Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20138P051 + (Sentinel 5S Radiation,Structural & Thermal Evaluation (Application for Type B(U) Package Approval))
- ML19254F557 + (Sentinel Product Line QA Program Plan TES-3143,Revision B)
- ML18060A360 + (Sep 26, 2018 BWRVIP Meeting on Subsequent License Renewal)
- ML18047A687 + (Sep,High Energy Line Breaks Inside Containment,Palisades Nuclear Station,Phase IV Summary of Results)
- ML20052C193 + (Sep,Topic III-10.A,Thermal-Overload Protection for Motors of Motor-Operated Valves,Big Rock Point, Informal Rept)
- ML20062K073 + (Sep,Topic V-II.A,Electrical,Instrumentation & Control Features for Isolation of High & Low Pressure Sys,Big Rock Point Nuclear Station)
- ML20027E249 + (Sep,Topic VI-10.A,Testing of RPS & ESF at Big Rock Point Plant)
- ML20041C380 + (Sep,Topic VI-7.C.1, Independence of Redundant Onsite Power Sys, Technical Evaluation Rept,Jan 1982)
- ML20023D085 + (Sep:Investigation Into Possible Existence of Solution Cavities Beneath Big Rock Point Nuclear Power Plant Near Charlevoix,Mi)
- ML19340E488 + (Separate Accompanying Summary Rept of Type B & C Events Since June 1977 Type a Test)
- ML20237C791 + (Separate Accompanying Summary Rept of Type B & C Results..)
- ML19329C705 + (Separate Answer to Cleveland Petition to Intervene & Amend. Requests Petition Be Denied)
- ML19329C701 + (Separate Answer to Cleveland,Oh Petition to Intervene & Amend.Requests Petition Be Denied)
- ML19329C702 + (Separate Answer to Cleveland,Oh Petition to Intervene & Amend.Requests Petition Be Denied)
- TSTF-289 + (Separate Closure Time Testing and Actuation Signal Testing for Msivs and Feedwater Isolation Valves)
- TSTF-107 + (Separate Control Rods That Are Untrippable Versus Inoperable)
- ML20086K596 + (Separate Effects Testing and Analyses to Investigate Liner Tearing of the 1:16-SCALE Reinforced Concrete Containment Building)
- ML19210C853 + (Separate Non Concurring Views in Commission Decision on Aslab Refusal to Order Cost/Benefit Analysis Re Protection Against Lng Fire.Methodology,Data & Future Events Should Not Be underestimated.ASLB-518 Should Have Been Reviewed)
- ML20058D845 + (Separate Rept Re Local Leak Rate Test Results from Core 19/20 Refueling Outage)
- ML102990399 + (Separate Statement of Administrative Judge Ann Marshall Young, in the Matter of Entergy Nuclear Generation Co. and Entergy Nuclear Operations, Inc. (Pilgrim Nuclear Power Station), Docket No. 50-293-LR, ASLBP No. 06-848-02-LR)
- ML073550732 + (Separate Statement of Judge Ann Marshall Young (Regarding December 19 Order Revising Schedule for Evidentiary Hearing and Responding to Pilgrim Watchs December 14 and 15 Motions))
- ML20217L468 + (Separate Storage Installations Diq Form (N94))
- ML16340E279 + (Separate View of Commissioner Gilinsky Reinstatement of Low Power OL at Diablo Canyon)
- ML20266J111 + (Separation & Misc Aux Relays Schematic Diagrams. Sheet 30)
- ML19351F455 + (Separation Audit of Class IE Electric Equipment & Circuits Rept)
- Information Notice 1979-32, Separation of Electrical Cables for HPCI and ADS + (Separation of Electrical Cables for HPCI and ADS)
- ML20126L170 + (Separation of Electrical Equipment Plant Wide Field Audit Procedure. Related Documentation Encl)
- Information Notice 1985-03, Separation of Primary Reactor Coolant Pump Shaft and Impeller + (Separation of Primary Reactor Coolant Pump Shaft and Impeller)
- ML18283B937 + (Sepember 2018 - McGuire Generic Fundamental Examination Results)
- ML19249C726 + (Sept 10, 2019 52.103(g) Meeting - Public Slides Final)
- ML23065A217 + (Sept 10th Transcript from the 1999 Agreement State Meeting (Sept 8, Sept 9, Sept 10))
- ML19266A563 + (Sept 12 2019 Fpra and NFPA 805 FAQ Meeting Summary)
- ML18262A023 + (Sept 18, 2018 - MP 3 Actions from Jul 12, 2018 Meeting Attendees)
- ML18241A070 + (Sept 18, 2018, Meeting on MP 3 Actions from July 12, 2018 Meeting)
- ML20204D231 + (Sept 1978 Monthly Highlight Ltr for SSC Code Development & SSC Code Validation Programs Fast Reactor Safety Assessment)
- ML20204D219 + (Sept 1978 Monthly Highlight Ltr for Thermal Hydraulic LMFBR Safety Exper Re Simmer Ii,Hydrodynamic Dispersion, Dispersion in Boiling Pools,Heat Transfer in Boiling Pool & two-phase Solidification)
- ML20150E202 + (Sept 1978 Monthly Highlight Rept for Fast Reactor Safety Analysis,Technical Assistance,Reactor Proj Re Accident Analysis,Plant Dynamics & Reliability Analysis,Fast Reactor Physics & Post-Accident Containment Analysis)
- ML20204D227 + (Sept 1978 Monthly Highlight Rept for LWR Thermal Hydraulic Development Program Re Analytic Modeling,Facilities, Densitometer & Flashing Experiments)
- ML20148K095 + (Sept 1978 Monthly Highlights Ofc of Nuc Reg Res Progs at Ornl. Technical Progress Presented for l6 Separate Prog Activities Incl Heavy Section Steel Technology,Multirod Burst Tests & NSIC)
- ML20148P676 + (Sept 1978 Progress Rept:Physical Protec of Nuc Facils. Documentation Effort for Safeguards Automated Facil Eval Computer Codes Initiated & Seminar Given to NRC & Sca Personnel.Fsnm Is Being Installed on Sla Computers)
- ML19289C048 + (Sept 1978 Tech Prog Progress Rept For,Source Term Measurements at Pwrs.Outlines in-plant Prog Planning & Measurements.Covers in-plant Measurements at Rancho Seco & Turkey Point & Dev of Software)
- ML20115A678 + (Sept 1980 Monthly Summary Time Scale Network Rept to Illinois Commerce Commission for Illinois Power Co,Clinton Unit 1 Project)
- ML20115A683 + (Sept 1980 Schedule Status to Illinois Commerce Commission for Illinois Power Co,Clinton Unit 1 Project)
- ML20129C259 + (Sept 1996 Wastewater Rept for Davis-Besse Nuclear Power Station,Unit 1)
- ML20198P436 + (Sept 1997 Wastewater Rept for Davis-Besse Nuclear Power Station,Unit 1)
- ML043150315 + (Sept 2004 - Initial Exam - Final Scenarios)
- ML043130174 + (Sept 2004 - Initial RO Written Final Exam)
- ML043130180 + (Sept 2004 - Initial SRO Written Final Exam)
- ML043000355 + (Sept 2004 RO Initial Exam)
- ML043000377 + (Sept 2004 SRO Initial Exam)
- ML073090199 + (Sept 2007-301 Licensee Post-Exam Comments)