Robinson: Difference between revisions
Jump to navigation
Jump to search
StriderTol (talk | contribs) No edit summary |
StriderTol (talk | contribs) No edit summary |
||
| Line 2: | Line 2: | ||
|name=Robinson | |name=Robinson | ||
|acronym=HBRSEP | |acronym=HBRSEP | ||
|site type=Plant | |||
|region=2 | |region=2 | ||
|state=South Carolina | |state=South Carolina | ||
| Line 11: | Line 12: | ||
|Power=2,339 MWt | |Power=2,339 MWt | ||
|Docket=05000261 | |Docket=05000261 | ||
|is cancelled=No | |||
|Reactor type=Westinghouse PWR 3-Loop | |Reactor type=Westinghouse PWR 3-Loop | ||
|Containment type=Dry, Ambient Pressure | |Containment type=Dry, Ambient Pressure | ||
Revision as of 13:55, 2 October 2018
| Plant | |
|---|---|
| Company | Duke Energy |
| Where | , South Carolina |
| Regulatory | |
| Region | NRC Region 2 |
| ISFSI docket | |
| wikipedia link | |
| Docket | 05000261 |
|---|---|
| Licensed Power Level (Thermal) | 2,339 MWt |
| Unit type | Westinghouse PWR 3-Loop |
| Containment | Dry, Ambient Pressure |
| Status | |
| NRC Website | |