are dependent upon maintenance effectiveness (including proper work practices, effective corrective actions, and the reduction of potential common-cause problems). Appendix A of this procedure provides guidance on how to evaluate aspects of maintenance effectiveness (including, but not limited to, adherence with applicable NRC regulations). The steps referenced in this section provide guidance for completing the corresponding blocks in the Appendix A flowchart. Start Issue Date: 04/29/11 6 71111.12 There are concerns involving degraded performance or condition of SSCs or the licensee=s proposed corrective actions. These concerns may be inspector or licensee identified. Place emphasis on SSCs with high safety significance. Blocks 1 & 2 - Routine Inspection, Screening Identify and screen equipment problems for review. Problems to be selected involve concerns with reliability, availability, work practices, or common cause failures. Note that these reviews are similar to and can be completed during performance of Inspection Manual Chapter 2515, Appendix D, APlant Status.@ Block 1 - Issue/Problem-Oriented Approach Identify problems with the performance (reliability and/or availability) or condition of SSCs within the scope of the MR using the sources of information listed below (or others as available). Review instances that appear to have maintenance effectiveness implications, warrant further assessment of work practices, and/or may be related to common cause failures, independent of whether the licensee has identified them as such. Block 2 - SSC/Function-Oriented Approach Review the performance or condition history of selected SSCs to identify degraded or declining performance or condition independent of licensee recognition. Review instances that appear to have maintenance effectiveness implications, warrant further assessment of work practices, and/or may be related to common cause failures, independent of whether the licensee has identified them as such. The SSCs may be selected and even scheduled for review. The more significant maintenance effectiveness issues involving these SSCs should be considered for further review, particularly those that may not have been recognized or appropriately dispositioned by the licensee. Sources of Information The following list is not meant to be all-inclusive, but is intended to provide the inspector with potential sources of information regarding equipment problems for evaluation: $ Operating logs (manual and automated) $ Plant event reports/condition reports $ Technical specification action statement logs $ System or component work order history $ Safety system unavailability and unreliability performance indicator data $ Other reliability and availability data (MR, PRA, INPO/WANO) $ Periodic Evaluation per (a)(3) $ Corrective action program documents $ Operability evaluations or non-conformance reports Issue Date: 04/29/11 7 71111.12 $ Temporary system modification documents $ Maintenance (or component) history databases $ System Ahealth@ reports $ Predictive maintenance test or condition monitoring results (e.g. thermography, lubricating oil analysis, vibration analysis, other in-service test results) $ Maintenance Rule program documents $ Plant walkdown observations and plant status information $ Licensee personnel interviews (e.g., maintenance personnel, work planning staff, system engineers, operators) $ Information discussed at licensee meetings $ Industry operating experience (IOE) information $ Operator workarounds log $ Control room equipment deficiency log The following are some sources of IOE information: $ NRC generic communications $ 10 CFR Part 21 notifications (and those posted on the NRC external website) $ Notifications from the Institute for Nuclear Power Operations (INPO) $ INPO=s Equipment Performance Information Exchange (EPIX) $ Nuc Net $ Vendor technical bulletins or other correspondence (Vendor Equipment Technical Information Program (VETIP) - see also NRC Generic Letter 90-03) $ Owners and users group information $ IOE information published by the Electric Power Research Institute (EPRI) $ NRC’s Office of Nuclear Reactor Regulation (NRR) Operating Experience Branch Consider the following when selecting samples: $ the risk significance of the problems/issues or of the affected SSC(s)/function(s), $ the duration and frequency of the problem, $ the impact of the problem on the SSC performance (i.e., reliability and unavailability) or condition, $ whether the problem results in frequent or repeated technical specification limiting condition for operations entries, $ the impact of the problem on the licensee=s organization (i.e., are operators and maintenance personnel challenged by frequent emergent work activities to resolve the issue?), $ whether the apparent cause of the problem could result in a common cause failure, and $ the extent to which the problem has been previously inspected. Block 3 - Detailed Historical Review Detailed review includes examining work orders and associated records for corrective and preventive maintenance and related corrective action documents. The inspector Issue Date: 04/29/11 8 71111.12 should be able understand the duration and extent of the problem(s) being evaluated and the effectiveness of the licensee=s corrective actions to improve SSC performance or to correct the identified problem. Obtaining an adequate understanding of the problem may require review of those applicable work orders and/or corrective action documents generated in at least the past 2 years. Reviews of up to 5 years may be considered for SSCs that are rarely operated or tested. Block 4 - Extent of Condition In conjunction with the detailed historical review, independent review of the problem(s) will enable the inspector to judge the accuracy with which the licensee has assessed the extent of condition. Block 5 - Work Practices Implicated (Inspection in this path should be performed in parallel with review of the potential for common cause or generic implications, as discussed in Block 8). Deficient work practices can cause or contribute to an SSC performance or condition problem. Note that the licensee's maintenance preventable functional failure (MPFF) evaluations and/or root cause analyses, if any, may contain insights in this area. If work practices are not implicated, continue inspecting for common cause implications. Block 6 - Observation of Work Activities If work practices are implicated, observation of affected and/or similar activities (as necessary) will enable the inspector to assess the extent and/or the impact of the maintenance problem. For instance, the inspector may determine that it is necessary to review a specific activity such as motor alignments, or perhaps it may be necessary to look more broadly at electrical maintenance activities to ensure that the nature and extent of the maintenance problem is fully understood. NOTE: Although it may require additional effort logistically, observing in progress maintenance activities can add significant value to a sample. Being in the field during maintenance activities can facilitate the assessment of the licensee’s procedural preparation and execution of work practices. Block 7 - Work Practices OK? If work practices are not acceptable, then evaluate the issue of concern per IMC 0612, Appendix B, “Issue Screening” and Appendix D of this inspection procedure. Continue inspection in other paths as appropriate (including a review of the potential for common cause or generic implications, as discussed in block 8). Block 8 - Common Cause (Inspection in this path should be performed in parallel with a review of the licensees Issue Date: 04/29/11 9 71111.12 work practices, as discussed in Block 5). For those issues with common cause or generic implications, determination of the extent of condition will reveal the issues= potential to result in, for example, failures of multiple or diverse trains of SSCs. NOTE: Common cause problems may be related to maintenance support activities, including plant design, application engineering, procurement and acceptance, material control, and commercial-grade dedication. However, problems may occur that are ultimately determined to be related to latent component design and manufacturing deficiencies that were not or would not reasonably expected to be identified by the licensee. This distinction may become important in determining if any resultant MR functional failures were maintenance preventable. If there are no apparent common cause implications, continue the inspection in the MR implementation area. If there are, proceed in this path. Block 9 - Corrective Actions Detailed review includes evaluation of the licensee's corrective actions for the common cause problem(s). The licensee should ensure that the entire extent of condition is identified and adequately addressed. In addition, overall maintenance effectiveness is in part dependent upon feeding the insights gained in dealing with common cause issues back into other maintenancerelated or support areas. If corrective actions are adequate, continue the inspection in the MR implementation area. If not, then evaluate the issue of concern per IMC 0612, Appendix B, “Issue Screening” and Appendix D of this inspection procedure; then continue inspecting the licensee’s implementation of their MR program. Block 10 - MR Scope Determination Is/are the SSC(s) being reviewed classified by the licensee as being within the scope of the MR? If so, continue inspecting and evaluating SSC/function performance (i.e., reliability and availability) or degraded condition issues if any. If not, go to block 11. Block 11 - Should the SSC(s)/function(s) be in scope of the MR? Determine if the SSCs in question should be in scope. Evaluate the SSC against the criteria in 10 CFR 50.65(b) to determine if it should be in scope.

Since the maintenance rule is a performance-based regulation, licensees have the flexibility to add or remove SSCs from the scope of 10 CFR 50.65(b) if an adequate technical basis exists for including or excluding the SSC in questions. The references provided in Section 06 of this procedure provide some additional insight on the criteria listed in 10 CFR 50.65(b). If it is determined that the SSC should be in the scope of the MR, then evaluate the Issue Date: 04/29/11 10 71111.12 issue of concern per IMC 0612, Appendix B, “Issue Screening” and Appendix D of this inspection procedure. Continue evaluating SSC performance (i.e., reliability and availability) and/or condition. If the SSC(s) in question are not required to be in scope, MR compliance is not a regulatory issue. Go to Block 21. Block 12 - Reliability SSC reliability may be evaluated by reviewing failure history independent of the licensee's recognition of failures as MR functional failures (MRFFs) (i.e., failures of one or more functions for which the SSC was included in the MR scope). $ Compare documented failures with those being tracked by the licensee under the MR. $ Evaluate these failures against the licensee=s reliability performance criteria for SSCs in (a)(2), or goals for SSCs in (a)(1), and evaluate licensee corrective actions. NOTE: For MR purposes, reliability or unreliability is tracked under all plant conditions for which the scoped SSC(s) or function(s) are expected to start and run, or remain running while meeting the appropriate success criteria for their required mission time. Valid demands may include automatic or manual operation in-service or during testing. When in doubt with regard to licensee recognition or categorization of functional failures, inspectors are encouraged to consult with MR experts in the region and/or NRR. If reliability is not an issue, then review availability/unavailability. If reliability is an issue, continue in this flowchart path. NOTE: For MR purposes, run-to-failure applies to SSCs that have little safety significance, for which there is little or no meaningful preventive maintenance established, for which conditions indicative of degradation prior to failure are not readily detectable, have fairly predictable failure rates or expected limited service life, and for which failure is self revealing so that the component can be promptly replaced (i.e., no testing would be required to identify a failed component that could impact any function important to safety were it to remain undetected and uncorrected). Examples would be components such as light bulbs, fuses with blown-fuse indicators, etc. An SSC that is inherently reliable applies to SSCs that, without preventative maintenance, have high reliability (e.g., jet shields, raceways). For SSCs categorized as run-to-failure or inherently reliable, the inspector may wish to review the categorization for appropriateness. Block 13 - Availability Review the SSC(s) availability/unavailability to determine if availability is affected. If it is, continue in this path. If neither availability nor reliability are affected, go to Block 21. Block 14 - Exceed performance criteria? Comparison of identified failures and unavailability with the licensee=s (a)(1) Issue Date: 04/29/11 11 71111.12 SSC/function goals and/or (a)(2) SSC/function performance criteria (i.e., reliability and availability) will enable the inspector to determine whether failures or unavailability exceeded them as applicable. a. If goals are not met or unreliability and/or unavailability goals are exceeded: 1. The licensee must take corrective actions under the MR for SSCs in (a)(1). 2. Note that prompt corrective actions may also be required for SSCs in (a)(2) by other regulations (e.g., Criterion XVI of 10 CFR Part 50, Appendix B or technical specifications). b. If there are MRFFs or MPFFs, and/or unavailability incurred for SSCs in (a)(2) status, particularly if unreliability or unavailability performance criteria are exceeded: 1. The licensee must determine whether effective control of SSC performance or condition is being demonstrated. 2. If not, the licensee must at least consider placing (a)(2) SSCs into (a)(1). SSCs experiencing repetitive MPFFs should be considered for (a)(1). 3. If reliability and availability performance criteria are being met, reliability and/or availability are not an issue unless the performance criteria are inappropriate and cannot be relied upon to identify degraded performance. In this case, the validity of the (a)(2) demonstration may be in doubt even when performance criteria are met. Whatever method the licensee uses to demonstrate performance must be reasonable, technically justifiable, and take into account availability and reliability. 4. If there are no issues of concern associated with reliability and availability, go to Block 21; otherwise continue. Block 15 - Licensee Aware? a. Of exceeding unreliability goals or performance criteria, as applicable. When the licensee miscounts failures and is unaware of exceeding unreliability goals or performance criteria as applicable, or when the licensee counts correctly, but still fails to recognize that goals or performance criteria have been exceeded, then evaluate the issue of concern per IMC 0612, Appendix B, “Issue Screening” and Appendix D of this inspection procedure; and continue inspecting in this path. b. Of exceeding unavailability goals or performance criteria as applicable Actual unavailable hours (or as determined by the inspector from records and applying applicable criteria) may not be consistent with those being tracked and Issue Date: 04/29/11 12 71111.12 counted by the licensee. When the licensee incorrectly tracks unavailability but is unaware that goals or performance criteria have been exceeded, or when the accounting is correct but the licensee still fails to recognize that goals or performance criteria have been exceeded, then evaluate the issue of concern per IMC 0612, Appendix B, “Issue Screening” and Appendix D of this inspection procedure; and continue inspecting in this path. Block 16 - Licensee Actions a. For exceeding unreliability goals or performance criteria as applicable. If the SSC performance trend is poor and not improving, the licensee=s corrective actions for this problem likely have not been timely and adequate. In cases where an SSC has experienced an apparently high number of failures, consult with a regional senior reactor analyst (SRA) to determine whether the SSC reliability problems are likely to result in a significant risk increase. If licensee actions are acceptable, proceed to assess availability. b. For exceeding unavailability goals or performance criteria as applicable. Unavailability trend data should show whether system performance is improving. If performance is not improving, 1. Ideally the licensee should take timely and reasonable corrective actions for this problem. 2. Depending on the circumstances, this situation may or may not amount to a violation of 10 CFR 50.65, but it reflects negatively upon maintenance effectiveness and should be evaluated per IMC 0612, Appendix B, “Issue Screening” and Appendix D of this inspection procedure. 3. In cases where an SSC has experienced an apparently large amount of unavailability, the licensee=s PRA may provide some insight as to the risk significance of this condition. 4. Also, use of the SDP or consultation with a regional SRA may be necessary to determine whether the SSC availability performance problems are likely to result in a significant risk increase. 5. If licensee actions are not acceptable, then evaluate the issue of concern per IMC 0612, Appendix B, “Issue Screening” and Appendix D of this inspection procedure; and continue to review MR disposition of the issue(s) in question. Block 17 - MR Monitoring Category If the SSC is already classified as (a)(1), continue to evaluate; if not, the inspector must decide if it should have been in (a)(1). Issue Date: 04/29/11 13 71111.12 The inspector should determine independently whether the licensee has demonstrated effective control of SSC or function performance through appropriate preventive maintenance for SSCs/functions in (a)(2). Block 18 - Should it be? If it is determined that the affected SSC should have been in (a)(1), but was instead was being carried in (a)(2) status even when effective control of SSC performance or condition was not being demonstrated, then evaluate the issue of concern per IMC 0612, Appendix B, “Issue Screening” and Appendix D of this inspection procedure. Block 19 - Evaluate Goals and Corrective Actions The (a)(1) monitoring goals must be appropriate, commensurate with safety and take industry operating experience into account where practicable. Corrective actions must be timely and must address the cause of the degraded performance or condition. For example, in setting goals, the licensee (expert panel) should have considered: a. Both reliability and availability b. Balancing of reliability and availability c. Industry operating experience (IOE) information d. Actual performance history e. Frequency of valid demands or expected operation within the monitoring period f. PRA or some other reasonable risk/safety consideration(s) If (a)(1) goals are not appropriate, not commensurate with safety, or did not take IOE into account where practicable, then evaluate the issue of concern per IMC 0612, Appendix B, “Issue Screening” and Appendix D of this inspection procedure. If (a)(1) goals are satisfactory, but have not been met, evaluate the licensee=s corrective actions. Repeated failure to meet goals may be indicative of inadequate corrective action. However, note that failure to meet (a)(1) goals is not, by itself, an MR violation. However, failure to take timely and adequate corrective action when (a)(1) goals are not met (corrective action that addresses the cause(s) of the problem(s)) may constitute a 50.65(a)(1) violation (depending on the circumstances) in addition to any other safetysignificant findings. Block 20 - Evaluate (a)(2) Performance Criteria For SSCs that remain in (a)(2) following the current problem, the licensee=s performance criteria should be appropriate, i.e., technically justifiable. They should be sensitive enough to identify unacceptably degraded performance while allowing a reasonable, technically defensible (in terms of both deterministic and risk factors) and balanced amount of unreliability and/or unavailability without invalidating the (a)(2) demonstration. In general, the licensee (expert panel) should consider factors similar to those used to establish (a)(1) goals. For example, it would be unreasonable if the number of MPFFs required to exceed the Issue Date: 04/29/11 14 71111.12 reliability performance criterion or goal for a given SSC exceeds the number of expected (or possible) valid demands during the monitoring period. In this case, the goal or performance criterion could never be reached, let alone exceeded, despite clearly degraded performance or condition of the affected SSC. After consultation with appropriate regional and possibly headquarters staff, such issues can be addressed with the licensee, who should have a sound technical basis for its goals and performance criteria. This area, if suspect, may also be a candidate for further and more in-depth examination of the licensee's (a)(3) periodic evaluation (PE) activities. NOTE: Condition monitoring or predictive maintenance is generally desirable, but when performance criteria allow no failures or unavailability during the monitoring period, typically for very high safety-significant and/or Amission-critical@ SSCs, then the condition of the SSC should be monitored or tracked using condition monitoring or Apredictive maintenance@ parameters that, to the extent practicable, alert the licensee to degradation in time for preventive maintenance prior to failure. For example, some licensees allow no failures of either offsite power source and/or their in-plant distribution SSCs. Therefore, they will track voltage and frequency of the offsite power sources closely, particularly during periods of grid instability or heightened probability of loss of offsite power. In addition, licensees may designate certain SSCs in a so-called Arun-to-failure@ category. These are typically SSCs that are simple, of relatively low safety/risk significance, for which there is little or no meaningful preventive maintenance established, for which conditions indicative of degradation prior to failure are not readily detectable, that have fairly predictable failure rates or expected limited service life, and for which failure is self revealing so that the component can be promptly replaced, i.e. no testing would be required to identify a failed component that could impact any function important to safety were it to remain undetected and uncorrected. Examples would be components such as light bulbs, fuses with blown-fuse indicators, etc. For SSCs categorized as run-to-failure, the licensee can and should promptly, commensurate with safety, repair or replace failed equipment, but adjustments to PM program may not be necessary and monitoring under (a)(2) may be able to continue, unless the affected component or batch of similar components appear to suffer excessive or too frequent failures or significantly shortened service life compared to vendor expectations and or industry norms. These circumstances even with usual runto-failure components warrant investigation. However, if an SSCs has a function which caused it to be within the scope of the MR, it has some safety significance; therefore, licensee should provide a sound technical justification which appropriately establishes a run-to-failure determination. An SSC that is inherently reliable applies to SSCs that, without preventative maintenance, have high reliability (e.g., jet shields, raceways). For SSCs categorized as run-to-failure or inherently reliable, the inspector may wish to review the categorization for appropriateness. Block 21 - END - Develop Regulatory Position and Documentation Block 22 - Periodic Evaluation (PE) (optional sample) Performance Verification Issue Date: 04/29/11 15 71111.12 a. Verify that PEs have been completed within the time constraints of the MR (i.e., once each refueling cycle, but not to exceed 24 months between PEs). b. Verify that the licensee has reviewed its (a)(1) goals, (a)(2) performance criteria, monitoring, and preventive maintenance activities, and effectiveness of corrective actions. c. Verify that industry operating experience (IOE) has been taken into account where practicable. d. Verify that the licensee makes appropriate adjustments as result of the PEs. NOTE: The requirements for performing the PE can be satisfied through the use of ongoing assessments combined with a higher level summary assessment performed at least once per refueling cycle not to exceed 24 months between evaluations. Balancing Verification If applicable to the licensee’s Maintenance Program, verify that the licensee balanced reliability and availability/unavailability (refer to NUMARC 93-01, Section 12.2.4). Most licensees reevaluate the balance between a SSCs unavailability and reliability when the performance criteria are exceeded. The licensee’s assessment of balance should determine: a. Whether preventive maintenance should be reduced if unavailability performance criteria are exceeded with few MPFFs. b. Whether preventive maintenance should be increased if reliability performance criteria are exceeded with low unavailability. NOTE: The PE and resulting adjustments should meet the MR requirement that the objective of preventing failures of SSCs through maintenance is appropriately balanced against the objective of minimizing unavailability of SSCs due to monitoring or preventive maintenance. 03.02 Identification and Resolution of Problems. PI&R are integral and essential elements of maintenance effectiveness; therefore the specific guidance in this inspection procedure covers review of licensee PI&R in the maintenance effectiveness area. Guidance on the conduct of PI&R inspections in general is contained in IP 711152. 71111.12-04 RESOURCE ESTIMATE This inspection procedure is estimated to take 84 to 102 hours a year for the routine maintenance effectiveness inspection. Issue Date: 04/29/11 16 71111.12 71111.12-05 COMPLETION STATUS Inspection of the minimum sample size will constitute completion of this procedure in the Reactor Programs System (RPS). The minimum sample for routine inspection will consist of 8 maintenance effectiveness issues (of high risk significance to the extent available) annually per site. 71111.12-06 REFERENCES NOTE: Selected references are available on the NRC public website (http://www.nrc.gov/reactors/operating/ops-experience/maintenance-effectiveness.html). NOTE: An internal NRC SharePoint site provides links to electronic versions of selected references, along with the names and contact information for MR points of contact (http://portal.nrc.gov/edo/nrr/dirs/irib/Working%20Group/Maintenance%20Rule/default.aspx).

Title 10 of the Code of Federal Regulations (10 CFR), Part 50, Section 50.65, ARequirements for monitoring the effectiveness of maintenance at nuclear power plants@ (10 CFR 50.65) Statements of Consideration for 10 CFR 50.65, Federal Register, Vol 56, No. 132, July 10, 1991, pages 31306 to 31324 Statements of Consideration for 10 CFR 50.65, Federal Register, Vol 64, No. 137, July 19, 1999, pages 38551 to 38557 NRC Regulatory Guide (RG) 1.160, Rev. 2, AMonitoring the Effectiveness of Maintenance at Nuclear Power Plants@ Nuclear Energy Institute (NEI) (formerly Nuclear Management and Resources Council (NUMARC)), NUMARC 93-01, Revision 2, AIndustry Guideline for Monitoring the Effectiveness of Maintenance at Nuclear Power Plants@ NUREG-1648, ALessons Learned from Maintenance Rule Baseline Inspections@ NUREG-1526, “Lessons Learned from Early Implementation of the Maintenance Rule at Nine Nuclear Power Plants” NRC Inspection Manual Chapter (IMC) 0609, AReactor Safety Significance Determination Process@ NRC IMC 0612, APower Reactor Inspection Reports@ Inspection Procedure (IP) 62706, AMaintenance Rule@ IP 71152, AIdentification and Resolution of Problems@ NRC Generic Letter 90-03, June 15, 1990, ARelaxation of Staff Position on Generic Issue Date: 04/29/11 17 71111.12 Letter 83-28, Item 2.2, Part 2, Vendor Interface for Safety-Related Components@ NRC Enforcement Manual, Section 7.11, AActions Involving the Maintenance Rule@ NRC Inspection Manual, Part 9900, Technical Guidance, APreconditioning of Structures, Systems, and Components (SSCs) Before Determining Operability@ END Attachments: Appendix A, ARoutine Maintenance Effectiveness Inspection Flowchart@ Appendix B, Deleted Appendix C, AMaintenance Rule Terminology@ Appendix D, AMaintenance Issue Screening@ Appendix E, Deleted Issue Date: 04/29/11 71111.12 APPENDIX A Routine Maintenance Effectiveness Inspection Flowchart FLOWCHART 1 START Maintenance Effectiveness Concerns 1 Issue/ Problem- Oriented Sample Selection 2 SSC/Train/ Function- Oriented Sample Selection Selected Items 3 Detailed Historical Review 4 Extent of Condition Item(s) Reviewed/ Evaluated 5 Work Practices Implicated? No Yes 8 Common Cause Implications? Yes 6 Observe Work 7 Work Practices Ok? 9 Adequate CA? No IOC No Yes Yes 10 SSC in Scope? No 11 Should it be? No Go to 21 Yes Yes IOC 12 Reliability Affected? 13 Availability Affected? No o 14 Exceeds PC? Yes 14 Exceeds PC? Yes No Go to 21 No 15 Licensee Aware? Yes 15 Licensee Aware? Yes IOC 16 Licensee Actions OK? 16 Licensee Actions OK? Yes Yes No No No Yes Yes 17 In (a)(1)? 18 Should it be? IOC No Yes 19 Evaluate: 1) Goals 2) Corrective Actions 3) IOE 20 Evaluate: (a)(2) Performance Criteria 21 Develop Regulatory Position, Document No Go to 17 Yes 22 Periodic Evaluation Yes Yes No No No IOC Yes Issue Date: 04/29/11 71111.12 APPENDIX B DELETED Issue Date: 04/29/11 C-1 71111.12 APPENDIX C Maintenance Rule Terminology NOTE: Terminology descriptions provided here are meant to aid NRC inspectors in execution of this inspection procedure and in their review and understanding of how potential issues of concern may be applicable to the maintenance rule. The regulations and applicable source documents remain the overriding guidance documents for the maintenance rule. (a)(2) Performance Criteria- A means, established by the NRC-endorsed industry MR guidance, NUMARC 93-01, by which licensees typically determine whether they are demonstrating effective control of the performance of SSCs within the MR scope through appropriate preventive maintenance. Note that (a)(2) performance criteria are not required or even recognized per se by the MR. Meeting or not meeting (a)(2) performance criteria is not, by itself, the sole test for a valid (a)(2) demonstration for MR compliance with regard to those SSCs being carried in (a)(2) status, i.e., not being monitored against goals in (a)(1) status. Therefore, not placing an SSC into (a)(1) status for failing to meet (a)(2) performance criteria alone may not be sufficient grounds for an (a)(1)/(a)(2) violation; just as meeting (a)(2) performance criteria alone may not be sufficient demonstration of effective control of SSC performance in (a)(2). If the inspector believes, on the basis of some objective standard (e.g., the plant=s PRA, the EPRI PRA applications guide, or industry operating experience) that unavailability and/or unreliability is excessive, even if the existing performance criteria (which may no longer be valid) are not exceeded, there may be justification to conclude that the licensee is not effectively controlling the performance of the affected SSC(s)/function(s) through appropriate preventive maintenance. In such a case, the licensee should at least be considering the affected SSC(s)/function(s) for monitoring under (a)(1). However, not having recognized the unacceptable performance or condition, the licensee will not have considered monitoring under (a)(1). This may be grounds for identifying an (a)(2) violation, but this kind of issue may be highly subjective and would require considerable objective evidence to support a violation or a risk-significant finding. Availability - Availability is often tracked by its numerical complement, unavailability, and typically only for high-safety-significance (HSS) SSCs as provided for in the endorsed industry guidance. Unavailability is the time an SSC is unavailable during periods when the SSC was required to be available. Unavailability may also be expressed as a fraction of the total time the SCC was required to be available. Under the MR, unavailability is customarily charged from the time of a demand failure or discovery of a degraded or failed condition until restoration. For the period prior to a demand failure or discovery of a failed or degraded condition, additional unavailability may be charged from when the condition first existed (i.e., fault exposure time) if the fault exposure time can be determined. However, for MR purposes, if the fault exposure time cannot be determined, additional unavailability need not be charged. Nevertheless, as an alternative to charging unavailability for fault exposure time, the licensee may impute a demand failure and count it against the unreliability performance Issue Date: 04/29/11 C-2 71111.12 criterion. Treatment of very long fault exposure time resulting from long-standing latent deficiencies (e.g., design deficiencies) depends on the circumstances. While the condition should be promptly corrected (and extent of condition addressed), it may legitimately be judged not to reflect adversely on current maintenance effectiveness or on other aspects of the Ahealth@ of the affected SSC(s); hence, not be charged as unavailability. Consultation with cognizant NRC staff in such instances is encouraged. An SSC may be considered unavailable, even if deemed operable under technical specifications, when it cannot meet the appropriate success criteria for one or more of its MR-scoped functions. On the other hand, if the performance of the scoped function is tracked at the system level, and not all trains of the system are unavailable (such that the system can still meet scoped functional success criteria), then the licensee may legitimately consider the system available. For MR purposes, support system unavailability is not normally cascaded onto supported system(s) because it is indicative only of the performance or condition (Ahealth@) of the support system, not that of the supported system. NUMARC 93-01 contains guidance on the restrictions for crediting operator recovery actions. Note that required availability may vary widely under different plant conditions. It may depend upon the licensee's relying on the SSC for alternate success paths to preserve key safety functions. With the assistance of regional and headquarters staff cognizant of the MR, the inspector should be able to keep abreast of changes to industry guidance related to maintenance effectiveness and the NRC positions with respect to that guidance. For example, it is current industry practice to track unavailability of HSS SSCs or functions for MR purposes under all plant conditions in which they are required. However, this may not always be the case during shutdown. Also, there may be changes in the way fault exposure time and discovered conditions are treated for MR purposes in the interest of improved consistency with unavailability tracking for ROP performance indicators and other reporting programs. Common Cause Failures - Failure of two or more SSCs due to single specific event or cause. For example, a design deficiency, operation and maintenance errors, a natural phenomenon, personnel-induced event, or an unintended cascading effect from any other operation or failure within the plant or a change in ambient conditions. Common Mode Failure - Failure of two or more SSCs in the same manner or mode due to a single event or cause (i.e., common mode failure is a type of common cause failure in which the SSCs fails in the same way.) Corrective Actions- Appropriate corrective actions must be taken where established goals under (a)(1) are not met. AAppropriate@ means that (a)(1) corrective actions should be broader than repair of the failed SSC and address the cause of poor maintenance effectiveness. Extent of Condition - The extent to which the problem(s) may affect other trains, systems, units or plants, or similar components in other applications. Issue Date: 04/29/11 C-3 71111.12 Inherently Reliable- Pertains to an SSC that, without preventative maintenance, has high reliability. Inherently reliable SSCs could be included in the formal preventative maintenance program under (a)(2) in which the condition could be monitored via visual inspection during walkdowns. Inherently reliable SSCs are normally not placed in (a)(1). However, the need to place an SSC under (a)(1) and establish goals may arise if the inherently reliable SSC has experienced a failure. In such cases, the SSC cannot be considered inherently reliable. Examples of SSCs that are generally considered inherently reliable include, but are not limited to, jet shields, raceways, and in some cases electrical cabling depending on vendor specifications. Maintenance Activities- All activities associated with the planning, scheduling, accomplishment, post-maintenance testing, and return to service activities for surveillances and preventive and corrective maintenance. These activities are considered maintenance regardless of which organization performs the activity (e.g., maintenance, operations, and contractors). (Also, refer to discussion of maintenance support activities in MR Reliability Performance Criteria in this Section.) Maintenance Preventable Functional Failure- Failure of an SSC within the scope of the MR to perform its intended function (i.e., the function performed by the SSC that required its inclusion within the scope of the Rule), where the cause of the failure of the SSC is attributable to a maintenance-related activity. The maintenance-related activity is intended in the broad sense of maintenance. For example, in general, repetitive MPFFs (i.e., multiple failures of the same SSC for the same maintenance-related reason) can demonstrate that preventive maintenance is not effective and may be sufficient cause for placing the affected SSC in (a)(1) even if the performance criterion was not exceeded. By the same token, failures that are technically MPFFs and that exceed the reliability performance criterion, but are not related to the health of the SSC itself, may be reasonably judged by an expert panel not to warrant the increased attention of (a)(1) status. (Also, refer to MR Reliability Performance Criteria definition in this Section.) Maintenance Rule Functional Failure- Failure of an SSC within the scope of the MR to perform its intended function (i.e., the function performed by the SSC that required its inclusion within the scope of the MR). Degraded performance may constitute a functional failure, even without a complete loss of function. (Also, refer to MR Reliability Performance Criteria definition in this Section.) MR Reliability Performance Criteria (Block 12)- Reliability: may be defined in various ways by the licensee, most of which are acceptable under the endorsed guidance. However, the inspector should be aware of limitations. For example, a licensee who defines reliability (or unreliability) in terms of MRFFs, may only consider a total loss of those functions to be an MRFF. The licensee=s program may not recognize certain degraded performance as an MRFF (e.g., reduction in capacity below the nominal value). Nevertheless, it may be reasonable to consider, for example, that an affected Issue Date: 04/29/11 C-4 71111.12 SSC which still retained its minimum design-basis capability did not suffer an MRFF, particularly if there were no condition monitoring being done on the SSC in question. Further, it may also be reasonable to consider some degraded performance not to be a MRFF when the minimum capability assumed in the PRA (upon which performance criteria are based in part) was maintained (i.e., PRA functional success criteria met) even if design-basis capability was not. However, such rationalization to avoid declaring MRFFs (or to avoid charging unavailability) may be counterproductive to maintenance effectiveness because the practice may mask declining performance trends that otherwise might be more promptly addressed, preferably before complete failures occur. In addition, the inspector should consider not only the design basis and/or PRA success criteria for the function(s) in question, but also the success criteria for all the functions for which the SSC was scoped (e.g., use in the EOPs). If the affected SSC cannot meet the appropriate functional success criteria for one or more of the functions for which it was scoped, the reduced capability should ideally be considered a MRFF. If it is not, then the inspector would be justified in questioning the licensee=s basis for this determination, whether or not counting the degraded performance as an MRFF would result in the need to consider putting the affected SSC in (a)(1). While this situation may not result in an MR violation, there may be PI&R and/or corrective action implications, in addition to some risk or safety significance that could possibly be assessed through the significance determination process (SDP), provided that a performance deficiency exists. Some licensees define their reliability performance criteria in terms of maintenancepreventable functional failures (MPFFs) in a given number of valid demands or within some time period, as opposed to merely MRFFs. This further distinction can become very subjective. In evaluating the licensee's characterization of MRFFs as MPFFs (or not), where circumstances warrant, the inspector should consider maintenance-related contributing factors in a broad sense, not limited to work practices or other activities of maintenance staff alone. For example, deficiencies in certain direct maintenance support activities may cause or substantially contribute to failures, allow failures to occur or fail to prevent them, or allow unsatisfactory conditions to persist. These activities can include (but are not limited to) procurement; acceptance (including receiving and commercial-grade dedication); material control and issue; engineering (including design control, specifications, procedures and drawings, and poorly designed postmaintenance tests), work controls (including clearances, equipment lineups, etc.); operators (reconfiguring systems and equipment in support of maintenance); and use of vendor information and industry operating experience to keep instructions and procedures up to date. Even certain common cause problems related to design and/or manufacturing deficiencies in replacement parts, component, or materials (e.g., sealants, adhesives, lubricants, etc.) may be legitimately considered to render an MRFF maintenancepreventable (i.e., the MRFF would become an MPFF) if the deficiencies could or should reasonably have been detected and screened out (or contained) by the licensee applying generally acceptable industry standard practices in procurement, acceptance, and comprehensive corrective action. These maintenance support activities can be viewed as part of a more comprehensive concept of maintenance, and preventive maintenance in particular. Issue Date: 04/29/11 C-5 71111.12 However, the inspector should also recognize that while such factors may indicate the need for improvements in maintenance and/or its support activities (e.g., re-training, improved work practices, etc.), they may not necessarily reflect degraded health of the affected SSC that would warrant monitoring. Contributing factors, such as certain operator errors committed in direct support of maintenance (e.g., clearances, valve or equipment lineups, etc.) may require a failure to be deemed a MPFF by the licensee=s program. However, absent any indications of actual degraded performance or condition of the SSC(s) involved, the licensee (typically an expert panel) may be justified in not placing or retaining the affected SSC(s) in (a)(1), even if that operator error-related MPFF caused the applicable performance criterion to be exceeded. It would be reasonable in such a situation for the licensee to prescribe corrective action more appropriate to the circumstances, such as remedial operator training or requalification. The licensee should be expected to be able to defend such decisions. Although not required by the MR to be documented, this sort of rationale may often be found recorded in expert panel meeting minutes or similar documents. Periodic Evaluation- An evaluation of maintenance activities at the unit which shall be conducted at least once a refueling cycle, not to exceed 24 months between evaluations. The evaluation shall take into account relevant industry experience. Reliability- A measure of the expectation that an SSC will perform its function on demand, at any future instant in time (assuming that the SSC is available). Reliability is typically measured in terms of the number of failures in some pre-established number of valid demands over a pre-established tracking or monitoring period. Along with availability, reliability is a performance measure. Run-to-Failure- Applies to SSCs that are typically simple, of relatively low safety/risk significance, for which there is little or no meaningful preventive maintenance established, for which conditions indicative of degradation prior to failure are not readily detectable, that have fairly predictable failure rates or expected limited service life, and for which failure is self revealing so that the component can be promptly replaced, i.e. no testing would be required to identify a failed component that could impact any function important to safety were it to remain undetected and uncorrected. Examples would be components such as light bulbs, fuses with blown-fuse indicators (particularly in standby SSCs), etc. For such SSCs, the inspector may wish to review the categorization for appropriateness. The licensee can and should promptly, commensurate with safety, repair or replace failed equipment of this type, but adjustments to PM program may not be necessary and monitoring under (a)(2) may be able to continue, unless the affected component or batch of similar components appear to suffer excessive or too frequent failures or significantly shortened service life compared to vendor expectations and or industry norms. These circumstances even with usual run-to-failure components warrant investigation. However, if an SSCs has a function which caused it to be within the scope of the MR, it has some safety significance; therefore, licensee should provide a sound technical justification which appropriately establishes a run-to-failure determination. For such SSCs, the inspector may wish to review the categorization for Issue Date: 04/29/11 C-6 71111.12 appropriateness. Scope of the Maintenance Rule (Block 11)- SSCs/functions that have one or more of the following attributes must be scoped into the maintenance rule program: $ Safety-related SSCs/functions [50.65(b)(1)] $ Non-safety-related SSCs that perform an accident or transient mitigation function [50.65(b)(2)(i)] (as defined in the Final Safety Analysis Report) $ Non-safety-related SSCs that are used in the emergency operating procedures (EOPs) [50.65(b)(2)(i)] $ Non-safety-related SSCs that could prevent the fulfillment of a safety-related function [50.65(b)(2)(ii)] $ Non-safety-related SSCs that could cause an unwanted reactor trip or engineered safety feature (ESF) activation [50.65(b)(2)(iii)] Since the maintenance rule is a performance-based regulation, licensees have the flexibility to add or remove SSCs from the scope of 10 CFR 50.65(b) if an adequate technical basis exists for including or excluding the SSC in questions. Technically Justifiable- means justifiable in terms of logic for both qualitative and quantitative considerations. For example, the reliability performance criterion for emergency diesel generators (EDGs) is typically expressed in terms of the number of failures to properly start and/or run on demand for some given number of attempts or demands within the monitoring (or (a)(2) "tracking") period. Technically justifiable criteria in terms of deterministic considerations would include, for example, allowable demand failures that are consistent with industry operating experience that are reasonably sensitive to declining performance (i.e., degraded performance would be recognized before complete failure), but not be so restrictive as to become unbalanced with availability. For example, the risk-informed EDG reliability performance criteria discussed above might also be judged against operating experience, among other deterministic considerations, by the expert panel to ensure they made sense for the plant in terms of tracking SSC health and monitoring the effectiveness of maintenance. Performance criteria may need to be adjusted logically as well. For example, if the industry average demand failures in a refueling cycle for some piece of equipment was two, then a reliability performance criterion of two demand failures allowed might be reasonable, except for a plant at which the equipment was never challenged more than twice during the monitoring period. In that case, it could fail two times and never exceed the performance criterion such that it would be considered for transition to (a)(1) status. If the equipment in question were non-safety-related, there would be no regulatory requirement to take corrective action. In such a case, the prudent licensee would consider the operating history of the equipment at its plant. If the equipment was more reliable historically than the industry average, then it might be more prudent to set the reliability performance criterion at zero or one in order to promptly flag degraded performance or establish condition monitoring to detect declining trends. Issue Date: 04/29/11 C-7 71111.12 If the inspector questions the performance criteria or a change in performance criteria (or a shift from HSS to LSS status), then the licensee should be asked to explain the basis for the criteria and/or change. If the inspector believes that the criteria or changes are not reasonable, or that the justification is inadequate, then the inspector should consider consulting with the regional SRA and MR contacts in the Region and NRR. Note that having (a)(2) performance criteria that are not technically justifiable or that are not commensurate with safety is not necessarily a violation of the rule. However, it could be a contributing cause of the licensee's failure to demonstrate effective control of performance or condition if there are an excessive number of functional failures or excessive unavailability. Determining what is excessive may be difficult, and inspector(s) should consider consulting cognizant MR staff in the region and NRR to assist in evaluating the situation and making the case for a violation if warranted. Trigger Values- A generic EDG reliability analysis was done that resulted in what were known as "trigger values." The trigger values allowed (1) 3 failures to start or run in 20 attempts, (2) 4 in 50 attempts, and (3) 5 in 100. However, it was later determined that the values were not technically justifiable from a risk standpoint (i.e., not commensurate with safety), because they allowed an unacceptably high risk level to be reached before the EDG would be considered for shifting into (a)(1) status. Instead, the more conservative demand failure figures given in the EPRI PRA Applications Guide of (1) 2 in 20, (2) 3 in 50, and (3) 4 in 100, based on generic bounding PRA analyses would keep the risk within acceptable limits. During the NRC MR baseline inspections, these were deemed to be technically justifiable in terms of risk and hence, commensurate with safety. (Also, refer to technically justifiable definition in this Section). Unavailable Hours- The numerical complement of availability. The hours within a period during which an SSC is required to be available when the SSC cannot perform its function. An SSC that is required to be available for automatic operation must be available and respond without human interaction. (See Availability in this Section). Work Practices- The term Awork practices@ refers to the broad range of activities performed to maintain SSCs, including (but not limited to) preventive maintenance program requirements, maintenance procedures, field activities, system isolation and restoration procedures and practices, and post-maintenance testing. Issue Date: 04/29/11 D-1 71111.12 APPENDIX D Maintenance Issue Screening Issues of concern (IOCs) related to maintenance effectiveness should be screened in accordance with IMC 0612, Appendix B, “Issue Screening.” The guidance provided below supplements the guidance in IMC 0612, Appendix B for the specific block and figure number provided. Based on the results of the inspector=s reviews and discussions with the licensee, the inspector should consider consulting with other knowledgeable sources, such as: other inspectors on site, the senior resident inspector (SRI), regional supervision, regional maintenance rule contact(s), regional enforcement specialist(s), the headquarters maintenance rule staff in the Division of Inspection and Regional Support (DIRS), and Office of Enforcement (OE) staff as necessary. Block 6, Figure 2: Does the IOC involve a PERFORMANCE DEFICIENCY (PD)? Performance deficiencies associated with maintenance issue(s) should be clearly identified. A maintenance related PD can involve various types of licensee performance problems, including, but not limited to: deficient procedures, instruments/measuring and test equipment, tools or other equipment, deficient work practices, deficient maintenance support activities (e.g., replacement parts procurement and dedication, storage and material issue), inadequate recognition and handling of common cause problems, or inadequate root-cause analysis and/or corrective actions for degraded performance or condition of SSC(s)/function(s). When answering the PD screening questions in IMC 0612, Appendix B, consider the terminology descriptions provided in Appendix C of this inspection procedure for the IOC. NUMARC 93-01 and RG 1.160 may provide some additional insight on properly characterizing a potential PD; however, inspectors should note that these are not regulatory requirements. In some instances, an issue of concern (IOC) may cause or contribute to degraded performance of an SSC or function within the scope of the maintenance rule (a SSC IOC) and a separate issue of concern may cause or contribute to improper consideration of that performance within the licensee’s maintenance program (a Program IOC). In this case the SSC IOC should normally be screened separately from the Program IOC. Block 9, Figure 2: Is the PD More-than-Minor (e.g., Is it a FINDING)? The identified performance deficiency (or deficiencies) should be screened against the criteria in IMC 0612, Appendix B to determine whether they are minor or more than minor. When answering the Minor screening questions in IMC 0612, Appendix B, consider the terminology descriptions provided in Appendix C of this inspection procedure for the applicable PD. A maintenance-related performance deficiency may be more than minor if it results in a degraded performance or condition of an SSC that is Issue Date: 04/29/11 D-2 71111.12 likely to adversely affect an associated cornerstone objective, regardless of whether the degraded performance or condition has been recognized, appropriately categorized and characterized by the licensee. In these instances, inspectors should consider how the PD impacted the function of the SSC. In cases where there is a SSC PD and a separate program PD (separate IOCs that screen as performance deficiencies as discussed above), the program PD can often be determined to be more than minor because actual problems with the equipment have occurred. Block 10, Figure 2: Does FINDING involve a non-Traditional Enforcement (TE) VIOLATION? One or more of the identified findings may constitute a violation of one or more NRC regulations. It is possible that a licensee may take action to avoid a violation of 10 CFR 50.65; however, a violation of separate NRC regulations may exist and inspectors should consider which requirements/regulations are applicable for each finding. For guidance on what constitutes a potential MR violation, refer to Section 7.11 of the Enforcement Manual. NUMARC 93-01, RG 1.160, and NUREG-1648 may provide some additional insight on properly characterizing a potential MR violation; however, inspectors should note that these documents are not regulatory requirements. Block 14, Figure 3: Is the FINDING POTENTIALLY GREATER-THAN-GREEN? All FINDINGS will be screened using the Phase 1, “Initial Screening and Characterization” worksheet described in Attachment 4 to IMC 0609 to determine if they are POTENTIALLY GREATER-THAN-GREEN. The safety significance of the SSC(s) (as defined by the license’s maintenance rule program) is a key factor in this screening process. This includes cases where there exists a SSC FINDING and a separate maintenance rule program FINDING. This is discussed in the IMC 0609 SDP phase I screening guidance. Example of screening Maintenance Rule FINDING(s): A high-safety-significant (HSS) SSC in (a)(2) status has suffered one or more MR functional failures (MRFFs), i.e., failures of one or more of the functions for which it was included in the scope of the licensee=s MR program. Typically one or more of the following circumstances exist: (1) The inspector has determined that the MRFFs were maintenance preventable (i.e., were MPFFs), but the licensee has not recognized this. If counted appropriately as an MPFF, the latest MRFF would exceed the licenseeestablished (a)(2) unreliability performance criterion (PC); and/or (2) the latest MPFF constituted a repetitive MPFF (i.e., same type of failure and same cause or type of cause). In either case, the circumstances may support an inspector determination that the licensee has failed to demonstrate for the affected (a)(2) SSC that its performance or Issue Date: 04/29/11 D-3 71111.12 condition has or is being effectively controlled through appropriate preventive maintenance. This demonstration must be made in order for the affected SSC/function to remain in (a)(2) status under the MR. But having failed to make this demonstration, the licensee must set goals and monitor the performance or condition of the affected SSC under (a)(1) to be in compliance with the MR. In this scenario, it is possible that a performance deficiency and associated finding exists without a violation of the maintenance rule. For instance, the licensee can maintain the affected SSC in (a)(2) status and remain in compliance with the maintenance rule as long as there is adequate justification (i.e., the root cause is being corrected or is unrelated to the equipment itself (e.g., personnel issues only)). Or, if the circumstances warrant monitoring the affected SSC/function under (a)(1), and the licensee takes the necessary and appropriate actions under (a)(1) within a reasonable amount of time, there has (thus far) been no violation of the maintenance rule. However, if the inspector’s review determines the time that has passed since the licensee=s first opportunity to comply with the maintenance rule is excessive, then a violation may exist. In making this determination, consider the following: When the inspector=s concerns are brought to the attention of the licensee, the licensee may immediately recognize the situation, convene its expert panel and consider putting the affected SSC into (a)(1). In this case, the licensee may have avoided a MR violation unless an excessive amount of time has already passed and/or the licensee has missed one or more reasonable opportunities to comply. However, the inspector should also expect the licensee to take prompt corrective action for the degraded performance or condition of the SSC regardless of the maintenance rule disposition. In this case, a separate performance deficiency, and associated finding may exist. Another possibility is that the series of MPFFs that invalidated the (a)(2) demonstration occurred some time ago (for example, before the licensee=s last (a)(3) periodic evaluation, or previous expert panels have been convened without addressing the issue, or more than one rolling MR monitoring period has gone by) and the licensee has never recognized that the SSC in question should have been in (a)(1). In this case, there is likely a violation of (a)(2) and/or (a)(1) in that effective preventive maintenance was not demonstrated under (a)(2), yet the SSC was never put in (a)(1) despite several opportunities for the licensee to comply with the MR. Issue Date: 04/29/11 E-1 71111.12 APPENDIX E DELETED Issue Date: 04/29/11 Att1-1 71111.12 ATTACHMENT Revision History - IP 71111.12 Commitment Tracking Number Issue Date Description of Change Training Needed Trainin g Comple tion Date Comment Resolution Accession Number N/A 03/13/06 Completed Four-year historical review NO N/A N/A N/A 07/01/2002 CN 02-025 Revised to clarify inspection objectives and to improve effectiveness of this procedure based on feedback and lessons learned from implementation. This revision provides greater focus on reviewing licensee's effectiveness at performing routine maintenance. The revised procedure also focuses on review of equipment performance issues associated with availability and reliability, preferably on high-risk significant systems, maintenance work practices, and common cause issues. Sample size and inspection resource requirements were revised based on experience gained from four verification and validation visits at one site in each region. NO N/A N/A Issue Date: 04/29/11 Att1-2 71111.12 N/A 01/05/2006 CN 06-001 Inspection frequency was changed from a biennial to a triennial frequency based on a mature industry maintenance program. Additionally, estimated inspection hours were changed to 36 hours every 3 years or annualized estimate of 12 hours based on the actual inspection resources expended to complete this inspection procedure during last several ROP cycles. Completed historical CN search. NO N/A N/A NA 03/13/06 CN 06-006 IP71111-12 has been revised to clarify inspection objectives and to improve effectiveness of this procedure based on feedback and lessons learned from implementation. NO N/A N/A N/A 10/31/07 IP 71111.12 has been revised to reflect the ROP FY-2007 realignment. The triennial inspection was eliminated because it was determined adequate oversight of licensee performance in the area of maintenance can be maintained through the quarterly portion of IP 71111.12 and other inspection activities. NO N/A N/A

N/A 01/31/08

CN 08-005 IP 71111.12 has been revised to clarify the level of effort section in which the inspection procedure clearly states that the samples are not required on a quarterly basis. NO N/A N/A Issue Date: 04/29/11 Att1-3 71111.12 N/A 11/16/09 CN 09-027 IP 71111.12 has been revised to reflect the ROP realignment 2009. The (a)(3) sample previously removed from the biennial/triennial portion of 71111.12 was added back as an optional annual sample (see ROPFF 71111.12-1306). App D was revised to correct inconsistencies with IMCs 0612, 0609, and 0305 (see ROPFF-71111.12-1422), the flowchart and references were updated, NRR MR lead contact info was changed from DRA to DIRS, and ROPFF 71111.12-1407 was incorporated. Inspection requirement 02.01.b.2 was added to remain consistent with the current Block 2 of the guidance section. Added definition of inherently reliable. NO N/A ML093010331 N/A ML102910230 04/29/11 CN 11-008 IP 71111.12 has been revised to remove guidance in that is redundant or contrary to guidance in IMC 0612 and IMC 0609. Guidance was also removed from the IP that could be misinterpreted as establishing or conveying an inaccurate regulatory position. NO N/A ML11068A019