Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML19346E463 + (11:50:45, 24 December 2024)
- ML19346E421 + (11:50:48, 24 December 2024)
- ML19346E419 + (11:50:49, 24 December 2024)
- ML19346E420 + (11:50:49, 24 December 2024)
- ML19346E417 + (11:50:50, 24 December 2024)
- ML19346E410 + (11:50:51, 24 December 2024)
- ML19346E409 + (11:50:52, 24 December 2024)
- ML19346E401 + (11:50:53, 24 December 2024)
- SECY-20-0001, Summary of Staff Review and Findings of the 2019 Decommissioning Funding Status Reports from Operating and Decommissioning Power Reactor Licensees + (11:50:54, 24 December 2024)
- ML19346E372 + (11:50:56, 24 December 2024)
- ML19346E371 + (11:50:57, 24 December 2024)
- ML19346E346 + (11:50:58, 24 December 2024)
- ML19346E318 + (11:50:59, 24 December 2024)
- ML19346E295 + (11:51:00, 24 December 2024)
- ML19346E296 + (11:51:00, 24 December 2024)
- ML19346E289 + (11:51:01, 24 December 2024)
- ML19346E286 + (11:51:02, 24 December 2024)
- ML19346E285 + (11:51:02, 24 December 2024)
- ML19346E207 + (11:51:03, 24 December 2024)
- ML19346D756 + (11:51:04, 24 December 2024)
- ML19346D683 + (11:51:05, 24 December 2024)
- ML19346D682 + (11:51:06, 24 December 2024)
- ML19346D669 + (11:51:06, 24 December 2024)
- ML19346D667 + (11:51:07, 24 December 2024)
- ML19346D228 + (11:51:08, 24 December 2024)
- 05000400/LER-2019-003, Both Source Range Nuclear Instruments Inoperable + (11:51:10, 24 December 2024)
- ML19346C997 + (11:51:11, 24 December 2024)
- ML19346C904 + (11:51:13, 24 December 2024)
- ML19346C826 + (11:51:14, 24 December 2024)
- ML19346C792 + (11:51:15, 24 December 2024)
- ML19346C357 + (11:51:16, 24 December 2024)
- ML19346C418 + (11:51:16, 24 December 2024)
- U-602159, Forwards Rev 15 to Clinton Power Station Physical Security Plan,Per 10CFR50.54(p).Plan Withheld,Per 10CFR73.2(c)(2) + (11:51:17, 24 December 2024)
- ML19346B574 + (11:51:26, 24 December 2024)
- RC-93-0160, Responds to NRC Bulletin 93-002.All Temporary Fibrous Matl Used During Outage Inside Containment Removed as to Not Reduce Performance of Emergency Sumps + (11:51:27, 24 December 2024)
- BSEP-93-0072, Special Rept SR 1-93-008:on 930504,LCO A1-93-F0430 Initiated Due to Fire Seal R1-2-081 Being Inoperable Due to Damaged Boot Seal.Applicable Fire Detectors Verified Operable & Hourly Fire Watch Established + (11:51:29, 24 December 2024)
- ML19346B397 + (11:51:33, 24 December 2024)
- ML19346B389 + (11:51:34, 24 December 2024)
- ML19346B381 + (11:51:34, 24 December 2024)
- L-92-270, Forwards Suppl to Rev 35 to Physical Security Plan, Transmitted Via .Encl Corrects One Sentence Inadvertently Deleted from Bottom of Page 3-2.Encl Withheld (Ref 10CFR73.21 & 2.790(a)(3)) + (11:51:36, 24 December 2024)
- ML19346B363 + (11:51:36, 24 December 2024)
- 05000423/LER-1992-018-01, :on 920722,both RHR Trains Rendered Inoperable Due to Procedure Deficiency.Both Trains of RHR Restored to Operable Condition & Surveillance Procedures for Both Trains Revised + (11:51:39, 24 December 2024)
- ML19346B068 + (11:51:41, 24 December 2024)
- IR 05000282/1981010 + (11:51:43, 24 December 2024)
- ML19346A428 + (11:51:44, 24 December 2024)
- 05000348/LER-1981-036-03, /03L-0:on 810526,diesel Generator 1-2A Failed to Reach Rated Speed & Voltage within Time Required.Cause Unknown + (11:51:46, 24 December 2024)
- 05000348/LER-1981-032-03, /03L-0:on 810508,diesel Generator 1C Failed to Start During Operability Test.Caused by Leaking Seal Between Inner & Outer Cylinder Which Allowed Water to Fill Cylinder 10.Cylinder Liner Replaced + (11:51:48, 24 December 2024)
- 05000348/LER-1981-031-03, /03L-0:on 810506,day Tank Fuel Level on Diesel Generator 1B Found Low.Caused by Operator Error.Tank Filled. Operators Reinstructed to Closely Monitor Tank Level.Design Change Being Evaluated + (11:51:50, 24 December 2024)
- 05000348/LER-1981-027-03, /03L-0:on 810429 & 30,injector Fuel Oil Leak Found on Diesel Generator 1-2A.Caused by Leaking Injector Seals. Seals Replaced + (11:51:52, 24 December 2024)
- 05000348/LER-1981-026-03, /03L-0:on 810506,on Two Separate Occasions,Diesel Generator 1C Failed to Reach Rated Speed & Voltage within Required Time.Caused by Faulty Fuel Oil Check Valve.Valve Replaced + (11:51:54, 24 December 2024)
- 05000348/LER-1981-024-03, /03L-0:on 810501,high Differential Pressure Across Strainer Found on Diesel Generator 1-2A.Caused by Excessive Accumulation of Lube Oil Sediment/Dirt in Strainer.Strainer Cleaned + (11:51:56, 24 December 2024)