ML110910108: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
| Line 16: | Line 16: | ||
=Text= | =Text= | ||
{{#Wiki_filter:}} | {{#Wiki_filter:LOCATION & TIME CHANGE MN No. 11-004 U.S. NUCLEAR REGULATORY COMMISSION REGION I NOTICE OF LICENSEE MEETING | ||
April 1, 2011 Licensee: Exelon Generation Company, LLC Facilities: Peach Bottom Atomic Power Station, Units 2 and 3 | |||
Docket Nos: 50-277; 50-278 | |||
Date/ Time: April 13, 2011 at 6:00 p.m. | |||
Location: Peach Bottom Inn 6085 Delta Road | |||
Delta, PA 17314 | |||
Purpose: The NRC will meet with the public to discuss the NRC's assessment of safety performance of the Peach Bottom Atomic Power Station for 2010, as described in the Annual Assessment Letter dated March 4, 2011. The NRC will respond to questions on specific performance issues at the plant and our role in ensuring safe plant operations. | |||
NRC Attendees: D. Roberts, Director, Division Reactor Projects P. Krohn, Chief, Division of Reactor Projects, Branch 4 F. Bower, Senior Resident Inspector, Peach Bottom | |||
Public Participation: This is a Category 3 Meeting. The public will have the opportunity to communicate with the NRC staff fo llowing the discussion of the assessment of the safety performance of the Peach Bottom Atomic Power Station during 2010. | |||
Meeting Contact: Paul G. Krohn, Chief, Projects Branch 4 610-337-5120 | |||
E-mail: paul.krohn@nrc.gov The NRC's annual assessment letter regarding Peach Bottom performance during 2010 can be found in ADAMS with Accession Number ML110620331 | |||
. ADAMS is accessible from the NRC website at: http://nrc.gov/reading-rm/adams.html. Additional information relative to the NRC's Annual Assessment process and the safety performance of Peach Bottom Atomic Power Station can be found on the NRC's website at: | |||
http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html. | |||
2 The NRC's Policy Statement, "Enhancing Public Participation in NRC Meetings," effective May 28, 2002, applies to this meeting. The policy statement may be found on the NRC website, http://www.nrc.gov/reading-rm/doc-collections/commission/policy/67fr36920.html , and contains information regarding visitors and security. | |||
The NRC provides reasonable accommodation to indivi duals with disabilities where appropriate. If you need a reasonable accommodation to participate in this meeting, or need the meeting notice or other information from the meeting in another format (e.g., Braille, large print), please notify the NRC's meeting contact. Determinat ions on requests for reasonable accommodation will be made on a case-by-case basis. Persons requiring assistance to attend the meeting shall make their requests known to the NRC meeting contact no later than two business days prior to the meeting. | |||
Attendance by other NRC personnel at this meeting should be made known by April 11, 2011, via telephone to the NRC meeting contact. | |||
Because meetings are sometimes canceled or rescheduled as a result of unforeseen circumstances, please confirm the meeting schedule. | |||
Approved by: | |||
_____/RA/_ | |||
______________ | |||
Paul G. Krohn, Chief Projects Branch 4 Division of Reactor Projects cc: Distribution via ListServ | |||
3 Agenda NRC's Annual Assessment Meeting Peach Bottom Atomic Power Station, Units 2 and 3 Peach Bottom Inn 6085 Delta Road Delta, PA 17314 April 13, 2011 6:00 pm Formal Meeting Introduction | |||
Discuss Peach Bottom Atomic Power Station Performance in 2010 ................ (10 minutes) | |||
Discuss US Plant Safe Operation In Light Of Japanese Event ....................... (10 minutes) | |||
NRC to address public questions .................................................................... (as needed) | |||
Closing Remarks ............................................................................................... (5 minutes) | |||
2 The NRC's Policy Statement, "Enhancing Public Participation in NRC Meetings," effective May 28, 2002, applies to this meeting. The policy statement may be found on the NRC website, http://www.nrc.gov/reading-rm/doc-collections/commission/policy/67fr36920.html , and contains information regarding visitors and security. | |||
The NRC provides reasonable accommodation to indivi duals with disabilities where appropriate. If you need a reasonable accommodation to participate in this meeting, or need the meeting notice or other information from the meeting in another format (e.g., Braille, large print), please notify the NRC's meeting contact. Determinat ions on requests for reasonable accommodation will be made on a case-by-case basis. Persons requiring assistance to attend the meeting shall make their requests known to the NRC meeting contact no later than two business days prior to | |||
the meeting. | |||
Attendance by other NRC personnel at this meeting should be made known by April 11, 2011, via telephone to the NRC meeting contact. | |||
Because meetings are sometimes canceled or rescheduled as a result of unforeseen circumstances, please confirm the meeting schedule. . Approved by | |||
: _______/RA/____________ | |||
Paul G. Krohn, Chief Projects Branch 4 Division of Reactor ProjectsDistribution: (Via E-Mail): Executive Director for Operations, OEDO (RIDSEDOMAILCENTER) Deputy Executive Director for Reactor Programs, OEDO (RIDSEDOMAILCENTER) | |||
Director, Office of Nuclear Reactor Regulation, NRR (RIDSNRROD) Deputy Director, Office of Nuclear Reactor Regulation, NRR (RIDSNRROD) Director, Division of Inspection and Regional Supprt, NRR/DIRS (RIDSNRRDIRS) Director, Division of Operating Reactor Licensing, NRR/DORL (RIDSNRRDORL) Asst. General Counsel Materials Litigation and Enforcement, OGC (RIDSOGCMAILCENTER) | |||
W. Dean, RA D. Lews, DRA D. Roberts, DRP J. Clifford, DRP P. Wilson, DRS S. Kennedy, DRS P. Krohn, DRP A. Rosebrook, DRP E. Torres, DRP S. Ibarrola, DRP F. Bower, DRP, SRI A, Ziedonis, DRP RI S. Schmitt, DRP, OA D. Screnci, PAO N. Sheehan, PAO R. Barkley, ORA N. McNamara, SLO D. Tifft, SLO G. Matakas, ORA K. Heater, DRP D. Bearde, DRS T. Haverkamp, DNMS V. Lewis, RI Receptionist RidsNrrPMPeachBottomResource RidsNrrDorlLpl1-2Resource ROPreportsResource SUNSI Review Complete: AAR (Reviewer's Initials) | |||
DOCUMENT NAME: G:\DRP\BRANCH4\Assessment (EOC, MC)\ROP 11\2010 EOC\AAM Notices\PBAPS 2010 AAMeeting Notice Revised.docx After declaring this document "An Official Agency Record" it will be released to the Public. To receive a copy of this document, indicate in the box: | |||
" C" = Copy without attachment/enclosure " E" = Copy with attachment/enclosure " N" = No copy ML110910108 OFFICE lhp RI/DRP RI/DRP NAME ARosebrook/ AAR PKrohn/ PGK DATE 04/01/11 04/01/11 OFFICIAL RECORD COPY}} | |||
Revision as of 21:32, 13 October 2018
| ML110910108 | |
| Person / Time | |
|---|---|
| Site: | Peach Bottom |
| Issue date: | 04/01/2011 |
| From: | Krohn P G Reactor Projects Region 1 Branch 4 |
| To: | |
| KROHN, PG | |
| References | |
| 11-004 | |
| Download: ML110910108 (3) | |
Text
LOCATION & TIME CHANGE MN No.11-004 U.S. NUCLEAR REGULATORY COMMISSION REGION I NOTICE OF LICENSEE MEETING
April 1, 2011 Licensee: Exelon Generation Company, LLC Facilities: Peach Bottom Atomic Power Station, Units 2 and 3
Docket Nos: 50-277; 50-278
Date/ Time: April 13, 2011 at 6:00 p.m.
Location: Peach Bottom Inn 6085 Delta Road
Delta, PA 17314
Purpose: The NRC will meet with the public to discuss the NRC's assessment of safety performance of the Peach Bottom Atomic Power Station for 2010, as described in the Annual Assessment Letter dated March 4, 2011. The NRC will respond to questions on specific performance issues at the plant and our role in ensuring safe plant operations.
NRC Attendees: D. Roberts, Director, Division Reactor Projects P. Krohn, Chief, Division of Reactor Projects, Branch 4 F. Bower, Senior Resident Inspector, Peach Bottom
Public Participation: This is a Category 3 Meeting. The public will have the opportunity to communicate with the NRC staff fo llowing the discussion of the assessment of the safety performance of the Peach Bottom Atomic Power Station during 2010.
Meeting Contact: Paul G. Krohn, Chief, Projects Branch 4 610-337-5120
E-mail: paul.krohn@nrc.gov The NRC's annual assessment letter regarding Peach Bottom performance during 2010 can be found in ADAMS with Accession Number ML110620331
. ADAMS is accessible from the NRC website at: http://nrc.gov/reading-rm/adams.html. Additional information relative to the NRC's Annual Assessment process and the safety performance of Peach Bottom Atomic Power Station can be found on the NRC's website at:
http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html.
2 The NRC's Policy Statement, "Enhancing Public Participation in NRC Meetings," effective May 28, 2002, applies to this meeting. The policy statement may be found on the NRC website, http://www.nrc.gov/reading-rm/doc-collections/commission/policy/67fr36920.html , and contains information regarding visitors and security.
The NRC provides reasonable accommodation to indivi duals with disabilities where appropriate. If you need a reasonable accommodation to participate in this meeting, or need the meeting notice or other information from the meeting in another format (e.g., Braille, large print), please notify the NRC's meeting contact. Determinat ions on requests for reasonable accommodation will be made on a case-by-case basis. Persons requiring assistance to attend the meeting shall make their requests known to the NRC meeting contact no later than two business days prior to the meeting.
Attendance by other NRC personnel at this meeting should be made known by April 11, 2011, via telephone to the NRC meeting contact.
Because meetings are sometimes canceled or rescheduled as a result of unforeseen circumstances, please confirm the meeting schedule.
Approved by:
_____/RA/_
______________
Paul G. Krohn, Chief Projects Branch 4 Division of Reactor Projects cc: Distribution via ListServ
3 Agenda NRC's Annual Assessment Meeting Peach Bottom Atomic Power Station, Units 2 and 3 Peach Bottom Inn 6085 Delta Road Delta, PA 17314 April 13, 2011 6:00 pm Formal Meeting Introduction
Discuss Peach Bottom Atomic Power Station Performance in 2010 ................ (10 minutes)
Discuss US Plant Safe Operation In Light Of Japanese Event ....................... (10 minutes)
NRC to address public questions .................................................................... (as needed)
Closing Remarks ............................................................................................... (5 minutes)
2 The NRC's Policy Statement, "Enhancing Public Participation in NRC Meetings," effective May 28, 2002, applies to this meeting. The policy statement may be found on the NRC website, http://www.nrc.gov/reading-rm/doc-collections/commission/policy/67fr36920.html , and contains information regarding visitors and security.
The NRC provides reasonable accommodation to indivi duals with disabilities where appropriate. If you need a reasonable accommodation to participate in this meeting, or need the meeting notice or other information from the meeting in another format (e.g., Braille, large print), please notify the NRC's meeting contact. Determinat ions on requests for reasonable accommodation will be made on a case-by-case basis. Persons requiring assistance to attend the meeting shall make their requests known to the NRC meeting contact no later than two business days prior to
the meeting.
Attendance by other NRC personnel at this meeting should be made known by April 11, 2011, via telephone to the NRC meeting contact.
Because meetings are sometimes canceled or rescheduled as a result of unforeseen circumstances, please confirm the meeting schedule. . Approved by
- _______/RA/____________
Paul G. Krohn, Chief Projects Branch 4 Division of Reactor ProjectsDistribution: (Via E-Mail): Executive Director for Operations, OEDO (RIDSEDOMAILCENTER) Deputy Executive Director for Reactor Programs, OEDO (RIDSEDOMAILCENTER)
Director, Office of Nuclear Reactor Regulation, NRR (RIDSNRROD) Deputy Director, Office of Nuclear Reactor Regulation, NRR (RIDSNRROD) Director, Division of Inspection and Regional Supprt, NRR/DIRS (RIDSNRRDIRS) Director, Division of Operating Reactor Licensing, NRR/DORL (RIDSNRRDORL) Asst. General Counsel Materials Litigation and Enforcement, OGC (RIDSOGCMAILCENTER)
W. Dean, RA D. Lews, DRA D. Roberts, DRP J. Clifford, DRP P. Wilson, DRS S. Kennedy, DRS P. Krohn, DRP A. Rosebrook, DRP E. Torres, DRP S. Ibarrola, DRP F. Bower, DRP, SRI A, Ziedonis, DRP RI S. Schmitt, DRP, OA D. Screnci, PAO N. Sheehan, PAO R. Barkley, ORA N. McNamara, SLO D. Tifft, SLO G. Matakas, ORA K. Heater, DRP D. Bearde, DRS T. Haverkamp, DNMS V. Lewis, RI Receptionist RidsNrrPMPeachBottomResource RidsNrrDorlLpl1-2Resource ROPreportsResource SUNSI Review Complete: AAR (Reviewer's Initials)
DOCUMENT NAME: G:\DRP\BRANCH4\Assessment (EOC, MC)\ROP 11\2010 EOC\AAM Notices\PBAPS 2010 AAMeeting Notice Revised.docx After declaring this document "An Official Agency Record" it will be released to the Public. To receive a copy of this document, indicate in the box:
" C" = Copy without attachment/enclosure " E" = Copy with attachment/enclosure " N" = No copy ML110910108 OFFICE lhp RI/DRP RI/DRP NAME ARosebrook/ AAR PKrohn/ PGK DATE 04/01/11 04/01/11 OFFICIAL RECORD COPY