Pages that link to "2B21-F013A"
Jump to navigation
Jump to search
The following pages link to 2B21-F013A:
Displayed 45 items.
- IR 05000321/2004006 (← links)
- IR 05000321/2002006 (← links)
- Information Notice 1988-30, Target Rock Two-State SRV Setpoint Drift Update (← links)
- ML093240230 (← links)
- ML091730177 (← links)
- IR 05000373/2018002 (← links)
- ML060450286 (← links)
- NL-17-1366, Proposed Alternative RR-V-11 Regarding Main Steam Safety Relief Valve Testing Requirements (← links)
- NL-18-0408, Proposed Alternative RR-V-12 Regarding Main Steam Safety Relief Valve Testing (← links)
- NL-16-2466, Fukushima Near-Term Task Force Recommendation 2.1 Expedited Seismic Evaluation Process Report Completion (← links)
- NL-11-0162, Submittal of Revision to Relief Request RR-V-4 Fourth 10-Year Interval Inservice Testing Program (← links)
- ML030520436 (← links)
- ML050560347 (← links)
- ML050540305 (← links)
- ML032591209 (← links)
- ML20070L991 (← links)
- ML20087H560 (← links)
- ML20083M348 (← links)
- ML20080E649 (← links)
- ML20076E107 (← links)
- ML20100M136 (← links)
- ML20093J763 (← links)
- ML20091K481 (← links)
- ML20138Q921 (← links)
- ML20134L091 (← links)
- ML20133F364 (← links)
- ML20204B404 (← links)
- ML20212P601 (← links)
- ML20235J313 (← links)
- ML20210R404 (← links)
- HL-5805, Monthly Operating Repts for June 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With (← links)
- HL-5795, Monthly Operating Repts for May 1999 for Ehnp Units 1 & 2. with (← links)
- IR 05000321/1993300 (← links)
- 05000366/LER-1992-019-01, :on 920928,personnel Notified That Test Results for SRV Exhibited Drift in Mechanical Setpoint Due to corrosion-induced Bonding.C/A Includes Installing Sys That Will Provide Electrical Signals to SRV (← links)
- 05000366/LER-1991-004, :on 910214,component Failure in Generator Exciter Caused Turbine Trip & Reactor Scram.Caused by Component Failure.Failed Component in Generator Exciter Sys Replaced (← links)
- 05000366/LER-1983-030-01, /01T-0:on 830503,during Performance of Main Steam Relief Valve Maint by Wyle Lab,10 Steam Relief Valves Found Unacceptable.Caused by Setpoint Drift,Pilot Tube Leakage & Long Delay Time (← links)
- 05000366/LER-1989-007, :on 890926,setpoint Drift Exhibited by Some Pressure Vessel Safety Relief Valves.Caused by corrosion- Induced Bonding of Surface Between Pilot Valve Disc & Seat. Valves Refurbished (← links)
- 05000366/LER-1982-052-03, /03L-0:on 820525,during Startup from Refueling & Performance of Safety Relief Valve Operability Tests, Solenoids of Valves 2B21-F013A & E Interchanged.Caused by Personnel Error.Personnel Reinstructed (← links)
- HL-1495, Annual Operating Rept for 1990 for Hatch Units 1 & 2 (← links)
- 05000366/LER-1990-001-01, :on 900112,reactor Scrammed Because MSIVs Were Less than 90% Open.Caused by Component Failure & Configuration of Condenser Vacuum Sensing Lines & Instruments.Valves Replaced (← links)
- 05000366/LER-1989-007-03, :on 890926,four Safety Relief Valves Had Exhibited Drift in Mechanical Lift Setpoints in Excess of 3% Tolerance Specified by Inservice Testing Requirements.Root Cause Being Investigated.Valves Refurbished (← links)
- PM-79-610, Forwards Monthly Operating Rept for June 1979 (← links)
- 05000366/LER-2011-002, Regarding Corrosion Induced Bonding Results in Setpoint Drift for Multiple Safety Relief Valves (← links)
- 05000366/LER-2009-001, Regarding Safety Relief Valves Allowable Test Range Exceeded Due to Setpoint Drift (← links)
- 05000366/LER-2008-004, Safety Relief Valves Allowable Test Range Exceeded Due to Setpoint Drift (← links)