ML080310073: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
| Line 19: | Line 19: | ||
=Text= | =Text= | ||
{{#Wiki_filter:SLs 2.0 Quad Cities 1 and 2 2.0-1 Amendment No. | {{#Wiki_filter:SLs 2.0 Quad Cities 1 and 2 2.0-1 Amendment No. | ||
2.1 SLs 2.1.1 Reactor Core SLs 2.1.1.1 With the reactor steam dome pressure < 785 psig or core flow < 10% rated core flow: | ===2.0 SAFETY=== | ||
LIMITS (SLs) | |||
2.1 SLs | |||
====2.1.1 Reactor==== | |||
Core SLs 2.1.1.1 With the reactor steam dome pressure < 785 psig or core flow < 10% rated core flow: | |||
THERMAL POWER shall be 25% RTP. | THERMAL POWER shall be 25% RTP. | ||
| Line 29: | Line 34: | ||
For two recirculation loop operation, MCPR shall be 1.11, or for single recirculation loop operation, MCPR shall be 1.13. 2.1.1.3 Reactor vessel water level shall be greater than the top of active irradiated fuel. | For two recirculation loop operation, MCPR shall be 1.11, or for single recirculation loop operation, MCPR shall be 1.13. 2.1.1.3 Reactor vessel water level shall be greater than the top of active irradiated fuel. | ||
2.1.2 Reactor Coolant System Pressure SL Reactor steam dome pressure shall be 1345 psig. | ====2.1.2 Reactor==== | ||
Coolant System Pressure SL Reactor steam dome pressure shall be 1345 psig. | |||
2.2 SL Violations | 2.2 SL Violations | ||
| Line 35: | Line 41: | ||
With any SL violation, the following actions shall be completed within 2 hours: 2.2.1 Restore compliance with all SLs; and | With any SL violation, the following actions shall be completed within 2 hours: 2.2.1 Restore compliance with all SLs; and | ||
2.2.2 Insert all insertable control rods.}} | ====2.2.2 Insert==== | ||
all insertable control rods.}} | |||
Revision as of 21:00, 14 October 2018
| ML080310073 | |
| Person / Time | |
|---|---|
| Site: | Quad Cities |
| Issue date: | 02/28/2008 |
| From: | NRC/NRR/ADRO/DORL/LPLIII-2 |
| To: | |
| Wiebe, J | |
| Shared Package | |
| ML080280231 | List: |
| References | |
| TAC MD7374, TAC MD7375 | |
| Download: ML080310073 (1) | |
Text
SLs 2.0 Quad Cities 1 and 2 2.0-1 Amendment No.
2.0 SAFETY
LIMITS (SLs)
2.1 SLs
2.1.1 Reactor
Core SLs 2.1.1.1 With the reactor steam dome pressure < 785 psig or core flow < 10% rated core flow:
THERMAL POWER shall be 25% RTP.
2.1.1.2 With the reactor steam dome pressure 785 psig and core flow 10% rated core flow:
For two recirculation loop operation, MCPR shall be 1.11, or for single recirculation loop operation, MCPR shall be 1.13. 2.1.1.3 Reactor vessel water level shall be greater than the top of active irradiated fuel.
2.1.2 Reactor
Coolant System Pressure SL Reactor steam dome pressure shall be 1345 psig.
2.2 SL Violations
With any SL violation, the following actions shall be completed within 2 hour2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />s: 2.2.1 Restore compliance with all SLs; and
2.2.2 Insert
all insertable control rods.