IR 05000250/2005005: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
| Line 1: | Line 1: | ||
{{IR-Nav| site = 05000250 | year = 2005 | report number = 005 | {{Adams | ||
| number = ML060720341 | |||
| issue date = 03/13/2006 | |||
| title = IR 05000250-05-005, & IR 05000251-05-005, on 01/27/2006, Preliminary White Finding Errata Letter, Turkey Point Nuclear Plant | |||
| author name = Munday J T | |||
| author affiliation = NRC/RGN-II/DRP/RPB3 | |||
| addressee name = Stall J A | |||
| addressee affiliation = Florida Power & Light Co | |||
| docket = 05000250, 05000251 | |||
| license number = DPR-031, DPR-041 | |||
| contact person = | |||
| case reference number = EA 06-027 | |||
| document report number = IR-05-005 | |||
| document type = Inspection Report, Letter | |||
| page count = 5 | |||
}} | |||
{{IR-Nav| site = 05000250 | year = 2005 | report number = 005 }} | |||
=Text= | |||
{{#Wiki_filter: | |||
[[Issue date::March 13, 2006]] | |||
Florida Power and Light CompanyATTN: Mr. J. A. Stall, Senior Vice President Nuclear and Chief Nuclear Officer P. O. Box 14000 Juno Beach, Florida 33408-0420 | |||
SUBJECT: TURKEY POINT NUCLEAR PLANT - INTEGRATED INSPECTION REPORT05000250/2005005 AND 05000251/2005005; PRELIMINARY WHITE FINDING ERRATA LETTEROn January 27, 2006, the U. S. Nuclear Regulatory Commission (NRC) issued the subjectinspection report for the Turkey Point Nuclear Plant. In reviewing this report, it was noted that the date was incorrect on the cover letter. Accordingly, we are providing a revised first page of the cover letter. Please replace the first page of the cover letter with the enclosed revision.In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and itsenclosure will be available electronically for public inspection in the NRC Public DocumentRoom or from the Publicly Available Records (PARS) components of NRC's document system(ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).I apologize for any inconvenience this error may have caused. If you have any questions,please contact me at (404) 562-4560. | |||
Sincerely,/RA/Joel T. Munday, ChiefReactor Projects Branch 3 Division of Reactor ProjectsDocket Nos: 50-250, 50-251License Nos. DPR-31, DPR-41 | |||
===Enclosure:=== | |||
As stated FP&L2cc w/encl:T. O. Jones Site Vice President Turkey Point Nuclear Plant Florida Power and Light Company 9760 SW 344 th StreetFlorida City, FL 33035Walter ParkerLicensing Manager Turkey Point Nuclear Plant Florida Power and Light Company 9760 SW 344 th StreetFlorida City, FL 33035Michael O. PearcePlant General Manager Turkey Point Nuclear Plant Florida Power and Light Company 9760 SW 344 th StreetFlorida City, FL 30035Mark Warner, Vice PresidentNuclear Operations Support Florida Power & Light Company P. O. Box 14000 Juno Beach, FL 33408-0420Rajiv S. KundalkarVice President - Nuclear Engineering Florida Power & Light Company P. O. Box 14000 Juno Beach, FL 33408-0420M. S. Ross, Managing AttorneyFlorida Power & Light Company P. O. Box 14000 Juno Beach, FL 33408-0420 | |||
_________________________OFFICERII:DRPSIGNATUREJTMNAMEJMundayDATE03/13/063/ /20063/ /20063/ /20063/ /20063/ /20063/ /2006 E-MAIL COPY? YESNO YESNO YESNO YESNO YESNO YESNO YESNO DOCUMENT TRANSMITTED HEREWITH CONTAINS SENSITIVE UNCLASSIFIEDINFORMATION WHEN SEPARATED FROM ATTACHMENTS 2 AND 3, THIS DOCUMENT IS DECONTROLLEDATTACHMENTS 2 AND 3 CONTAIN PROPRIETARY INFORMATIONJanuary 27, 2005EA 06-027Florida Power and Light CompanyATTN:Mr. J. A. Stall, Senior Vice PresidentNuclear and Chief Nuclear Officer P. O. Box 14000 Juno Beach, FL 33408-0420 | |||
SUBJECT: TURKEY POINT NUCLEAR PLANT - INTEGRATED INSPECTION REPORT 05000250/2005005 AND 05000251/2005005; PRELIMINARY WHITE FINDING | |||
==Dear Mr. Stall:== | |||
On December 31, 2005, the US Nuclear Regulatory Commission (NRC) completed aninspection at your Turkey Point Units 3 and 4. The enclosed integrated inspection report documents the inspection findings which were discussed on January 12, 2006, with Mr. W. Webster and other members of your staff.The inspection examined activities conducted under your license as they relate to safety andcompliance with the Commission's rules and regulations and with the conditions of your license. | |||
The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel.This letter and the enclosed supporting documentation discuss a finding that appears to havelow to moderate safety significance (White). This finding was assessed based on the best available information, including influential assumptions, using the applicable Significance Determination Process (SDP) and was preliminarily determined to be a White finding (i.e., a finding with some increased importance to safety, which may require additional NRC inspection). This finding is characterized as an Apparent Violation (AV) of NRC requirements and is beingconsidered for escalated enforcement action in accordance with the NRC Enforcement Policy. The current Enforcement Policy is included on the NRC's Web site athttp://www.nrc.gov/what-we-do/regulatory/enforcement/enforce-pol.html. | |||
DOCUMENT TRANSMITTED HEREWITH CONTAINS SENSITIVE UNCLASSIFIED INFORMATIONWHEN SEPARATED FROM ATTACHMENTS 2 AND 3, THIS DOCUMENT IS DECONTROLLEDATTACHMENTS 2 AND 3 CONTAIN PROPRIETARY INFORMATIONJanuary 27, 2006EA 06-027Florida Power and Light CompanyATTN:Mr. J. A. Stall, Senior Vice PresidentNuclear and Chief Nuclear Officer P. O. Box 14000 Juno Beach, FL 33408-0420 | |||
SUBJECT: TURKEY POINT NUCLEAR PLANT - INTEGRATED INSPECTION REPORT 05000250/2005005 AND 05000251/2005005; PRELIMINARY WHITE FINDING | |||
==Dear Mr. Stall:== | |||
On December 31, 2005, the US Nuclear Regulatory Commission (NRC) completed aninspection at your Turkey Point Units 3 and 4. The enclosed integrated inspection report documents the inspection findings which were discussed on January 12, 2006, with Mr. W. Webster and other members of your staff.The inspection examined activities conducted under your license as they relate to safety andcompliance with the Commission's rules and regulations and with the conditions of your license. | |||
The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel.This letter and the enclosed supporting documentation discuss a finding that appears to havelow to moderate safety significance (White). This finding was assessed based on the best available information, including influential assumptions, using the applicable Significance Determination Process (SDP) and was preliminarily determined to be a White finding (i.e., a finding with some increased importance to safety, which may require additional NRC inspection). This finding is characterized as an Apparent Violation (AV) of NRC requirements and is beingconsidered for escalated enforcement action in accordance with the NRC Enforcement Policy. The current Enforcement Policy is included on the NRC's Web site athttp://www.nrc.gov/what-we-do/regulatory/enforcement/enforce-pol.html. | |||
}} | |||
Revision as of 14:24, 28 October 2018
| ML060720341 | |
| Person / Time | |
|---|---|
| Site: | Turkey Point |
| Issue date: | 03/13/2006 |
| From: | Munday J T NRC/RGN-II/DRP/RPB3 |
| To: | Stall J A Florida Power & Light Co |
| References | |
| EA 06-027 IR-05-005 | |
| Download: ML060720341 (5) | |
Text
March 13, 2006
Florida Power and Light CompanyATTN: Mr. J. A. Stall, Senior Vice President Nuclear and Chief Nuclear Officer P. O. Box 14000 Juno Beach, Florida 33408-0420
SUBJECT: TURKEY POINT NUCLEAR PLANT - INTEGRATED INSPECTION REPORT05000250/2005005 AND 05000251/2005005; PRELIMINARY WHITE FINDING ERRATA LETTEROn January 27, 2006, the U. S. Nuclear Regulatory Commission (NRC) issued the subjectinspection report for the Turkey Point Nuclear Plant. In reviewing this report, it was noted that the date was incorrect on the cover letter. Accordingly, we are providing a revised first page of the cover letter. Please replace the first page of the cover letter with the enclosed revision.In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and itsenclosure will be available electronically for public inspection in the NRC Public DocumentRoom or from the Publicly Available Records (PARS) components of NRC's document system(ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).I apologize for any inconvenience this error may have caused. If you have any questions,please contact me at (404) 562-4560.
Sincerely,/RA/Joel T. Munday, ChiefReactor Projects Branch 3 Division of Reactor ProjectsDocket Nos: 50-250, 50-251License Nos. DPR-31, DPR-41
Enclosure:
As stated FP&L2cc w/encl:T. O. Jones Site Vice President Turkey Point Nuclear Plant Florida Power and Light Company 9760 SW 344 th StreetFlorida City, FL 33035Walter ParkerLicensing Manager Turkey Point Nuclear Plant Florida Power and Light Company 9760 SW 344 th StreetFlorida City, FL 33035Michael O. PearcePlant General Manager Turkey Point Nuclear Plant Florida Power and Light Company 9760 SW 344 th StreetFlorida City, FL 30035Mark Warner, Vice PresidentNuclear Operations Support Florida Power & Light Company P. O. Box 14000 Juno Beach, FL 33408-0420Rajiv S. KundalkarVice President - Nuclear Engineering Florida Power & Light Company P. O. Box 14000 Juno Beach, FL 33408-0420M. S. Ross, Managing AttorneyFlorida Power & Light Company P. O. Box 14000 Juno Beach, FL 33408-0420
_________________________OFFICERII:DRPSIGNATUREJTMNAMEJMundayDATE03/13/063/ /20063/ /20063/ /20063/ /20063/ /20063/ /2006 E-MAIL COPY? YESNO YESNO YESNO YESNO YESNO YESNO YESNO DOCUMENT TRANSMITTED HEREWITH CONTAINS SENSITIVE UNCLASSIFIEDINFORMATION WHEN SEPARATED FROM ATTACHMENTS 2 AND 3, THIS DOCUMENT IS DECONTROLLEDATTACHMENTS 2 AND 3 CONTAIN PROPRIETARY INFORMATIONJanuary 27, 2005EA 06-027Florida Power and Light CompanyATTN:Mr. J. A. Stall, Senior Vice PresidentNuclear and Chief Nuclear Officer P. O. Box 14000 Juno Beach, FL 33408-0420
SUBJECT: TURKEY POINT NUCLEAR PLANT - INTEGRATED INSPECTION REPORT 05000250/2005005 AND 05000251/2005005; PRELIMINARY WHITE FINDING
Dear Mr. Stall:
On December 31, 2005, the US Nuclear Regulatory Commission (NRC) completed aninspection at your Turkey Point Units 3 and 4. The enclosed integrated inspection report documents the inspection findings which were discussed on January 12, 2006, with Mr. W. Webster and other members of your staff.The inspection examined activities conducted under your license as they relate to safety andcompliance with the Commission's rules and regulations and with the conditions of your license.
The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel.This letter and the enclosed supporting documentation discuss a finding that appears to havelow to moderate safety significance (White). This finding was assessed based on the best available information, including influential assumptions, using the applicable Significance Determination Process (SDP) and was preliminarily determined to be a White finding (i.e., a finding with some increased importance to safety, which may require additional NRC inspection). This finding is characterized as an Apparent Violation (AV) of NRC requirements and is beingconsidered for escalated enforcement action in accordance with the NRC Enforcement Policy. The current Enforcement Policy is included on the NRC's Web site athttp://www.nrc.gov/what-we-do/regulatory/enforcement/enforce-pol.html.
DOCUMENT TRANSMITTED HEREWITH CONTAINS SENSITIVE UNCLASSIFIED INFORMATIONWHEN SEPARATED FROM ATTACHMENTS 2 AND 3, THIS DOCUMENT IS DECONTROLLEDATTACHMENTS 2 AND 3 CONTAIN PROPRIETARY INFORMATIONJanuary 27, 2006EA 06-027Florida Power and Light CompanyATTN:Mr. J. A. Stall, Senior Vice PresidentNuclear and Chief Nuclear Officer P. O. Box 14000 Juno Beach, FL 33408-0420
SUBJECT: TURKEY POINT NUCLEAR PLANT - INTEGRATED INSPECTION REPORT 05000250/2005005 AND 05000251/2005005; PRELIMINARY WHITE FINDING
Dear Mr. Stall:
On December 31, 2005, the US Nuclear Regulatory Commission (NRC) completed aninspection at your Turkey Point Units 3 and 4. The enclosed integrated inspection report documents the inspection findings which were discussed on January 12, 2006, with Mr. W. Webster and other members of your staff.The inspection examined activities conducted under your license as they relate to safety andcompliance with the Commission's rules and regulations and with the conditions of your license.
The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel.This letter and the enclosed supporting documentation discuss a finding that appears to havelow to moderate safety significance (White). This finding was assessed based on the best available information, including influential assumptions, using the applicable Significance Determination Process (SDP) and was preliminarily determined to be a White finding (i.e., a finding with some increased importance to safety, which may require additional NRC inspection). This finding is characterized as an Apparent Violation (AV) of NRC requirements and is beingconsidered for escalated enforcement action in accordance with the NRC Enforcement Policy. The current Enforcement Policy is included on the NRC's Web site athttp://www.nrc.gov/what-we-do/regulatory/enforcement/enforce-pol.html.