ZIONSOLUTIONSL-LC _______
November 1, 2018 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Zion Nuclear Power Station, Units 1 and 2 An EnergySo/utions Company Facility Operating License Nos. DPR-39 and DPR-48 NRC Docket Nos. 50-295 and 50-304
Subject:
Final Status Survey (FSS) Final Report - Phase 1 ZS-2018-0093 The Zion Station Restoration Project License Termination Plan (LTP) describes the process of releasing land for unrestricted use. LTP Section 5.11 states that the FSS Final Report will be provided to the NRC in phases as remediation and FSS are completed with related portions of the site. contains the Zion Station Restoration Project FSS Final Report - Phase 1. This Phase 1 Final Report specifically addresses ten (10) open land area survey units that total approximately 221,234 m2 in area. This report contains a compilation of all ten (10) Release Records that are within the Phase 1 scope. Table 1-1 provides a listing of all the survey units addressed in this report, along with their classifications and size. Figure 1-1 depicts the locations of the survey units in relation to the Zion Nuclear Power Station (ZNPS) site as well as survey unit boundaries.
ZionSolutions anticipates three additional FSS Final Report submittals. The Phase 2 FSS Final Report will encompass remaining basement structures, embedded pipe, penetrations, and buried pipe. The Phase 3 FSS Final Report will include the open land survey units encompassing the southern portion of the site, and the Phase 4 FSS Final Report will encompass the northern portion. Interim submittals may be filed with the NRC with the goal of providing Release Records as soon as possible to support NRC review and the release of site open lands.
ZionSolutions hereby requests the NRC review the attached Phase 1 FSS Final Report for acceptance of this portion of the site final radiological survey by March 31, 2019.
There are no regulatory commitments made in this submittal. If you should have any questions regarding this submittal, please contact me at (860) 462-9707.
Respectfully,
(;~~~~
Gerard van Noordennen Vice President Regulatory Affairs 101 Shiloh Boulevard, Zion
- IL 60099 (224) 789-4016
- Fax: (224) 789-4008
- www.zionsolutionscompany.com
ZionSolutions, LLC ZS-2018-0093 Page 2 of2 Attachments: - Final Status Survey Final Report - Phase 1 - Preflight Report
Enclosures:
- CD contains Final Status Survey Final Report - Phase 1 & Appendices cc:
John Hickman, U.S. NRC Senior Project Manager Regional Administrator, U.S. NRC, Region III Service List (Cover letter only, no attachments and enclosures)
Zion Nuclear Power Station, Unit 1 and 2 License Transfer Service List cc:
Ken Robuck President and CEO Energy Solutions 299 South Main Street, Suite 1700 Salt Lake City, UT 84111 John Sauger Executive VP & Chief Nuclear Officer Reactor D&D Energy Solutions 121 W. Trade Street, Suite 2700 Charlotte, NC 28202 Bruce Hinkley General Manager ZionSolutions, LLC 2701 Deborah Avenue Zion, IL 60099 Gerard van N oordennen VP Regulatory Affairs Energy Solutions 121 W. Trade Street, Suite 2700 Charlotte, NC 28202 Jerry Houff Decommissioning Plant Manager ZionSolutions, LLC 2701 Deborah Avenue Zion, IL 60099 Russ Workman General Counsel Energy Solutions 299 South Main Street, Suite 1700 Salt Lake City, UT 84111 Steven A. Reynolds Manager, Nuclear Facility Inspection Division of Nuclear Safety Illinois Emergency Management Agency 245 W. Roosevelt Road, Units 55 & 56 West Chicago, Illinois 60185 Kelly F. Grahn Decommissioning and Field Office Manager Bureau of Radiation Safety Illinois Emergency Management Agency 245 W Roosevelt Road, Building 8, Suite 55 West Chicago, IL 60185 William P. Mazzeno Emergency Management Coordinator Lake County Emergency Management Agency 1303 N. Milwaukee Avenue Libertyville, IL 60048-13 08 John E. Matthews Morgan, Lewis & Bockius LLP 1111 Pennsylvania A venue, NW Washington, DC 20004
ATTACHMENT 1 Final Status Survey Final Report - Phase 1
ENCLOSURE 1 CD contains Final Status Survey Final Report - Phase 1 and Appendices I.
- r I I I
I I I I l i I
I
ZionSolutions, LLC ZS-2019-0093: Attachment 2 Page 1 of 1 This document serves as preflight report for Attachment 1 to the letter ZS-2018-0093. The following files do not pass pre-flight criteria or do not meet NRC criteria, but text is word searchable with clarity/legibility of high quality.
File Name Preflight Reason Status FSS Final Report Phase I October 2018 Error / Failed Document contains logos, color maps signatures, and scanned pages < 300 ppi, clear and legible Appendices to the Final Status Survey Final Report Phase I A 1 FSS Release Record, Survey Unit 10205 Error / Failed Document contains logos, color maps signatures, and scanned pages < 300 ppi, clear and legible A2 FSS Release Record, Survey Unit 10212A Error / Failed Document contains logos, color maps signatures, and scanned pages < 300 ppi, clear and legible A3 FSS Release Record, Survey Unit 10213A Error / Failed Document contains logos, color maps signatures, and scanned pages < 300 ppi, clear and legible A4 FSS Release Record, Survey Unit I 0219A Error / Failed Document contains logos, color maps signatures, and scanned pages < 300 ppi, clear and legible AS FSS Release Record, Survey Unit 10219B Error/ Failed Document contains logos, color maps signatures, and scanned pages < 300 ppi, clear and legible A6 FSS Release Record, Survey Unit 10220C Error / Failed Document contains logos, color maps signatures, and scanned pages < 300 ppi, clear and legible A 7 FSS Release Record, Survey Unit 10222 Error/ Failed Document contains logos, color maps signatures, and scanned pages < 300 ppi, clear and legible A8 FSS Release Record, Survey Unit 10223 Error / Failed Document contains logos, color maps signatures, and scanned pages < 300 ppi, clear and legible A9 FSS Release Record, Survey Unit 10224 Error/ Failed Document contains logos, color maps signatures, and scanned pages < 300 ppi, clear and legible AlO FSS Release Record, Survey Unit 10301 Error / Failed Document contains logos, color maps signatures, and scanned pages < 300 ppi, clear and legible