Pages that link to "I3R-08"
← I3R-08
Jump to navigation
Jump to search
The following pages link to I3R-08:
Displayed 47 items.
- ML16159A024 (← links)
- ML15028A176 (← links)
- ML14206A012 (← links)
- ML14064A373 (← links)
- ML120600603 (← links)
- ML12058A005 (← links)
- ML112700599 (← links)
- ML11266A003 (← links)
- ML111720008 (← links)
- ML11147A187 (← links)
- ML111260532 (← links)
- ML110601120 (← links)
- ML11269A018 (← links)
- ML080940215 (← links)
- ML080500584 (← links)
- ML073610587 (← links)
- ML070660108 (← links)
- ML070180612 (← links)
- ML063530322 (← links)
- ML063480067 (← links)
- ML062510169 (← links)
- ML061180496 (← links)
- RS-11-050, Braidwood, Units 1 and 2 - Third 10-Year Inservice Inspection Interval Relief Request I3R-08, Alternative Requirements to ASME Section Xi Appendix Vii (Supplements 2 and 10), Examinations of Class 1 Pressure Retaining Welds Conducted from (← links)
- ULNRC-06321, Response to Request for Additional Information, Third 10-Year Interval Inservice Inspection Request for Relief No. I3R-08 (← links)
- ULNRC-06218, 10CFR50.55a Requests: Relief from Impractical Examination Coverage Requirements for the Third Ten-Year Inservice Inspection Program Interval (← links)
- HNP-11-013, Completion of Regulatory Commitment Regarding Relief Request I3R-08 (← links)
- RS-11-173, Response to Request for Additional Information Related to Relief Request I3R-08 (← links)
- RA07-036, Submittal of Relief Requests Associated with the Third Inservice Inspection (ISI) Interval and the Second Containment Inservice Inspection (Cisi) Interval (← links)
- BYRON 2006-0119, Pressurizer Weld Overlay Examination Results Related to Relief Request I3R-08 (← links)
- RS-06-131, Commitment Regarding Byron Station Relief Request I3R-08 (← links)
- BYRON 2006-0097, Response to NRC Request for Additional Information to Byron Station Relief Request I3R-08 (← links)
- TMI-11-061, ISI Program Plan, Fourth Ten-Year Inspection Interval (← links)
- ML072120510 (← links)
- CP-201301199, Relief Request No. C-3 for the Unit 2 Reactor Pressure Vessel leak-off Flange (Second ISI Interval Start Date: August 3, 2004; Second ISI Interval End Date: August 2, 2014 (← links)
- HNP-10-097, Relief Request from ASME Boiler and Pressure Vessel Code, Section XI Requirements for the Service Water System (← links)
- FOIA/PA-2014-0245 (← links)
- L-PI-19-002, 10 CFR 50.55a Requests Nos. 1-RR-5-10 and 2-RR-5-10, Proposed Alternative to Reactor Vessel Inservice Inspection (ISI) Intervals for Prairie Island, Unit 1 and Unit 2 (← links)
- L-2020-160, Extension of St. Lucie Unit 2 RPV Welds from 10 to 20 Years (← links)
- RA-20-0328, Request for Alternative for Implementation of Extended Reactor Vessel Inservice Inspection Intervals (← links)
- L-2021-107, Fifth Ten-Year Inservice Inspection Interval Revised Relief Request Nos. 8 and 9 Proposed Alternative in Accordance with 10 CFR 50.55a(z)(l), Extension of Inspection Interval for Turkey Point Units 3 and 4 Reactor Pressure (← links)
- 1CAN062301, Request for Alternative for Implementation of Extended Reactor Vessel Inservice Inspection Interval (ANO1-ISI-037) (← links)
- L-PI-23-027, Revision to 10 CFR 50.55a Requests Nos. 1-RR-5-10 and 2-RR-5-10, Proposed Alternative to Reactor Vessel Inservice Inspection (ISI) Intervals (← links)
- 1CAN122301, Responses to Request for Additional Information for Request for Alternative for Implementation of Extended Reactor Vessel Inservice Inspection Interval (ANO1-ISl-037) (← links)
- ML24018A064 (← links)
- RS-11-050, Third 10-Year Inservice Inspection Interval Relief Request I3R-08, Alternative Requirements to ASME Section XI Appendix VII (Supplements 2 and 10), Examinations of Class 1 Pressure Retaining Welds Conducted from the Inside (← links)
- DCL-25-034, ASME Section XI Inservice Inspection Program Request for Alternative NDE-U2-RPV-20-Year (← links)
- ML25262A158 (← links)