Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML19224B657 + (Operator Special Summaries B & C for 790330 (Computer Printout of Instrument Readings During Accident))
- ML19224B670 + (Operator Special Summaries a & C for 10:49 PM to 10:57 PM 790331 (Computer Printout of Instrument Readings During Accident))
- ML19224B666 + (Operator Special Summary A-C for 790329 (Computer Printout of Instrument Readings During Accident))
- ML19224B319 + (Operator Special Summary B (Group 12))
- ML19224B658 + (Operator Special Summary C (Computer Printout of Instrument Readings During Accident))
- ML20003E293 + (Operator Training & Certification Program,Morris Operation)
- ML20051M340 + (Operator Training - Degraded Core Recognition & Mitigation, Study Guide Phase 1,Vol 1)
- ML20028E969 + (Operator Training Instructor Indoctrination/Qualification Training Program, Rev 0)
- ML19345A696 + (Operator Training Program, Procedure AP-0500,Revision 3)
- ML20148F995 + (Operator Training Program, Revision 4)
- ML19338C848 + (Operator Training Svcs Instructor Requalification Program)
- ML25192A233 + (Operator Training and Testing Program for the Non-Power Kairos Power Fluoride Salt-Cooled High-Temperature Reactors - Topical Report)
- 05000261/FIN-2010012-03 + (Operator Transient Response Adversely Affected by Uncorrected, Known Plant Deficiency)
- IR 05000348/2017301 + (Operator Written Examination Approval 05000348/2017301 and 05000364/2017301)
- IR 05000353/2006301 + (Operator and Senior Reactor Operator Initial Examination Report No. 05000352 and 05000353-06-301)
- IR 05000247/2005301 + (Operator and Senior Reactor Operator Initial Examination Retake Report No. 050000247-05-301)
- ML19327A497 + (Operator/Senior Operator Requalification Program)
- ML20262A205 + (Operators Console Details)
- ML20262A098 + (Operators Console Details. Rev Date Illegible)
- ML20261B391 + (Operators Control Console IH13-P680 Center Section)
- ML20261B386 + (Operators Control Console IH13-P680 Computer Interfaces)
- ML20261B382 + (Operators Control Console IH13-P680 Left Hand Section)
- ML20261B395 + (Operators Control Console IH13-P680 Right Hand Section)
- ML20215A714 + (Operators Degrees - Operators Viewpoint)
- 05000244/FIN-2009003-02 + (Operators Did Not Have Corrective Lens Kits Available to Implement Emergency Plan Requirements)
- 05000397/FIN-2017008-02 + (Operators Fail To Follow Procedure Causes RCIC Overspeed Trip)
- 05000397/FIN-2017008-01 + (Operators Fail To Follow Reactor Scram Procedure)
- 05000259/FIN-2010002-03 + (Operators Failed to Correctly Monitor and Assess RPV Beltline Temperatures During RPV Hydrostatic/In-service Leak Test)
- ML20207U017 + (Operators Licenses & Conforming Amends, 10CFR50 & 55 Final Rule.Regulations Amended Clarifying Requirements for Issuing Licenses to Operators & Senior Operators & Codifying Procedures for Administering Requalification Exams)
- ML19308D033 + (Operators Licenses, 10CFR55.Establishes Procedures & Criteria for Issuance of Licenses to Operators,Including Senior Operators,Of Facilities Per Atomic Energy Act of 1954)
- ML20005C104 + (Operators Manual for Cobalt Teletherapy Digital Treatment Timer,Model A102408-654, for Insertion in Digital Treatment Timer Operators Manual,Edition 2,Jan 1980)
- ML20005C108 + (Operators Manual for the Eldorado 78 Co-60 Teletherapy Unit,Edition 10, for Insertion in Eldorado 78 Operators Manual Edition 9,June 1981)
- 05000255/FIN-2011015-02 + (Operators did not inform management an at-the-controls reactor operator left the at-the-controls area of the Control Room without providing a turnover to a qualified individual or obtaining permission from the Control Room Supervisor.)
- ML20054J034 + (Opines Re Calculations of site-specific Spectra & Seismic Risk for Seismic Category I Structures Outside Std Plant Portion of Facility.High Degree of Conservatism Built Into Assumed Seismic Risk Acceptable)
- ML20054M315 + (Opines Re NRC Severe Fuel Damage Research Program.Phase I Pbf Tests Essential to Success of Program.Phase II Should Put Emphasis on Full Length Studies)
- ML17276B527 + (Opines Re Nuclear Liability Site Description.Limited Site Description Would Apply Only During Period Fuel in Storage & Would Be Broadened to Encompass Contiguous WPPSS Property at Time of Fuel Loading)
- ML20206E036 + (Opines That 10CFR50.54(x) & (Y) Superfluous & Dangerous.Nrc Should Instruct Operators Not to Depart from Tech Specs in Emergency.Author Resume Detailing Experience in Commercial Nuclear Power Field Encl)
- ML20062A710 + (Opines That 1977 Fes Should Be Updated)
- ML20028B987 + (Opines That Continued Operation of Similarly Configured Plants Is Irreconcilable W/Deferral of Decision to Lift Immediately Effective Suspension of TMI-1 on Basis of Aslab Generic Concerns Re Dhr.Svc List Encl)
- ML20084D332 + (Opines That Dec 1974 - Jan 1975 Cracks Appear Similar to Sept 1974 Cracks in Reactor Water Recirculation 4-inch Diameter Piping.Repetition of Investigation Will Serve No Useful Purpose)
- ML20071G924 + (Opines That Decision Re Continued Plant Operation Must Weigh Health Effects of Replacement by Coal Burning Plants)
- GO2-86-568, Opines That Existing Neutron Monitoring Sys Adequate to Meet post-accident Needs for Measuring Neutron Flux Per Sser 4 (NUREG-0991).License Need Not Be Amended Yet to Conform to Rev 2 to Reg Guide 1.97 + (Opines That Existing Neutron Monitoring Sys Adequate to Meet post-accident Needs for Measuring Neutron Flux Per Sser 4 (NUREG-0991).License Need Not Be Amended Yet to Conform to Rev 2 to Reg Guide 1.97)
- ML20214V742 + (Opines That Maintaining Spent Fuel at Current Location Under Appropriate Safeguards Currently Imposed Is Immeasurably Better than Transportation to Unavailable Site Via Potentially Dangerous Means of Transportation)
- ML20024A505 + (Opines That NRC Approach to Separate Corporate Institution from Corporate Employees Legally Presumptuous & Solidifies Contention That NRC in Collusion W/Utils)
- ML20083G368 + (Opines That NRC Recommendation to Restart Unit 1 Premature in Light of Unanswered Questions Re Competency,Integrity & Safety Issues.Further Decision Re Restart Should Be Delayed Until Issues Resolved)
- ML20054K470 + (Opines That No New CPs or OLs Should Issue Unless Environ Impacts of Waste Mgt Considered in Each Case,Due to DC Circuit Court of Appeals 820427 Decision Invalidating Commission Table S-3 Rule)
- ML20065A997 + (Opines That Plant Can Be Safely Operated Pending Resolution of Unresolved Generic Safety Issues A-45 & A-46)
- ML20215E096 + (Opines That Proposed Resolution of USI A-44, Station Blackout, Acceptable But That Final Rule Not Be Issued Until NUMARC Initiatives Investigated,Per ACRS 325th & 326th Meetings on 870507-09 & 0604-06,respectively)
- ML20027D078 + (Opines That Questions Re Operator Exam Cheating Must Be Thoroughly Investigated)
- ML20062C825 + (Opines That Rationale Expressed in Applicant post-hearing Ltr Unpersuasive to Grant Exemption Request.Applicants Confuse Total Informational Benefits to Ldp W/Marginal Benefits of 6-month Shift in Schedule)
- ML20062C765 + (Opines That Small Increase in Crbr Efficiency That Might Result from Granting Exemption Request Does Not Justify Extraordinary Relief from NRC Licensing Process)