Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- TSTF-558 + (Clarify SR Bases Added by TSTF-523)
- TSTF-400 + (Clarify SR on Bypass of DG Automatic Trips)
- TSTF-524 + (Clarify Th Application of SR 3.0.2 to SR 3.1.3.2, Mtc)
- TSTF-147 + (Clarify That RPS and ESFAS Matrix Logic Testing Does Not Affect Operability)
- TSTF-211 + (Clarify That Remove All Power to the CRD System Means Remove Power to CRD Trip Breakers)
- TSTF-529, Clarify Use and Application Rules + (Clarify Use and Application Rules)
- TSTF-543 + (Clarify Verification of Time Constants)
- TSTF-046 + (Clarify the CIV Surveillance to Apply Only to Automatic Isolation Valves)
- TSTF-464 + (Clarify the Control Rod Block Instrumentation Required Action)
- TSTF-335 + (Clarify the Ice Basket 20 Basket Weight Criteria)
- TSTF-555 + (Clarify the Nuclear Instrumentation Bases Regarding the Detection of an Improperly Loaded Fuel Assembly)
- TSTF-109 + (Clarify the Qptr Surveillances)
- ML19098B470 + (Clarifying Certain Statements Reported in NRC Summary Re Fracture Toughness Requirements of Unit 1 Reactor Vessel)
- ML20211G647 + (Clarifying Decision on Remand Re Adequacy of Nassau County Veterans Memorial Coliseum as Reception Ctr for Monitoring, Decontaminating & Transferring of Evacuees to Sheltering Facilities in Event of Emergency.Served on 861030)
- ML19030A863 + (Clarifying How Fall 1976 and Spring 1979 Commercial Operation Dates Relate to the Reduced Rate of Load Growth)
- RS-09-017, Clarifying Information Concerning Request to Implement Subsequent Edition of ASME OM Code, Subsection ISTC, Inservice Testing of Valves in Light-Water Reactor Nuclear Power Plants + (Clarifying Information Concerning Request to Implement Subsequent Edition of ASME OM Code, Subsection ISTC, Inservice Testing of Valves in Light-Water Reactor Nuclear Power Plants)
- ULNRC-05353, Clarifying Information Regarding Application for License Amendment to Revise Technical Specification 3.6.7, Recirculation Fluid Ph Control System + (Clarifying Information Regarding Application for License Amendment to Revise Technical Specification 3.6.7, Recirculation Fluid Ph Control System)
- ML15075A026 + (Clarifying Information Related to Response to Request for Additional Information Proposed License Amendment Request Permanent Fifteen-Year Type a Test Interval)
- ML122790101 + (Clarifying Information for Question No. 4 (with Attachment))
- ML023440140 + (Clarifying Information for Radiological Emergency Response Plan Change Submitted May 6, 2002 for Callaway Plant)
- ML18227B286 + (Clarifying Proposed Tech Spec Changes Re Allowing Full PWR Operation with Up to 25% of Steam Generator Tubes Plugged, Pertaining to Reactor Core Thermal Hydraulic Limits)
- ML102090751 + (Clarifying Relief Request No. 16 Nozzle-to-Vessel Weld Exam)
- ML110740158 + (Clarifying Response to Request for Additional Information: License Amendment Request 236, Automatic Operation of Transformer Load Tap Changers)
- TSTF-434 + (Clarifying SR 3.0.1 Bases to State That Surveillance CAN Be Performed in Steps)
- ML18192A287 + (Clarifying Statements Made in PVNGS Environmental Report Concerning Use of Waste Water for Cooling Purpose. Maximum Use of Waste Water for Application Will Be Approximately 75,800 acre-feet Per Year as Stated in the Report)
- RIS 2005-02, Clarifying the Process for Making Emergency Plan Changes + (Clarifying the Process for Making Emergency Plan Changes)
- ML103640433 + (Clark County, Nevadas Fourth Certification of No Additional Party Witnesses)
- ML103640434 + (Clark County, Nevadas Fourth Certification of No Additional Other Witnesses)
- ML103630504 + (Clark County, Nevadas Notice of Certification of LSN Supplementation)
- ML20135E098 + (Clark County,Nv Dept of Comprehensive Planning,Nuclear Waste Div Comments on DSI-6, High-level Waste & Spent Fuel)
- ML20135D921 + (Clark County,Nv Dept of Comprehensive Planning,Nuclear Waste Div Comment on DSI-14, Public Communication Initiatives)
- ML20135E092 + (Clark County,Nv Dept of Comprehensive Planning,Nuclear Waste Div Comment on DSI-2, Oversight of Doe)
- ML20149L944 + (Clark County,Nv Dept of Comprehensive Planning,Nuclear Waste Div Comments on DSI-12, Risk-Informed,Performance-Based Regulation)
- ML22145A391 + (Clarkb-sp2-bio)
- ML22145A161 + (Clarkj-t4-bio)
- ML22140A310 + (Clarkt-hv-th24)
- ML22145A293 + (Clarkt-th24-bio)
- ML20248F217 + (Class 1 & 2 Component & Piping Sketches.W/One Oversize Drawing)
- ML23023A141 + (Class 1 Fssr Review)
- ML22277A350 + (Class 1 Fssr Review - Clarification Activities)
- ML22321A014 + (Class 1 Fssr Review - Clarification Activities Part 2)
- ML060190021 + (Class 1 Piping Operability Evaluation Submittal Per Code Requirements)
- 05000251/LER-2008-003, Class 1 Weld Leak Due to Fatigue and Completion of Technical Specification Required Shutdown + (Class 1 Weld Leak Due to Fatigue and Completion of Technical Specification Required Shutdown)
- 05000482/FIN-2015002-01 + (Class 1E 4kV Feeder Breakers from Station Blackout Diesel Generators Current Transformer Wiring not Installed per Design Drawings)
- ML12241A292 + (Class 1E AC Meeting Slides August 29, 2012)
- ML20062J514 + (Class 1E Digital Systems Studies)
- 05000483/LER-2022-003-01, Class 1E Electrical Air Conditioning System Thermal Expansion Valve Failure Resulted in Condition Prohibited by Technical Specifications + (Class 1E Electrical Air Conditioning System Thermal Expansion Valve Failure Resulted in Condition Prohibited by Technical Specifications)
- ML20262A330 + (Class 1E Instrument AC Schematic)
- ML18066A802 + (Class 1E Raychem Cable Splices Which Had Been Incorrectly Installed.Commitment Listed)
- ML19347F519 + (Class 2 Sys Weld Program)
- ML20266C532 + (Class 300 Ball Valve Butt Weld Ends Manually Actuated W Lever Loc Size 1 Fig S304 S6L G S6.Sheet 1 of 2)