Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20266F643 + (Main Steam (Ms) (Safety Related) P&Id, as-built)
- 05000237/FIN-2016009-01 + (Main Steam Acoustic Safety/Relief Valve Monitoring Channel Calibration Not Performed)
- ML20266F981 + (Main Steam Atmospheric Dump Valve Control System Malfunction. Sheet 1 of 1)
- ML20211D360 + (Main Steam Bypass Sys Testing Program Rept)
- ML20263R613 + (Main Steam Doghouse General Arrangement/Arch Plan El 594 Ft & 613 Ft Transverse Section Longitudinal Section)
- ML20261M870 + (Main Steam Doghouse General Arrangement/Arch Platform Plan El 622 Ft Platform Plan El 634 Ft Unit 1 Outside)
- ML20261M875 + (Main Steam Doghouse General Arrangement/Arch Plan El 594 Ft & 613 Ft Unit 1 Inside. No Revision Date.Full Drawing Number Is CN-REF-1200-16.1)
- ML20261M883 + (Main Steam Doghouse General Arrangement/Arch Platform Plan El 622 Ft Platform Plan El 634 Ft Unit 2 Inside)
- ML20261M882 + (Main Steam Doghouse General Arrangement/Arch Platform Plan El 622 Ft Platform Plan El 634 Ft Unit 2 Outside. No Revision Date)
- ML20261M878 + (Main Steam Doghouse General Arrangement/Arch Platform Plan El 622 Ft Platform Plan El 634 Ft Unit 1 Inside. No Revision Date.Full Drawing Number Is CN-REF-1200-16.2)
- ML20261M867 + (Main Steam Doghouse General Arrangement/Arch Plan El 594 Ft & 613 Ft Transverse Section Longitudinal Section Unit 1 Outside)
- ML20261M980 + (Main Steam Feedwater Pipe Anchorages. Sheet 1 of 2)
- 05000327/LER-1980-028-01, Main Steam Header Pressure Transmitters 1-PT-1-2B,-9A,-9B,-20A,-20B & 27B Found to Lack Environ Qualification.Caused by Design Error + (Main Steam Header Pressure Transmitters 1-PT-1-2B,-9A,-9B,-20A,-20B & 27B Found to Lack Environ Qualification.Caused by Design Error)
- ML20259D143 + (Main Steam Isol Bypass Valves Logic Diagram System:S-10. Sheet 2.No Revision Date)
- ML20265C772 + (Main Steam Isolation Bypass Valves Logic Diagram System: Ms)
- ML20261K234 + (Main Steam Isolation Bypass Valves Logic Diagram System: Ms)
- ML20260L144 + (Main Steam Isolation Valve Auxiliary Relays. Sheet 60)
- ML20260L149 + (Main Steam Isolation Valve Auxiliary Relays. Sheet 63)
- ML20260L160 + (Main Steam Isolation Valve Auxiliary Relays. Sheet 64)
- Information Notice 1985-21, Main Steam Isolation Valve Closure Logic + (Main Steam Isolation Valve Closure Logic)
- ENS 57578 + (Main Steam Isolation Valve Failed to Close)
- ENS 55785 + (Main Steam Isolation Valve Failed to Shut)
- Information Notice 2015-13, Main Steam Isolation Valve Failure Events + (Main Steam Isolation Valve Failure Events)
- Information Notice 1994-44, Main Steam Isolation Valve Failure to Close on Demand because of Inadequate Maintenance and Testing + (Main Steam Isolation Valve Failure to Close on Demand because of Inadequate Maintenance and Testing)
- Information Notice 1994-44, Main Steam Isolation Valve Failure to Close on Demand Because of Inadequate Maintenance and Testing + (Main Steam Isolation Valve Failure to Close on Demand Because of Inadequate Maintenance and Testing)
- Information Notice 1988-59, Main Steam Isolation Valve Guide Rail Failure at Waterford Unit 3 + (Main Steam Isolation Valve Guide Rail Failure at Waterford Unit 3)
- 05000333/FIN-2011003-03 + (Main Steam Isolation Valve Leak Rate Exceeds Authorized Limit)
- 05000387/LER-2024-001, Main Steam Isolation Valve Leakage + (Main Steam Isolation Valve Leakage)
- 05000387/LER-2022-001, Main Steam Isolation Valve Leakage + (Main Steam Isolation Valve Leakage)
- EPID:L-2024-LLR-0033 + (Main Steam Isolation Valve Leakage)
- 05000388/LER-2019-001-01, Main Steam Isolation Valve Leakage + (Main Steam Isolation Valve Leakage)
- 05000387/LER-2018-003, Main Steam Isolation Valve Leakage Due to Pilot Poppet and Pilot Poppet Seat Wear/Degradation + (Main Steam Isolation Valve Leakage Due to Pilot Poppet and Pilot Poppet Seat Wear/Degradation)
- 05000387/LER-2024-001-01, Main Steam Isolation Valve Leakage Due to Valve Body Seat Wear + (Main Steam Isolation Valve Leakage Due to Valve Body Seat Wear)
- 05000263/LER-2023-001, Main Steam Isolation Valve Leakage Exceeds Technical Specification Requirements Due to Stem Scoring + (Main Steam Isolation Valve Leakage Exceeds Technical Specification Requirements Due to Stem Scoring)
- 05000298/FIN-2015008-03 + (Main Steam Isolation Valve Scram Closure condition Prohibited By Technical Specifications)
- ML20265B329 + (Main Steam Isolation Valve Sealing System)
- ENS 42674 + (Main Steam Isolation Valve Stuck During Testing)
- ENS 52750 + (Main Steam Isolation Valves Exceeded Primary Containment Local Leak Rate Acceptance Criteria)
- ENS 47857 + (Main Steam Isolation Valves Fail to Shut)
- 05000254/LER-2025-003, Main Steam Isolation Valves Local Leak Rate Test Exceed Technical Specification Limits + (Main Steam Isolation Valves Local Leak Rate Test Exceed Technical Specification Limits)
- 05000254/LER-2025-003-01, Main Steam Isolation Valves Local Leak Rate Test Exceed Technical Specification Limits + (Main Steam Isolation Valves Local Leak Rate Test Exceed Technical Specification Limits)
- ML20265C768 + (Main Steam Isolation Valves Logic Diagram System:Ms)
- ML20262B697 + (Main Steam Isolation Valves Logic Diagram System:Ms)
- ML20260D738 + (Main Steam Isolation Valves Logic Diagram System:Ms)
- ML20260B151 + (Main Steam Isolation Valves Logic Diagram System:Ms)
- ML20259D149 + (Main Steam Isolation Valves Logic Diagram System:S-10. Sheet 1)
- 05000457/LER-2001-002 + (Main Steam Isolation Valves Not Stroke Timed in Mode 3 as Required)
- 05000278/LER-2023-002, Main Steam Isolation Valves Stroke Times Exceed Technical Specification Limit + (Main Steam Isolation Valves Stroke Times Exceed Technical Specification Limit)
- ML20260D754 + (Main Steam Isolation by PASS Valves Logic Diagram System: Ms. Actual Drawing NUMBER:5S-10-9-Z-40078 1)
- ML20266C239 + (Main Steam LOOP Weld Locations Cooper Nuclear Station. Sheet 4 of 8)
- ML20263T259 + (Main Steam Leakage Collection System Flow Diagram)
- ML20263T248 + (Main Steam Leakage Collection System Piping Isometric 2, Task 18,CR-703,Ref FP-97A & B)
- ML20263T245 + (Main Steam Leakage Collection System Piping Isometric 1, Task 18,CR-703,Ref FP-97A & B)
- ML20263T257 + (Main Steam Leakage Collection System Piping Isometric 5, Task 18,CR-703,Ref FP-97A&B)