- ML20198P415 (← links)
- A05276, Forwards Safety & Safeguards Insp Fees for 841223-850330 (← links)
- 05000259/LER-1989-017-02, :on 890701,potential Transformer Compartment Door on 4 Kv Shutdown Board B Fell Open Disconnecting Fuse & Cabinet Contacts.Caused by Door Latching Mechanism Failure. General Operating Instruction to Be Issued (← links)
- 05000298/LER-1989-004, :on 890216,emergency Diesel Generator Trouble Alarm Received Due to Inadvertent Actuation of Safety Shutdown Valve Overspeed Trip Lever.Caused by Personnel Error.Responsible Supervisor Counseled (← links)
- 05000298/LER-1989-012, :on 890407,actuation of ESF Group Isolations Occurred Subsequent to Planned Manual Scram.Caused by design.State-of-the-art Digital Turbine Control Sys Being Installed (← links)
- 05000260/LER-1989-015-01, :on 890523,discovered No Air Flow in RHR 2C Pump Room Cooler Fan Duct.Caused by Personnel Error.Proper Fan Rotation Established & Verified.Min Qualification for Personnel Performing Const Test Initiated (← links)
- 05000458/LER-1989-023, :on 890507,unplanned ESF Actuation Occurred. Caused by Lifted Wire Inadvertently Making Contact with Energized Terminal Point Causing Relay to Energize.Loads Reset & Personnel Briefed (← links)
- 05000348/LER-1987-016, :on 870917,fire Dampers Inoperable Due to Failure to Close W/Air Flow.Caused by Improper Installation. Damper Removed from Sys & re-installed Correctly (← links)
- 05000285/LER-1987-019, :on 870527,diesel Driven Fire Pump Improperly Returned to Svc,Resulting in One Fire Pump Being Inoperable in Excess of 7 Days.Caused by Personnel Error.Addl Training Will Be Provided (← links)
- 05000338/LER-1986-018-01, :on 860915,w/unit in Hot Shutdown,Reactor Trip Breakers Opened When Individual Rod Position Indicators Determined Inoperable.Caused by Failed Transformer on Firing Card.Firing Card Replaced (← links)
- 05000220/LER-1987-002-01, :on 870126,NRC Notified of Problem W/Improper Seating of Agastat GP Series Relays That Could Cause Substantial Safety Hazard.Caused by Improper Installation of Relays.Relays Reseated Per GE Instructions (← links)
- 05000245/LER-1986-029-01, :on 861206,reactor Bldg Ventilation Monitor Tripped Upscale,Resulting in Steam Tunnel & Isolation & Automatic Initiation of Standby Gas Treatment Sys.Caused by Failed Sensor/Converter.Component Replaced (← links)
- 05000269/LER-1986-009-02, :on 860610,discovered That Keowee Battery Racks Did Not Comply W/Seismic Design Requirements.Caused by Poor Communication & Design/Installation Deficiency.Styrofoam Cell Spacers Installed (← links)
- 05000482/LER-1986-026, :on 860609,containment Visual Insp Per Tech Spec 3.5.2 & One Containment Air Lock Seal Demonstration Per Tech Spec 3.6.1.3 Inadvertently Omitted.Caused by Inadequate Status Chart.Chart Revised (← links)
- 05000414/LER-1986-010-01, :on 860426,steam Generator 2A Channel 3 Level Indicator Pegged High Causing Steam Generator hi-hi Level Alarm Actuation.Caused by Vent Valve on Ref Leg of Level Transmitter leaking-by.Indicator Repaired (← links)
- 05000440/LER-1988-020, :on 880605,reactor Scram Occurred Due to High APRM Neutron Flux Levels.Caused by Personnel Error.Automatic Mode of Flux Control Disabled Until Adjustments Completed & Personnel Involved Disciplined (← links)
- 05000328/LER-1988-011-01, :on 880306,cold Leg Accumulator 3 Declared Inoperable Due to Failure to Perform Surveillance Requirement Used to Verify Boron Concentration.Caused by Personnel Error.Procedure Revised (← links)
- 05000315/LER-1985-063, :on 851117,main Steam Flow Transmitters MFC-110 & MFC-111 Declared Inoperable During Startup.Caused by Defective Square Root Extractor in MFC-110 & Lack of Calibr in MFC-111.Transmitters Repaired & Recalibr (← links)
- 05000266/LER-1985-009, :on 851009,turbine Runback Occurred Due to Rod Drop Signal on Power Range Nuclear Instrumentation Sys. Caused by Technician Introducing Signal During Calibr of Negative Rate Runback Setpoint (← links)
- 05000366/LER-1997-003-02, :on 970328,excessive Leakage Identified on Secondary Bypass Valves Was Caused by Undersized Valve Operators & Inappropriate Valve & Operator Orientation. Re-routed Piping Containing Valves (← links)
- 05000302/LER-1996-024, :on 961011,plant Mod Created Unanalyzed Condition Re Emergency Feedwater Availability.Caused by Inadequate Translation of Assumptions from Earlier Designs. Design Basis Documents Were Corrected (← links)
- 05000280/LER-1985-011, :on 850626,while Racking Charging Pump B Breaker 15J5 Out for Pump Maint,Normal Feeder Breaker 15H6 for Operating Charging Pump C Tripped Due to Electrical Interlock.Caused by Inadequate Precautions (← links)
- 05000275/LER-1985-030, :on 850827,lo-lo Steam Generator Level Reactor Trip Occurred.Caused by Loose Termination on Main Feedwater Pump Local Manual Trip Button.Loose Termination Tightened. Local Manual Trip Connections Inspected (← links)
- 05000315/LER-1985-025, :on 850515,continuous Fire Watch Coverage Not Provided within 1 H Time Limit Following Failure of Low Pressure C02 Fire Protection Valve Operator to Close.Caused by Lack of Fire Watch Personnel (← links)
- 05000213/LER-1985-012, :on 850520,Tech Spec Surveillance Frequency Requirement Not Met in Performance of Rev 2 to Procedure SUR-5.5-26, Periodic Channel Functional Test of Reactor Coolant Pump Heat Detectors (← links)
- 05000259/LER-1996-002-02, :on 960328,EDG auto-started Due to Undervoltage Condition as Result of Personnel Error.Functional Tests on Breakers Associated W/Shutdown Bus Stopped & EDG Shutdown & Placed in Standby Readiness (← links)
- 05000302/LER-1992-004, :on 920428,emergency Feedwater Block Valves Failed to Close During Differential Pressure Testing.Caused by Normal Valve Wear & Inadequate Motor Operator Capabilities.Cable Combinations Modified (← links)
- 05000388/LER-1985-010, :on 850223,ESF Actuation Occurred.Caused by Tripped Reactor Protection Sys Power Supply Breaker.Breaker Reset & Affected Sys Restored (← links)
- 05000321/LER-1984-021-01, :on 841019,half Scram Occurred in Channel a Due to Wire Shorted to Live Circuit in Panel H11-P609.Caused by Personnel Error.Scram Condition Cleared.Personnel Counseled to Use Caution While Working (← links)
- 05000338/LER-1995-004-02, :on 950907,missed Surveillance of N-16 Monitors Occurred.Caused by Result of Being Unaware N-16s Inoperable. Selector Switch Operated to Both Ni Selector Positions & Proper Power Levels Obtained/Restored (← links)
- 05000255/LER-1995-015, :on 951219,determined Up to Twenty MOVs Could Become Unavailable as Result of App R Fire Scenario.Caused by Original App R Review Not Considering Valve Limit Switch Circuits Could Be Routed in Configuration.Valves Repaired (← links)
- 05000302/LER-1995-027, :on 951206,leak Found in Underground EFW Pump Recirculation Line.Caused by Nearby Excavation Using Power Tools.Mechanical Clamping Device Temporarily Used to Stop Leak Until Repairs Scheduled for 960229 (← links)
- 05000302/LER-1995-024, :on 951030,annubar Flow Tap Orientation Caused Seismic Qualification Concerns Resulted in Operation Outside Design Basis of Plant.Caused by Personnel Error.Placed Aft Under Administrative Control (← links)
- 05000387/LER-1984-030, :on 840627,boron Concentration in Standby Liquid Control Tank Fell to 0.4% Below Tech Spec Limit.Cause Unknown.Tank Level & Concentration Returned to within Limits (← links)
- 05000348/LER-1984-008, :on 840302,determined That Control Room Fire Barrier Penetration for NRC Red Phone Cable Not Properly Sealed.Caused by Personnel Error.Penetration Sealed. Personnel Reinstructed on Proper Installation (← links)
- 05000397/LER-1984-013, :on 840213,during Shutdown Conditions,Both post-LOCA Hydrogen Recombiner (CAC-HR-1A & 1B) Motors Tripped on Electrical Overload.Caused by Differences Between Nameplate Date & Design.Fuses Resized (← links)
- 05000302/LER-1995-002, :on 950207,EDG Lops Signal Generated,Stripping Emergency Safeguards Bus a & Opening & Locking Out Supply Breaker (Brkr 3211).Caused by Personnel Error.Shop Personnel Counseled & Event Reviewed (← links)
- 05000285/LER-1993-012, :on 930923,identified Condition Involving Five MOVs Having Cables That Were Inadequately Sized Due to Lack of Attention to Detail in Design Package Preparation for 1990 Mod.Thermal Overloads Enabled (← links)
- 05000285/LER-1993-017, :on 931116,time Delay Relays for Offsite Power Low Signal (Opls) Found Out of Tolerence Due to Inadequate Technical Review of Calibr Procedures for Opls Circuitry. Opls Calibr Procedures Revised (← links)
- 05000302/LER-1989-035, :on 890906,determined Safety Related Components Were Exposed to Voltages in Excess of Mfg Stated Voltage Ratings Due to Inadequate Control of Design Process.Replaced Inoperable Items W/High Voltage Components (← links)
- 05000302/LER-1993-005, :on 930518,notified That Control Circuit for Makeup & Purification Sys Letdown Isolation Valve Did Not Meet Electrical Isolation Criteria Due to Human Error.Mod in Development Will Be Expanded (← links)
- 05000530/LER-1989-011-01, :on 891206,discovered That Quarterly ASME Surveillance Testing on Train a of Air Start Sys Check Valve for Train B Emergency Diesel Generator Not Performed.Caused by Insufficient Controls.Procedure Revised (← links)
- 05000389/LER-1991-004, :on 910503,two Containment Fan Coolers Inoperable Based on Low Component Cooling Water Flow.Caused by Design Error.Flows Returned to Normal Values & Verified to Be Above Tech Specs Limits (← links)