ULNRC-04869, Core Operating Limits Report
| ML031880815 | |
| Person / Time | |
|---|---|
| Site: | Callaway |
| Issue date: | 06/27/2003 |
| From: | Shafer D AmerenUE |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| ULNRC-04869 | |
| Download: ML031880815 (2) | |
Text
I Union Electric One Ameren Plaza 1901 Chouteau Avenue PO Box 66149 St. Louis, MO 63166-6149 314.621.3222 June 27, 2003 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Mail Station P1-137 Washington, DC 20555-0001 Ladies and Gentlemen:
UJLNRC-04869 WAmerenUF CALLAWAY PLANT DOCKET NUMBER 50-483 CORE OPERATING LIMITS REPORT Attached is the Callaway Plant Cycle 13 Core Operating Limits Report (COLR), Revision 3. The COLR was revised to include new RCS boration requirements prior to blocking Safety Injection below the P-1I interlock (Table A.2).
In accordance with Technical Specification 5.6.5, new cycle and mid-cycle revisions to the COLR are transmitted to the NRC Staff for information. If you have any questions concerning this report, please contact us.
Very truly yours, Dave Shafer Acting Manager, Regulatory Affairs DJW/Jdg
Attachment:
Appendix A, Callaway Cycle 13 Core Operating Limits Report, Rev. 3 a
subsidiary of Aln'An Corporation
ULNRC-04869 June 27, 2003 Page 2 cc:
U. S. Nuclear Regulatory Commission (Original and 1 copy)
Attn: Document Control Desk Mail Stop P1-137 Washington, DC 20555-0001 Dr. Thomas P. Gwynn Acting Regional Administrator U.S. Nuclear Regulatory Commission Region IV 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011-4005 Senior Resident Inspector Callaway Resident Office U.S. Nuclear Regulatory Commission 8201 NRC Road Steedman, MO 65077 Mr. Jack N. Donohew (2 copies)
Licensing Project Manager, Callaway Plant Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Mail Stop 7E1 Washington, DC 20555-2738 Manager, Electric Department Missouri Public Service Commission PO Box 360 Jefferson City, MO 65102