Pages that link to "NEDC-32749P"
Jump to navigation
Jump to search
The following pages link to NEDC-32749P:
Displayed 31 items.
- ML17010A361 (← links)
- ML17010A336 (← links)
- ML17254A042 (← links)
- ML16244A408 (← links)
- NL-11-1812, Edwin I. Hatch, Unit 2 - 2011 Updated Final Safety Analysis Report, Revision 29, Chapter 6, Engineered Safety Features Through Chapter 7, Instrumentation and Control (← links)
- NL-18-1333, Completion of Required Action for NRC Order EA-13-109 Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions (← links)
- NL-16-1897, Fifth Six-Month Status Report of the Implementation of the Commission Order with Regard to Requirements for Reliable Hardened Containment Vents (EA-13-109) (← links)
- ML041530387 (← links)
- NL-04-0392, Response to RAI on the Proposed Technical Specifications Revision to Primary Containment Leakage Rate Testing Program (← links)
- ML040690512 (← links)
- ML040690502 (← links)
- NL-04-0158, Edwin J. Hatch Nuclear Plant Supplement to Technical Specifications Revision to Include Monitoring of Linear Heat Generation Rate (← links)
- NL-03-1842, Technical Specifications Revision to Include Monitoring of Linear Heat Generation Rate (← links)
- ML051010036 (← links)
- ML20151T211 (← links)
- ML20203A603 (← links)
- ML20237D606 (← links)
- ML20236V519 (← links)
- ML20217F185 (← links)
- ML20216G031 (← links)
- ML20216D725 (← links)
- ML20211J260 (← links)
- HL-5613, Forwards Response to NRC 980327 RAI Re Proposed Amend, Increasing Max Power Level for Both Units from Current Limit of 2558 Mwt to 2763 Mwt.Responses to Questions 56,59 & 60 Are Not Included & Will Be Submitted No Later than 980525 (← links)
- HL-5660, Forwards Response to Request for Addl Info Re Extended Power Uprate License Amend.Encl 2 Provides Proprietary Page Change to 980706 Submittal for NRC Question 91.Proprietary Encl Withheld,Per 10CFR2.790 (← links)
- HL-5471, Provides Response to NRC RAI Re 970509 Submittal to Change Plant TS Re Block Monitor Operability Requirements (← links)
- HL-5579, Forwards Proprietary & non-proprietary Response to 980210 RAI Re License Amend Request to Increase Authorized Max Power Level to 2,763 Mwt.Topical Rept NEDO-32749 Encl. Proprietary Info Withheld (← links)
- HL-5488, Forwards non-proprietary Version of GE License TRs NEDO-32749 & NEDO-32424.SAR for Plant for Release to NRC PDR Provided (← links)
- HL-5413, Application for Amends to Licenses DPR-57 & NPF-5,allowing Plant to Operate at Uprated Power Level of 2763 Mwt Which Represents Power Level Increase of 8%.Proprietary TR NEDC-32749P Encl (← links)
- NL-24-0026, Application to Revise Technical Specifications Surveillance Requirements to Increase Safety/Relief Valves Setpoint (← links)
- HL-5647, Forwards Proprietary & non-proprietary Info in Response to 980327 RAI Re Licensee Extended Power Uprate Amend Request, Submitted on 970808.Calculations SMNH-97-007 & SMNH-97-008, Encl.Proprietary Info Withheld (← links)
- ML20155C660 (← links)