Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000456/FIN-2012004-02 + (Failure to Adequately Evaluate the Specified TS CST Function After the Identification of a Non-Conforming Condition Adversely Affecting SG PORV Flow Rates)
- 05000482/FIN-2012007-08 + (Failure to Adequately Evaluate the Suitability of NONSAFETY-RELATED Gaskets, O-RINGS, and Seals Installed in SAFETY-RELATED Equipment and to Identify Extent of the Condition)
- 05000219/FIN-2012008-01 + (Failure to Adequately Evaluate the impact of Increased Emergency Diesel Generators Loading on the Volume of Available Fuel Oil)
- 05000328/FIN-2015002-01 + (Failure to Adequately Follow Foreign Material Control Procedures)
- 05000361/FIN-2009005-02 + (Failure to Adequately Identify Problems in Correction Action Program)
- 05000263/FIN-2008008-01 + (Failure to Adequately Identify a Condition Adverse to Quality and Identify Corrective Actions to Prevent Recurrence)
- 05000259/FIN-2016011-02 + (Failure to Adequately Identify and Evaluate All Circuit Failures for NSCA Credited Equipment)
- 05000259/FIN-2013007-04 + (Failure to Adequately Identify, Evaluate, and Correct the EECW Strainers Degraded/Nonconforming Condition)
- 05000361/FIN-2009005-06 + (Failure to Adequately Implement Compensatory Measures to Maintain Equipment Operable)
- 05000369/FIN-2014005-02 + (Failure to Adequately Implement Containment Closeout Resulting in Loose Debris and Unanalyzed Materials Left in Containment)
- 05000335/FIN-2012009-01 + (Failure to Adequately Implement Design Changes Procedure)
- 05000285/FIN-2014002-09 + (Failure to Adequately Implement Design Requirements for Containment Air Cooler Pipe Supports)
- 05000336/FIN-2012005-01 + (Failure to Adequately Implement Flooding EALs)
- 05000298/FIN-2011002-03 + (Failure to Adequately Implement Foreign Material Exclusion Controls)
- 05000313/FIN-2010004-05 + (Failure to Adequately Implement Foreign Material Exclusion Controls)
- 05000313/FIN-2010003-02 + (Failure to Adequately Implement Foreign Material Exclusion Controls)
- 05000361/FIN-2010002-07 + (Failure to Adequately Implement Foreign Material Exclusion Controls)
- 05000313/FIN-2009004-04 + (Failure to Adequately Implement Foreign Material Exclusion Controls)
- 05000313/FIN-2008005-03 + (Failure to Adequately Implement Foreign Material Exclusion Controls)
- 05000259/FIN-2012002-01 + (Failure to Adequately Implement Impaired Fire Barrier and Detector Controls)
- 05000413/FIN-2015004-01 + (Failure to Adequately Implement In-service Test Procedure for the Unit 1 Standby Makeup Pump)
- 05000482/FIN-2018002-03 + (Failure to Adequately Implement Instrumentation and Controls Surveillance Procedures)
- 05000318/FIN-2004008-01 + (Failure to Adequately Implement Modification Design Review of the Reactor Regulating System Quick Open Circuit)
- 05000282/FIN-2010002-02 + (Failure to Adequately Implement Operability Procedure)
- 05000483/FIN-2008005-05 + (Failure to Adequately Implement Plant Equipment Control Tagout Procedure)
- 05000400/FIN-2015004-02 + (Failure to Adequately Implement Post-Maintenance Testing)
- 05000269/FIN-2009003-01 + (Failure to Adequately Implement Procedures for Draining the Reactor Coolant System)
- 05000528/FIN-2008005-02 + (Failure to Adequately Implement Procedure Requirements for Refueling Machine Operation)
- 05000528/FIN-2008003-06 + (Failure to Adequately Implement Procedural Requirements for Open Doors, Hatches, and Floor Plugs)
- 05000390/FIN-2009003-01 + (Failure to Adequately Implement Procedures to Maintain the Design of the Intake Pumping Station Missile Shield)
- 05000259/FIN-2013011-07 + (Failure to Adequately Implement Procedure 3-SR-3.3.8.2.1(B))
- 05000443/FIN-2012005-02 + (Failure to Adequately Implement Procedure Led to Reactor Coolant System Leakage from Pressurizer Safety Valve Flange)
- 05000413/FIN-2016002-01 + (Failure to Adequately Implement RHR Operating Procedure)
- 05000334/FIN-2014005-01 + (Failure to Adequately Implement Risk Management Actions)
- 05000247/FIN-2016001-02 + (Failure to Adequately Implement Risk Management Actions for the Containment Key Safety Function)
- 05000361/FIN-2010002-13 + (Failure to Adequately Implement Station Work Order)
- 05000315/FIN-2008003-04 + (Failure to Adequately Implement Surveillance Test Inspection Requirements for the Unit 1 ECCS Recirculation Sump)
- 05000456/FIN-2017002-01 + (Failure to Adequately Implement Surveillance Frequency Program for the Deferral of a Technical Specification Surveillance)
- 05000413/FIN-2011004-01 + (Failure to Adequately Implement Tagout Procedures)
- 05000413/FIN-2012003-01 + (Failure to Adequately Implement Tagout Procedures)
- 05000456/FIN-2017002-02 + (Failure to Adequately Implement Technical Specification Surveillance Frequency Requirements into Implementing Procedures)
- 05000454/FIN-2015008-05 + (Failure to Adequately Implement a Design Change Associated with the RWSTs)
- 05000400/FIN-2014003-01 + (Failure to Adequately Implement a Plant Modification)
- 05000382/FIN-2011004-02 + (Failure to Adequately Implement a Reactor Coolant System Drain Down Procedure)
- 05000369/FIN-2015003-01 + (Failure to Adequately Implement a Temporary Modification for a Leak Enclosure)
- 05000285/FIN-2015012-01 + (Failure to Adequately Implement and Maintain Required NFPA 805 Implementation Items)
- 05000456/FIN-2017002-03 + (Failure to Adequately Implement and Maintain the Radiological Environmental Monitoring Program by Collecting Representative Samples from the Principal Food Pathways)
- 05000390/FIN-2016001-03 + (Failure to Adequately Implement the Administration of Site Technical Procedures for TDAFW Pump Governor Calibration)
- 05000400/FIN-2015003-01 + (Failure to Adequately Implement the Clearance and Tagging Procedure)
- 05000313/FIN-2011005-06 + (Failure to Adequately Implement the Configuration Control Program)
- 05000400/FIN-2015002-02 + (Failure to Adequately Implement the Control Room Area HVAC System Procedure)